Generation 
This Page Intentionally Left Blank 
May 1, 2003 
xix 
Convert from pdf to jpg - Convert PDF to JPEG images in C#.net, ASP.NET MVC, WinForms, WPF project
How to convert PDF to JPEG using C#.NET PDF to JPEG conversion / converter library control SDK
convert pdf to jpg batch; advanced pdf to jpg converter
Convert from pdf to jpg - VB.NET PDF Convert to Jpeg SDK: Convert PDF to JPEG images in vb.net, ASP.NET MVC, WinForms, WPF project
Online Tutorial for PDF to JPEG (JPG) Conversion in VB.NET Image Application
c# convert pdf to jpg; change pdf to jpg online
Generation 
Section 1  
General Information  
Notice: Document Subject to Change 
The online version of the Distribution Interconnection Handbook, located at 
http://www/TechLib/, will be updated as quickly as possible when changes occur. 
The
of changes in the process or requirements. 
1.1. Purpose 
The purpose of this manual is to provide information on how to 
Gas and Electric Company’s (PG&E’s) electrical distribution lines. This 
information is presented by PG&E in an effort to maintain safe, uniform, 
and reliable service to generating facilities and customers. 
This manual is based on the applicable Federal Energy Regulatory 
Commission (FERC) and California Public Utilities Commission (CPUC) 
rules and tariffs (e.g., Electric Rules 2, 21, and 22), as well as accepted 
industry practices and standards contained within the Applicable 
Reliability Criteria. 
There are four types of interconnection. They are included in the 
following two categories: 
•  Retail 
–  Standard E-NET 
–  Expanded E-NET 
–  Rule 21 
•  Wholesale 
–  Wholesale Distribution Tariff (WDT) 
(The Wholesale category will not be discussed in this 
handbook.) 
1.2. Retail (Under CPUC Jurisdiction) 
There are three types of interconnection in the retail category: 
•  Standard E-NET 
To apply for Standard E-NET interconnection, all of the following 
conditions must apply for: 
May 1, 2003  
1-1 
Online Convert Jpeg to PDF file. Best free online export Jpg image
Online JPEG to PDF Converter. Download Free Trial. Convert a JPG to PDF. You can drag and drop your JPG file in the box, and then start
convert pdf pages to jpg; change pdf file to jpg online
Online Convert PDF to Jpeg images. Best free online PDF JPEG
Download Free Trial. Convert a PDF File to JPG. Easy converting! We try to make it as easy as possible to convert your PDF files to JPG.
change pdf file to jpg; convert pdf images to jpg
Generation 
General Information 
–  Generating systems that are10 kilowatts (kW) or less. 
–  Residential and small commercial customers. 
–  Photovoltaic (PV) systems or wind systems or a hybrid of 
both. 
–  For incidental export of power to PG&E’s distribution lines. 
(For more detailed information, please see Section 2, 
“Standard E-NET Interconnection,” of this handbook). 
•  Expanded E-NET 
To apply for Expanded E-NET interconnection, all of the following 
conditions must apply for: 
–  Generating systems that are greater than 10 kW and up to 1 
megawatt (MW). 
–  Residential, medium, and large commercial (peak demand of 
at least 20 kW) and all agricultural customer-generators. 
–  PV or wind systems or a hybrid of both. 
–  Incidental export of power to PG&E’s distribution lines. 
(For more detailed information, please see Section 3, 
“Expanded E-NET Interconnection,” of this handbook). 
•  Rule 21 
To apply for Rule 21 interconnection, all of the following conditions 
must apply for: 
–  Any types of generating systems but the sizes can be limited 
based on the capabilities of distribution circuits. 
–  All types of customers. 
–  Parallel generation for a customer’s site use. 
–  No export of power to PG&E distribution lines. 
(For more detailed information, please see Section 4, “Rule 21 
Generating Facility Interconnection,” of this handbook). 
1.3. Time Frames and Fees 
Table 1-1 outlines the interconnection process. Please see Section 2 to 
Section 4 of this Distribution Interconnection Handbook for detailed 
information on each interconnection category. 
