November 2009  
15
accommodate  the  installation,  removal,  maintenance,  and  upgrades  in a  safe  manner.    The 
customer shall provide the concrete transformer pad or foundation in accordance with regional 
specifications.  If such a site is not available, a customer provided transformer vault might be used.   
When a transformer  vault  is  necessary,  said  vault shall be  furnished  and  maintained  by the 
customer on the customer’s premises at the customer’s expense, in accordance with national, 
local, and Company requirements.   
Transformer vaults may contain only the supply transformers and associated primary equipment 
and, where necessary, customer-owned secondary bus.  Under no conditions are service meters, 
customer-owned fuses, switches, or other customer -owned equipment to be installed therein.  
Secondary devices and service meters, however, are to be installed as near the transformer vault 
as practicable, but not in it.   
For certain high usage customers, current and voltage instrument transformers constitute a part of 
the Company's metering equipment.  For distribution secondary voltages, they are usually installed 
in instrument transformer enclosures.  For vaults in buildings, these enclosures are located outside 
the transformer vault, preferably on the vault wall, unless some other more desirable location is 
mutually agreed to by the customer and the Company.  See Exhibit 16 for a typical metering 
installation with current transformers.   
Mobile Homes or Mobile Home Parks
See Exhibits 11 and 12 for typical methods.   
Pdf to tiff converter open source c# - control application platform:C# PDF Convert to Tiff SDK: Convert PDF to tiff images in C#.net, ASP.NET MVC, Ajax, WinForms, WPF
Online C# Tutorial for How to Convert PDF File to Tiff Image File
www.rasteredge.com
Pdf to tiff converter open source c# - control application platform:VB.NET PDF Convert to Tiff SDK: Convert PDF to tiff images in vb.net, ASP.NET MVC, Ajax, WinForms, WPF
Free VB.NET Guide to Render and Convert PDF Document to TIFF
www.rasteredge.com
November 2009  
16
MINIMUM REQUIREMENTS FOR ALL METER SOCKETS  
Meter sockets for a Service of 200 amps or less are supplied and installed by the customer.  For other 
service sizes, see Exhibits 19  and 20 to see customer/Company responsibilities.  All customer supplied 
meter sockets must meet the minimum requirements defined below.  For Services 400 amps and 
greater, consult the Company for the appropriate metering equipment.   
Minimum Requirements For All Meter Sockets 
Residential Single-Phase 
Commercial Single & Three-Phase 
ɷ
Must be UL listed and labeled 
ɷ
Must be UL listed and labeled 
ɷ
Meter socket jaws must be tin plated copper 
and spring supported 
ɷ
Meter socket jaws must be tin plated copper 
and spring supported 
ɷ
Extruded aluminum tin plated  
ɷ
Extruded aluminum tin plated  
ɷ
Sockets must be 5
th
terminal adaptable 
(preferably @ 9 o’clock position) 
ɷ
Sockets must be 5
th
terminal adaptable 
(preferably @ 9 o’clock position) 
ɷ
Sockets must be ringless type with clasp and 
slot closure. 
ɷ
Sockets must be ringless types with clasp 
and slot closure. 
ɷ
Must have bypass horns 
ɷ
Must have lever-operated jaw release and 
by-pass rated for 100% continuous duty. 
ɷ
Must have ¼ inch ground wire knockout 
ɷ
Must have ¼ inch ground wire knockout 
ɷ
Cardboard or plastic protector 
ɷ
Cardboard or plastic protector 
ɷ
Must accept blanking plate 
ɷ
Must accept blanking plate 
ɷ
Triple ground lug (triplex) 
ɷ
Triple ground lug (triplex) 
ɷ
All sockets must have the Landis & Gyr HQ 
Series, the Milbank HD Series, or the 
Eaton/Cutler Hammer MSL Series Block 
Assembly. 
