69 
10.1.2.3 Stand-alone inverter 
(stand-alone) 
System
Technical data
> option 
AC appliances
Stand-alone inverter
-> Requirement: 
If AC appliances are selected, there must be a stand-alone inverter which converts the PV 
DC into AC for them. 
-> How to proceed: 
1. Load a 
Stand-alone inverter
. The dialog 
Load file
is opened. 
2. Select an inverter. 
If the desired inverter is not available, please enter it via 
Database > Inverter/ For 
stand-alone systems
Exit the dialog with 
OK
3. The following data are displayed:  
AC power rating, maximum output of power consumers, installed PV output, 
nominal DC voltage, battery voltage
The AC power rating of the inverter should match the maximum output of the 
appliances 
The nominal DC voltage should match the battery voltage. 
Pdf merge documents - Merge, append PDF files in C#.net, ASP.NET, MVC, Ajax, WinForms, WPF
Provide C# Demo Codes for Merging and Appending PDF Document
pdf merge comments; best pdf combiner
Pdf merge documents - VB.NET PDF File Merge Library: Merge, append PDF files in vb.net, ASP.NET, MVC, Ajax, WinForms, WPF
VB.NET Guide and Sample Codes to Merge PDF Documents in .NET Project
pdf mail merge plug in; pdf split and merge
70 
10.1.2.4 Battery 
(stand-alone) 
System
Technical data
Battery
The type and number of batteries are defined on the "
Battery
" page. 
-> How to proceed: 
1. Open a Battery from the database. 
If the desired battery is not available there, it must be entered via the menu 
Databases > 
Battery
2. The Number and Number in series must match the nominal DC voltage of the 
inverter and the MPP trackers or the module voltages. 
- Enter the 
Number of batteries
- Enter the 
Number in series
3. a) System with Back-up generator:  
In 
Charge condition at simulation start
, enter the value 50 %. 
Calculating the suitable start condition is not possible. 
4. a) System Without back-up generator:  
Select the option 
Preliminary simulation to establish start condition
(The 
Charge 
condition at simulation start
is then ignored).  
An initial year is simulated and then December 31 used as the start value for 
January 1 of the next simulation year.  
This prevents the energy balance of the simulation being displaced by a large 
deviation in the start value of the battery charge condition after the simulation. 
C# XDoc.HTML5 Viewer- Supported File Formats
FREE TRIAL: HOW TO: XDoc.HTML5 Viewer for C#▶: C# ASP.NET: View documents; C# ASP.NET PDF to HTML; C#: Convert PDF to Jpeg; C# File: Compress PDF; C# File: Merge
acrobat reader merge pdf files; pdf combine
C# Word - Merge Word Documents in C#.NET
C# Word - Merge Word Documents in C#.NET. Provide C# Demo Codes for Merging and Appending Word Document. Overview. RasterEdge C#.NET
build pdf from multiple files; pdf merger
71 
10.1.2.5 Charge Controller 
Because of the large number of different designs, there is no database unit for special 
charge controllers in PV*SOL
®
On the ”Charge Controller” sheet an entry is made for the battery’s Lower Discharge 
Threshold. 
For your information in regard to charge controller sizing, the short circuit current at 1000 
W/m² and 50 C module temperature, and the appliances’ maximum electricity use are 
shown. 
C# PowerPoint - Merge PowerPoint Documents in C#.NET
C# PowerPoint - Merge PowerPoint Documents in C#.NET. Provide C# Demo Codes for Merging and Appending PowerPoint Document. Overview.
add pdf together one file; break pdf file into multiple files
C# PDF Print Library: Print PDF documents in C#.net, ASP.NET
FREE TRIAL: HOW TO: XDoc.HTML5 Viewer for C#▶: C# ASP.NET: View documents; C# ASP.NET PDF to HTML; C#: Convert PDF to Jpeg; C# File: Compress PDF; C# File: Merge
pdf merge; reader combine pdf pages
72 
10.1.2.6 Back-up generator 
(stand-alone) 
System
Technical data
> Option 
System with back-up generator
Back-up generator
If you plan a 
system with a Back-up generator
, a corresponding tab appears. 
The following data on the system are displayed in summary:  
PV output, gross area, active solar surface 
-> Requirement: 
On the 
System
page, the option 
System with back-up generator
is selected. 
-> How to proceed: 
1. Enter the 
Power rating
2. Enter the 
Minimum power output
of the intended back-up generator. 
