asp.net pdf viewer control c# : Create pdf thumbnail SDK software API wpf windows html sharepoint sellwood-bridge-activity-book-20134-part1603

Create pdf thumbnail - Draw thumbnail images for PDF in C#.net, ASP.NET, MVC, Ajax, WinForms, WPF
Support Thumbnail Generation with Various Options for Quick PDF Navigation
enable pdf thumbnails in; create thumbnail from pdf c#
Create pdf thumbnail - VB.NET PDF Thumbnail Create SDK: Draw thumbnail images for PDF in vb.net, ASP.NET, MVC, Ajax, WinForms, WPF
Support Thumbnail Generation with Various Options for Quick PDF Navigation
.pdf printing in thumbnail size; show pdf thumbnail in html
Water, Soil & Roads 
Can you define these terms? 
Watershed:   
Bioswale:    
Hydrology:    
In-Water Work:    
Habitat:  
What is geology and why is it important when building a bridge? Can you define these 
geologic terms? 
Geology:    
Volcano:    
Glaciers:    
Weathering:  
Earthquake:  
Landslide:    
39 
Sellwood Bridge—Activity Book & Curriculum Guide  
How to C#: Generate Thumbnail for Word
Images. Convert Word to ODT. Convert PDF to Word. File: Create, Load a Word File. File: Merge Text Search. Insert Image. Thumbnail Create. Thumbnail Create. |. Home
how to make a thumbnail from pdf; generate pdf thumbnails
How to C#: Generate Thumbnail for PowerPoint
Conversion. Convert PowerPoint to PDF. Convert PowerPoint File: Create, Load a PowerPoint File. File Annotate PowerPoint. Text Search. Insert Image. Thumbnail Create
pdf thumbnails; create pdf thumbnail image
Did You Know??? 
Prior to the construction of the existing Sellwood Bridge people used the 
Spokane Street Ferry to cross the river! 
1.  The existing Sellwood Bridge was made of recycled girders from which Portland bridge? 
a) Hawthorne Bridge      
c) Fremont Bridge    
 b) Macadam Bridge      
d) Burnside Bridge 
2.  Sixteen jacks were evenly distributed to lift the existing bridge. If the bridge weighs five 
million pounds, what lifting force was required by each jack? 
a) 250,500 lbs or 125.25 tons    
c) 375,500 lbs or 187.75 tons 
b) 312,500 lbs or 156.25 tons    
d) 210,750 lbs or 105.38 tons 
3.  What is the maximum depth below the riverbed the contractor will need to drill to install 
drilled shafts? 
a) 155 ft.    
c) 150 ft. 
b) 130 ft.    
d) 145 ft. 
4.   The new bridge is approximately 1780 ft. long. How long is the bridge in inches? 
a) 23,450    
c) 21,360. 
b) 22,850    
d) 30,250 
40 
Sellwood Bridge—Activity Book & Curriculum Guide  
VB.NET Image: Program for Creating Thumbnail from Documents and
language. It empowers VB developers to create thumbnail from multiple document and image formats, such as PDF, TIFF, GIF, BMP, etc. It
pdf files thumbnails; pdf thumbnail creator
How to C#: Generate Thumbnail for Raster
PDF Reading, C#.NET Annotate PDF in WPF, C#.NET PDF Create, C#.NET VB.NET How-to, VB.NET PDF, VB.NET Word, VB.NET Excel How to C#: Generate Thumbnail for Raster.
generate pdf thumbnail c#; pdf thumbnail html
DID YOU KNOW??? 
Oregon is a geology sandwich that started 
out as underwater volcanoes, weathered in 
place, and then got covered by gravel and 
soil. 
The snow you see on Mt. Hood in the summer 
time is actually a glacier.  
There is a cinder cone (popcorn) volcano in 
Gresham!  
The oldest things ever found on earth are 
rocks in the Grand Canyon that are over a 
billion years old! 