Additional Requirements For Specific Socket Types 
Single-Phase Single Position Overhead 100 A & 200 A : 
Small hub opening (minimum) 
Lug size - #6 AWG to 2/0 AWG (for 100 A) or #2 AWG to 350 kcmil (for 200 A) 
Bottom knockout – 2½ inch conduit minimum 
Hub not included 
control application platform:C# PDF Text Extract Library: extract text content from PDF file in
it is feasible for users to extract text content from source PDF document file the following C# example code for text extraction from PDF page Open a document
www.rasteredge.com
control application platform:C# PDF Page Extract Library: copy, paste, cut PDF pages in C#.net
Online C# source code for extracting, copying and pasting PDF The portable document format, known as PDF document, is of file that allows users to open & read
www.rasteredge.com
November 2009  
17
Single-Phase Single Position Overhead 320 A : 
Large hub opening  
Lug size - #4 AWG to 600 kcmil 
Bottom knockout – 3 inch conduit minimum 
Large hub opening  
Bypass lever with jaw release 
Single-Phase Multiple Position OH/UG 125 A : 
Small hub opening (minimum) 
Lug size - #6 to 2/0 AWG (load) and #2 AWG to 350 kcmil (line) 
Bottom knockout – 3 inch conduit (for incoming utility cable) 
Hub not included 
Single-Phase Multiple Position OH/UG 200 A : 
Large hub opening 
Lug size - #2 AWG to 350 kcmil (load) and #6 AWG to 400 kcmil (line) 
Minimum 2 inch conduit per position bottom knockout, additional bottom knockout – 3 inch 
conduit (for incoming utility cable) 
Hub not included 
Single-Phase Multiple Position OH/UG 125 A with disconnect switch: 
Small hub opening (minimum) 
Lug size - #6 to 2/0 AWG (load) and #4 AWG to 350 kcmil (line) 
Bottom knockout – 3 inch conduit (for incoming utility cable) 
Hub not included 
Disconnect switch 
Single-Phase Multiple Position OH/UG 200 A with disconnect switch: 
Large hub opening  
Lug size - #2 AWG to 350 kcmil (load) and 1/0 AWG to 600 kcmil (line) 
Bottom knockout – 3 inch conduit (for incoming utility cable) 
Hub not included 
Disconnect switch 
Single-Phase Single Position UG 200 A: 
Lug size - #2 AWG to 350 kcmil 
Bottom knockouts – two 3 inch conduits  
Side wired  
control application platform:C# PDF File Merge Library: Merge, append PDF files in C#.net, ASP.
Free online C#.NET source code for combining multiple PDF pages together in .NET framework. Combine scanned images to PDF, such as tiff, jpg, png, gif, bmp
www.rasteredge.com
control application platform:C# PDF: PDF Document Viewer & Reader SDK for Windows Forms
in different display formats, and save source PDF file using file to a specified path in C# WinForms application visible page in the currently open PDF document
www.rasteredge.com
November 2009  
18
Single-Phase Single Position UG 320 A: 
Lug size - #4 AWG to 600 kcmil 
Bottom knockouts – two 4 inch conduits  
Bypass lever with jaw release 
Side wired  
Single-Phase Single and Double Position UG Pedestal 200 A: 
Lug size - #2 AWG to 350 kcmil 
Stabilizing foot or base  
A hasp for a padlock may be provided in place of barrel lock 
Grounding provisions (if the pedestal is metal, it must be grounded to meter socket ground 
or have another method of grounding it) 
36 inch minimum below grade (including stabilizing foot or base) 
Series main breaker 
Poly-Phase Single Position Self Contained OH 125A & 200 A: 
Small hub opening (minimum) 
Lug size - #6 to 2/0 AWG (for 125 A) or #6 AWG to 350 kcmil (for 200 A) 
Bottom knockout (min) – 2-inch conduit (125 A) or 3-inch conduit (200 A) 
Seven-terminal three-phase four-wire 
Poly-Phase Single Position Self Contained OH/UG 320 A: 
Large hub opening  
Lug size - #6 AWG to 600 kcmil 
Bottom knockout – 4 inch conduit  
Seven-terminal three-phase four-wire 
Side wired  
Poly-Phase Single Position Self Contained UG 200 A: 
Lug size - # 6 AWG – 350 kcmil  
Bottom knockout (min) – 3-inch conduit  
Side wired  
Seven-terminal three-phase four-wire 
control application platform:C# Create PDF from OpenOffice to convert odt, odp files to PDF in
Best C# OpenOffice to adobe PDF file converter SDK for Visual Online source code for C#.NET class. Description: Convert to PDF/TIFF and save it on the disk.