A back-up generator which should always meet consumption in an emergency must be able 
to supply the maximum power of the appliances (corrected with the battery charger 
efficiency). The generator modulates between the minimum and maximum power output. 
With a single-stage generator, the minimum power output is the same as the power rating. 
3. Enter the 
Fuel consumption
. This is required to calculate pollutant emissions and 
for the Economic efficiency calculation.  
4. The 
Maximum power of the appliances
and the 
Total battery capacity
are 
displayed. 
Battery charger  
5. Enter the 
Efficiency
of the AC/DC conversion. 
6. Enter the 
Switch on threshold
(related to the nominal battery capacity), which may 
not be lower than the battery's discharge threshold (see page 
Charge controller
). 
7. Enter the 
Switch off threshold
(related to the nominal battery capacity) for the 
battery charging. 
8. Enter the 
Switching on times
for battery charging. 
The back-up generator always ensures security of supply for the appliance and 
adherence to the lower battery discharge threshold. Once the back-up generator 
has turned on due to the battery reaching the lower discharge threshold, it only 
switches off on reaching the switch off threshold. A condition for this, however, is 
that the time switch is activated. 
! As meeting the requirements of the appliances takes priority, the battery also 
charges when the generator is supplying too much energy to meet the load on 
account of its minimal power output. 
VB.NET PDF Print Library: Print PDF documents in vb.net, ASP.NET
FREE TRIAL: HOW TO: XDoc.HTML5 Viewer for C#▶: C# ASP.NET: View documents; C# ASP.NET PDF to HTML; C#: Convert PDF to Jpeg; C# File: Compress PDF; C# File: Merge
c# merge pdf; how to combine pdf files
XDoc.HTML5 Viewer for .NET, Zero Footprint AJAX Document Image
controls, PDF document, image to pdf files and components for capturing, viewing, processing, converting, compressing and stroing images, documents and more.
add two pdf files together; combine pdf
73 
10.1.3 Technical data, grid connected 
System > Technical data > PV Array / Array i
Inverter Concept  
In grid connected operation, there are systems which use a central System inverter or 
systems  
with one inverter per Array
or string and module inverters, i.e. with several inverters. 
The system inverter is defined on the 
System inverter
page.  
When designing with several inverters, the information on the inverter is part of the 
Array
page. 
Arrays 
Enter the number of arrays. 
The PV output, gross area and active solar surface are calculated and displayed. 
PV array or arrays 
On the next page(s), the 
PV array
or the arrays are specified 
System inverter 
Here, select a suitable system inverter. 
The following data are displayed: 
MPP tracking range, MPP voltages (STC) of the arrays, inverter output, system output 
-> Buttons in the right-hand area: 
• 
Click on 
Losses to 
check the influence of losses in the DC cabling. 
• 
To check the configuration of modules and inverters, click on the 
Check
button. 
• 
System diagram
shows the print preview of the system schematic also included in 
the summary report. Each array is summarized as a PV symbol and an inverter 
symbol. 
• 
Following a positive 
Check
of the system, you can start the Simulation. 
-> See also: 
Technical data, stand-alone 
Technical data 
C# PDF: C#.NET PDF Document Merging & Splitting Control SDK
file. C#.NET APIs to Combine Two or More PDF Documents. void String destn); C#.NET Sample Codes to Merge Multiple PDF Files. public void
acrobat merge pdf files; pdf merge files
VB.NET PDF: Use VB.NET Code to Merge and Split PDF Documents
VB.NET PDF - How to Merge and Split PDF. How to Merge and Split PDF Documents by Using VB.NET Code. Visual C#. VB.NET. Home > .NET Imaging
break a pdf into multiple files; c# merge pdf files
74 
10.1.3.1 System Inverter 
System > Technical data > (Inverter concept) One system inverter > System inverter
-> Requirement: 
On the 
System
page, the option 
System inverter
is selected in the inverter concept 
area. 
-> How to proceed: 
1. Select a suitable system inverter. 
2. The following data are displayed: 
MPP tracking range, 
MPP voltages (STC) of the arrays, 
Inverter output, 
System output 
75 
10.1.3.2 PV array, grid connected 
System > Technical data > PV array
The PV array is specified on this page. 
-> How to proceed: 
1. Give the array a 
Name
2. Select a 
PV module
If your desired module is not available, you must first enter it in the 
PV module
database. 
