5
10. If Residential
: Determine heating fuel (oil, gas, electric, etc.), water heater fuel, electric range, 
air conditioning (size, if yes), total square feet, preferred electric meter location, and number of 
services.  Also, determine if any other large or special electric loads (e.g., welder or kiln) will be 
used.   
11. If General Service (Commercial/Industrial
): Electric load information (nameplate data) for all 
single-phase motors larger than 5 hp, three-phase motors larger than 10 hp, tons of air 
conditioning, kW process heat, kW lighting, kW computers, and any unusual loads. 
12. For Developments:
An approved plot plan drawn to scale showing crossroads, proposed 
structures, wells, septic, decks, drives/parking areas, pools, ponds, preferred service route, 
planned major landscape changes and future development areas, and any other known or 
proposed obstructions that may interfere with the Company supplying electrical service.   
13. Date service wanted.   
• Application for electric service can be handled by telephone as follows:  
LOCATION 
PHONE NUMBER 
New Jersey – JCP&L 
(800) 662-3115 
Ohio – Illuminating Company Area 
(800) 589-3101 
Ohio – Ohio Edison Area 
(800) 633-4766 
Ohio – Toledo Edison Area 
(800) 447-3333 
Pennsylvania – Met-Ed Area 
(800) 545-7741 
Pennsylvania – Penn Power Area 
(800) 720-3600 
Pennsylvania & New York – Penelec Area 
(800) 545-7741 
• Application for electric service can be handled though the Internet by typing 
http://www.firstenergycorp.com
and clicking on the appropriate Company link.   
• The customer/developer shall stake the location of the proposed building, the lot lines, and 
driveway location so that decisions about service location can be made.   
Line Extensions
• In order to avoid delay, persons desiring service beyond the existing electric distribution lines of the 
Company are advised to inquire of the Company the conditions under which service will be 
extended and make the necessary arrangements before wiring installations are commenced.  
Dependent on the situation and the nature of the facilities desired or required, the customer may be 
responsible for some of the construction and right-of-way costs (in Ohio, customers will be 
responsible for a percentage of the costs).
Number of Services & Meters 
• The Company will connect only one set of service conductors to a building for each class of service 
rendered.  If the building is occupied by one customer only one watt-hour meter for each class of 
service rendered will be installed except when the rate schedule under which the customer takes 
service states otherwise.  If occupied by several customers, each customer will have one meter for 
each class of service rendered.  Therefore, for each class of service, customers will be served with 
either single-phase or three-phase, but not both.  All customer installations must conform to the 
NEC and local codes.  Parallel runs of service cable extending from Company-owned equipment to 
multi-position meter centers should be avoided and require prior Company approval.   
• If a second service is permitted based on the exceptions listed in Article 230.2 of the NEC, a 
permanent plaque or directory shall be installed at each service drop or lateral, or at each service 
equipment location.  It shall denote all other services on or in that building or structure, and the area 
served by each.   
Adjusting page size in pdf - Compress reduce PDF size in C#.net, ASP.NET, MVC, Ajax, WinForms, WPF
C# Code & .NET API to Compress & Decompress PDF Document
best online pdf compressor; best pdf compressor online
Adjusting page size in pdf - VB.NET PDF File Compress Library: Compress reduce PDF size in vb.net, ASP.NET, MVC, Ajax, WinForms, WPF
VB.NET PDF Document Compression and Decompression Control SDK
change font size in pdf comment box; change font size in pdf file
November 2009  
6
Use of Service by Customer
• The customer's wiring and equipment including the meter socket will be maintained by the 
customer, at the customer's expense, in the condition required by the insurance and governmental 
authorities having jurisdiction.   
• The service shall not be used in any manner that disturbs or impairs the operation of the 
Company's system or that will interfere with service to other customers.  If such interference does 
occur, due to the use of apparatus installed upon a customer's premises, such customer must 
either discontinue the use of such apparatus or make the necessary revisions to the apparatus, 
including additional equipment that may be required to alleviate such conditions, or the Company 
shall have the right to discontinue the offending service.   
