eRA CommonsUserGuide
StatusModule
171
March2,2016
Figure 165: Process Final Invention Statement Link
The Submit Final Invention Statement screen displays. The options available on this 
screen include:
 
l
View Invention Statement (<inventions reported> -or- <no inventions reported>) link
 
l
Submit (only if you have an SO role)
l
Change
l
Cancel
Figure 166: Select the Change Button to Update Your FIS
 5. To change your FIS, select the Change button.
When Change is selected, you have the option to re-select Yes or No to indicate 
whether inventions are being reported. Select the No button if you wish to certify that no 
inventions are being reported. Otherwise, follow the next steps to update your saved 
inventions on the FIS.
 6. To update the inventions on your FIS, select the Yes button.
The Add Invention screen displays. From here, you can add another invention or remove 
saved inventions. Refer to the section of this document titled Reporting Inventions on 
Your FIS on Page 163.
12.7.2.4  Submitting Your FIS
If you hold an SO role, you may submit a Final Invention Statement.
Convert pdf to powerpoint online - C# Create PDF from PowerPoint Library to convert pptx, ppt to PDF in C#.net, ASP.NET MVC, WinForms, WPF
Online C# Tutorial for Creating PDF from Microsoft PowerPoint Presentation
how to convert pdf to ppt using; image from pdf to ppt
Convert pdf to powerpoint online - VB.NET Create PDF from PowerPoint Library to convert pptx, ppt to PDF in vb.net, ASP.NET MVC, WinForms, WPF
VB.NET Tutorial for Export PDF file from Microsoft Office PowerPoint
how to convert pdf to powerpoint; convert pdf to powerpoint online for
eRA CommonsUserGuide
StatusModule
172
March2,2016
To submit the FIS:
 1. Select the Process Final Invention Statement link from the Closeout Status screen.
Figure 167: Process Final Invention Statement Link
The Submit Final Invention Statement screen displays. As an SO, your options include:
 
l
View Invention Statement (<inventions reported> -or- <no inventions reported>)
 
l
Submit (available only to SO role)
l
Change
l
Cancel
Figure 168: Submit Button for FIS
 2. Select the View Invention Statement link to look the FIS over and verify its accuracy. The 
report will open in a separate window as a PDF document.
 3. Select the Submit button.
In a separate window, a certification statement displays. 
I hereby certify that, to the best of my knowledge and belief, all inventions are listed 
which were conceived or first actually reduced to practice during the course of work 
under the referenced DHHS grant or award for the specified period. Further, this report 
does not in any way relieve our obligation to promptly and fully report all inventions 
directly to the National Institutes of Health, as required by the terms of the grant or award. 
Online Convert PowerPoint to PDF file. Best free online export
Online Powerpoint to PDF Converter. Download Free Trial. Convert a PPTX/PPT File to PDF. Just upload your file by clicking on the blue
convert pdf to powerpoint slide; convert pdf to ppt online without email
VB.NET PDF - Convert PDF Online with VB.NET HTML5 PDF Viewer
RasterEdge. PRODUCTS: ONLINE DEMOS: Online HTML5 Document Viewer; Online XDoc.PDF Word to PDF; Convert Excel to PDF; Convert PowerPoint to PDF; Convert Image
converting pdf to powerpoint slides; how to add pdf to powerpoint slide
eRA CommonsUserGuide
StatusModule
173
March2,2016
 4. Select the OK button to confirm and continue. 
Once you have submitted the report, you cannot update it. If you need to hold off on 
submission, you can select Cancel to return to the Submit Final Invention Statement 
screen. 
 Once you've submitted the FIS, the status details update as follows:
 
l
Status = Received
 
l
Result of Actions = Verified by <your name>
 
l
Date = Current date/date you submitted the report
 
l
Action = View link
The FIS is now available to view using the View link on Closeout Status. It can also be 
viewed from the Status Information screen for the grant.
Figure 169: Closeout Status Showing Submitted FIS
12.7.3  Submitting Your Final Progress Report
A Final Progress Report is required for any grant that has ended and any grant that is not 
to be extended through award of a new competitive segment. This report should be 
prepared in accordance with instructions provided by the awarding component. 
At a minimum, the Final Progress Report should include:
 
l
A statement of progress made towards the achievement of originally stated aims
 
l
A list of results (positive and/or negative) considered significant
 
l
A list of publications resulting from the project, including plans, if any, for further 
publication. 
A copy of reprints or publications not previously submitted should accompany the 
C# HTML5 PDF Viewer SDK to convert and export PDF document to
RasterEdge. PRODUCTS: ONLINE DEMOS: Online HTML5 Document Viewer; Online XDoc.PDF Word to PDF; Convert Excel to PDF; Convert PowerPoint to PDF; Convert Image
and paste pdf to powerpoint; adding pdf to powerpoint slide
XDoc.HTML5 Viewer for .NET, Zero Footprint AJAX Document Image
View, Convert, Edit, Sign Documents and Images. Online Demo See the HTML5 Viewer SDK for .NET in powerful & profession imaging controls, PDF document, image to
drag and drop pdf into powerpoint; how to convert pdf to powerpoint in
eRA CommonsUserGuide
StatusModule
174
March2,2016
Final Progress Report.  If publications have been submitted to the PubMed Central 
(PMC) archive, a reference to the PMC submission identification number may be 
included in lieu of submitting a hard copy. 
 
