GUIDELINES FOR AVAILING FINANCIAL ASSISTANCE UNDER 
AGRICULTURE EXPORT PROMOTION PLAN SCHEME 
(EXCLUDING TRANSPORT ASSISTANCE) FOR XII PLAN 
w.e.f. 01/04/2014 
Compliance points common to all components: 
1.  It is mandatory for the exporters to file the application on-line  on APEDA 
website  at the link  given below and followed by submission of physical 
application: 
http://itrack.apeda.gov.in
2. The assistance under Financial Assistance Scheme of APEDA is available to 
registered exporters or other organizations as mentioned under each sub-
component and for APEDA Scheduled Products only . Details are available at 
the link  
http://www.apeda.gov.in/apedawebsite/trade_promotion/Financial_Assista
nce_Schemes.htm
3. The assistance under the scheme under various components is available 
only once per unit during XII Plan period except for the sub-components 
mentioned under Point No 4 where admissibility will be on per annum basis. 
However, for a unit, the competent authority reserves the right to sanction 
more than once under a sub-component in the plan period. However, the 
assistance would not exceed the maximum limit under the sub-component 
in plan period.  
4. Assistance under following components of the scheme will be admissible on 
per annum basis: 
(a) Market Development  (Component III)  
(i) A. Packaging Development – sub component 2. 
(ii) C. Export Promotion Market Development – Sub Component 3 & 6.  
(b) Quality Development (Component IV) 
(i) A. Promotion of Quality & Quality Control – sub component 5, 6 & 7.  
(ii)  The assistance for installing quality management/quality assurance 
systems (sub-component A-2) will be applicable for a period of three 
years  
Convert pdf file into jpg format - Convert PDF to JPEG images in C#.net, ASP.NET MVC, WinForms, WPF project
How to convert PDF to JPEG using C#.NET PDF to JPEG conversion / converter library control SDK
convert pdf to jpg for; change pdf to jpg image
Convert pdf file into jpg format - VB.NET PDF Convert to Jpeg SDK: Convert PDF to JPEG images in vb.net, ASP.NET MVC, WinForms, WPF project
Online Tutorial for PDF to JPEG (JPG) Conversion in VB.NET Image Application
convert pdf image to jpg online; batch convert pdf to jpg online
5.  Application should be filed in on-line on APEDA website in the prescribed 
format and only in respect of products handled by APEDA.  
6. Each column in the application form should be filled in with complete 
information, as required  
7. Application should be accompanied with self certified copies of  
(a) APEDA RCMC along with amendments, if any  
(b) Quotation/proforma invoice /invoices from suppliers of equipment / 
packaging 
boxes/ 
advertisement 
/consultants 
(feasibility 
study/ISO/HACCP) etc.  
(c) Technical brochure/literature/Pamphlet depicting equipment details in 
case of infrastructure/laboratory equipment/any other assets etc  
(d) The cost estimate from a Chartered Engineer or Civil Architect  shall be 
submitted for civil work with regard to intermediate storage shed , 
effluent treatment plant , Integrated  post harvest facilities, pre cooling 
facilities, CA/MA storages etc. 
8. Export performance for last three years should be mentioned year-wise in 
quantity (MTs) and value terms  (Rs lakh) in the format given in Annexure-
1-application form. Consolidated single figure will be treated as a 
deficiency. 
9. Projected exports for next five years should also be mentioned year wise in 
quantity (MTs) and value (Rs lakh) terms in the format given in Annexure-
1-application form. Consolidated single figure only will be treated as a 
deficiency  
10The Monthly Party Returns for the period preceding one month from the 
date of application must be posted on APEDA website as a mandatory 
condition. 
11. Confirmation of posting of monthly export returns on APEDA website 
should be sent as the declaration in the Application Form (Annexure –I). 
Export Returns shall be filled even in the case of NIL exports. APEDA will 
consider the application only after verification of export returns on the 
website. Non-compliance on part of the applicant will result in rejection of 
the application  
12Financial assistance will be considered in cases where the unit is newly 
commissioned and/or the registered exporter has approached APEDA for 
the first time seeking financial assistance under the schemes. However, for 
Online Convert Jpeg to PDF file. Best free online export Jpg image
So, feel free to convert them too with our tool. Easy converting! If you want to turn PDF file into image file format in C# application, then RasterEdge
changing pdf to jpg on; convert multipage pdf to jpg
C# PDF Convert to Images SDK: Convert PDF to png, gif images in C#
to multiple image forms, including Jpg, Png, Bmp Turn multipage PDF file into single image files respectively in use this sample code to convert PDF file to Png
convert pdf file to jpg format; convert pdf to high quality jpg
subsequent applications for financial assistance, these would be considered 
if the exporter has executed some exports during the preceding 12 months.  
