Key points     
165
8
Good project planning and communication can help you avoid or mitigate these 
and other problems that arise in project execution‮ For example, developing proper 
task durations and status-reporting periods should help you identify tasks that have 
varied substantially from baseline early enough to make adjustments‮ Having well-
documented and well-communicated task-completion criteria should help prevent 
downstream surprises‮ Nevertheless, large, complex projects will almost always vary 
from the baseline‮
+
CLEAN UP
Close the Simple Tracking file. 
Key points 
Before tracking actual work in a plan, you should set a baseline‮ This provides you 
with a snapshot of your initial plan‮
After recording progress in your plan, you can then compare the plan as currently 
scheduled with its baseline‮ This is one way to tell whether your project is on track‮
When recording progress in a plan, you have a range of options, including  tracking 
progress as scheduled, by percent complete, or by actual work, start, finish, or 
duration values‮
Reader combine pdf pages - Merge, append PDF files in C#.net, ASP.NET, MVC, Ajax, WinForms, WPF
Provide C# Demo Codes for Merging and Appending PDF Document
add pdf files together online; pdf combine two pages into one
Reader combine pdf pages - VB.NET PDF File Merge Library: Merge, append PDF files in vb.net, ASP.NET, MVC, Ajax, WinForms, WPF
VB.NET Guide and Sample Codes to Merge PDF Documents in .NET Project
merge pdf; merge pdf files
C# PDF: C#.NET PDF Document Merging & Splitting Control SDK
List<BaseDocument> docList, String destFilePath) { PDFDocument.Combine(docList, destFilePath); }. For example, if the target PDF file has 8 pages and you
how to combine pdf files; c# merge pdf files
C# PDF File Split Library: Split, seperate PDF into multiple files
which C# developers can split target PDF document file by specifying a page or pages. If needed, developers can also combine generated split PDF document files
add multiple pdf files into one online; add pdf together
Advanced 
Scheduling 
Techniques
9 Advanced task scheduling 
168
10 Fine-tuning task details 
198
11 Fine-tuning resource and assignment 
details 
216
12 Fine-tuning the Project plan 
248
13 Organizing project details 
274
14 Tracking progress on tasks and  
assignments 
298
15 Viewing and reporting project status 
322
16 Getting your project back on track 
342
C# Word - Merge Word Documents in C#.NET
Combine and Merge Multiple Word Files into One Using C#. This part illustrates how to combine three Word files into a new file in C# application.
pdf merger online; acrobat combine pdf
C# PowerPoint - Merge PowerPoint Documents in C#.NET
Combine and Merge Multiple PowerPoint Files into One Using C#. This part illustrates how to combine three PowerPoint files into a new file in C# application.
combine pdfs online; pdf combine
Chapter at a glance
Relate
Change how tasks are related to each other, 
page 170‮
Constrain
Apply constraints to control when tasks can 
be scheduled, page 179‮
Interrupt
Interrupt work on a task, page 185‮
Control
Fine-tune how Project responds to schedule 
changes, page 191‮
VB.NET PDF Page Insert Library: insert pages into PDF file in vb.
add and insert one or multiple pages to existing RasterEdge XDoc.PDF SDK is compatible with Visual Studio ways to create VB application to combine .NET Imaging
pdf merge files; combine pdf online
VB.NET PDF: Use VB.NET Code to Merge and Split PDF Documents
VB.NET program and it includes all pages information in APIs for Merging PDF Documents in VB.NET. Private Sub Combine(source As List(Of BaseDocument), destn As
c# combine pdf; all jpg to one pdf converter
9
169
IN THIS CHAPTER, YOU WILL LEARN HOW TO
Visually highlight a task’s predecessors and successors‮
Adjust task links for more control over how tasks are related‮
Apply a constraint to a task‮
Split a task to record an interruption in work‮
Create a calendar and apply it to a task‮
Change a task type to control how Project schedules tasks‮
In Part 3, ”Advanced scheduling techniques,” you’ll complete a full project life cycle 
( planning, tracking progress, and responding to variance) as you did in Part 2, “Simple 
scheduling basics‮” In Part 3, however, you dive deeper into the Microsoft Project 2013 
feature set to handle more complex needs‮ This chapter and the next one introduce you to 
a broad feature set that focuses on a deeper level of task management‮ This chapter focuses 
on core task scheduling features, including task links, constraints, and task types‮
PRACTICE FILES
Before you can complete the exercises in this chapter, you need to copy 
the book’s practice files to your computer. A complete list of practice files is provided in 
“Download the practice files” at the beginning of this book. For each exercise that has a 
practice file, simply browse to where you saved the book’s practice file folder.
