November 2009  
25
In New Jersey, whenever the installation of a customer-owned service will require excavation within 
State Highway right-of-way, a Utility Opening Permit must be obtained by the Company from the 
NJDOT.  The Company will execute for the customer an "Agreement for Obtaining Utility Opening 
Permit.”  The customer will be required to pay the associated fee to the Company.  The time required 
for the NJDOT to process a Utility Opening permit is approximately two months.   
Pad-mounted & Cubicle Primary Service from Overhead Lines – 34.5 kV Wye & Below 
Where pad-mounted or cubicle metering is to be installed, the Company will furnish and install the 
primary cable from the riser pole to the primary metering enclosure or compartment.  Beyond the 
metering compartment, the customer shall install all cables and terminations from there to the line 
side of a Company approved disconnecting and overcurrent protective device.  The Customer will 
provide and install the Company-approved primary metering enclosure for pad-mounted metering.  
Cubicle metering is acceptable if the customer provides the cubicle, plus detailed specifications of the 
metering section of the cubicle for approval by the regional Meter Services Section before installation; 
the Company will provide the current  and potential transformers.  Line and  load side must be 
identified by the customer in all metering cubicles.   
The location of the disconnecting and overcurrent protective devices shall not exceed ten (10) feet 
from the  metering  equipment;  except for  cubicle  metering that is  prebussed  to  the  customer's 
switchgear.  The Company shall make all primary terminations at the riser pole and the line side of 
the metering.  The customer shall be responsible for all primary cables and terminations beyond the 
load side of the metering.  The customer shall provide the trench as well as the backfill.  In addition, 
the customer shall furnish  and install all necessary conduits (with an approved pulling means), 
manholes, pull boxes, and a concrete pad for the metering equipment - all subject to Company 
approval.  The Company will supply the meter-mounting device, for installation by the customer.   
The Company will specify the required conduit diameter.  A maximum of three (3) riser conduits shall 
be permitted on any single pole.  Ten (10) feet of type TC2 schedule 80 PVC conduit must be 
provided for the riser, along with two 90-degree conduit sweeps at the base of the pole.  The 
remaining conduit shall be type TC2 schedule 40 PVC; the 90-degree conduit sweeps at the metering 
and disconnect enclosures shall be schedule 40 PVC.   
See above for permit requirements for customer-owned services that will be installed in New Jersey 
Department of Transportation rights-of-way.   
Underground Primary Service from Underground Lines  
This type of primary service shall be similar to that described as above, except that the Company's 
primary service cable will originate at a manhole or pad-mounted switch instead of at a riser pole.   
See above for permit requirements for customer owned services that will be installed in New Jersey 
Department of Transportation rights-of-way.   
Indoor Cubicle Primary Metering  
Indoor cubicle metering may be approved by the Company for overhead or underground primary 
service.  Consult the appropriate regional Meter Services Section for details.   
Temporary Primary Service   
Where temporary primary service is required, the appropriate regional Engineering Services Section 
must be consulted for details since each installation will have different requirements.   
Pdf to tiff converter c# - SDK Library service:C# PDF Convert to Tiff SDK: Convert PDF to tiff images in C#.net, ASP.NET MVC, Ajax, WinForms, WPF
Online C# Tutorial for How to Convert PDF File to Tiff Image File
www.rasteredge.com
Pdf to tiff converter c# - SDK Library service:VB.NET PDF Convert to Tiff SDK: Convert PDF to tiff images in vb.net, ASP.NET MVC, Ajax, WinForms, WPF
Free VB.NET Guide to Render and Convert PDF Document to TIFF
www.rasteredge.com
November 2009  
26
Subtransmission or Transmission Service  
The Company may supply service at subtransmission or transmission voltage levels when required 
by special conditions, such as location and size or type of load.  For specific requirements, consult 
the appropriate FEOC.   
