114 
Figure 5 
By selecting “Team Leader” you will see a list of survey group staff members. See Figure 6. 
Team leader:  A team leader is a person currently assigned a work task item within a work 
order. Until their task is completed/reassigned, they will be listed as “Team Leader”.  
You can see in Figure 6 below a list of team leaders, i.e. “Team Leader : GT – Doe (12)”. The 
first item after the colon is the abbreviated job title of the team leader followed by the dash and 
last name of the team leader. The number in parenthesis (#) is the current number of work 
orders the team member has been assigned. 
Convert from pdf to jpg - Convert PDF to JPEG images in C#.net, ASP.NET MVC, WinForms, WPF project
How to convert PDF to JPEG using C#.NET PDF to JPEG conversion / converter library control SDK
best way to convert pdf to jpg; change pdf to jpg online
Convert from pdf to jpg - VB.NET PDF Convert to Jpeg SDK: Convert PDF to JPEG images in vb.net, ASP.NET MVC, WinForms, WPF project
Online Tutorial for PDF to JPEG (JPG) Conversion in VB.NET Image Application
convert pdf to jpeg; change pdf to jpg
115 
Figure 6 
By selecting “Status” the user will see a listing of the current status for all open work orders. 
See Figure 7  
Figure 7 
Online Convert Jpeg to PDF file. Best free online export Jpg image
Online JPEG to PDF Converter. Download Free Trial. Convert a JPG to PDF. You can drag and drop your JPG file in the box, and then start
convert pdf pages to jpg online; convert pdf file to jpg
Online Convert PDF to Jpeg images. Best free online PDF JPEG
Download Free Trial. Convert a PDF File to JPG. Easy converting! We try to make it as easy as possible to convert your PDF files to JPG.
change format from pdf to jpg; convert pdf file into jpg
116 
The alpha codes in parenthesis have the following designations: 
(A) Administration 
(F) Field 
(O) Office 
- ### - represent Supervisor status items:  
-TBA- = To Be Archived 
-TBC- = To Be Closed 
- TBD- = To Be Delivered 
-TBR- = To Be Reviewed 
*?????*  represents a status that is neither office or field, it is used for outsourced projects when 
they are assigned to a consultant. 
By selecting “Request Types” from the views window, the user will now see a list of all the 
request types used for open and closed work orders, the number in parenthesis indicates the 
number of work orders having that type of request. 
C# Image Convert: How to Convert Adobe PDF to Jpeg, Png, Bmp, &
This demo code just converts first page to jpeg image. String inputFilePath = @"C:\input.pdf"; String outputFilePath = @"C:\output.jpg"; // Convert PDF to jpg.
convert multi page pdf to jpg; convert pdf to jpg
C# Image Convert: How to Convert Tiff Image to Jpeg, Png, Bmp, &
RasterEdge.XDoc.PDF.dll. This demo code will convert first page to jpeg image. C:\input.tif"; String outputFilePath = @"C:\output.jpg"; // Convert tiff to jpg.
convert pdf page to jpg; change pdf file to jpg online
117 
Once “Request Type” is selected your screen will look similar to the screen in Figure 8 below. 
The numbers in parenthesis are the total number of work orders for that request type. 
Figure 8 
By selecting “Public Requests” the user will see a list of work orders that were performed as 
public requests. See Figure 9 
C# Create PDF from images Library to convert Jpeg, png images to
Batch convert PDF documents from multiple image formats, including Jpg, Png, Bmp, Gif, Tiff, Bitmap, .NET Graphics, and REImage.
pdf to jpg converter; convert multipage pdf to jpg
VB.NET PDF Convert to Images SDK: Convert PDF to png, gif images
Resize converted image files in VB.NET. Convert PDF to Jpg, Png, Bmp, Gif, Tiff and Bitmap in ASP.NET. Embed PDF to image converter in viewer.
batch pdf to jpg; convert pdf file to jpg online
118 
Figure 9 
The Admin section of the Home Screen is only used by authorized individuals to add new 
Members, Job Names, Parcel information and other data to the program to make it available 
during work order entry. 