1-2  
May 1, 2003 
C# Image Convert: How to Convert Adobe PDF to Jpeg, Png, Bmp, &
This demo code just converts first page to jpeg image. String inputFilePath = @"C:\input.pdf"; String outputFilePath = @"C:\output.jpg"; // Convert PDF to jpg.
change pdf to jpg image; convert pdf page to jpg
C# Image Convert: How to Convert Tiff Image to Jpeg, Png, Bmp, &
RasterEdge.XDoc.PDF.dll. This demo code will convert first page to jpeg image. C:\input.tif"; String outputFilePath = @"C:\output.jpg"; // Convert tiff to jpg.
convert pdf into jpg online; convert .pdf to .jpg
Generation 
General Information 
Table 1-1 Interconnection Process 
Technology Initial Review 
Supplemental 
Review 
Detailed Study 
Standard 
PV/wind or No cost to the No cost to the No cost to the 
E-NET 
a hybrid of 
customer for 
customer if 
customer if PG&E 
(Section 2) 
both 
initial review if 
PG&E 
determines that 
the proposed 
project 
qualifies as a 
simplified 
interconnection 
PG&E 
determines 
that a 
supplemental 
review is 
required. 
determines that an 
additional detailed 
study is required. 
Expanded 
PV/wind or • 10 business • 10 business • The local division 
E-NET 
a hybrid of 
days 
days 
Planning 
(Section 3) 
both 
• No fees 
collected 
• No fees 
collected 
department 
determines the 
need for a 
detailed study. 
• No fees are 
collected if PG&E 
determines that a 
detailed study is 
needed. 
Rule 21 
Any type of • 10 Business • 10 business • The local division 
(Section 4) 
generation 
Days 
• $800 fee 
collected 
days 
• $600 fee 
collected 
Planning 
department 
determines the 
need for a 
detailed study. 
• Fees are 
collected if PG&E 
determines that a 
detailed study is 
needed. 
1.4. Single Point of Contact 
PG&E’s interconnection Services group is the single point of contact for 
processing all DG interconnection to PG&E’s distribution lines. 
Following are the contact information: 
• Frank Salguero 
(8) 223–2284 
• Art McAuley 
(8) 223–6924 
May 1, 2003 
1-3 
C# Create PDF from images Library to convert Jpeg, png images to
Batch convert PDF documents from multiple image formats, including Jpg, Png, Bmp, Gif, Tiff, Bitmap, .NET Graphics, and REImage.
change pdf to jpg on; .net pdf to jpg
VB.NET PDF Convert to Images SDK: Convert PDF to png, gif images
Resize converted image files in VB.NET. Convert PDF to Jpg, Png, Bmp, Gif, Tiff and Bitmap in ASP.NET. Embed PDF to image converter in viewer.
convert pdf into jpg; reader convert pdf to jpg
Generation 
General Information 
This Page Intentionally Left Blank 
1-4 
May 1, 2003 
C# TIFF: C#.NET Code to Convert JPEG Images to TIFF
Use C# Code to Convert Jpeg to Tiff. string[] imagePaths = { @"C:\demo1.jpg", @"C:\demo2.jpg", @"C:\demo3.jpg" }; // Construct List<REImage> object.
convert pdf to jpg 100 dpi; convert pdf file into jpg
JPEG to PDF Converter | Convert JPEG to PDF, Convert PDF to JPEG
Convert JPEG (JPG) Images to, from PDF Images on Windows. Features and Benefits. Powerful image converter to convert images of JPG, JPEG formats to PDF files;
change pdf into jpg; convert pdf to jpg c#
Generation 
Section 2 
Standard E-NET Interconnection 
2.1. Introduction 
Standard E-NET is an energy net metering service for customers who 
the facility to the Pacific Gas and Electric Company’s (PG&E) electric 
distribution grid system. 
Customers who meet the above criteria qualify for Standard E-NET, if 
they are: 
• Residential, or 
• Commercial customers with a peak demand of 20 kW or less. 
The Standard E-NET program allows customers to install their own 
generating facilities or distributed generation (DG), which is 
interconnected to and operates in parallel with PG&E’s electric grid. 