• For proper service, the wiring on all single or three-phase installations should be arranged so that 
the load, to the extent possible, should be balanced among each phase-wire.  This will minimize the 
amount of current carried on the neutral wire.  For three-phase services, the load imbalance 
between phases shall not be greater than 15 percent of the kVA connected.   
Interruption & Liability 
1
• The Company will endeavor to furnish continuous service but does not guarantee uninterrupted 
service.  The Company is not liable for any damage, which the customer may sustain because of 
the failure or partial failure of the energy, or failure or reversal of phases, or variation in service 
characteristics, whether caused by accident, or other causes.  Nor is the Company liable for 
damage that may be incurred by the use of any service wiring, connections, instruments, services, 
or electrical appliances, installed by or for the customer.  Nor is the Company liable for damage that 
may be incurred due to the presence of the Company's property on the customer's premises.  It is 
the customer's responsibility to inform the Company of outages so that the outage can be 
expeditiously handled.   
1
To the extent this provision contradicts any terms in the Company’s current applicable tariff, the tariff provision 
shall govern  
C# PDF copy, paste image Library: copy, paste, cut PDF images in
one. Easy to zoom and crop image for adjusting image size. Besides C#.NET Project DLLs: Copy, Paste, Cut Image in PDF Page. In
change paper size pdf; can pdf files be compressed
VB.NET Image: Generate GS1-128/EAN-128 Barcode on Image & Document
width & height and four margin size in a EAN-128 barcode on multi-page TIFF/PDF/Word documents such as removing the document noise, adjusting page color mode
best compression pdf; best pdf compression tool
November 2009  
7
Final Connections
• Residential/Commercial - All final connections for temporary or permanent service, between the 
Company's facilities and the customer's wiring, will be made by the Company.  See Exhibits 19 & 
20 to determine party responsible for supplying connectors.  (Exception: In New Jersey and Met-
Ed, in most cases, a licensed electrical contractor is allowed to perform a disconnect/reconnect of 
an overhead single-phase 200 amp and below service.  Contact the Company for additional 
details.)   
• The Company will assume no responsibility for changing the location of its service drop 
attachments if an improper location is chosen without consultation with the Company, or if the 
mutually acceptable location is not utilized.   
• If, in order to comply with the requirements of governmental agencies or Codes as approved by 
ANSI, it becomes necessary for the Company to make any change in the location of its equipment 
or to change the character of its service, the customer will, at the customer’s expense, make such 
changes in the customer’s wiring, service entrance, and utilization equipment as are thereby made 
necessary.   
• Service entrance equipment interrupting capacity shall meet or exceed the maximum available fault 
current.  If necessary, contact the Company to determine the estimated available fault current.  
Contact the Company for the minimum required equipment rating.   
Inspection
• Before initial service to a customer service location is energized, the Company should verify that 
the installation of the customer’s meter base and associated equipment:  
1. has been inspected and approved by the local or state inspection authority, or  
2. in any area where there is no local or state inspection authority, has been inspected by a 
licensed electrician or Company representative, or  
3. in Pennsylvania, has been inspected and approved by personnel certified in accordance with 
the Uniform Construction Code (Act 45).   
• When the Company deems that a hazardous condition exists, it may refuse to energize the 
customer’s service until the customer complies with these requirements.   
• In addition to complying with the National Electrical Code, the service shall be in accordance with 
the requirements of the Company and such state and local inspection requirements as may be in 
force at the time such installation is made.   
• Service Restoration - Fire or Flood: If the meter or service entrance equipment has been subjected 
to fire or flood conditions, an inspection from the above referenced authority, and a release, when 
applicable, from a Fire Marshall or equivalent is required before service will be re-connected.   
• Service Restoration – Disconnected Services: If a service has been disconnected (service wires cut 
or meter blocked) for 12 months or more, a new inspection by the local or state inspection authority 
is required before the service will be reconnected.  In Ohio and New Jersey, in any area where 
there is no local or state inspection authority, or the local or state inspection authority will not 
perform the inspection for whatever reason, a licensed electrician must perform the inspection.  The 
licensed electrician must provide the Company with a signed letter on the electrician's company 
letterhead stating that the service has been inspected.   