13. The physical application form and declaration must be duly signed with 
stamp along with the name and designation of the authorized signatory. 
14. The physical application must be accompanied by the electronic application 
covering sheet  bearing application Track No.  which must be quoted in all 
future correspondence. 
15. physical applications  completed in all respects only will be considered for 
grant of In Principle Approval  
16. Under the column seeking information on assistance availed earlier, 
scheme-wise, year-wise and component-wise correct information should be 
furnished. This information should be furnished only for the XII Plan period 
(1.4.2012 to 31.03.2017) 
17.  In Principle Approval is mandatory for availing financial assistance under 
APEDA schemes except for testing charges (sub-component 5 of Quality 
development, Packaging material (sub-component 2) of the Component of 
Market Development.  The invoice must spell out the advertisement 
schedule. The exporter must also clearly specify the number and schedule 
of intended advertisements.
18. In-Principal Approval (IPA) issued by APEDA will generally be valid up to 
31st March of the financial year. However, in cases where IPA is issued 
during last quarter of the financial year (i.e. January to March), the validity 
of such IPA will be up to 31
st
March of the next financial year.  
19.  For consideration of issuance of In Principle Approval by APEDA, the date 
of receipt of physical documents will be treated as actual date of receipt 
Any expenditure incurred prior to the date of receipt of physical 
application in APEDA would  disqualify for assistance. 
20.
APEDA reserves the right to grant In Principle Approval based on eligible 
items only and any expenditure on ineligible items would be disqualified. 
The decision of APEDA relating to admissibility of claim will be final and 
filing of application will not provide any right to assistance.  
21.
Any change in ownership/management/style of the company or any change 
in supplier/equipment model/consultant/certification body etc should be 
got approved by sending a written request to APEDA.  
22.
It is incumbent upon the applicant to file final claim documents within the 
validity of the IPA letter  or apprise APEDA on the progress of the activity 
C# Create PDF from images Library to convert Jpeg, png images to
Batch convert PDF documents from multiple image formats, including Jpg, Png, Bmp, Gif, Tiff If you want to turn PDF file into image file format in C#
convert pdf file to jpg; pdf to jpeg converter
C# PDF Convert to Tiff SDK: Convert PDF to tiff images in C#.net
zoomValue, The magnification of the original PDF page size Any valid file path on the disk Description: Convert to DOCX/TIFF with specified zoom value and save it
change file from pdf to jpg; batch pdf to jpg
and seek written extension of validity of the In Principle Approval Letter, 
wherever required, well ahead of expiry of the original validity of such letter. 
23.
If the applicant/beneficiary has more than one manufacturing unit at 
different locations, APEDA will consider assistance for each such unit. 
However, such units must be first incorporated in the IEC and APEDA 
RCMC. 
24. In cases where IPA is not required, assistance will be disbursed subject to 
availability of funds. 
C# PDF File Merge Library: Merge, append PDF files in C#.net, ASP.
Combine scanned images to PDF, such as tiff, jpg, png, gif, bmp, etc. Description: Combine the source PDF streams into one PDF file and save it into a new
convert pdf image to jpg; conversion pdf to jpg
VB.NET PDF File Merge Library: Merge, append PDF files in vb.net
This part illustrates how to combine three PDF files into a new file in VB.NET application. You may also combine more PDF documents together.
convert pdf to jpeg on; convert pdf to jpg 300 dpi
I. 
INFRASTRUCTURE DEVELOPMENT :  
Under the component, assistance is provided to achieve higher quality in 
the final produce and to save post harvest wastages.  The exporters are 
supported for creation of requisite infrastructure for post harvest 
handling, 
specialized 
cold 
storages 
like 
high 
humidity, 
controlled/modified atmosphere, mechanized grading, sorting and 
package forming/sealing machine etc. Establishment of common 
infrastructure facilities in identified clusters by Government or public 
sector agencies including PPP mode in setting up cold chain and value 
added processing facilities are encouraged. Assistance is also available to 
registered exporters as detailed in Parts II and III. 