Customer-Owned Transformer Guidelines
These guidelines are provided for use by customers who are required or desire to furnish their own 
transformers.   Customers  are  advised  to  confer  with  local  Company  representatives  while  the 
installation is still in the design stage to verify source voltage, metering requirements, and the areas 
of their responsibility.  It is also suggested that the customer review with the Company their proposed 
transformer specifications, construction details, and the coordination of protective devices.  
Customers owning their own transformers will be responsible for the purchase, installation, operation, 
maintenance, and replacement of such equipment and for any liability or damage claims arising from 
its ownership or use.  Transformers shall comply with the applicable sections of Publication C57 of 
the American National Standards Institute (ANSI), and Publication TR1 of the National Electrical 
Manufacturers Association (NEMA).  Transformers containing polychlorinated biphenyls (PCB) will 
not be acceptable.   
In general, customer-owned transformers will be of the "pad-mounted type" designed for ground level 
installation, although other types may be used with prior Company approval.  When the Company’s 
supply voltage is 4-wire wye, customer-owned three-phase transformers shall normally have Y-Y 
windings  and  single-phase  units  shall  have  the  primary  windings  suitable  for  phase-to-neutral 
connection.  If the Company’s supply voltage is a 4-wire wye, but customer transformers must be 
connected delta on the high side, then a three-phase group operated switch must be installed ahead 
of  the  transformer(s).    It  is  recommended  that  the  customer's  group  operated  switch  operate 
automatically to prevent a single-phase condition.  Units for operation at voltages other than listed 
above may be approved depending on local circumstances.   
The customer's equipment and installation must comply with all applicable provisions of the National 
Electrical  Code (NEC).   Particular attention  should  be given  to  Article  450,  "Transformers  and 
Transformer Vaults" and Article 230, "Services" specifically Part VIII, "Services Exceeding 600 Volts, 
Nominal.”  The customer is responsible for providing overcurrent protection and surge arresters for 
customer-owned transformers.  This protection may consist of fusing supplied as an integral part to 
the transformer or as current-limiting fuses mounted external to the transformer.  The customer must 
consult with the Company to ensure proper coordination of surge and overcurrent devices with 
Company equipment.   
The customer is also responsible  for providing three-phase primary disconnecting equipment  in 
accordance with NEC Article 230.205, "Disconnecting Means", the Company does not furnish primary 
disconnecting equipment, for operation by the customer, ahead of the customer-owned transformer.   
SDK Library service:C#: How to Use SDK to Convert Document and Image Using XDoc.
Sample Code. Here's a snippet of sample code for converting Tiff to PDF file using XDoc.Converter for .NET in C# .NET program. Six
www.rasteredge.com
SDK Library service:C# Convert: PDF to Word: How to Convert Adobe PDF to Microsoft
RasterEdge.Imaging.Processing.dll. RasterEdge.XDoc.Converter.dll. RasterEdge.XDoc. Office.Inner.Office03.dll. RasterEdge.XDoc.PDF.dll. RasterEdge.XDoc.TIFF.dll.
www.rasteredge.com
November 2009  
27
Before connection of service, the wiring on customer's premises must be inspected and the Company 
provided a Certificate of Approval issued by a recognized inspection agency or municipal inspection 
bureau (in New Jersey).  All such Certificates of Approval shall state that the Customer's installation 
meets, at a minimum, the requirements of the latest revision of the National Electrical Code.   
In Pennsylvania, in case of primary service customers (over 600 volts), the Company may, at its sole 
discretion,  in  lieu  of  a  Certificate  of  Approval by  a recognized  inspection  agency  of  municipal 
inspection bureau, accept a letter of certification from a Registered Professional Engineer certifying 
that the electrical inspection on the customer's premises complies with all applicable codes.   
Metering, supplied by the Company, may be either located on the high voltage (primary) side, or low 
voltage (secondary) side of the customer-owned transformer at the option of the Company.  When 
metering is located on the low voltage side, the customer's billing will be adjusted to reflect the 
transformer losses.  If compensated metering is to be used, the customer must furnish transformer 
loss data.  The Company will furnish the customer any information needed regarding character of 
service, coordination requirements, and installation suggestions.   