2.2. Purpose 
customers to offset part or all of their electric loads. These customers may 
continue to purchase power from PG&E’s electric grid, as well as deliver 
incidental power to the grid. This is conforming with CPUC Code 2727. 
An E-NET customer’s electric meter may run forward (to account for 
grid). 
2.3. Standard E-NET Eligibility 
Standard E-NET customers can access information about the program on 
PG&E’s website: http://www/TechLib/. 
PG&E’s website currently has E-NET forms and links to the relevant 
rules. These rules apply to those residential or small commercial 
customers with peak demand loads of less than 20 kW, who want to install 
facilities with a capacity of 10 kW or less. 
This standard E-NET service is only applicable to customers who install 
PV or wind generating systems to offset part or all of their electrical 
requirements. The customer must be a residential or a small commercial 
customer, with less than 20-kW-maximum-billing demand for at least 9 of 
the most recent 12 months. 
For more information, please refer to the tariff and: 
1. http://www.pge.com/customer_services/business/tariffs/ 
May 1, 2003 
2-1 
Generation 
Standard E-NET Interconnection 
2. Section 2827 of the California Public Utilities Code at: 
http://www.leginfo.ca.gov/cgi-bin/calawquery?codesection=puc&code 
body=&hits=20. 
Note:  Customers wishing to export power to the grid are not 
allowed to participate in the E-NET program and will 
be assigned the appropriate rate schedule. 
2.4.  Application and Agreements 
2.4.1. Application Form and Fees 
The customer needs to submit a Standard E-NET application. 
Standard E-NET applications may be obtained in the following 
ways: 
•  Call PG&E’s Generation Hotline at (415) 972-5676 and 
leave a voicemail message. 
•  Send an email to Gen@pge.com. 
•  Copy from this handbook (Attachment 12). 
Return the completed application to: 
Pacific Gas and Electric Company  
Attn: Generation Interconnection Services Section (GIS) 
P.O. Box 770000 
Mail Code B13J 
San Francisco, CA 94177 
Or, email the application to Gen@pge.com. 
2.4.2. E-NET Forms and Application Process 
The applicant must provide the following documents: 
2.4.2.1. Completed Application Form 
Please see Attachment 12 for the details and instructions 
for filling out the application form “Application for 
Interconnecting Residential or Small Commercial Net 
Energy Metering (E-NET) Customers with Solar or Wind 
Electric Generating Facilities of 10 Kilowatts or Less,” 
(Form 79-994). 
Applicants must submit an application form complete with 
all required information before PG&E will process the 
application. 
2.4.2.2. Single-Line Diagram and Project Details 
A single-line diagram must accompany the application. 
This drawing must meet National Electric Code (NEC) or 
2-2  
May 1, 2003 
2.4.2.3.  
Generation 
Standard E-NET Interconnection 
have a drawing with a Professional Engineering Stamp or 
C10 license. 
For an example of a single-line diagram please refer to 
Figure 2-1 on Page 2-7. 
In the interest of assisting PG&E in its goal to deliver safe, 
uniform service, the following guidelines are 
recommended for transmitting electronic drawing files for 
architectural, mechanical, and civil site plans: 
•  The PG&E electronic drawing tool is AutoCAD  
R14, .DWG format. All submitted electronic  
drawings must be completely readable and  
compatible with AutoCAD release 12 or above.  
•  Drawings should be sent on 3.5-inch diskettes, CDs, 
or as attached email files. 
•  The “Pack & Go” feature of AutoCAD should be 
used, if available. 
•  Drawings for large projects should be sent in a  
zipped format.  
•  The use of layering is encouraged and should be  
preserved when transferring files to PG&E.  
•  All drawings should be saved in model space instead 
of paper space. 
•  Drawing plans should be two dimensional, with the 
“Z” elevation at zero. 
•  Any External Reference Files (Xref) or drawing 
updates should maintain a consistent insertion point. 
•  All related drawing files should be included. 
If you have any questions, please contact your local PG&E 
representative. 
Signed Agreement 
The applicant must provide a signed copy of the 
“Interconnection Agreement for Net Energy Metering of 
Solar or Wind Electric Generating Facilities of 1000 KW 
or Less, Other than Residential or Small Commercial 
Facilities of 10 KW or Less” (Form 79-978, in 
Attachment 12). 