Common Infrastructure Development  :  
Assistance is available to Government or Public Sector agencies for 
establishment of common infrastructure facilities which is detailed under 
Part I (A & B ).  
PART I : Assistance to Government or Public Sector Agencies 
A - For establishment of common infrastructure facilities in the Public 
Sector the following is required:  
(i) The beneficiaries under 2(I) A  are   Central /State Government 
PSUs/Government Departments etc. IPA is required  and the terms and 
conditions of assistance and reimbursement pattern are specified in the 
Memorandum of Understanding (MOU) which is to be signed before 
release of assistance 
(ii) Pattern of Assistance: Maximum 90% Grant-in-Aid by APEDA and 10% 
from other Government or Public Sector agencies other than land. 
(iii) The common facilities are intended to be set up for common benefit of 
exporters of APEDA scheduled products. 
(iv) A proper Detailed Project Report (DPR)  containing detailed concept of 
the project, details of production of intended crops to be handled , 
location advantages, availability of land in possession of the 
implementing agency and free from all encumbrances, sensitivity 
analysis, SWOT analysis ,  Cash flow Statement, Break Even Point 
(BEP), Internal Rate of Return (IRR), Economic Rate of Return (ERR), 
Debt Service Coverage  Ratio (DSCR) , Net Present Value (NPV) etc. 
export orientation, Operation & Maintenance arrangement, details of 
equipment, plant and machinery, socio economic benefits , backward 
JPEG Image Viewer| What is JPEG
an easy-to-use interface enabling you to quickly convert your JPEG images into other file formats, including Bitmap, Png, Gif, Tiff, PDF, MS-Word
advanced pdf to jpg converter; convert pdf pictures to jpg
VB.NET Word: Word to JPEG Image Converter in .NET Application
NET example below on how to convert a local use DOCXDecoder open a word file Dim pageCount provide powerful & profession imaging controls, PDF document, image
convert pdf to jpg c#; convert pdf into jpg
and forward linkages, collection of produce and transportation to the 
facility arrangement etc. 
(v)  In the Detailed Project Report (DPR) cost of land, margin money, 
working capital, contingencies, cost escalation, external electrification 
etc should be clearly and separately mentioned as these expenditures 
are not eligible for consideration of reimbursement from APEDA and 
have to be brought in by the Implementing agency. 
(vi) The DPR should clearly bring out the likely end users of the facility . 
(vii) The DPR should be based on National Horticulture Mission 
(NHM)/National Horticulture Board (NHB)/ National Council for Cold 
Chain Development (NCCD)/ or any other Government agency   norms 
for cold chain systems viz refrigeration (ozone protecting refrigerants 
like R-104A/404A), pre-cooling, cold store, civil work. 
(viii) The project cost should also be supported by a cost  estimate from 
Chartered Engineer/Civil Architect for civil work and  proforma 
invoices/quotations from suppliers of plant and machinery, 
electrification, water supply arrangement etc. 
(ix) APEDA will consider providing assistance up to 90% of the project cost  
excluding land. However, the upper ceiling for reimbursement will be 
decided by APEDA depending upon the availability of funds and other 
considerations. The balance requirements will have to be mobilized by 
the project proponent from other sources and commitments in this 
regard should be communicated to APEDA before the sanction of funds. 
(x) The DPR should also be submitted with a confirmation letter from the 
State Government/Public Sector Agency about funding at least 10% 
project cost component. 
(xi) Confirmation from Implementing Agency that necessary support 
infrastructure like connecting roads, electricity, water supply etc would 
be arranged by them . 
(xii)  For Common Infrastructure Facilities under the component for 
Infrastructure Development, advance may be released in consonance 
with the terms of payment to be stipulated under the Model 
Memorandum of Understanding (MoU) (Annexure-2). Subsequent 
remittances will be against submission of running bills duly certified by 
a financial authority e.g. CA/DDO etc and in consonance with the terms 
of payment stipulated under the MoU. The MoU is an important 
instrument and compliance with all terms and conditions must be 
ensured by the parties. The facility should have a clear schedule for 
completion not exceeding 24 months (including tendering process) 
VB.NET Create PDF from images Library to convert Jpeg, png images
Components to batch convert PDF documents in Visual Basic .NET class. If you want to turn PDF file into image file format in VB.NET class, then RasterEdge
convert pdf picture to jpg; convert pdf into jpg format
VB.NET PDF insert image library: insert images into PDF in vb.net
Save changes to existing PDF file or output a new PDF file. Insert images into PDF form field in VB.NET. to provide users the most individualized PDF page image
changing pdf to jpg file; changing pdf to jpg
B - For establishment of common infrastructure facility in PPP mode:     
Operating Guidelines under preparation.  