Disconnect Requirements
Central Business District Network Areas  
The customer must provide a lockable (for Company padlock) disconnecting means with overcurrent 
protection (fuses) before entering the metering equipment on all underground services in Central 
Business District network systems.   
Multiple Meter Installations  
Disconnect requirements on installations with multiple meters vary dependent upon the nature of the 
installation and level of load served.  For disconnect (main and/or individual meter) requirements 
contact the regional Meter Services Section.   
480 Volt Self-Contained Meter Installations  
For all single-phase and three-phase 480-volt services with self-contained metering, a disconnecting 
means is required on the source side of the meter socket.  The disconnecting means shall be 
installed, owned, and maintained by the customer.  The disconnecting means must have provisions 
for a Company meter seal and/or padlock.  See Exhibit 22 for details.   
For 480-volt multiple metering units (i.e., gang sockets), a disconnecting means is required on the 
source side of each socket as specified above for single meter installations.  This requirement also 
applies to 480-volt multiple metering units having a main disconnect.  See Exhibit 8 for details.   
The customer must contact the Company’s Meter Services Section during the electrical design stage 
to discuss the 480-volt meter disconnect requirements and to obtain approval for the proposed 
installation.   
SDK Library service:C# Create PDF from Tiff Library to convert tif images to PDF in C#
Best and free C# tiff to adobe PDF converter SDK for Visual Studio .NET. .NET component for batch converting tiff images to PDF documents in C# class.
www.rasteredge.com
SDK Library service:Online Convert PDF file to Tiff. Best free online PDF Tif
Online PDF to Tiff Converter. Download Free Trial. Web Security. Your PDF and Tiff files will be deleted from our servers an hour after the conversion.
www.rasteredge.com
November 2009  
28
CUSTOMERS’ EQUIPMENT  
Motors (Inrush Limitations & Motor Protection) 
Single-Phase Motors  
1.  All single-phase motors with ratings of 1hp and larger should be connected for supply at 240 volts 
whenever it is practical, in order to minimize voltage fluctuation in the wiring system.  Where 
service is supplied from a 208Y/120-volt system, these motors should be purchased for operation 
at 208 volts.   
2.  Motor installations for air conditioning equipment, farm applications, and heat pumps in ratings of 
1 to 7-1/2 hp should be of the capacitor start-capacitor run design.  The Company shall be 
notified of each installation of five hp or more.  In addition, for installations of air conditioning or 
heat pumps more than 3.5 tons, notify the Company.   
3.  Overload protection must be provided for all motor circuits in accordance with National Electrical 
Code requirements.   
4.  The use of automatic time-delay circuit breakers for circuit protection is strongly recommended 
and where fuses are used, they should always be of the time-delay type.  This time-delay will, in 
many instances, prevent unnecessary shutdowns due to the tripping of an instantaneous type 
circuit breaker or blowing of ordinary short-time fuses by large currents resulting from motor 
starting, temporary overloads, or temporary low voltage conditions. 
Three-Phase Motors  
1.  Before any three-phase motors are installed, it is advisable that the Company is consulted in 
order to determine the character and adequacy of the available service.  The Company will 
endeavor to help its customers make the most economical installations possible in each case.   
2.  Customers having three-phase  service may  install three-phase motors for service  when  the 
proposed installation will not increase the customer's connected load more than 20 percent.  The 
Company should be notified if the connected load will be increased more than 20 percent so that 
the supply facilities may be increased if necessary.   
3.  The Company shall be notified of each installation of 10 hp or more.  The Company will provide 
the  maximum  permissible  inrush  for  the  location  and  for  the  conditions  of  that  particular 
installation.  Because of widely varying conditions in different locations, it is not possible to 
determine  a  general  rule  regarding  the  maximum  value  of  starting  currents  that  may  be 
permissible for these larger motors.   