www.rasteredge.com
control application platform:VB.NET PDF Annotate Library: Draw, edit PDF annotation, markups in
Decode source PDF document file into an in-memory object, namely 2.pdf" Dim outputFilePath As String = Program.RootPath + "\\" Annot_8.pdf" ' open a PDF file
www.rasteredge.com
November 2009  
19
Three-Phase Current Transformer Cabinets
(400 Amperes to 2,400 Amperes) 
Must be UL listed and labeled as a “Metering Transformer Cabinet” 
14 gauge electroplated galvanized or equivalent gray painted steel (or aluminum with 
equivalent physical strength and corrosion resistance) 
Outdoor type must be weatherproofed 
Split door with stainless steel hinges (or equivalent hinges for aluminum cabinet) 
Padlockable handle on door with internal mechanism for three points of latching: top 
of door, bottom of door, and handle 
Each door must be equipped with a non-detachable door stop for holding it in a fixed 
open position 
Typical dimensions for cabinets rated 400 A to 800 A: 36-inch wide, 36-inch high, and 
10-inch deep 
Typical dimensions for cabinets rated over 800 A to 2,400 A: 42-inch wide, 60-inch 
high, and 20-inch deep 
Removable copper bus bar on each phase for installation of window-type current 
transformers (Company will provide current transformer dimensions upon request) 
Each bus bar must be drilled and tapped on both ends with a 10-32 screw to facilitate 
connection of meter potential wires 
Bus support brackets on each phase must be spaced to accommodate installation of 
standard bar-type current transformers 
Gangable Sockets  
Maximum height to center of top socket 72 inch 
Minimum height to center of bottom socket 24 inch (indoor), 30 inch (outdoor) 
Minimum spacing between meters 8 inch 
Plastic jaw guides 
Five jaw standard for three-phase in, single-phase out (for 120/208 V three-wire 
applications)  
320 A units approved on a case by case basis   
Residential units – no bypass lever: Commercial units – bypass lever required 
A hasp for a padlock may be provided in place of barrel lock 
480 V units must have disconnecting means on source side of each socket with 
provisions for meter  seal and/or padlock 
control application platform:C# PDF Convert to Text SDK: Convert PDF to txt files in C#.net
RasterEdge.XDoc.Office.Inner.Office03.dll. RasterEdge.XDoc.PDF.dll. RasterEdge.XDoc. PowerPoint.dll. RasterEdge.XDoc.TIFF.dll. using RasterEdge.XDoc.Converter;
www.rasteredge.com
control application platform:C# PDF Convert to Jpeg SDK: Convert PDF to JPEG images in C#.net
Open source codes can be added to C# class. When using RasterEdge PDF to JPEG converter library control SDK, C# developers may customize the names of all
www.rasteredge.com
November 2009  
20
Metering Equipment Installation Guideline Summary 
ɷ
The Company shall approve all metering equipment locations. 
ɷ
The meter socket shall be mounted level. 
ɷ
Mount the socket on a solid part of the structure. 
ɷ
Use corrosion inhibited mounting hardware. 
ɷ
Do not mount the socket with nails. 
ɷ
Meter socket to be surface mounted.  Do not build in or enclose the meter socket or meter within 
the structure. 
ɷ
Do not recess the meter socket in brick, masonry, or siding. 
ɷ
The installation shall meet the requirements set forth by the NEC and any local, state, or federal 
codes that apply to the installation.  For installations that require electrical inspection, the 
inspection is required before the installation is connected to the Company’s system. 
ɷ
It is recommended that a qualified electrical contractor perform all work on customer facilities. 
ɷ
Customer’s meters, auxiliary devices, relays, etc., shall normally not be connected to the 
Company’s metering circuits. 
