Load 
Technical Requirements for Load Entities 
pole-mounted meters, and pedestals meet the 
following requirements: 
•  Located within 5 circuit-feet of the 
centerline of the meter. 
•  Located between a minimum of 18 inches 
and a maximum of 72 inches above the 
finished grade. 
When cellular telephones are used, the same 
location requirements apply to the power supply, 
as measured from the load side of the meter. The 
power supply must be located outside PG&E’s 
sealable section. 
6.8. Revenue Metering Interconnection Point 
Customers who are served at distribution voltage must have the revenue 
meter installed at the point of service or when there is a change in 
ownership. 
High-side metering is PG&E’s preferred metering configuration. 
However, PG&E will grant exceptions if the customer can demonstrate 
that high-side metering will impose extraordinary costs or cause 
significant safety issues. 
the line between the point of service and the point of metering. 
6.9. Communications Circuits 
PG&E may require communications circuits between PG&E and the 
customer’s generation facilities for the following purposes: 
•  Protection 
•  Energy Management System (EMS) 
•  Supervisory Control and Data Acquisition (SCADA) 
•  Voice communications 
must ensure that the high-voltage protection (HVP) equipment on these 
circuits meets all applicable standards. 
6.10. Preparallel Inspection 
In order for PG&E to provide the PS customer with a timely 
pre-energization service, it is important to meet all the deadlines stated in 
this section. 
6-14  
May 1, 2003 
Convert pdf file into jpg format - Convert PDF to JPEG images in C#.net, ASP.NET MVC, WinForms, WPF project
How to convert PDF to JPEG using C#.NET PDF to JPEG conversion / converter library control SDK
change pdf file to jpg online; .pdf to .jpg online
Convert pdf file into jpg format - VB.NET PDF Convert to Jpeg SDK: Convert PDF to JPEG images in vb.net, ASP.NET MVC, WinForms, WPF project
Online Tutorial for PDF to JPEG (JPG) Conversion in VB.NET Image Application
conversion of pdf to jpg; batch pdf to jpg converter online
Load 
Technical Requirements for Load Entities 
It is the PS customer’s responsibility to ensure that any inspections 
required by local governmental and regulatory agencies are complete and 
any applicable permits are obtained before the energization date. 
6.11. Required Tests for the PS Customer’s Equipment Before Energizing 
the interconnection point, up to and including the main transformer, and 
the relays, along with the PG&E-required connected circuits. 
The items below that are marked ∇are the common requirements for both 
fused transformers and transformers protected by circuit breakers. 
However, fused transformers need to meet only the requirements that are 
marked ∇. 
The customer has to meet the following requirements: 
• Ensure that the equipment completes and passes all the tests outlined 
in the sections below. 
• Submit two copies of the test reports to a PG&E representative a 
minimum of 10 working days before the requested energization 
date. 
• Ensure that all the test reports identify the equipment in their header 
information and that the identification matches the single-line or 
three-line diagrams. 
• Submit single-line and three-line diagrams of the facility along with 
the test reports. 
The customer must meet all the above requirements and ensure that the 
test reports are approved at least 3 working days before the requested 
energization date. 
6.11.1. Proving Insulation 
A 2,500 volt (V) dc megger or a 1,000 V high-pot test is preferred 
for any of the insulation tests below, but a 1,000 V megger test is 
acceptable. 
• ∇The main transformer(s) must be meggered 
winding-to-winding and each winding-to-ground. 
• The circuit breaker(s) at the interconnection point that are 
operated by PG&E-required relays must be meggered 
according to Table 6-4 on Page 6-16. 
May 1, 2003  
6-15 
Online Convert Jpeg to PDF file. Best free online export Jpg image
So, feel free to convert them too with our tool. Easy converting! If you want to turn PDF file into image file format in C# application, then RasterEdge
convert pdf picture to jpg; convert pdf to jpg 100 dpi
C# PDF Convert to Images SDK: Convert PDF to png, gif images in C#
to multiple image forms, including Jpg, Png, Bmp Turn multipage PDF file into single image files respectively in use this sample code to convert PDF file to Png
reader convert pdf to jpg; convert pdf to jpeg
Load 
Technical Requirements for Load Entities 
Table 6-4 Circuit Breaker Positions and Connections 
Circuit Breaker Position Connection 
Circuit breaker open 
Each pole to ground, pole 1 to 2, 
pole 3 to 4, pole 5 to 6 
Circuit breaker closed 
Pole 1-ground, pole 3-ground, pole 
5-ground 
If the poles are in a 
common tank or cell 
Pole 1 to 3, pole 3 to 5, pole 5 to 1 
• ∇All buses from the interconnection point to the main 
transformer must be meggered phase-to-phase and 
phase-to-ground. 
• ∇The main transformer(s) and main circuit breaker(s) must 
have a dielectric test performed on the insulating medium 
(gas or oil). This test is not required for factory-sealed, 
circuit-switcher interrupters. 
