mvc open pdf in browser : Convert from pdf to jpg Library control component .net azure winforms mvc dih05010310-part109

Generation 
Portable, Emergency, Standby Generators Interconnection 
•  Extension cords must be properly sized to carry the electric load. 
Overloaded cords can overheat and cause fires or damage to 
equipment. 
5.3. Standby Generators 
Only a qualified professional, such as a licensed electric contractor, may 
install a permanent standby generator. 
When a generator is permanently connected to a customer’s electric 
system, it energizes the building’s wiring. This type of installation 
requires a device that prevents the generator from being connected to 
PG&E’s power lines. 
PG&E recommends using a double-pole, double-throw transfer switch to 
keep the generator from backfeeding into PG&E’s system. 
(T
http://www.pge.com/004_safety/images/transfer_large.gif
To Meter 
To Main 
Fuse Box 
To Generator 
Figure 5-1 
Transfer Switch  
•  Keeps PG&E’s power from re-energizing the building’s wiring 
while the generator is running. 
•  Protects the generator, wiring, and appliances from damage when 
the service is restored. 
5-2  
May 1, 2003 
Convert from pdf to jpg - Convert PDF to JPEG images in C#.net, ASP.NET MVC, WinForms, WPF project
How to convert PDF to JPEG using C#.NET PDF to JPEG conversion / converter library control SDK
bulk pdf to jpg converter online; convert multiple pdf to jpg online
Convert from pdf to jpg - VB.NET PDF Convert to Jpeg SDK: Convert PDF to JPEG images in vb.net, ASP.NET MVC, WinForms, WPF project
Online Tutorial for PDF to JPEG (JPG) Conversion in VB.NET Image Application
best program to convert pdf to jpg; convert pdf to jpg converter
Generation 
Portable, Emergency, Standby Generators Interconnection 
5.3.1. Safety Requirements 
•  The city or county building department must inspect all 
additions to the building’s wiring. 
•  When the customer completes the installation, the customer 
must inform PG&E of the back-up system, so that, when 
there is an outage, PG&E’s workers will be aware of the 
generators in the area. In some cases, PG&E line workers 
may ask to check the electric generator’s transfer switch for 
safety purposes. 
•  Customers should call the local building inspector or a 
licensed contractor for help determining if a 
permanently-installed standby generator is installed properly. 
•  Customers who have installed or operated the generators 
improperly are responsible for any injuries and damages to 
the property of the customer, neighbors, or PG&E
5.4. Emergency Generators 
There are two methods of transferring an electric power supply between 
the PG&E source and the emergency generator system: 
•  Open transition (“break before make”). 
•  Closed transition (“make before break”). 
5.4.1. “Break Before Make” 
Customers may transfer loads using the “break-before-make” 
method via a double-throw transfer switch or an interlock scheme 
that prevents the two systems from operating in parallel. 
The circuit breaker that supplies power from PG&E to the 
customer must open before the customer’s generator closes. This 
open-transition method does not require any additional protective 
equipment; however, it does cause the customer to experience a 
short outage while transferring back to PG&E. The length of this 
outage depends on the transfer equipment
5.4.2. “Make Before Break” 
The “make-before-break” method is used when the customer wants 
to minimize any loss of power or disturbance to its electric load 
during a system outage. 
With the “make-before-break” method, the customer’s generator 
and PG&E’s electric system are in parallel for the very short 
interval during which the customer’s load is being transferred 
between the PG&E source and the emergency generator. 
May 1, 2003  
5-3 
Online Convert Jpeg to PDF file. Best free online export Jpg image
Online JPEG to PDF Converter. Download Free Trial. Convert a JPG to PDF. You can drag and drop your JPG file in the box, and then start
change pdf to jpg; convert online pdf to jpg
Online Convert PDF to Jpeg images. Best free online PDF JPEG
Download Free Trial. Convert a PDF File to JPG. Easy converting! We try to make it as easy as possible to convert your PDF files to JPG.
convert pdf to jpg c#; c# convert pdf to jpg
Generation 
Portable, Emergency, Standby Generators Interconnection 
The transfer of load from PG&E to the emergency source and back 
to PG&E can be done without causing the customer to experience 
an outage. 
5.4.3. Interconnection Requirements 
The list below gives the requirements for interconnecting 
emergency generators that use open or closed transfer schemes. 
