14.2 Settings 
Options > Settings
These settings stay put after closing a project. 
Projects
• 
On the worksheet, Projects, you can specify with which project the programme 
should open. You can select that either a new project or the last project worked on 
appears each time the programme is started. 
• 
“No monitoring of project components” gives you the option of selecting that 
various Messages appear (click on field) or do not appear (leave field blank) during 
programme use: 
• 
Select a standard feed-in tariff for new projects. This should be an .eta-file. The 
selected tarifr is displayed. 
• 
Select either metric or imperial (U.K.) units. 
see Project Design. 
System Check
Here you can enter the settings that are required for the System Check. 
Temperature and irradiation maximums are usually calculated from the Climate data file. 
However, if you are certain about the maximum values that you wish to use as the basis for 
system calculation, you can enter these as the set values. 
Background Image
Define whether the current system or an uploaded image should be the program 
background.  
Load an image for grid connected systems and stand-alone systems, each. 
Calculation Model
Select whether the Dynamic Temperature Model or the Linear Temperature Model is to be 
used. 
Please note that these setting remain in force after you exit the project. 
Project report
Define your company's contact data for the project report. 
Define Company Logo for Project Report Heading 
Select a logo to appear in the header of the project report.  
If you select “
Show Company Logo on Screen
”, the logo appears on PV*SOL’s main screen 
as a background image. 
Pdf merger online - Merge, append PDF files in C#.net, ASP.NET, MVC, Ajax, WinForms, WPF
Provide C# Demo Codes for Merging and Appending PDF Document
add multiple pdf files into one online; batch pdf merger
Pdf merger online - VB.NET PDF File Merge Library: Merge, append PDF files in vb.net, ASP.NET, MVC, Ajax, WinForms, WPF
VB.NET Guide and Sample Codes to Merge PDF Documents in .NET Project
acrobat reader merge pdf files; c# merge pdf files
PV*SOL Expert 6.0  -  Manual  
200 
Update Check
-> Prerequisite: active internet connection 
Proxy settings: PV*SOL Expert is using your computer's system proxy settings to connect 
to the network. 
-> The program checks whether a new update is available on the server according to the 
settings on the page Internet update: 
• 
Daily at first program start 
• 
Or on clicking 
Check now …
• 
If you are using a proxy server, you can enter the required settings here.    
• 
If a new release or new databases are available, the program will close and the 
installation program will be downloaded to the Desktop and run from there. 
-> See also: 
Message: ... Database file ... 
Database Monitoring System 
C# PDF: C#.NET PDF Document Merging & Splitting Control SDK
SDK > C# > Merge and Split Document(s). "This online guide content ". C# PDF Merging & Splitting Application. This C#.NET PDF document merger & splitter
pdf merger; add pdf files together
C# Word: .NET Merger & Splitter Control to Merge & Split MS Word
From this online article, you will know C#.NET MS Word document merging and RasterEdge C#.NET MS Word (DOCX) document merger & splitter control add-on. C#
combine pdf online; build pdf from multiple files
201 
14.2.1 Message: ... Database file ... 
The database file has been changed! Load file data into your project? 
Components from the corresponding Database are loaded from the dialogs: Tariffs, 
Polutant mix, Technical Data and the load pattern in the Electrical Appliances dialog. The 
programme loads the corresponding values and notes the file name. 
If you change the database files that have been loaded or saved in a project, the 
programme informs you before simulation, that you have made changes to the database 
file without loading the new values into the project. 
If you answer YES the project data is updated with the corresponding amended database 
data; if you answer NO the original values are retained. 
Because all the database files that are loaded into a project are checked before 
simulation, you can click on Accept All so that you only have to answer the question once. 
Cancel ends not only the data checks, but also the simulation. 
This message appears for modules and inverters, and also on opening the technical data 
dialog. 
No data checks for “To Grid Tariffs”! 
VB.NET TIFF: .NET TIFF Merger SDK to Combine TIFF Files
This online guide content is A 2: Yes, this VB.NET TIFF merger SDK allows developers to to provide powerful & profession imaging controls, PDF document, image
acrobat split pdf into multiple files; add pdf pages together
VB.NET Word: Merge Multiple Word Files & Split Word Document
Word processing and editing controls, this VB.NET Word merger and splitter are dedicated to provide powerful & profession imaging controls, PDF document, image
combine pdf files; all jpg to one pdf converter
202 
14.2.2 Database Monitoring System 
When a mismatch is uncovered by the database monitoring system, a corresponding 
message appears on screen. For example: 
In PV Array 1 no module file has been selected from the database! Do you want to 
select a PV module? 
If so click on the PV Module button. 
The database file for the module 
data in PV Array 1 no longer exists! 
Do you want to save the data to a new file? 
The database file 
c:\pvsol\biblio\module\mei76.mod 
has been changed! 
Load file data into your project? 