• ∇If the main transformer is fused, all fuses must be checked 
for continuity before energizing. 
6.11.2. Proving Ratios 
∇The main transformer(s) ratio(s) must be proven by one of the 
following methods: 
• Using a turns-ratio tester. 
• Using a voltage-ratio test on the final operating tap. This tap 
position must be recommended by PG&E to best match the 
present distribution-system voltages. 
6.11.3. Circuit Breakers 
The following are the requirements for circuit breakers: 
• A minimum-to-trip test at 70% or less of the nominal control 
voltage must be performed on all circuit breakers or circuit 
switchers operated by PG&E-required relays. 
• The customer must perform a micro-ohm test on the main 
circuit breaker(s) at the interconnection point. 
• The customer must perform a timing test showing the time 
from the trip initiation to the opening at the main poles. 
6.11.4. Current Transformers and Current Circuits 
Customers must perform the following tasks for current 
transformers (CTs) and current circuits: 
• Check the saturation on all CTs associated with the required 
PG&E relays. If this is not possible, a manufacturer’s curve 
is acceptable. 
6-16  
May 1, 2003 
C# Create PDF from images Library to convert Jpeg, png images to
Batch convert PDF documents from multiple image formats, including Jpg, Png, Bmp, Gif, Tiff If you want to turn PDF file into image file format in C#
convert pdf image to jpg online; convert pdf to jpg 100 dpi
C# PDF Convert to Tiff SDK: Convert PDF to tiff images in C#.net
zoomValue, The magnification of the original PDF page size Any valid file path on the disk Description: Convert to DOCX/TIFF with specified zoom value and save it
change pdf to jpg online; convert pdf pictures to jpg
Load 
Technical Requirements for Load Entities 
• Prove the ratio of all CTs by using current (primary to 
secondary) or voltage (secondary to primary). 
• Check the CTs for the proper polarity whenever they feed 
PG&E equipment. 
• Check the CT circuits for the proper connections. 
• Check the continuity of the CTs by performing the following 
tasks: 
–  Apply primary current or secondary current at the CT 
block. 
–  Verify that the proper current exists in each phase relay 
and the ground relay. 
Customers must perform each test (primary or secondary) in 
all combinations to prove that all phase relays and ground 
relays have proper connections. 
In addition, customers must ensure that no loose wiring or 
parallel current paths exist, by applying or injecting the 
current to achieve a secondary reading of 5 amperes (A) in 
each relay. 
• Check the single phase on each phase of each current circuit 
feeding PG&E-required relays. 
• Megger the total circuit with the ground wire lifted, to prove 
that only one ground exists. 
6.11.5. Relays/Fuses 
The following are the requirements for relays/fuses: 
• Customers must ensure that all the relays are utility-grade 
and PG&E-approved. If multifunctional relaying is used, 
some form of redundancy is required. 
• ∇Customers must keep a full set of replacement fuses 
(PG&E must approve the size and type) on-site. 
• Customers must ensure that all relays are field-tested to 
specified settings to verify the following items: 
–  The minimum operating point at which the relay picks 
up (minimum pickup). 
–  Time delays at three, different, current-test points, in 
integral multiples of the minimum pickup, that closely 
characterize the relay time-current curve. 
May 1, 2003  
6-17 
C# PDF File Merge Library: Merge, append PDF files in C#.net, ASP.
Combine scanned images to PDF, such as tiff, jpg, png, gif, bmp, etc. Description: Combine the source PDF streams into one PDF file and save it into a new
c# pdf to jpg; reader pdf to jpeg
VB.NET PDF File Merge Library: Merge, append PDF files in vb.net
This part illustrates how to combine three PDF files into a new file in VB.NET application. You may also combine more PDF documents together.
best way to convert pdf to jpg; .pdf to jpg converter online
Load 
Technical Requirements for Load Entities 
– The PG&E tolerances listed below: 
Current/Voltage/Time 
±10 % 
Impedance/Phase Angle 
±0.05 % 
Frequency  
±0.05 Hz 
6.12. Energizing 
Customers must meet the following requirements before PG&E can begin 
the energizing process: 
• ∇If possible, the customer must use a proven PG&E circuit breaker 
for the initial energizing of all equipment. A PG&E representative 
must write a test program outlining all the steps to energize the 
equipment. 
• A PG&E technical representative must witness trip checks of all the 
required relays. This may require injecting a signal to trigger the 
relay. This is to prove that the relay will handle the trip current of 
the circuit breaker and to provide relay targeting. Jumpering the 
studs on the back of the relay is not acceptable. 
• After load is placed on the feeder, a PG&E technical representative 
must witness the reading of the load current in each phase relay and 
the absence of load current in the ground relay. The PG&E technical 
representative must then seal the relays. A PG&E technical 
representative must witness these tests. 