l
Reports on the inclusion of gender and minority study subjects (using the gender and 
minority inclusion table as provided in the PHS2590)
 
l
Indication of whether children were involved in the study or how the study was relevant for 
conditions affecting children
 
l
Description of data, research materials (e.g., cell lines, DNA probes, and animal models), 
protocols, software, or other information resulting from the research that is available to be 
shared with other investigators and how it may be accessed
If a competitive renewal (Type 2) has been submitted, whether funded or not, the 
progress report contained in that application may serve in lieu of a separate Final 
Progress Report.  In addition, at the discretion of the awarding unit, a reprint or pre-print 
may be used for this purpose.  Grantees should contact the assigned Grants 
Management Specialist for information on these alternatives.
The Final Progress Report is accessible via the Closeout Status screen. To submit your 
Final Progress Report:
 1. Select the Requires Closeout link for the grant from Status search results.
The Closeout Status screen displays. Final Progress Report is listed in the 
Closeout Submission Requirement column. The Action column should include 
a link for Process Final Progress Report.
 2. From Closeout Status, select the Process Final Progress Report link.
The Closeout - Upload Final Progress Report screen opens. From this screen, you 
can upload your report. Note that the report must be in a Adobe PDF format. 
IMPORTANT: eRA has recently updated the Closeout screens for PIs (and 
delegates) based on our new standards. SOs will see similar changes in a future 
release. Refer to the appropriate steps and images provided for your eRA 
Commons role. 
 3. Follow the steps for uploading based on your Commons role. 
 
l
If you are a PI: Select the Upload button to search for and select your 
progress report file. This file must be in PDF format. 
C# PDF Convert to Jpeg SDK: Convert PDF to JPEG images in C#.net
NET library to batch convert PDF files to jpg image files. Turn multiple pages PDF into single jpg files respectively online.
table from pdf to powerpoint; how to convert pdf slides to powerpoint
VB.NET PDF Convert to Jpeg SDK: Convert PDF to JPEG images in vb.
RasterEdge. PRODUCTS: ONLINE DEMOS: Online HTML5 Document Viewer; Online XDoc.PDF Word to PDF; Convert Excel to PDF; Convert PowerPoint to PDF; Convert Image
how to change pdf file to powerpoint; convert pdf into ppt online
eRA CommonsUserGuide
StatusModule
175
March2,2016
Figure 170: Closeout - Upload Final Progress Report screen for a PI
 
l
If you are an SO: Select the Choose File button to search for and select your 
progress report file. This file must be in PDF format. 
Figure 171: Closeout - Upload Final Progress Report screen for an SO
 4. Select the Submit button. 
In a separate window, a certification statement displays. 
APPLICANT ORGANIZATION CERTIFICATION AND ACCEPTANCE: I certify 
that the statements herein are true, complete and accurate to the best of my 
knowledge, and accept the obligation to comply with Public Health Services terms 
and conditions if a grant is awarded as a result of this application. I am aware that 
C# HTML5 PDF Viewer SDK to view PDF document online in C#.NET
RasterEdge. PRODUCTS: ONLINE DEMOS: Online HTML5 Document Viewer; Online XDoc.PDF Word to PDF; Convert Excel to PDF; Convert PowerPoint to PDF; Convert Image
export pdf into powerpoint; conversion of pdf into ppt
VB.NET PDF Convert to HTML SDK: Convert PDF to html files in vb.
Convert PDF to HTML. |. Home ›› XDoc.PDF ›› VB.NET PDF: PDF to HTML. Convert PDF to HTML in VB.NET Demo Code. Add necessary references:
pdf to powerpoint converter online; convert pdf pages into powerpoint slides
eRA CommonsUserGuide
StatusModule
176
March2,2016
any false, fictitious, or fraudulent statements or claims may subject me to criminal, 
civil, or administrative penalties. 
 5. Select the OK button to continue. 
You can select Cancel if you have made a mistake and need to return to the 
Closeout - Upload Final Progress Report screen. 
 6. When you save the report, the status of the report updates to Received and the 
Action column contains only the View FPR link for viewing the report. You can 
see this status on the Closeout Status screen.  
Figure 172: PI's Closeout Status Showing Received Final Progress Report
eRA CommonsUserGuide
StatusModule
177
March2,2016
Figure 173: Closeout Status Showing Received Final Progress Report 
Upon review of the final progress report, the Program Officer (PO) may determine that 
additional information is needed from the grantee institution and will make a request for 
this information. This is referred to as a Final Progress Report Additional Material 
(FRAM) request. In this event, a FRAM Update link will appear in the Action column 
providing a means for submitting the additional material. Refer to the topic titled Final 
Progress Report Additional Materials (FRAM) on Page 177 for information and the steps 
for completing this request. 
12.7.3.1  Final Progress Report Additional Materials (FRAM)
We are in the process of updating this topic. Thank you for your patience.
 