4.  The use of reverse phase relays, phase failure relays, and low voltage relays, preferably of the 
adjustable time-delay type, with circuit breakers or equivalent devices, is highly recommended.  
These devices are desirable to automatically disconnect motors that cannot be safely reversed or 
would be damaged by a phase or voltage failure.  Such devices are to be furnished, installed, and 
maintained by the customer at the customer’s expense.   
SDK Library service:C# PDF Convert to Jpeg SDK: Convert PDF to JPEG images in C#.net
When using RasterEdge PDF to JPEG converter library control SDK, C# developers may customize the names of all converted JPEG image files in .NET class
www.rasteredge.com
SDK Library service:XDoc.Converter for .NET, Support Documents and Images Conversion
and 2007) Word, Excel, PowerPoint, PDF, Tiff, Dicom, SVG RasterEdge XDoc.Converter for .NET provides complete Programming languages like C#, VB.NET and Delphi
www.rasteredge.com
November 2009  
29
Starting Currents – General  
1.  Motor starts can produce voltage fluctuations resulting in objectionable flicker on lighting supplied 
by the same or nearby circuits.  Through industry standardization, starting currents of motors 
generally used in residential and small commercial applications have been established at values, 
which  will  not  cause objectionable flicker  under normal  conditions (See Starting  Currents - 
Intermittent Start Motors below).   
2.  Starting of large three-phase motors and operation of furnaces and welders requires special 
consideration of the power supply and wiring.  The Company is prepared to assist the customer in 
planning these installations; and in every case, the Company must be notified so that adequacy 
of the service facilities may be determined and changes may be made if necessary.   
Starting Currents - Frequently Started Motors  
Frequently started (more than four starts per hour) single-phase motors for general use, such as 
for refrigerators, oil burners, water pumps, and similar devices, should have a locked rotor current 
not exceeding 20 amperes for operation at 120 volts and 25 amperes for operation at 240 volts.  
These motors are permissible on the system.   
Starting Currents - Intermittent Started Motors  
1.  Single-phase motors for installations such as heat pumps, central air conditioners, grain dryers, 
etc., with locked rotor currents not exceeding 175 amperes served at nominal 120/240 volts or 
network 120/208Y volts, may be connected to the single-phase lighting service furnished through 
one meter.   
2.  Motors having starting currents exceeding the limits stated in "Starting Currents - Frequently 
Started Motors" and in item (1.) of Intermittent Started Motors) above should not be installed 
without the consent of the Company.   
3.  The maximum permissible motor starting currents, as indicated in item (5.) below, shall apply to 
the application of manually or infrequently started motors.  These values are based on not more 
than  four  starts  per  hour  with  long  periods  of  continuous  operation  under  maximum  load 
conditions.   
4.  Where equipment ratings or inrush characteristics other than those covered in this section are 
being considered, the Company must be consulted.  The starting currents permitted will depend 
upon the frequency of start of the motor, the size and character of the customer's load, and the 
capacity of the Company's system in the area.  The maximum allowable starting current will be 
that value which in the Company's opinion can be supplied without causing undue interference 
with service to other customers.   
SDK Library service:C# Create PDF from Excel Library to convert xlsx, xls to PDF in C#
Free online Excel to PDF converter without email. Following is C# demo code for Excel2003(.xls) to PDF Description: Convert to PDF/TIFF and save it on the disk.
www.rasteredge.com
SDK Library service:C# Create PDF from PowerPoint Library to convert pptx, ppt to PDF
Free online PowerPoint to PDF converter without email. from PowerPoint2003 by using following C# demo code. Description: Convert to PDF/TIFF and save it on the
www.rasteredge.com
November 2009  
30
5.  Maximum Permissible Motor Starting Currents 
a.  Equipment with Motors Rated in Horsepower  
Equipment Rated at
Total Locked Rotor Current Not to Exceed
120 volts, single-phase 
70 amps  
230 volts, single-phase  
Two hp or less 
60 amps  
Two hp to 6.5 hp 
60 amps plus 20 amps/hp over 2 hp 
Over 6.5 hp 
Consult the Company. 