Processing of Common Infrastructure Proposals 
(i)  The project proposal  will be evaluated by  a Technical Committee (TC) 
constituted by APEDA. 
(ii)  If the proposal is approved by the TC, the same will be placed before 
APEDA Authority for approval. 
(iii) After sanction of the proposal by the Authority, an MoU will be signed 
between APEDA and the  Implementing Agency (Anmnexure-2).  
(iv)  The responsibility of running, operation and maintenance of the project 
and all statutory liabilities (legal or financial) accruing from „The project‟ 
rest with the Implementing Agency and in strict accordance with the 
terms and conditions of the MoU 
PART-II  INFRASTRUCTURE DEVELOPMENT:   Assistance   to  
Registered Exporters 
A.  Assistance for specialized Transport vehicles: 
(i) 
The beneficiaries are registered Exporters.  
(ii) 
For availing assistance, in Principle Approval (IPA) is required. 
(iii)  Pattern of assistance : 40% of the cost subject to a ceiling of Rs 
7.50 lakhs per vehicle per beneficiary per annum (maximum 3 
vehicles in the Plan Period) 
(iv)  The application should be accompanied by clear proforma 
invoices/ quotations for the three components of the reefer van viz 
(a) chassis  with make and model (b) container with make and 
model (c) refrigeration. 
(v)  The quotation/Proforma Invoice (PI) should be on the letter head of 
the supplier duly signed by the authorized signatory and must 
provide component wise costs along with validity and other terms 
and conditions. 
(vi)  In case the beneficiary intends to purchase specialized transport 
for other purposes, details of the intended purpose   along with 
invoices/quotations shall be submitted. 
PART II (B) : Assistance for all APEDA scheduled products : The maximum 
amount that can be availed under Part II(B)   will not exceed Rs 75.00 lakhs 
per beneficiary per Plan period. 
B.1. Intermediate storage shed :  
(i) 
The beneficiaries are registered Exporters. 
(ii) For availing assistance, in Principle Approval (IPA) is required. 
(iii) Pattern of assistance : 40% of the cost of equipment subject to a 
ceiling of Rs 10.00 lakhs per beneficiary per Plan period. 
(iv)  The civil estimate duly certified by Chartered Engineer/Civil 
Architect should be submitted clearly specifying the overall size of 
the shed (LXWXH). 
(v)    The application should clearly indicate the grading/cleaning 
/storage operations to be carried out for the produce to be handled 
(vi)   The equipment would include puff panels/pre fabricated panels 
etc. 
B.2 (a).   Mechanized handling facilities :  
(i) 
The beneficiaries are registered Exporters. 
(ii) 
For availing assistance in Principle Approval (IPA) is required. 
(iii)  Pattern of assistance : 40% of the cost of equipment subject to a 
ceiling of Rs 25.00 lakhs per beneficiary per Plan period. 
(iv)   Proforma invoices/Quotations from suppliers of equipment along 
with make and model , validity and other terms and condition. The 
quotation/PI should be on the letter head of the supplier duly 
signed by the authorized signatory and must provide component 
wise costs . 
N.B: Assistance for Packaging  implies assistance for box sealing /formation 
machines only  
B.2(b)  Pre-cooling facilities with proper  air handling system as well as 
cold storage for storing the perishable produce 
(i) 
The beneficiaries are  registered Exporters.  
(ii) 
For availing assistance, in Principle Approval (IPA) is required. 
(iii)  Pattern of assistance : 40% of the cost of equipment subject to a 
ceiling of Rs 25.00 lakhs per beneficiary per Plan period. 
(iv)  Proforma invoices/Quotations from suppliers of equipment 
specifying make and model  of the pre-cooling and refrigeration 
equipment and the refrigerant to be used; along with validity and 
other terms and condition. The quotation/PI should be on the 
letter head of the supplier duly signed by the authorized signatory 
and must provide component wise costs. 
(v)  Civil estimate duly certified by Charted Engineer/Civil Architect for 
cold store and refrigeration equipment and the refrigerant to be 
used 
(vi)  Stand alone cold storages will not qualify for assistance. However, 
setting up of stand alone pre cooling facility  as expansion project 
in an existing facility can be considered after ensuring that the 
existing cold storage capacity is sufficient to meet the requirement 
entailed with the new pre cooling facility within the overall ceiling 
provided under the sub-component.  