Leave the 
Load file
dialog by clicking OK. The parameters are taken over into the current 
project. 
The complete data record of the selected modules appears in an information window if the 
cursor is held over the 
PV modules
button. 
3. As required, select the option 
Create preview of roof layout with Photo Plan
.  
4. Enter the 
Installation type
: free, with rear ventilation and without rear ventilation.  
5. 
Array output
- Specify the number of modules: Enter the 
Number of modules
 
- Determine output from roof area: The Minimum distance of the rows of modules 
are calculated in the 
Roof parameters
dialog in order to minimize mutual shading 
and thus determine the number of modules from the available roof area. 
The resulting output of the array is calculated from the number of modules. 
6. 
Orientation
With the help of the 
Orientation
, the irradiation onto the horizontal surface is 
converted into irradiation to the inclined PV area. 
7. 
Inverter
Load an 
Inverter
.  
The name of the inverter appears on the right. The complete data record of the selected 
inverter appears in an information window if the cursor is held over the 
Inverter
button. 
! The 
Inverter
button and the 
Number of inverters
input field cannot be seen under 
System 
inverter
. These entries are made on the 
System inverter
page.  
If the option "
Set fixed number of modules in series when selecting 
inverter
" is selected, only those inverters which fit in series for the given 
number of modules are displayed. 
If the option "
Set fixed number of modules in series when selecting 
inverter
" is not selected, all inverters which fit in any configuration are 
displayed. After selecting the inverter, a suitable configuration can be 
selected for the number of modules in series in 
Configuration
8. Enter the Number of inverters. 
The installed inverter output and the MPP tracking range are displayed. 
9. 
Configuration per Inverter
PV*SOL Expert 6.0  -  Manual  
76 
a) Inverter with one MPP tracker: 
8.  
1. Enter the 
Number of modules in series
.  
In 
Configuration 
, all technically possible configurations are shown, 
taking into account permissible currents and voltages. 
If the option 
"
Set fixed configuration when selecting inverter
" is selected, 
all mathematically possible configurations of the modules per inverter are 
displayed, otherwise only technically relevant configurations will be 
displayed. 
9. b) Inverter with several MPP trackers: 
1. If a multi-string inverter with several independent MPP trackers was 
selected, the configuration can be entered separately for each MPP tracker 
in the 
Define multi-string configuration
dialog. 
-> See also: 
The cabling losses in the cables of the individual modules to the string distributor can be 
generally taken into account in 
Losses
77 
10.1.3.3 Number of inverters 
System > Technical data > Number of inverters
When setting the number of inverters, the installed module output and the installed 
inverter output must match. 
The following also applies: 
Number of modules per inverter = number of modules / Number of inverters 
The program only allows symmetrical configurations, the number of modules per inverter 
must be the same for all strings of an array. 
This is checked when you leave the dialog by clicking 
OK
.  
A possible error message is: 
The number of modules must be a multiple of the number of inverters. 
78 
10.1.3.4 Losses through Feed-in Management 
System > Technical data > Losses > Feed-in Management
On the basis of the 2012 EU amendment on maintaining grid stability in order to ensure 
reactive power balance between the grid and appliances, PV system operators must 
provide reactive power.  
e.g.: Grid operator requires cos 
φ = 0.9 
-> The inverter must supply 10 % more output: 90 % 
for the previous active power + 10 % for the new reactive power  
In addition, larger PV systems with > 30 kW must be remotely controllable by the grid 
operators. 
Small PV systems with < 30 kW must be limitable to 70 %. 
Reactive power feed-in 
Enter a displacement factor cos 
φ between 0.8 and 
1. 
With a factor < 1, the usable active power of the inverter will be less. 
With a cos 
φ of 0.95, only 95 %   
The inverter should therefore be sized 5 % larger. 
This is taken into account in the System check, where only the active power is entered in 
the sizing. For identification, 
cos φ
appears after the AC nominal power with a cos 
φ < 1.
If the inverter is sized too small, the simulation will reveal drops in yield. 
Feed-in limitation 
Enter a limitation in PV output of between 60 and 100 percent. 
Feed-in outputs which exceed this value with their installed PV output will be limited to 
this percentage in the simulation. 
-> Proceed as follows: 
1. Enter a displacement factor cos φ between 0.8 and 1. 
2. Select  
Maximum feed-in
Enter a limitation in PV output of between 60 and 100 percent. 
Documents you may be interested
Documents you may be interested