C# Image: Zoom Image and Document Page in C#.NET Web Viewer
is designed to help developer view source image or document page by adjusting the target file enlarge or reduce the source file until the file size fits the
pdf custom paper size; change font size in pdf fillable form
VB.NET Excel: VB Methods to Set and Customize Excel Rendering
we treat every single Excel spreadsheet as a page in our VB the fixed image size ration that the size is limited Thus, when VB.NET users are adjusting the image
pdf compression settings; change font size fillable pdf
November 2009  
8
Meter & Seal Tampering 
• Tampering laws define tampering as interfering with, damaging, or bypassing a meter or service 
equipment to reduce the amount of electric service registered on the meter.  Under the law, proof of 
tampering or reconnecting an electric meter is considered sufficient evidence that the customer 
caused the tampering or reconnected the meter.  Violators of the law may be sentenced to jail 
and/or fined.  In addition, violators must pay for the value of electricity consumed and the cost of 
repairs or replacement.   
• Breaking of meter seals and/or removal of meters by customers, electrical contractors, or other 
unauthorized personnel, without prior Company permission, is prohibited and may be subject to 
penalties.   
Meter Attachments
• No attachments by the customer or the customer’s agent are permitted to Company-owned meters, 
meter circuits, or ancillary meter devices.   
• The Company will supply, upon request by a customer, kWh and/or kvarh pulses from a Company-
owned meter for demand control purposes.  A cost will be assessed to the customer in accordance 
with specific Company charges for this connection.   
Disconnect/Reconnect of Existing Service (Upgrades)
•  
• The first step to be taken when upgrading or performing maintenance on an existing service is to 
contact the Company’s Customer Contact Center.  The Company must be informed of the 
necessity to break the meter seal, so that a Company representative can be scheduled to re-seal 
the meter after the work has been completed.   
• For some service territories, a licensed electrical contractor who is upgrading or performing 
maintenance on a single-phase overhead service of 200 amps or less, and not changing the point 
of attachment, will be required to disconnect and reconnect to the Company’s service drop, unless 
a two wire service drop is involved or other unusual circumstances exist.  The connection must be 
made with permanent connectors.  The Company recommends that all connections to the service 
drop, by the contractor, be made with compression connectors.  Appropriate and properly applied 
mechanical connectors are also considered permanent.  Verify with local inspection agency.   
• All underground electrical upgrades must be inspected prior to reconnection.   
• JCP&L has an “Agreement For Temporary Uninspected Service” (Form X-2904) which is applicable 
for single-phase overhead service less than 200 amps.  This form provides a means by which a 
service can be re-energized before it has been inspected.  This waiver cannot be utilized in 
conjunction with new, temporary, underground, or three-phase services, 320 amp, or greater 
services, nor for service restoration following a building fire.   
• Electrical contractors will not be permitted to disconnect and reconnect to the Company’s service 
drop for upgrades or maintenance involving the following: 
• Single-phase overhead services greater than 200 amps  
• Any overhead service where the point of attachment is being changed  
• Any overhead service drop that consists of only two wires  
• All overhead three-phase services  
View Images & Documents in Web Image Viewer | Online Tutorials
control add-on offers developers three different APIs for adjusting image viewing size. developers to adjust the width of current displayed page to the
pdf form change font size; advanced pdf compressor online
VB.NET Image: Image Resizer Control SDK to Resize Picture & Photo
VB.NET Code for Adjusting Image Size. In order to We are dedicated to provide powerful & profession imaging controls, PDF document, image to pdf files and
best pdf compression; reader compress pdf
November 2009  
9
• All underground single or three-phase services  
• When an electrical contractor is performing a disconnect/reconnect and a metal backed meter is 
encountered, the metal-backed meter must not be reinstalled due to a potential hazard.  Contact 
the Company and a new meter will be furnished.   
• The Company reserves the right to update meter and service locations at the time of upgrade for 
the purposes of applying current clearance requirements and meter location guidelines.  Service 
equipment installed without approval or incorrectly located will be subject to change or relocation.   
Locating Underground Electric Facilities
• State laws require that an excavator notify the One-Call System in advance of digging.  Trained 
personnel will locate and mark underground facilities.   