IMPORTANT
If you are running Project Professional with Project Web App/Project Server, take 
care not to save any of the practice files you work with in this book to Project Web App (PWA). For 
more information, see Appendix C, “Collaborating: Project, SharePoint, and PWA‮”
Advanced task 
scheduling
VB.NET Image: Barcode Reader SDK, Read Intelligent Mail from Image
How to combine PDF Document Processing DLL with Barcode As String = FolderName & "Sample.pdf" Dim reImage own customized Word Intelligent Mail Barcode Reader.
attach pdf to mail merge in word; how to combine pdf files
VB.NET PowerPoint: Merge and Split PowerPoint Document(s) with PPT
Just like we need to combine PPT files, sometimes, we also the split PPT document will contain slides/pages 1-4 If you want to see more PDF processing functions
acrobat merge pdf files; add pdf pages together
170
Chapter 9 Advanced task scheduling 
See task relationships with Task Path
When fine-tuning task relationships, you need to keep track of the predecessor tasks that 
affect the scheduling of their successor tasks‮ In complex plans, visually identifying prede-
cessor and successor relationships is not always easy‮ This is especially true when a task has 
multiple predecessors or successors‮ 
Project 2013 introduces a feature called Task Path that applies color formatting to the Gantt 
bars of the selected task’s predecessor and successor tasks‮ Task Path can also  distinguish a 
task’s driving predecessor (the predecessor that directly determines, or drives, the start date 
of the task) from that task’s other predecessors‮ (Predecessor tasks that can slip without 
rescheduling their successor tasks are said to have slack, described in detail in Chapter 10, 
“Fine-tuning task details‮”) The Task Path feature can also do the same for driving successor 
tasks‮
The scenario: At Lucerne Publishing, at an upcoming team meeting you’d like to 
demonstrate some of the more complex task dependencies in a new children’s book plan‮ 
In this exercise, you use the Task Path feature to see predecessor and successor tasks‮
SET UP
You need the Advanced Tasks_Start file located in your Chapter09 practice file 
folder to complete this exercise. Open the Advanced Tasks_Start file, and save it as Ad-
vanced Tasks. 
Vertically scroll the task list until task 16, Proofread and index, is near the top‮ 
See task relationships with Task Path    
171
9
Now you’ll more easily see the results of your next actions‮ 
Click the name of task 29, Send to color house
You’d like to identify this task’s predecessor and successor tasks‮
On the Format tab, in Bar Styles group, click Task Path and then click Predecessors‮
Project applies a gold highlight formatting to the Gantt bars of task 29’s predecessor 
tasks‮
As you can see in the view, task 29 has a chain of predecessor tasks‮ Next you’ll take a 
closer look at the predecessor tasks that directly affect the scheduling of task 29‮
On the Format tab, in the Bar Styles group, click Task Path and then click Driving 
Predecessors‮
Project applies a dark orange highlight formatting to the Gantt bars of this task’s 
driving predecessor tasks‮
172
Chapter 9 Advanced task scheduling 
Some of the predecessor tasks directly drive the scheduling of task 29, and are 
referred to as driving predecessors (task 24 is one example)‮ Other predecessor tasks 
have some amount of slack between them and task 29 (task 27 for example)‮ 
In addition to predecessor highlighting, you can also use Task Path to highlight the 
selected task’s successor tasks‮
With task 29 still selected, on the Format tab, in Bar Styles group, click Task Path and 
then Successors‮
Project applies a light purple highlight formatting to the Gantt bars of this task’s 
successor tasks‮ These are tasks 30 and 31‮
Adjusting task link relationships    
173
9
Now the predecessor, driving predecessor, and successor task highlighting is turned 
on for the selected task‮ Next you’ll see these highlights for another task‮
Select the name of task 22, Proof and review
Project applies highlight formatting to the Gantt bars of this task’s predecessor, 
driving predecessor, and successor tasks‮
To conclude this exercise, you’ll turn off the highlighting and change the zoom level‮
On the Format tab, in the Bar Styles group, click Task Path and then click Remove 
Highlighting‮
On the View tab, in the Zoom group, in the Timescale box, click Days‮
When you’re working in a complex project, you can turn on Task Path highlighting to help 
you quickly visually identify predecessor and successor tasks‮ The different color highlight-
ing for driving predecessor and successor tasks is especially useful when you’re focused on 
managing the overall duration of a sequence of linked tasks‮
Adjusting task link relationships
You might recall from Chapter 4, “Building a task list,” that there are four types of task 
dependencies, or relationships:
Finish-to-start (FS) The finish date of the predecessor task determines the start 
date of the successor task‮
174
Chapter 9 Advanced task scheduling 
Start-to-start (SS) The start date of the predecessor task determines the start date 
of the successor task‮
Finish-to-finish (FF) The finish date of the predecessor task determines the finish 
date of the successor task‮
Start-to-finish (SF) The start date of the predecessor task determines the finish 
date of the successor task‮
When you link tasks in Project, they are given a finish-to-start relationship by default. This 
is fine for many tasks, but you will most likely change some task relationships as you fine-
tune a plan‮ The following are some examples of tasks that require relationships other than 
finish-to-start:
You can start setting pages as soon as you start illustration work on a book project (a 
start-to-start relationship)‮ This reduces the overall time required to complete the two 
tasks, because they are completed in parallel‮
Planning the editorial work for a book can begin before the manuscript is complete, 
but it cannot be finished until the manuscript is complete. You want the two tasks to 
finish at the same time (a finish-to-finish relationship).
Task relationships should reflect the sequence in which work should be performed. After 
you have established the correct task relationships, you can fine-tune your schedule by 
entering overlap (called lead time) or delay (called lag time) between the finish or start 
dates of predecessor and successor tasks‮
When two tasks have a finish-to-start relationship
Lead time causes the successor task to begin before its predecessor task concludes‮
Lag time causes the successor task to begin sometime after its predecessor task 
concludes‮
The following is an illustration of how lead and lag time affect task relationships‮ Assume 
that you initially planned the following three tasks using finish-to-start relationships.