5.4.3.1. Interconnection Study 
A study is not required if the applicant meets the 
requirements outlined in this section and submits the 
required reports and drawings for review and approval. 
5.4.3.2. Transfer Switch 
The transfer switch must be rated for the maximum 
possible load current. 
5.4.3.3. Notification and Documentation 
The customer must notify PG&E in writing regarding all 
emergency generator installations, regardless of the method 
of interconnection or transfer. 
The customer must submit completed documentation that 
includes, but is not limited to, the following information: 
•  A description of the generator and control-system 
operation. 
•  Single-line diagrams of the customer’s system. 
•  Identification of all interlocks. 
•  A description of the sequence of events for transfer 
operation and the specifications for any 
PG&E-required protective devices. 
PG&E must conduct relay tests and approve all 
documentation before the customer’s system is installed. 
PG&E must review and approve the relay test reports at 
least 15 days before scheduling the preparallel inspection. 
5.4.3.4. Operation/Clearance 
For the purposes of any clearance or line work, the 
customer must consider the emergency generator as a 
power source. 
Before a customer may perform any load transfers by the 
“make-before-break” transfer method, the customer must 
notify the responsible operation center of the intent to 
transfer load to the emergency generator and back to the 
5-4  
May 1, 2003 
C# Image Convert: How to Convert Adobe PDF to Jpeg, Png, Bmp, &
This demo code just converts first page to jpeg image. String inputFilePath = @"C:\input.pdf"; String outputFilePath = @"C:\output.jpg"; // Convert PDF to jpg.
best pdf to jpg converter; change format from pdf to jpg
C# Image Convert: How to Convert Tiff Image to Jpeg, Png, Bmp, &
RasterEdge.XDoc.PDF.dll. This demo code will convert first page to jpeg image. C:\input.tif"; String outputFilePath = @"C:\output.jpg"; // Convert tiff to jpg.
convert pdf into jpg; convert pdf document to jpg
Generation 
Portable, Emergency, Standby Generators Interconnection 
PG&E power source. This notification is not required for 
“break-before-make” operation. 
5.4.3.5.  “Break-Before-Make” Transfer Switch: Specific 
Requirements 
The customer must ensure that the transfer switch has an 
interlock or other means to prevent it from closing and 
connecting the customer’s system to PG&E’s, while the 
emergency generator is still connected to the customer’s 
load. 
5.4.3.6.  “Make-Before-Break” Requirements 
5.4.3.6.1. Transfer Switch 
In the event that the transfer switch closes into a 
fault condition, the transfer switch must be rated 
for the level of fault possible in the system. 
In the event that the transfer switch fails, the 
customer must ensure that there is an interlock 
that will trip either the main or the generator’s 
circuit breaker, so that the unit will not remain 
paralleled to PG&E’s electric system. 
The controls for the transfer switch must prevent 
parallel operation of the customer’s generator and 
PG&E’s electric system for an extended period of 
time. 
Customers who have systems that allow parallel 
conditions to exist for more than 0.5 seconds (30 
cycles) on the transmission system and more than 
1 second (60 cycles) on the distribution system 
must meet an additional set of requirements 
outlined in Section 4, “Rule 21 Generating 
Facility Interconnection,” of this manual. 
5.4.3.6.2. Manual Disconnect 
The customer must provide a manual disconnect, 
located at the point of interconnection, that may 
be used to establish a visually open safety 
clearance to protect PG&E’s employees working 
on PG&E’s electric system. 
The manual disconnect must be: 
•  Operated by PG&E. 
•  Lockable in either the opened or closed 
transition. 
May 1, 2003  
5-5 
C# Create PDF from images Library to convert Jpeg, png images to
Batch convert PDF documents from multiple image formats, including Jpg, Png, Bmp, Gif, Tiff, Bitmap, .NET Graphics, and REImage.
.pdf to jpg converter online; convert pdf to jpg for online
VB.NET PDF Convert to Images SDK: Convert PDF to png, gif images
Resize converted image files in VB.NET. Convert PDF to Jpg, Png, Bmp, Gif, Tiff and Bitmap in ASP.NET. Embed PDF to image converter in viewer.
batch pdf to jpg converter online; convert multipage pdf to jpg
Generation 
Portable, Emergency, Standby Generators Interconnection 
5.4.3.6.3. 
5.4.3.6.4. 
•  Easily accessible (preferably located  
adjacent to the electric meter).  
•  Have a full load-break capability. 