Checks 1 and 2 take place when the corresponding dialog (Tariffs, Technical Data, 
Appliances) is closed with ”OK”. These messages are for information and can be closed 
by clicking on ”No”. 
Check 3 takes place before simulation and, for modules and inverters, additionally when 
the ”Technical Data” dialog is opened. 
It is best to answer ”Yes” to the question ”Load file data into your project?” (except in 
the instance when you open an old project and want to simulate the old conditions), or 
to select ”Accept All” beforehand. (see Message: ... Database File...). 
C# PDF: C# Code to Process PDF Document Page Using C#.NET PDF
C# PDF Page Processing: Sort PDF Pages - online C#.NET tutorial page for C# PDF Page Processing: Merge PDF Files - C#.NET PDF document merger APIs for
pdf merge documents; acrobat merge pdf files
C# PowerPoint: C# Codes to Combine & Split PowerPoint Documents
SDK is some like PowerPoint file merger in its PowerPoint files with the aid of online C# sample code powerful & profession imaging controls, PDF document, tiff
reader combine pdf; pdf combine two pages into one
203 
15 Language Menu 
PV*SOL
®
currently offers a selection of the following languages: English, French, German, 
Italian, Spanish. 
VB.NET TIFF: Merge and Split TIFF Documents with RasterEdge .NET
Besides TIFF document merger and splitter, RasterEdge still In our online VB.NET tutorial, users can powerful & profession imaging controls, PDF document, tiff
batch pdf merger online; adding pdf pages together
VB.NET PowerPoint: Merge and Split PowerPoint Document(s) with PPT
here is what you are looking for - RasterEdge VB.NET PPT Document Merger and Splitter Note: If you want to see more PDF processing functions in VB.NET, please
pdf merge comments; reader combine pdf pages
204 
16 Help Menu 
Menu 
Help
Contents
opens the help  -  You always get context-sensitive help using the F1 key. 
Click 
Internet Service
in order to   
• 
download an 
Order Form
 
• 
visit the 
Valentin Energiesoftware
homepage, which is opened in your internet 
browser or  
• 
check for Updates
of the program or the databases.  
Manual 
opens the manual as .pdf file 
Manual 3D Visualization 
opens the manual for design using the 3D visualization as .pdf 
file 
Under 
Help > Info
, you will find 
General information
Further information
Registration
Program and release 
number, contact data for Dr. 
Valentin EnergieSoftware 
GmbH. 
View licence contract 
Version numbers for all 
program files, automatically 
gathered information on 
your operating system and 
hardware. 
Register by entering the 
serial number and activation 
code. If you have an internet 
connection, you can register 
here or access an order form 
on our website. 
Change the PV*SOL Expert version by using the 
Change Registration
button. 
For example, this is necessary if you want to convert a time-limited version to a full 
version, or the Grid-Connected-Only version to the version for both Grid Connected and 
Stand-Alone Systems. 
205 
17 Glossary 
Array – see PV Array. 
Back-up Generator – Direct Energy Use 
If a back-up generator is specified in the system configuration, the energy generated by 
the back-up generator and the energy used directly by the appliances is identified. With 
direct current appliances, the alternating current is converted to direct current by the 
battery charger. 
Back-up Generator - Energy 
The energy generated by the back-up generator includes direct energy consumption and 
the energy used to charge the battery. 
Back-up Generator – Fuel Consumption 
If a back-up generator is used, the annual fuel requirement needs to be specified. The fuel 
consumption is calculated from the energy generated by the back-up generator and the 
specific fuel requirement entered. 
Battery - Charge 
The total energy going into the battery (or the batteries) is shown. If the system is 
simulated without a back-up generator, this corresponds to the solar energy charge. 
Battery –Charge, Solar 
For systems with a back-up generator, the portion of the charge that comes from solar 
energy is given separately. The difference from the total charge comes from the back-up 
generator’s portion. 
Battery – Charge Condition 
The battery’s charge condition at the start of simulation can be defined in the system 
configuration (default = 30%) 
Battery – Content, Back-up Generator (After Simulation) 
This value appears only when a back-up generator is used. It describes the proportion of 
energy produced by the back-up generator that is available in the battery at the end of the 
simulation period. 
Battery – Content, Solar (After Simulation) 
The proportion of solar energy available in the battery at the end of the simulation period 
is given. 
Battery - Discharge 
The total energy from the battery (or the batteries) is shown. If the system is simulated 
without a back-up generator, this corresponds to the discharge of solar energy. 
PV*SOL Expert 6.0  -  Manual  
206 
Battery – Discharge, Solar 
For systems with a back-up generator, the proportion of discharge that is based on solar 
energy is given separately. The difference from the total discharge comes from the back-up 
generator’s portion. 
Battery - Losses 
Battery losses come from the battery efficiencies during charge and discharge, and self-
discharge. 
Battery - Performance Ratio 
The battery’s performance ratio is the relationship between discharge and charge. 