ɷ
The Company will furnish the metering facilities required in accordance with its standard rate 
schedules. 
ɷ
After an installation is made, changes in location of meters for the convenience of the customer 
will be at the customer’s expense, after the necessary service entrance wiring to the new location 
has been completed by the customer. 
ɷ
Only service entrance conductors may run through meter sockets or meter connection boxes. 
ɷ
Meter connection devices shall not be used as junction boxes. 
ɷ
All equipment furnished by the Company shall remain its exclusive property and the Company 
shall have the right to remove the same after termination of service for any reason whatsoever. 
ɷ
For identification purposes, it is necessary that wherever two or more meters are grouped at one 
location, all sockets/metering equipment (inside and out)  and breakers must be plainly and 
permanently marked to designate the particular apartments, suites or offices served (e.g., Apt 
1A).  Likewise, the apartment or suite entrance(s) must be identified accordingly (e.g., APT 1A).  
Tags are the only means that have found satisfactory for marking entrance equipment or service 
or service conductors, whereas sockets or meter connection boxes may be marked by neat 
stencils with paint as well as by the use of permanent tags (label maker tags are not acceptable).  
These identification markings must be located as follows: 
9
Inside main electrical panel in the apartment or suite.  
9
Inside the meter socket near the jaw assembly.  
9
On the cover of both main panel and meter socket.   
ɷ
For multi-meter installations, any unmetered positions shall have the cardboard shipping covers 
replaced by plastic protectors. 
ɷ
Metered and unmetered conductors must not be in the same trough, conduit, or wireway. 
ɷ
For typical installations, see the FIRSTENERGY INFORMATION AND GUIDANCE FOR 
CUSTOMER ELECTRIC SERVICE, Exhibits 5, 8, 11, 12, 13, 14, 15, 16, 17, 18, and 22.  In 
unusual cases, contact the Company. 
control application platform:VB.NET PDF File Split Library: Split, seperate PDF into multiple
Separate source PDF document file by defined page range in VB.NET class application. Divide PDF file into multiple files by outputting PDF file size.
www.rasteredge.com
November 2009  
21
Minimum Size Meter Socket - 480-Volt Services
The smallest permissible size meter socket on 480Y/277-volt three-phase four-wire services is 200 
amps.   
Installations Requiring 320 Amperes & Less of Continuous Metering Load
Typically on new installations or on existing installations where the service entrance conductors, 
service  entrance panel, or main  disconnect switch  are  rearranged, the meters  will  be  installed 
outdoors.  If an indoor installation is required, the Company shall be consulted before starting the 
installation.   
Installations Requiring Over 320 Amperes of Continuous Metering Load 
The regional Meter Services Section will determine in each case (either new or to be rebuilt) the type 
of meter installation to be made.   
In Ohio, interval meters will be required for customers who select a Certified Supplier other than the 
regulated utility and have a maximum annual peak demand greater than or equal to 200 kW for the 
most recent twelve (12) month period, and for all customers whose expected load pattern does not 
match one of the Company’s standard load profiles.  Either the customer or the Certified Supplier 
shall  provide,  at its sole  cost and expense, the installation, operation,  and maintenance of the 
required compatible communication/telephone link(s) in order to transmit metered information from 
meters equipped for telemetry of metered data.   
Instrument transformers are required for these installations.  In most situations, the customer will 
supply and install a current transformer cabinet or mounting facility in accordance with Company 
requirements.  See Exhibit 16.  These instrument transformer cabinets are not to be used as junction 
boxes or raceways (troughs).  Other alternative current transformer locations, as determined by the 
Regional Meter Services Manager or designee, may be applicable as per Exhibits 17 or 18.  All 
instrument transformer locations must be readily accessible to authorized Company representatives 
for checking and testing.  However, before such an installation is made, the Company must be 
consulted regarding the meter location and facilities required.   
When the space above the instrument transformer cabinet is intended as the location for the meter or 
meters, it is necessary that adequate space be reserved for this purpose.   