B.2(c): Facilities for treatment such as fumigation, X-ray screening and 
other screening/detection equipment, hot water dip treatment, water 
softening plant :  
(i) 
The beneficiaries are registered Exporters.  
(ii) 
For availing assistance, in Principle Approval (IPA) is required. 
(iii) Pattern of assistance : 40% of the cost of equipment subject to a 
ceiling of Rs 25.00 lakhs per beneficiary per Plan period. 
(iv) Proforma invoices/Quotations from suppliers of equipment 
specifying make and model along with validity and other terms and 
conditions. The quotation/PI should be on the letter head of the 
supplier duly signed by the authorized signatory and must provide 
component wise costs.   
(v)    Water softening plant here implies industrial type for production 
purposes and not a portable kitchen use type. Therefore, for Water 
softening plant technology and technical aspects must be clearly 
indicated .  
(vi)  Detailed product literature/technical brochure should also be  
submitted 
B.2(d):  Setting up of integrated post harvest-handling system (pack house 
with any two or more of the above facilities):  
(i) 
The beneficiaries are registered Exporters.  
(ii) 
For availing assistance, in Principle Approval (IPA) is required. 
(iii) 
Pattern of assistance : 40% of the cost subject to a ceiling of         
Rs 75.00 lakhs per beneficiary per Plan period. 
(iv) The DPR should be based on NHM/ NHB/NCCD/  any other 
Government agencies‟  norms for cold chain systems viz 
refrigeration,  pre-cooling, cold store, civil work available at the link 
http://www.nhb.gov.in/technical_standards.html 
(v)  Proforma invoices/Quotations from suppliers of equipment 
specifying make and model along with validity and other terms and 
condition. The quotation/PI should be on the letter head of the 
supplier duly signed by the authorized signatory and must provide 
component wise costs.   
(vi)  Detailed product literature/technical brochure should also be 
submitted 
10 
(vii)  Civil estimate duly certified by Charted Engineer/Civil Architect for 
high humidity cold store and refrigeration equipment and the 
refrigerant to be used. 
(viii) Where the project is linked to Bank loan/term loan, project 
appraisal report from the bank should be sent with the application. 
In case of self-financed projects, appraisal of the project by a 
Financial Institution/Bank/Recognized Financial consultant should 
be submitted. 
B.3. Setting up of cable cars (covering minimum of 50 ha of plantation) for 
banana and other crops (as decided by APEDA):  
(i)   The beneficiaries are registered  Exporters. 
(ii)   For availing assistance, in Principle Approval (IPA) is required. 
(iii)  Pattern of assistance : 40% of the cost subject to a ceiling of Rs 75.00 
lakhs per beneficiary per Plan period. 
(iv)   Quotations/proforma invoices from the supplier clearly indicating the 
number of cable hook system or any other technology that may be 
developed from time to time  along with their suspension and 
propulsion mechanism, the component wise cost structure , after sale 
service, operation and maintenance system,  transmission speed etc. 
(v)  Detailed product literature/technical brochure should also be 
submitted: 
B.4. Setting up of vapour heat treatment, electronic beam processing or 
irradiation facilities:  
i. The beneficiaries are registered Exporters.  
ii. For availing assistance, in Principle Approval (IPA) is required. 
iii. Pattern of assistance : 40% of the cost subject to a ceiling of Rs 50.00 
lakhs per beneficiary per Plan period. 
iv. Detailed Quotation /  Proforma invoice from supplier .  
v. For irradiation facilities statutory approvals from Ministry of 
Environment & Forests / Atomic Energy Regulatory Board (AERB) 
vi. For VHT, proper description of the technology and equipment details.  
vii. Detailed product literature/technical brochure should also be submitted 
B.5  Assistance for setting up of environment control system e.g.    
pollution control, effluent treatment etc:  
(i) 
The beneficiaries are registered Exporters.  
(ii) 
For availing assistance, in Principle Approval (IPA) is required. 
(iii)  Pattern of assistance : 40% of the cost subject to a ceiling of Rs 
35.00 lakhs per beneficiary per Plan period. 
(iv)  Performa invoices/Quotations from suppliers of equipment 
specifying make and model along with validity and other terms and 
conditions. 
Documents you may be interested
Documents you may be interested