• To simplify the "Call Before You Dig" calling process, 8-1-1 has been designated by the FCC as a 
nation-wide telephone number.  State utility commissions have issued rulings instructing local 
telecommunications companies to direct incoming 8-1-1 telephone calls through a voice activated 
answering system to the appropriate state One-Call system.  Each State One-Call Center will retain 
their existing 800-telephone number and 8-1-1 will just serve as an additional method to contact the 
appropriate state One-Call Center.  Note: In Ohio, the 8-1-1 number will transfer a caller to OUPS 
(see Item 1 below) but not to OGPUPS (see Item 2 below), which must be called separately.   
• For projects in Ohio
1. Call the Ohio Utility Protection Service (OUPS) at least 48 hours but not more than ten days 
before digging.  Call OUPS at (800) 362-2764 to request that a location be marked.  Additional 
information can be obtained at their website: http://www.oups.org
2. In Ohio, you must also call the Ohio Oil & Gas Producers Underground Protection Service 
(OGPUPS).  When you call them, they will give you a list of their members that you must 
individually notify of your planned excavation.  Call OGPUPS at (800) 925-0988 or visit their 
website at http://www.ogpups.com
to fill out an on-line form.   
• For projects in Pennsylvania,
call the Pennsylvania One-Call System at least three (3) full 
working days but not more than ten (10) days before digging at (800) 242-1776 to request that a 
location be marked.  Their website can provide additional information:  http://www.paonecall.org
  
• For projects in New Jersey,
call the New Jersey One-Call System at least three (3) full working 
days but not more than ten (10) days before digging at (800) 272-1000 to request that a location be 
marked.  Their website can provide additional information:  http://www.nj1-call.org.  
• For projects in New York,
call Dig Safely New York at (800) 962-7962 at least two (2) days before 
digging not counting the day of call to request that a location be marked.  Their website can 
provide additional information: http://www.digsafelynewyork.com
.   
Required Clearance from Markout for Digging in the Vicinity of Company Underground Electric Facilities
• The Company prefers that an additional 12-inch separation be included beyond the state mandated 
18-inch to 24-inch clearance (requirements vary by state and dimension of buried facility) from the 
markout stake, flag, or hash mark and the closest edge of any parallel trench dug by another party 
adjacent to the Company’s underground facilities.  Refer to FE Distribution Engineering Practice 
11-100
for more details.   
VB.NET Image: How to Process & Edit Image Using VB.NET Image
vintage effect creating, image color adjusting and image VB.NET image editor control SDK online tutorial page. functions into several small-size libraries that
change font size pdf form reader; pdf file size
C# Image: How to Add Customized Web Viewer Command in C#.NET
Able to adjust the displaying image size and style button for deleting an existing page from web other options for you, such as adjusting toolbar, controlling
change file size of pdf; batch reduce pdf file size
November 2009  
10
TEMPORARY SERVICE  
• Service entrance, meter, and other wiring on temporary indoor or outdoor installations are installed 
in the same manner as for permanent installations (except in New Jersey).  In JCP&L service 
territory, temporary services may not be attached to buildings or mobile structures (trailers).  When 
no building is available for the installation of service conductors and service equipment, it will be 
necessary to consult the Company's local office for recommendations as to suitable support for the 
service drop or termination of service lateral, meter, and weatherproof housing for the service 
equipment.  See Exhibits 1 and 2 for typical requirements for temporary service structures.   
• See “Application for Service” Section for additional information regarding temporary service.   
• Temporary services shall not exceed approximately six months except when associated with 
construction of a major facility.   
• In Ohio, Penelec, and Penn Power, Company temporary structures are available.  Contact 
Customer Service for further information.   
PERMANENT SERVICE – OVERHEAD  
General
In order to avoid errors, it is essential that the customer, architect, or contractor ascertain from the 
Company the point of attachment for the service drop or the termination of the service lateral.  As 
close as practical, the Company will designate a location for the point of attachment that is mutually 
acceptable to the customer and Company.  The point of attachment will be located to provide the 
shortest practicable service drop distance to the Company’s pole.  The point of service is the 
connection of the overhead service drop to the customer’s service entrance conductors/equipment.   