Where the instrument transformer and/or service conductors are of such size that it is not practical to 
use instrument transformer cabinets, the current transformers may be mounted, at the customer's 
expense, in a bus structure.  The current transformer compartment shall have a hinged lockable door.  
However, before such an installation is made, the Company must be consulted regarding the meter 
location and facilities required.   
For  services exceeding  2,400  amperes,  the customer  shall  provide a  switchgear  enclosure for 
metering.  Switchgear compartments meeting ANSI C57.12.28 must be a minimum of 36”H x 30”W x 
20”D with a bus separation of at least 10.5 inches on center, 7.5 inches minimum separation from the 
enclosure sides, and located on the supply side of any protective equipment.  Bus dimension shall be 
a maximum of five (5) inch to allow for window type CT's.  Contact the regional Meter Services 
Section for additional details and to determine if the nature of the installation allows for an alternative 
metering arrangement.   
November 2009  
22
Approved Current Transformer Cabinets
When a current transformer cabinet is required, the customer shall provide an approved unit from the 
table shown below.  These cabinets shall not be used as junction boxes for circuit extensions and 
shall have line and load sides identified.   
All current transformers listed below are rated for indoor/outdoor use unless otherwise noted.   
The short-circuit current ratings that will be labeled on the current transformer cabinets are included 
next to the catalog numbers listed below.  This information is being provided so that the customer can 
select a unit with a short-circuit current rating equal to or greater than the available short-circuit 
current at the cabinet as may be required by the local or state inspection authority.   
Manufacturer
CT Cabinet Catalog Number
Short-Circuit Current Rating
Size:  600 - 800 Amp  
CTJ-800-A (indoor) 
East Coast Panelboard 
CTJ-800R-A (outdoor) 
50,000 amps 
Hoffman Enclosures 
A800HCT1R 
50,000 amps 
Lake Shore Electric 
JCTC-Series 
50,000 amps 
Meter Devices 
507U7591-1 
10,000 amps 
Milbank 
U5838-O 
10,000 amps 
Size:  1000 Amp  
CTJ-1000-A (indoor) 
East Coast Panelboard 
CTJ-1000R-A (outdoor) 
50,000 amps 
Erickson Electrical 
CT-124-FECD 
100,000 amps 
Lake Shore Electric 
MCTC-Series 
50,000 amps 
Size:  1200 Amp  
CTJ-1200-A (indoor) 
East Coast Panelboard 
CTJ-1200R-A (outdoor) 
50,000 amps 
Erickson Electrical 
CT-124-FECD 
100,000 amps 
Lake Shore Electric 
MCTC-Series 
50,000 amps 
Size:  1600 Amp  
CTJ-1600-A (indoor) 
East Coast Panelboard 
CTJ-1600R-A (outdoor) 
50,000 amps 
Erickson Electrical 
CT-164-FECD 
100,000 amps 
Lake Shore Electric 
SCTC-Series 
100,000 amps 
November 2009  
23
Manufacturer
CT Cabinet Catalog Number
Short-Circuit Current Rating
Size:  2000 Amp  
CTJ-2000-A (indoor) 
East Coast Panelboard 
CTJ-2000R-A (outdoor) 
50,000 amps 
Erickson Electrical 
CT-204-FECD 
100,000 amps 
Lake Shore Electric 
SCTC-Series 
100,000 amps 
Size:  2400 Amp  
CTJ-2500-A (indoor) 
East Coast Panelboard 
CTJ-2500R-A (outdoor) 
50,000 amps 
Erickson Electrical 
CT254-FECD 
100,000 amps 
Lake Shore Electric 
SCTC-Series 
100,000 amps 
Meter Location
Outdoor  
1.  All new outdoor meter installations shall be located on the building at the nearest practical point 
from  Company  facilities  and  readily  accessible  to  authorized  Company  representatives.  