Please review the agreement checklist, which provides 
instructions for completing the agreement. 
May 1, 2003  
2-3 
Generation 
Standard E-NET Interconnection 
2.4.2.4. Proof of Insurance Coverage 
The customer must provide a copy of the declaration page 
of all risk property insurance and comprehensive personal 
liability insurance that is currently in effect. 
2.4.2.5. Approved Building Permit 
Before performing a preparallel inspection, PG&E requires 
proof that the installation has passed a building inspection 
by local authorities. 
2.4.2.6. Electric Vehicles 
The E-9 rate is mandatory for applicants with electric 
vehicles. A completed E-9 Checklist “All Customers 
Selecting The Schedule E-9 Rate Must Complete the 
Following Qualifying Checklist,” must be included with 
the application. The E-9 Checklist is located in 
Attachment 12 of this manual. 
2.4.2.7. Timeline 
Table 2-1 Standard E-NET Interconnection Process 
Technology Initial Review 
Supplemental 
Review 
Detailed Study 
Standard 
E-NET 
PV/wind or 
a hybrid of 
both 
No cost to the 
customer for 
initial review if 
PG&E 
determines that 
the proposed 
project 
qualifies as a 
simplified 
interconnection 
No cost to the 
customer if 
PG&E 
determines 
that a 
supplemental 
review is 
required. 
No cost to the 
customer if PG&E 
determines that an 
additional detailed 
study is required. 
The turnaround time for PG&E to approve the application 
is 10 days. 
PG&E uses an automated system, the E-NET Online 
System (ENOS), to track the timeline of the application. 
2.5. Requirements 
2.5.1. Protective Devices 
For Standard E-NET, PG&E requires inverters that are certified by 
Underwriters Laboratories’ Standard UL 1741 and listed on the 
California Energy Commissioner’s (CEC) eligible list. 
2-4 
May 1, 2003 
Generation 
Standard E-NET Interconnection 
For more information, please refer to the following link: 
http://www.consumerenergycenter.org/buydown/eligible_inverters. 
html. 
When interconnecting facilities to the PG&E distribution system, it 
is important to minimize the potential hazard to life and property. 
A basic safety rule requires automatic detection and isolation of an 
abnormal condition within a reasonable time. Please refer to the 
CPUC Electric Rule 2 Description of Service at: 
http://www.pge.com/customer_services/business/tariffs/pdf/ER2.p 
df. 
Moreover, the interconnection of a new facility to the PG&E 
distribution system must not degrade any of the existing PG&E 
protection and control schemes nor lower the existing levels of 
safety and reliability to other customers. 
Also, as a general rule, neither PG&E nor the customer should 
depend on the other for the protection of their respective 
equipment. 
Note:  As specified in CPUC Rule 21, PG&E’s 
minimum protection requirements are designed 
and intended to protect the PG&E power 
system only. 
The customer is responsible for the costs of PG&E’s installation of 
any protective equipment necessary to ensure safe and reliable 
operation of both PG&E’s and the customer’s facilities. The need 
for protective equipment will vary, depending on the facility’s 
location within a PG&E circuit. 
2.5.2. Manual Disconnect Switch 
A manual disconnect switch is required for all generation facilities 
larger than 1 kW. The customer must provide a disconnect device 
to electrically isolate the PG&E system from the customer’s 
generating facilities. This disconnect device may be located on 
either side of the main switch. 
Note:  PG&E’s safety specifications require that the 
switch be visible and in close proximity (10 feet 
or less) to the main utility meter panel. 
In accordance with PG&E’s safety rules and practices, the device 
must be used to establish a visually open, working clearance 
boundary when performing maintenance and repair work. 
The disconnect device also must be accessible and lockable in the 
open position. In addition, the manufacturer and model number of 
the disconnect device must be among those approved for use by 
PG&E, as listed in Engineering Document 060559, “Disconnect 
Switches For Interconnection With Small Power Producers And 
Cogenerators.” A copy of this document is located in Attachment 3 
of this manual. 
May 1, 2003  
2-5 