208 or 240 volts, three-phase* 
Two hp or less 
50 amps  
Two hp to 19.9 hp 
50 amps plus 14 amps/hp over 2 hp 
Over 19.9 hp 
Consult the Company. 
b.  Room and Unitary Air Conditioning or Heat Pump Equipment Rated in Btu per Hour (Btu/h).  
Note: 12,000 Btu/h equals one ton.   
Equipment Rated at
Total Locked Rotor Current Not to Exceed
120 volts, single-phase 
50 amps  
208 or 240 volts, single-phase  
20,000 Btu/h or less 
60 amps  
20,000 Btu/h to 43,333 Btu/h 
60 amps plus 3 amps/1000 Btu/h in 
excess of 20,000 Btu/h  
Over 43,333 Btu/h 
Consult the Company  
208 or 240 volts, three-phase*  
20,000 Btu/h or less 50 amps  
20,000 Btu/h to 50,000 Btu/h 
50 amps plus 2.5 amps/1000 Btu/h in 
excess of 20,000 Btu/h  
Over 50,000 Btu/h 
Consult the Company  
* Three-phase supply is not available for residential service (except as provided for in Toledo 
Edison’s Tariff.)   
6.  Definitions & Notes for Motor Starting Requirements  
a.  Total locked rotor current is defined as the steady state current taken from the supply line 
with the motor rotor or rotors locked, with all other power-consuming components, including a 
current-reducing starter if used, connected in the starting position, and with rated voltage and 
frequency applied.   
b.  Where the equipment contains more than one motor and some motors are arranged for 
sequence starting, locked  rotor current applies to  that  combination of  power-consuming 
components simultaneously started that produces a higher draw of starting current than any 
other combination.  In such sequence arrangements, the subsequent motor(s) shall not be 
started for a minimum of 1/2 second after the preceding motor(s) have completed their 
starting mode.   
November 2009  
31
c.  Where the design of the equipment is such that unequal currents appear in the supply wires 
(i.e., auxiliary motors on single-phase equipment or single-phase auxiliary motors on three-
phase equipment), locked rotor current applies to the supply wire carrying the largest current.   
d.  For three-phase motors and equipment rated at voltages other than 240 volts, the locked 
rotor currents specified shall be multiplied by the inverse ratio of the voltages [For example, 
for a 480-volt motor, the locked rotor current would be the value in the table in item (5) above 
multiplied times the ratio 240/480 (0.5)].   
Power Factor
It is desirable to maintain the power factor of any load as near unity as possible.   
The Company shall not be obligated to furnish service when the power factor is not maintained at or 
above the level specified in the tariff.  In general, the customer power factor must be a minimum of 85 
percent or  higher.   If power  factor corrective equipment is necessary, it, together with required 
switching equipment, shall be provided and maintained by the customer at the customer’s expense.   
In general, capacitors must be applied more carefully than most types of electrical equipment in order 
that  satisfactory  operation and maintenance will result.   The  customer should  consult  with the 
Company before any installations of this type of equipment are made.   
Welders & Industrial Furnaces
The Company is prepared to assist its customers in planning installations of electric welders and 
industrial type furnaces.  In order to have ample time to determine the electrical supply requirements, 
it is essential in every case that the Company is consulted when such installations are being planned 
and before the customer commits to the purchase of the equipment.   
Commercial Cooking, Space Heating, Water Heating, & Ice / Snow Melting
In some instances, installations of commercial cooking, space heating, water heating, ice and snow 
melting, and similar equipment require additional service capacities for satisfactory operation.  Before 
any such installations are made, consultation with the Company is advisable.   
Special Equipment
It is also necessary that the installation of any special equipment not covered in this section be 
referred to the Company for advice before any commitments for purchase or installation are made.  