• In general, service entrance conductors should be installed on the outside of the building to be 
served.  If the service entrance conductors on the supply side of the meter are installed in rigid 
conduit without junctions or pull boxes, then the service entrance may be partially concealed.   
• In situations involving parallel service entrance conductors, the Customer shall minimize the 
number of conductors to reduce both the electrical connections and the complexities inherent in 
such installations.   
• See Exhibits 3, 3A, 4, 6A, 6B, 7A, 7B, 9, 11, 12, 14, 16, 17, and 22 for typical methods.   
VB.NET Image: VB.NET Rectangle Annotation Imaging Control
New RectangleAnnotation() ' set annotation size obj.X rectangle annotation by adjusting annotation properties profession imaging controls, PDF document, image
batch pdf compression; pdf paper size
VB.NET PDF: How to Create Watermark on PDF Document within
add text or image as a watermark on PDF page using VB be used as a text watermark; Support adjusting text font style in VB class, like text size and color;
advanced pdf compressor; pdf file size limit
November 2009  
11
Service Drop Clearances 
• The point of attachment of the service drop to the building must be such that the drip loop shall not 
be less than ten (10) feet above the ground.  In addition, the point of attachment must be located to 
allow the Company to comply with the following NESC clearance requirements.  The attachment 
should not be more than 24 feet above ground unless a greater height is necessary for proper 
clearances.   
• Twelve (12) feet above sidewalks and spaces accessible to pedestrians  
• Sixteen (16) feet above roads, streets, alleys, driveways and other areas subject to truck 
traffic (18 feet over PA state roads)  
• Two (2) feet above communication lines at any point of crossing, and one (1) foot at the 
point of attachment to the building  
• Three (3) feet between service drop conductors (attached to the buildings) and windows, 
doors, porches, and fire escapes  
• Five (5) feet between service drop conductors (not attached to the buildings) adjacent to 
windows, awnings, fire escapes and other building projections  
• Three and one-half (3.5) feet between service drop conductors and roofs of projections not 
accessible to pedestrians  
Clearance of Trees from Power Lines
Trees & Transmission Rights-of-Way  
• FirstEnergy's long distance, high voltage transmission lines provide power to thousands of our 
customers and are vital reliability links with other utilities across the country.  Keeping our 
transmission rights-of-way free of unwanted trees and other vegetation is very important to 
providing reliable and safe electric service.   
• All vegetation on or adjacent to the right-of-way shall be low-growing, compatible species.  (For 
specific requirements in the State of New Jersey, see NJAC 14:5-9 et. al.).   
• Additional information on correct tree selection can be found on the Company Internet site at: 
https://www.firstenergycorp.com/Get_Help_With/Safety/ 
Maintaining_Trees_Near_Lines/ 
Maintaining_Transmission_Rights-of-Way.html
Trees & Distribution Lines  
• Tree related incidents are a major cause of electrical outages.  Therefore, care must be exercised 
when planting trees to make certain that they will not interfere with distribution power lines, even 
when the trees reach full, mature growth.  Trees that grow more than 25-feet tall should not be 
planted within 20 feet of distribution power lines.   
• Additional information on correct tree selection can be found on the Company Internet site at 
https://www.firstenergycorp.com/Get_Help_With/Safety/Maintaining_Trees_Near_Lines/How_to_Se
lect_the_Right_Tree_for_the_Location.html
Mobile Homes or Mobile Home Parks
• The Company has an established policy for extending service to mobile homes and will assist in 
planning the installation of mobile home parks.  The Company's rules and regulations as filed with 
the State shall apply to the installation and use of the service furnished.   
• Meter and service facilities for a mobile home or mobile home parks will be determined on a case-
by-case basis.   
November 2009  
12
• For non-subdivision type mobile home parks, the Company recommends a group meter 
arrangement (See Exhibit 11 for typical methods).  Mobile home park operators shall be 
responsible for the effective grounding of all mobile homes.  Additional information is available upon 
request from the Company.   