A Final Progress Report is required for any grant that has ended and any grant that is not 
to be extended through award of a new competitive segment. This report should be 
prepared in accordance with instructions provided by the awarding component. 
NOTE: Refer to the topic titled Submitting Your Final Progress Report on Page 173 for 
information related to the Final Progress Report. 
The Final Progress Report Additional Materials (FRAM) feature provides a means for 
grantees to enter, review, route, and submit information in response to specific request(s) 
by the Program Official (PO) for additional information related to the Final Progress 
Report (FPR).
While reviewing a submitted FPR, the PO may determine that additional materials 
related to the submitted report are required. In this case, the PO will submit a request for 
this information referred to as a FRAM request. When a FRAM request is made, the PI is 
notified via email; Final Progress Report status on Closeout Status is updated to 
FRAM Requested; and a FRAM Update link appears in the Closeout Status screen. 
The link is located as an action on the Final Progress Report line for  Closeout 
Submission Requirement
This topic discusses the steps for uploading, viewing, and submitting FRAM.
Uploading Final Report Additional Materials
When FRAM is requested by the reviewing PO, an email notification will be sent to the 
PI (and SO) describing the additional information being requested. It is the PI who is 
responsible for uploading this requested FRAM via the Closeout module in Commons. 
To upload FRAM:
eRA CommonsUserGuide
StatusModule
178
March2,2016
 1. Navigate to the Closeout
Status
 screen.
 2. Locate the Final Progress Report line item under the Closeout Submission Requirement 
column. 
If a PO has requested additional material related to the final progress report, the 
Status will show FRAM Requested, the Result of Action column will show 
FRAM Requested By <PO Name>, and the FRAM Update link will appear in the 
Action column of this line item. If this information is not there, the request was not 
made. 
 3. Select the FRAM Update link. 
Figure 174: FRAM Update Link
The Final Progress Report Additional Materials (FRAM) screen appears. From this 
screen, the PI has the ability to upload an attachment meeting the requirements of 
the requested information.
Tip: You can view the original request for information from the Status Information 
screen. The Closeout Final Report Additional Materials Request (FRAM) link 
located in Other Relevant Documents section of Status Information will show the 
original request. 
 4. Use the Add Attachment button to search for and select the appropriate document from 
your local computer. The attached document must be in PDF format and no larger than 
6MB.
eRA CommonsUserGuide
StatusModule
179
March2,2016
Figure 175: Add Attachment Button for FRAM
After passing system validations, the screen will display a message as follows: FRAM 
was successfully uploaded and is ready for processing by the SO in your institution.
FRAM attachments can be viewed at any time using the View Attachment or View 
button on the screen. Before being submitted to Agency, FRAM attachments can be 
deleted using the Delete Attachment button. 
Figure 176: FRAM Successfully Uploaded
When FRAM is attached, the Closeout Status screen updates to show FRAM Updated in 
the Status column and FRAM Updated By <PI Name> in the Result of Action column. 
You will notice that the FRAM Update link remains as an available action. Attachments 
for additional requests can be uploaded using this link and following the same steps 
eRA CommonsUserGuide
StatusModule
180
March2,2016
described above. Subsequent uploads will be appended in the stored PDF document 
viewable in Status Information.
Figure 177: FRAM Uploaded Status on Closeout
The SO is now able to submit FRAM. Refer to the steps in the section titled Submitting
 
FRAM
 for details on how an SO submits FRAM to Agency.
IMPORTANT: Please note that after the SO submits FRAM, the FRAM Update link on 
Closeout Status will be replaced by the View FRAM link and updates can no longer be 
made. 
Submitting FRAM
Once a response to a FRAM request has been uploaded by the PI using the 
Final Progress Report Additional Materials (FRAM) screen, the SO can submit the 
material to Agency. Only those with an SO role in Commons can submit FRAM.
To submit FRAM:
 1. Navigate to the Closeout Status screen for the specific grant. 
 2. Locate the Final Progress Report line item under the Closeout Submission Requirement 
column. 
If the PI has uploaded the additional material successfully, the Result of Action 
column will show FRAM Updated By <PI Name>. The FRAM Update link will 
appear in the Action column of this line item.  
Documents you may be interested
Documents you may be interested