Synchronizing Function 
The customer must do the following to ensure that 
the load is transferred safely and smoothly: 
•  Ensure that the transfer scheme has adequate 
controls and protective devices. 
•  Use an auto synchronizer or a synchronizing 
relay to ensure that the customer
’s 
electric 
system synchronizes with PG&E’s system 
before the two systems are paralleled. 
The auto synchronizer or synchronizing relay 
must have: 
•  Slip frequency matching of 0.1 Hz or less. 
•  Voltage matching of ± 10 % or less. 
•  A phase-angle acceptance of ± 10 º or less. 
•  A circuit breaker closure-time  
compensation.  
Protection 
The emergency generators are paralleled with 
PG&E’s electric system. Therefore, in the event of 
a fault on the system during a load transition, the 
customer must have protective devices to prevent 
the customer’s generator from remaining 
connected to PG&E’s electric system. 
It is important to prevent damages on the 
customer’s equipment, PG&E’s electric system, 
and other PG&E customers’ equipment caused by 
possible back-feeding of the customer’s power to 
the PG&E system. 
In most installations, the customer installs a 
reverse-power relay to meet this protection 
requirement. 
The customer must install this relay on the 
customer’s side of the service transformer that is 
connected to PG&E’s electric system. 
To ensure that reverse power flow is detected 
before it actually enters PG&E’s electric system 
5-6  
May 1, 2003 
C# TIFF: C#.NET Code to Convert JPEG Images to TIFF
Use C# Code to Convert Jpeg to Tiff. string[] imagePaths = { @"C:\demo1.jpg", @"C:\demo2.jpg", @"C:\demo3.jpg" }; // Construct List<REImage> object.
convert pdf page to jpg; convert pdf to gif or jpg
JPEG to PDF Converter | Convert JPEG to PDF, Convert PDF to JPEG
Convert JPEG (JPG) Images to, from PDF Images on Windows. Features and Benefits. Powerful image converter to convert images of JPG, JPEG formats to PDF files;
change pdf file to jpg; change pdf to jpg image
5.4.3.6.5.  
Generation 
Portable, Emergency, Standby Generators Interconnection 
and other customers’ equipment, the relay must 
meet the following requirements: 
•  Be able to trip the customer’s main circuit 
breaker. 
•  Be able to detect the transformer core’s  
magnetizing power.  
To ensure that the relay meets the requirements, 
the customer must set the current-level pickup to 
be equivalent to 60 % of the transformer bank’s 
magnetizing current. Because this current value 
will be small, the current transformers associated 
with the relay must be capable of carrying small 
currents. 
When transferring the customer’s load back to 
PG&E’s electric system, incidental power may 
flow back to PG&E’s system. Properly setting the 
synchronizing and/or generator control will avoid 
this reverse flow. 
To prevent the reverse-power relay from 
unnecessarily tripping the generator each time 
there is a transfer, a short delay may be required. 
However, this delay must not exceed 1 second. 
Dedicated Transformer 
Due to the fact that the emergency generator may 
be connected in parallel with PG&E’s electric 
system, all transfer schemes of the 
“make-before-break” type must have a dedicated 
transformer. 
The use of dedicated transformers makes it less 
likely that other PG&E customers will be affected 
by transfer activities. In addition, customers need 
a dedicated transformer to install the 
reverse-power relay scheme. 
May 1, 2003  
5-7 
Generation 
Portable, Emergency, Standby Generators Interconnection 
This Page Intentionally Left Blank 
5-8 
May 1, 2003 
Load 
Section 6 
Technical Requirements for Load Entities 
6.1. Purpose 
This section specifies the technical requirements for electric load 
customers interconnecting to the Pacific Gas and Electric Company’s 
all new, primary service (PS) customers. 
following generation sections applies: 
• Section 3, “Expanded E-NET Interconnection” 
• Section 4, “Rule 21 Generating Facility Interconnection” 
6.2. Applicability 
The applicable protection standards of this section apply to all PS 
customers interconnecting to any part of PG&E’s primary distribution 
system. 
To ensure consistency with the applicable reliability criteria, PG&E has 
developed protection standards to govern the design, inspection, and 
testing of the protective devices. 
6.3. Requirements For Load Interconnection 
customer’s equipment and the isolation of that equipment within a 
reasonable time. 
The most important system troubles are faulty equipment conditions such 
as short-circuit problems. 