Such special equipment shall include X-ray, induction and dielectric heating equipment, sign flashers, 
compressors or radio transmission rectifiers, and other similar devices   
November 2009  
32
Low-Voltage Surge Arresters (750 Volts or Less)
When low-voltage surge arresters are installed by the customer, they shall not be connected to the 
service drop conductors, nor to the service entrance conductors, and they shall not be installed in the 
meter socket.  Where installed to protect utilization equipment, low-voltage surge arresters may be 
either inside or outside the enclosure containing the equipment to be protected or installed at the 
service equipment.  These arresters should never be considered as taking the place of the bond 
between the neutral or grounded conductor and the metallic systems at ground potential such as: 
metallic siding, water, waste lines, central heating, television towers and antennas, and sometimes 
lightning rods, but only as devices which may help to reduce appliance failures.   
UPS, Cogeneration, & Back-up Generation
It is necessary to consult with the Company before considering or commencing design of such a 
system, due to the potential safety hazard involved.  In addition, if generation can run in parallel with 
the Company supply system; obtain additional information on interconnection requirements from the 
Company's local Engineering Services Section.  It is specifically prohibited to operate generation in 
parallel with Company facilities unless the Company has approved the interconnection design.   
When installing emergency generators, customers shall employ a switch that will prevent electrical 
backfeed onto Company facilities when the generator is in operation.   
Harmonic Producing Equipment 
Customers shall meet the requirements of IEEE Standard 519 Section 10, Recommended Practices 
for Individual Customers.  Typical examples of harmonic producing equipment are rectifiers, SCR 
drives, power supplies, inverters, arc-furnaces, welders, etc.   
Protective Devices
The Company  will supply necessary  information  relative to  the  required  interrupting  capacity of 
protective devices to be installed at any definite location on the Company lines.  Where service is 
supplied from high capacity systems, special fuses or breakers of high interrupting capacity shall be 
used.  This is of particular importance where protective devices are to be installed in underground 
secondary network Central Business District and high voltage systems.  While the Company will 
endeavor, where possible, to anticipate system changes which may affect these values, it does not 
assume  responsibility  or  liability  with  respect  to  such  protective  devices,  nor  guarantee  their 
continuing adequacy  against increased interrupting  capacity requirements  resulting  from  system 
changes.   
The service equipment installed, irrespective of type, should be of such capacity as to permit the full 
utilization of the capacity of the service entrance conductors installed at the time of the original 
installation.  Circuit breaker type service equipment is preferable in all cases, and its use is strongly 
recommended.  However, fused type equipment is also acceptable.   
Protection against loss of voltage, voltage unbalance, undervoltage transient, sustained overvoltage, 
phase  reversal,  loss  of  synchronism,  overcurrent,  short  circuit  and  single  phasing  is  highly 
recommended for three-phase equipment and is the responsibility of the Customer.
Reverse phase 
relays must be provided on three-phase motors for elevators, cranes, hoists, or any other equipment 
requiring constant direction of  rotation, where reversal of  power would result in  damage to the 
equipment.   
November 2009  
33
GENERAL NOTES APPLYING TO EXHIBITS  
Every installation of customer facilities shall be sized and rated per National Electrical Code requirements 
for its applications.  Specifically, grounding shall meet National Electrical Code, Article 250.  Customer is 
responsible to determine when additional ground rods are required.   
Meter sockets and cabinets may be connected to an external ground rod if required by the local authority 
having jurisdiction.   
Check with local authority having jurisdiction for permit and inspection requirements.   
Self-contained meter sockets on commercial accounts must have a lever operated jaw release and 
bypass.   
Customer or contractor is responsible to provide and install the overhead service attachment to the 
structure.  (See Exhibit 3A)   
Comments,  corrections,  and  suggestions  regarding  this  document  should  be  directed  to 
FirstEnergy, Energy Delivery  Operations  Services  Department,  Distribution  Design  Standards 
Section at (800) 633-4766.   
Documents you may be interested
Documents you may be interested