Travel Trailer or RV Parks
• Electric service requirements for travel trailer parks will be determined individually.  Contact the 
Company for additional information.   
• See Exhibit 11 for typical method.   
Central Pole Distribution Metering
• With the exception of New Jersey, an option for service to farms is Central Pole Distribution 
Metering.  When this option is selected, the customer shall furnish, install, and own a pole centrally 
located with respect to the various buildings to be served.  The central distribution pole in each 
case shall be a dead-end pole, as far as the Company lines are concerned, without any unmetered 
service extending beyond it.   
• If it is impractical to serve all farm buildings from a centrally located pole due to distance between 
buildings or the necessity of crossing public roadways, the Company will provide services and 
meters for separate accounts for each building, as conditions require.   
• See Exhibit 9 for suggested methods.   
PERMANENT SERVICE – UNDERGROUND  
General
• Based on an engineering evaluation, a Company representative will determine a pole, pad-
mounted 
transformer, or handhole/pedestal 
location to which an underground service lateral can be 
extended.   
• Typically, 
the customer is responsible for the trenching, providing conduit where applicable, and 
backfilling.  Refer to Exhibit 23 for trench details for direct buried cables.  Since the actual trench 
dimensions may vary by soil condition, location, and other factors, it is necessary to confirm trench 
dimensions with the Company representative.  
• The customer is responsible for the trenching, conduit where applicable, and backfilling.  In some 
cases, the customer is also responsible for the installation of the underground service lateral cable.  
See the applicable Exhibits 19 and 20 for specific customer and Company installation/ownership 
responsibilities for each item associated with the service and for determination of point of service.  
The utility retains ownership of conductors and equipment it supplies.  In special situations, if the 
point of service varies from Exhibits 19 and 20, the customer’s installation documents will clearly 
designate the equipment ownership and the exact point of service.   
• History has shown that settlement of trench backfill has resulted in damage to service cable, meter 
sockets, and house siding.  The NEC 300.5 (J) requires ground movement protection for direct 
buried cables.  The Company recommends the use of a slip joint and slack box conduit product 
such as the Rizzcon Safety Slip to avoid such problems.   
• In situations where the customer owns and installs the underground service lateral, the contractor 
shall run the service lateral to within three feet of the designated Company pad-mounted 
transformer or handhole/pedestal or within six inches of overhead secondary for a vertical riser 
November 2009  
13
installation.  (Caution: Facilities may be energized.)  The contractor shall leave sufficient spare 
amount of coiled cable to complete termination of the cables – five feet for handholes/pedestals, 
ten feet for transformers, or five feet vertical risers.  Refer to the appropriate Exhibit 19 or 20 to 
determine the party responsible for supplying the connectors to terminate the service lateral cable 
at the source end.  
• In situations involving a customer installed and owned underground service lateral, if a customer 
increases the service lateral length or load, the customer is responsible to verify that ampacity, 
voltage drop, and voltage flicker limitations are suitable to serve the load.  If load is being added, 
the customer shall advise the Company so that the Company can insure all Company associated 
facilities are adequate to serve the new load.   
• There should be no fence, guardrail, wall, or other obstruction placed around pad-mounted 
transformers or handholes that would limit the Company from performing maintenance on the 
equipment or replacing it completely.  This includes any tree, shrub, bush, or other vegetation that 
would have to be removed in order to operate, maintain, or replace equipment.  The minimum 
clearance is three (3) feet from the back and sides, and ten (10) feet from the front of all pad-
mounted equipment.  Additionally, a customer shall not cover (even partially) any of these devices 
with mulch or dirt as this prevents them from being quickly located or safely operated as well as 
accelerating their corrosion.   
Underground Services from Overhead Lines
• If at any time it becomes necessary for the Company to change the location of a pole upon which a 
customer owned underground service lateral terminates, the necessary changes in the service 
lateral will be made by the customer at the customer's expense.  (This is applicable in Ohio Edison 
and generally applicable in Jersey Central Power & Light, Met-Ed, and Penelec.  However, some 
exceptions may apply in certain cases involving State Highway widening projects.)   
• See Exhibits 5A, 5B, 6A, 6B, 7A, 7B, 10, 11, and 12 for typical installations.   