Clearance in front of and to the sides of meter sockets must be maintained as per NEC Section 
110.26.  The location should not be subject to severe vibration.  Meters shall not be installed in 
locations where the meter readers or service personnel may inadvertently damage flowerbeds or 
shrubbery or where it will be necessary for them to climb over fences or other obstructions to read 
or service the meters.  Additionally, they shall not be installed in locations where they may be 
accidentally damaged, such as on buildings where they will extend unguarded into alleys or 
driveways, or where they will cause inconvenience to the customer or the Company.   
2.  Meters, located outdoors, should be placed so that the center of the meter socket will be five feet 
above final grade level.  However, if it is necessary to locate a meter over a sidewalk or walkway, 
contact the Company.   
3.  The customer must install steel concrete filled barrier posts to protect metering equipment where 
vehicle traffic may interfere with or damage such equipment.   
4.  Meters shall not be located closer than three feet to any natural gas equipment.  For LP gas 
installations, meters shall be no closer than 10 feet from tanks filled on site or five feet if tanks are 
not filled on site.   
Indoor (must be pre-approved by Regional Meter Services Manager)  
1.  Where an indoor installation is required, the meters should be located on the first floor or in the 
basement where they will be readily accessible to authorized Company representatives.  The 
location should not be subject to severe vibration, excessive dampness, high magnetic fields, or 
excessive heat and must be installed in accordance to the NEC.   
November 2009  
24
2.  In multiple occupancy (more than two occupancies) buildings, where several floors, apartments, 
stores, etc., are rented separately, meters and service equipment shall be located preferably all 
together.  In high-rise buildings, it may be necessary to have several meter locations, possibly 
every other floor or every third floor as may be necessary.   
3.  The meter room or space shall be readily accessible to all tenants and Company representatives 
at hours specified in accordance with the filed rates, rules, and regulations.  This room shall be 
for the sole purpose intended and shall meet local fire codes as well as the NEC.  This room shall 
not be used for the storage of materials or equipment.   
See Exhibit 8 for typical indoor/outdoor installation for multiple occupancy 
Service at Voltages Greater Than Secondary (Greater Than 600 V)
General  
Service at primary, subtransmission, or transmission voltage level may be available dependent upon 
the size of the load served, location of the facility, and other economic factors.  Contact your local 
Engineering Services Section for additional information.  Contact the Company well in advance of the 
time such service will be required so that the customer's and the Company's engineering, design, and 
construction work may be properly coordinated and equipment made available.   
The  Company will  furnish and maintain one meter  or one unified set  of  meters and  metering 
equipment for each service contract.  The customer shall provide, free of cost to the Company and 
close to the point of delivery, foundations and steel framework (where necessary), conduit runs, 
suitable space for the installation of meters, meter cabinets, instrument transformer enclosures, and 
other  equipment.    The instrument  transformers  for providing service shall  be  located  near the 
terminus of the Company's supply facilities.   
Customers electing to be metered at primary voltages shall provide at its sole cost and expense, the 
installation, operation and maintenance of a dedicated phone line for the retrieval of metered data for 
billing purposes.   
Information pertaining to the installation and maintenance of meters and metering equipment and 
other equipment and apparatus is available from the Company upon request.   
Overhead Primary Service from Overhead Lines – 34.5 kV Wye & Below  
Where overhead primary service is supplied, the Customer will install Company's supplied primary 
metering  equipment  on  a  customer-owned  pole  one  span  (80  feet  maximum)  away  from  the 
Company's facilities.  The Company will furnish and install primary conductors for the span from the 
Company facilities to the metering pole and make the termination on the customer's pole.  The 
Customer will also furnish and install a second pole and Company approved disconnecting and 
overcurrent protective devices disconnect, not more than one span away from the customer-owned 
metering pole.  The Company will furnish information so that the interrupting ratings of the customer's 
equipment can be determined.  The regional Engineering Services Section shall be consulted for 
coordination of the overcurrent protective device.   
Underground Primary Service from Overhead Lines – 34.5 kV Wye & Below  
Where the primary metering is to be installed as described above, the customer's underground, 
primary service shall terminate on a customer-owned pole.  The customer shall furnish and install all 
cable terminations and shall be required to furnish and install a Company approved disconnecting 
and overcurrent protective device on the terminal pole.   