Work Order 
The following will illustrate the different tabs and functions within any given work order in 
“Geomatics Services” 
Project Scope Tab  
Select a job name from the pull down menu 
or request a new name be created by 
assigning the new work order to a survey 
administrator with a comment
regarding the 
name you would like created (should match 
PIMS if applicable)
This area is usually 
populated by the 
requestor. If not, 
simply enter the
requestor's name 
and the other fields
automatically 
populate. 
When a new work order is saved for the first 
time the Work Order # gets assigned 
automatically. It is not visible until the work 
order is saved. 
This area is for land 
acquisition and is 
usually filled in by 
requestor. An 
administrator will 
need to set up the 
Parcel number data 
in order for it to be 
available in the list. 
Charge code information 
These areas are populated by 
the team leader.
These areas are populated by the 
requester or team leader.
Fill this area out if the work order is a public 
request for historical data. Fill in as much 
information as possible. 
Blue boxes with white arrows are scroll boxes 
and offer predefined selections or a calendar for 
dates. This is typical for all of “Geomatics 
Services”. 
C# TIFF: C#.NET Code to Convert JPEG Images to TIFF
Use C# Code to Convert Jpeg to Tiff. string[] imagePaths = { @"C:\demo1.jpg", @"C:\demo2.jpg", @"C:\demo3.jpg" }; // Construct List<REImage> object.
convert multiple page pdf to jpg; reader convert pdf to jpg
JPEG to PDF Converter | Convert JPEG to PDF, Convert PDF to JPEG
Convert JPEG (JPG) Images to, from PDF Images on Windows. Features and Benefits. Powerful image converter to convert images of JPG, JPEG formats to PDF files;
change pdf into jpg; convert pdf to jpg file
119 
Public Request Tab 
Description of work is a required field. It is 
typically filled in by the requester; however, 
additional information should be added by the 
team leader. A general overview of work 
needing to be performed should be described. 
120 
Deliverable Data Tab 
Scroll through and select a status that best 
describes the work order's current status. If you 
are not working on a work order its status 
should be set to a “Pending” type.  
(A) = Administration status 
(F) = Field status 
(O) = Office status 
-X- = to be used when sending to 
supervisor for an action: 
-TBA- = To Be Archived 
-TBC- = To Be Closed 
-TBD- = To Be Delivered 
Datum, GNSS, Field Books, 
Product Date: Last Revision Date: 
Survey Date:, Certified By: are all 
filled out prior to peer review. Scroll 
down and select all that apply.  
Field Books: will use the following 
format:  book no./pages (i.e. 19-
200/15-35).   This does not apply to 
outsourced vendor field books, 
simply type ”vendor” if that is the 
case. 
Counties: these should be selected and 
entered when the work order is first 
created. Select all that apply. 
Section Township and Range should be 
filled out when work order is first created 
and double checked prior to peer review
Select all that apply.
Team Members: be sure to add your name 
here when a work order is assigned to you. 
This is important to keep track of the work 
orders you have worked on at review time. 
121 
Quantities Tab 
Once edit is selected one can 
populate the following fields with 
the appropriate data 
Select the appropriate quantities 
item and input a number for 
quantity or units which ever 
applies. 
This area filled out for in-house 
projects only (District staff 
performed the field and office 
survey work). Enter the primary 
control i.e. NGS stations that 
project control is based on be sure 
to include PID. Enter Secondary 
control i.e. local municipality, 
county control stations. 
Acres: enter known acreage total 
for boundaries of 
acquired/surplused lands 
easements etc. 
122 
Field Instructions Tab 
Select edit and then select “Add Field Instructions” button, this will bring up a text editor box, 
field instructions should be a detailed outline of the survey field items needed. This area will be 
filled in by the project surveyor. Instructions should be clear and concise. 
This is the text box for entering 
field instructions. 
Once the work order is saved 
geomatics will date stamp the 
entry and the author’s name will 
appear as seen above. 
123 
Additional Info Tab 
The “Additional Info” tab works similar to the “Field Instructions” tab, once edit is selected a text 
box appears, the user can then add additional information about the project that does not fit 
other tabs or formats, such as purchase order number for outsourced projects. 
Documents you may be interested
Documents you may be interested