The following are the PS customer’s responsibilities: 
• To perform all the tests with the PG&E representative as an 
observer. 
• To provide all the test equipment and the qualified personnel to 
perform the required tests. 
6.13. General Notes 
• The PG&E system has an A-C-B counterclockwise rotation. 
• Before the customer can make any changes to the PG&E-required 
protection equipment or major substation equipment (transformer, 
breaker, etc.), the customer must submit the proposed changes to the 
PG&E representative for review and to the appropriate PG&E 
engineer for approval. 
• Routine maintenance on PG&E-required protective relays and on 
circuit breaker(s) must meet PG&E’s maintenance and test practices. 
After completion of these tests, the customer must submit the test 
reports to the PG&E representative for review and to the appropriate 
PG&E engineer for approval. 
6-18  
May 1, 2003 
JPEG Image Viewer| What is JPEG
an easy-to-use interface enabling you to quickly convert your JPEG images into other file formats, including Bitmap, Png, Gif, Tiff, PDF, MS-Word
pdf to jpg; to jpeg
VB.NET Word: Word to JPEG Image Converter in .NET Application
NET example below on how to convert a local use DOCXDecoder open a word file Dim pageCount provide powerful & profession imaging controls, PDF document, image
convert pdf photo to jpg; convert pdf page to jpg
Load 
Technical Requirements for Load Entities 
A PG&E technical representative must reseal the PG&E-required 
relays at the customer’s facilities. 
• All questions must be directed to the local PG&E representative
May 1, 2003 
6-19 
VB.NET Create PDF from images Library to convert Jpeg, png images
Components to batch convert PDF documents in Visual Basic .NET class. If you want to turn PDF file into image file format in VB.NET class, then RasterEdge
best pdf to jpg converter for; changing pdf to jpg file
VB.NET PDF insert image library: insert images into PDF in vb.net
Save changes to existing PDF file or output a new PDF file. Insert images into PDF form field in VB.NET. to provide users the most individualized PDF page image
advanced pdf to jpg converter; convert pdf picture to jpg
Load 
Technical Requirements for Load Entities 
This Page Intentionally Left Blank 
6-20 
May 1, 2003 
Attachments 
Attachment 1 
Glossary 
This glossary can also be found online at 
http://www.pge.com/002_biz_svc/gen/pdf/wi_handbook/gloss.pdf 
May 1, 2003 
A1-1 
Attachments 
This Page Intentionally Left Blank 
A1-2 
May 1, 2003 
Attachments 
Attachment 2 
Website Addresses 
To Locate 
Website Link 
Section 2 – Standard E-NET Interconnection 
Tariff Book 
http://www.pge.com/customer_services/business/tariffs/ 
California Public 
Utilities Code 
http://www.leginfo.ca.gov/cgibin/calawquery?codesection=puc 
&codebody=&hits=20 
Single–line diagram 
http://www.pge.com/002_biz_svc/gen/enet_diagram.gif 
CEC List of Eligible 
Inverters 
http://www.consumerenergycenter.org/buydown/eligible_invert 
ers.html 
CPUC Electric Rule 2 
Description of Service 
http://www.pge.com/customer_services/business/tariffs/pdf/E 
R2.pdf 
UL1741 Certification 
http://ulstandardsinfonet.ul.com/scopes/1741.html 
Section 3 – Expanded E-NET Interconnection 
CEC List of Eligible 
Inverters 
http://www.consumerenergycenter.org/buydown/eligible_invert 
ers.html 
CPUC Electric Rule 2 
Description of Service 
http://www.pge.com/customer_services/business/tariffs/pdf/E 
R2.pdf 
Western Electricity 
Coordinating Council 
(WECC) 
http://www.wecc.biz/main.html 
Information on 
Expanded E-NET 
Generator 
Interconnection on 
PG&E website 
http://www.pge.com/002_biz_svc/gen/expanded_enet.shtml 
California Public 
Utilities Code 
http://www.leginfo.ca.gov/cgibin/calawquery?codesection=puc 
&codebody=&hits=20 
Tariff Book 
http://www.pge.com/customer_services/business/tariffs/ 
Rule 21 – Generating 
Facility 
Interconnections 
http://www.pge.com/customer_services/business/tariffs/pdf/E 
R21.pdf 
UL1741 Certification 
http://ulstandardsinfonet.ul.com/scopes/1741.html 
Interconnection 
Agreement for Net 
Energy Metering of 
Solar or Wind Electric 
Generating Facilities 
Residential or Small 
Commercial Facilities 
of 10kW or Less 
http://www.pge.com/002_biz_svc/pdf/e–net_interconnection_a 
greement.pdf 
Rule 2–Description of 
Service 
http://www.pge.com/tariffs/doc/ER2.doc 
Appendix J – 
Generation Operating 
Agreement 
http://www.pge.com/002_biz_svc/gen/pdf/wi_handbook/app_j. 
pdf 
May 1, 2003 
A2-1 