Underground Services in Underground Residential Areas 
• In Pennsylvania, New York, and Ohio, the contractor, developer, or customer will provide all 
trenching and backfilling to Company specifications.  In New Jersey, since trenching and backfilling 
obligations vary, contact the Company.  
• In cases where the service lateral is installed by the customer, the Company will determine the 
pole, transformer, or handhole/pedestal
location to which a customer owned underground service 
lateral can be extended.  The service lateral cable shall be of sufficient length to allow the Company 
to complete the connections.  If the customer increases the service lateral length or load, the 
customer is responsible to verify that ampacity, voltage drop, and flicker limitation are suitable to 
serve the load.   
• For single-phase customer-owned underground services at 400 amps or less, the customer shall 
install only one set of service cables sized for the expected load.  Multiple or parallel sets of cables 
are not acceptable for services at 400 amps or less.  Refer to Exhibits 6, 7, and 19.  
• For services greater than 400 amps, the customer must consult the Company as soon as possible 
during the building design stage to discuss the multiple or parallel cable service requirements.   
• Due to connector physical limitations, cable size shall be limited to 600 kcmil when terminating in a 
pad-mounted transformer and 350 kcmil when terminating in a handhole.   
November 2009  
14
Underground Services in Underground Commercial Areas
• The customer shall provide the Company with suitable space at a mutually acceptable location to 
accommodate the necessary transformation and switching equipment required to supply the 
customer’s load.  Space requirements will vary dependent on the customer’s load and service 
requirements, as well as the availability of Company facilities in the area.  It is therefore imperative 
that the customer contacts the Company at the earliest possible opportunity in the customer’s 
electrical design stage to ensure that appropriate accommodations can be made for the required 
Company facilities.   
• The Company will provide (install, own, and maintain) a pad-mounted enclosure, handhole, or other 
suitable means which can be used to terminate the service lateral cable.   
• In those cases where the customer’s building is located at the property line (Central Business 
Districts) and sufficient space is not available for necessary transformation and medium voltage 
switching equipment, the customer shall make provision to accommodate the necessary 
transformation and switching equipment at a mutually acceptable location inside the building wall.  
The Company’s equipment must be accessible at all times.  Special design requirements must be 
adhered to so that appropriate safety, maintenance, and operating conditions can be satisfied.  
Please consult the Company to obtain written approval from the Manager of Regional Engineering 
Services as soon as possible during the building design stage and to discuss any special needs 
and design specifications (Company, OSHA, NESC, NFPA, NEC, etc.).  The Company will install, 
own, and maintain the necessary primary cable, transformer(s), and switchgear to provide electrical 
service.   
• For those areas where the tariffs require the Company to own the primary or secondary service 
lateral cables and where the point of service is inside the building, the customer shall make 
provisions to terminate the lateral conductors at a mutually acceptable location.  Special design 
requirements must be adhered to so appropriate safety, maintenance, and operating conditions can 
be satisfied.  Please consult the Company as soon as possible during the building design stage to 
discuss requirements.   
• For those areas where the tariffs require the customer to own the secondary service lateral cables, 
the customer with underground services at 400 amps or less, shall install only one set of service 
cables sized for the expected load.  Multiple or parallel sets of cables shall not be acceptable for 
services at 400 amps or less, unless prior written agreement is made with the Company.   
• For services greater than 400 amps, the customer must consult the Company as soon as possible 
during the building design stage to discuss the multiple or parallel cable service requirements.   
• Where a service raceway or duct enters from an underground distribution system, the customer 
shall seal the end within the building with suitable compound to prevent the entrance of moisture 
(water) or gases.  Spare or unused ducts shall also be sealed.   
• See Exhibits 10, 15, 18, and 22 for typical installations.   
Underground Services in Central Business District Network Areas
• All services shall originate from manholes or handholes.  No service shall be energized directly 
from a transformer vault (Exception – spot networks at 480Y/277 V).   
Transformer Foundations & Vaults
• Typically, it is required that the customer provides a suitable above ground external site to 
accommodate a pad-mounted transformer.  The provided area shall be of sufficient size to 