Please refer to “Electric Rule 2-Description of Service” at: 
http://www.pge.com/customer_services/business/tariffs/pdf/ER2.pdf and in 
Attachment 10. 
Moreover, interconnection of a new facility to the PG&E distribution 
system must not degrade any of the existing PG&E protection and control 
schemes or lower the existing levels of safety and reliability to other 
customers. 
As a general rule, neither party must depend on the other for the 
protection of its respective equipment. As such, PG&E’s minimum 
protection requirements are designed and intended to protect the PG&E 
power system only. Refer to CPUC Rule 21 of additional information. 
(See Attachment 11.) 
May 1, 2003 
6-1 
Load 
Technical Requirements for Load Entities 
In view of these objectives, PG&E requires that the protective equipment 
automatically be able to detect and rapidly isolate only the faulty 
equipment or section, so that only the faulty equipment or section is 
interrupted and the fewest number of customers are affected by any 
outage. 
The PS customer is responsible for protecting its own system and 
equipment from faults or interruptions originating from both PG&E’s and 
the PS customer’s side of the interconnection. 
The PS customer’s facilities must be designed to isolate any fault or 
abnormality that could affect adversely the PG&E electric system or the 
interconnection to PG&E meet either of the following two criteria: 
•  The protective device(s) is listed on Table 6-3, “Utility-Grade  
Relays for Generation Application,” on Page 6-9, or  
•  The protective device(s) has been tested for PG&E-specified  
functions by a test facility acceptable to PG&E.  
PG&E’s typical minimum requirement consists of installing three, 
device nearest to the point of interconnection with PG&E. 
relays, interrupting devices, or circuit breakers and all other devices 
necessary
1
to remove promptly any fault condition caused by the PS 
customer’s facilities that contributes to any short circuit occurring on the 
electric system not otherwise isolated by PG&E’s equipment. 
Please refer to Table 6-3, “Utility-Grade Relays for Generation 
additional information. 
Notes 
1. The PS customer must set the required relays to coordinate with the 
appropriate PG&E devices. 
2. The PS customer is responsible for the cost of installing additional 
protective equipment requirement. PG&E will communicate and 
coordinate the installation of additional protective equipment with the 
PS customer. 
PG&E assumes no liability for damage to the PS-customer-owned 
customer’s protective device(s) and PG&E’s protective devices, or 
negligence due to the PS customer’s failure to maintain protective and/or 
isolation equipment. 
1
6-2  
May 1, 2003 
Load 
Technical Requirements for Load Entities 
PG&E recommends that the PS customer acquire the services of a 
qualified and licensed electrical engineer to review its plans. The PS 
customer must, at its expense, install, operate, and maintain system 
requirements, and in accordance with this handbook. 
The customer’s primary protective device must be installed at a 
PG&E-designated service delivery point. The service delivery point must 
be at or near the customer’s property line. The drawings in Figures A3-1 
PG&E for the location of the PS customer’s protective device. 
The relays must be tested before energizing and a test report submitted to 
PG&E (see Attachment 12, Form G2-2, “Relay Test Report”). The relays 
must be tested every 4 years after the initial energization and the report 
sent to the PS customer’s local PG&E account representative. The PG&E 
account representative will coordinate all communication between the PS 
customer and the local PG&E electric planning department. 
The following are the test requirements that the PS customer must 
perform on-site (generic test reports are not allowed) before energizing: 
•  At least 10 working days before energizing, the PS customer must 
provide on-site test reports to PG&E from a qualified testing firm. 
for information regarding preparallel inspections. 
•  On-site power (typically 120 volts alternating current [Vac]) is 
required for the test equipment. 
•  Circuit breakers must be tested every 8 years after the preparallel 
inspection. 
either a delay in service or disconnection from the PG&E power system. 
6.3.1. Data Provided by the Applicant 
The customer’s load interconnection must not impact adversely the 
service reliability of other PG&E customers that are served via the 
same distribution system as the PS customer. 
The following are the responsibilities of PS customers: 
•  To install, set, and operate their primary protective devices to 
isolate the PS customer from PG&E, when problems occur 
on the PS customer’s system. 
•  To coordinate their protective devices with the appropriate, 
PG&E, source-side protective equipment. 
A PS customer must ensure that the coordination of the PS 
customer protective equipment meets the criteria outlined in the 
PG&E protection standards that are provided to the customer or its 