Charge Condition at Simulation Start/End 
The battery’s charge condition at the start of simulation (defined in the system 
configuration) and the calculated charge condition at the end of simulation is shown. 
Consumption - Requirement 
The requirement is the sum of the annual energy requirement of all defined Appliances. 
If no appliances have been defined, this value is not given. You are also able to define 
appliances if the ”Full Supply” to grid concept has been selected. 
Consumption – Covered by Solar Energy 
The consumption covered by solar energy is made up of direct energy use and the solar 
portion of the battery charge. 
Consumption – Not Covered 
The consumption requirement that cannot be covered by the system is shown as the 
amount of energy required that cannot be provided either by the PV array or by the battery. 
Electricity Production Costs 
The Electricity Production Costs are the annual costs divided by the amount of electricity 
produced. 
The annual costs result from the: Cash value of annual costs, One-off Payments, Loan 
Payments, Self-Financing 
Multiplied by the Annuity Factor.Energy Converter 
This dimension is only shown if MPP tracking is going to be used. The losses that occur 
when using an MPP tracker are subtracted from the generated energy. 
Energy Requirement - Covered by PV Generator 
This dimension is only given when the ”Own Use” concept is selected. It is the energy 
generated by the solar system that is used to cover the energy requirement of the 
appliances. 
Definitions 
207 
External Temperature 
The external temperature is a specification taken from the climate data files. It is required 
to define the module temperature, as the module efficiency is dependent on the 
temperature (see PV Module). 
Generated Solar Energy (Alternating Current Side) 
The generated solar energy (AC side) is the energy after conversion of the PV direct current 
into alternating current, which can either be fed into the grid or used to cover the load 
requirement. The energy used by the inverter itself is not taken into account. 
Generated Solar Energy (Direct Current Side) 
When designing a PV system, the energy that is produced by the PV modules is also of 
interest, ie the energy flow before entry into inverter. 
Grid, Electricity From 
If all the energy produced by the PV system is fed into the grid, the total load requirement 
and the inverter’s own consumption will have to be covered by electricity drawn from the 
grid. If the ”Own Use” concept is selected, the energy drawn from the grid is reduced by 
the proportion of PV generated energy that is used to cover the load requirement. 
Grid, Electricity To 
If the ”Full Supply” to grid concept is selected (see Tariffs), all solar energy generated is 
fed into the grid and this dimension is not given. If the ”Own Use” concept is selected, 
only the proportion of energy that is not used by the appliances is exported to the grid. 
Inverter Efficiency 
The inverter efficiency is the energy generated on the alternating current side in relation to 
the energy fed into the direct current side. 
The efficiency is made up of the Inverter Characteristic Curve, the MPP adjustment 
efficiencies (see Inverter Database) and the inverter’s own consumption. 
A very poor inverter efficiency (in comparison to maximum efficiency) is above all possible 
if the inverter is oversized or because its maximum nominal output limits the PV power 
output. 
Irradiation onto Tilted Array Surface 
The irradiation onto the tilted Array surface is the energy (after subtraction of shade) on 
the PV surface that is available for conversion. A proportion of this energy is lost through 
reflection on the module’s surface. 
Module Temperature 
There are two different Temperature Models in the programme. Module temperature 
definition is dependent on the climate data, module specific parameters and the type of 
mount. The module temperature for each array is given on each array worksheet. 
PV*SOL Expert 6.0  -  Manual  
208 
Own Consumption - PV System 
The PV system’s own consumption comes from the energy used by the inverter, when no 
PV energy is being produced. During the day, the inverter draws on the grid for its stand-by 
consumption. At night, if the inverter is not switched off completely, it also draws energy 
for night consumption. Both dimensions are entered in the characteristics for the Inverter. 
Net Present Value 
The Net Present Value is calculated from the: 
• 
Cash Value of all Annual Costs 
• 
Cash Value of all Annual Lodgements and Savings 
• 
Cash Value of Loan Payments 
• 
Cash Value of Tax Payments 
• 
One-off Payments 
• 
Subsidies 
• 
Self-Financing 
Payback Period 
The period required to get to the point when the net present value of the investment 
first becomes positive. 
Performance Ratio 
The performance ratio is a measurement of the energy losses within the system that occur 
in comparison with the system’s nominal output. The nominal output is calculated from 
the irradiation onto the tilted PV surface multiplied by the module efficiency under 
standard test conditions (25 C, 1000W/m²). 
PV Array – Direct Energy Use 
Direct energy use means the energy that flows direct (without being stored before use) to 
the appliances. With alternating current appliances, however, the energy will have to be 
converted to AC by the stand-alone system inverter, before it can be used to cover 
electricity consumption. 
PV Array – Energy Surplus 
An energy surplus occurs if the solar energy available is not required by the appliances 
and the battery is charged. 
PV Array – Generated Energy 
The generated energy is the energy exiting the PV generator. Losses through MPP tracking 
are not accounted for. These dimensions also include any PV array surplus that may occur. 