The last big earthquake in Oregon was seen 
as big waves in Japan in the year 1700. That 
is over 300 years ago! 
When you look at a hill side, the oldest mate-
rial is always on the bottom and the young-
est is always on top. 
The earth is precious and it 
took a long time to make it. 
If you take care of the 
earth, it will take care of 
you! 
We are here! 
41 
Sellwood Bridge—Activity Book & Curriculum Guide  
How to C#: Set Image Thumbnail in C#.NET
VB.NET How-to, VB.NET PDF, VB.NET Word, VB.NET Excel How to C#: Set Image Thumbnail in C#.NET. With XImage.Raster SDK library, you can create an image viewer and
create pdf thumbnail; show pdf thumbnails in
Create Thumbnail in Web Image Viewer | Online Tutorials
or Images; Create Thumbnail; Generate Barcodes on Your Documents; Read Barcodes from Your Documents. Multi-page Tiff Processing; RasterEdge OCR Engine; PDF Reading
create thumbnail jpg from pdf; enable thumbnail preview for pdf files
Willamette River Facts: 
The Willamette River Basin is one of the largest watersheds in the state, covering more than 
11,500 square miles. Thirteen major tributaries join the __________________ as it stretches 
nearly 300 miles from its headwaters at Waldo Lake in the Cascade Mountains southeast 
of Eugene to the confluence with the Columbia River at Kelley Point in Portland! The Wil-
lamette River is one of the few major rivers in the United States that flows primarily 
___________! 
The Willamette River flows through _____ counties and _____ cities! 
The Willamette River provides ports for commercial barges and oceangoing ships, irriga-
tion for crops sold worldwide, an abundant fishery, and recreational opportunities! 
Other Fun Water Facts: 
Water is millions of years old! 
There is the same amount of water on Earth now as there was MILLIONS of years ago! 
Nearly 97% of the world’s water is salty or otherwise undrinkable. Another 2% is locked in 
ice caps and glaciers.  
The average total home water use of 
each person in 
the U.S. is about 50 GALLONS a day!  
DID YOU KNOW??? 
What can you do to 
use less water? 
42 
Sellwood Bridge—Activity Book & Curriculum Guide  
Create Thumbnail Winforms | Online Tutorials
Create Thumbnail; Generate Barcodes on Your Documents; Read Barcodes from Your Documents. Multi-page Tiff Processing; RasterEdge OCR Engine; PDF Reading; Encode
how to show pdf thumbnails in; pdf preview thumbnail
How to C#: Overview of Using XImage.Raster
You may edit the tiff document easily. Create Thumbnail. See this C# guide to learn how to use RasterEdge XImage SDK for .NET to perform quick file navigation.
.pdf printing in thumbnail size; pdf first page thumbnail
Geology: The study of rock, soil and  
water 
Volcano: A cone that shoots out melted 
rock, dust, or cinders (like popcorn) 
Glacier: Big thick sheet of ice (some are 
over 1,000 feet thick) that used to sit on 
Oregon and most of the United States 
Weathering: When rock turns into soil 
Earthquake: When two pieces of the 
earth move against each other and 
make the ground shake 
Landslide: When rocks and soil move 
downhill  
Watershed:  An area of land that drains into 
a lake, wetland, stream or river. In Oregon, 
no matter where you live, you are in a  
watershed  
Bioswale:  Gently sloped, vegetated 
ditches that clean runoff into the sewer  
system. The names grassy swale, vegetative 
filter, and vegetative infiltration basin  
represent different types of bioswales 
Hydrology: The scientific study of the  
behavior of water in the atmosphere on the 
Earth’s surface and underground 
Hydrologic Cycle: The natural recycling 
process powered by the sun that causes 
water to evaporate into the atmosphere, 
condense, and return to earth as  
precipitation 
In-Water Work:  Construction-related  
activities, such as underwater welding, pile 
driving, and excavation, that occur at the  
surface or under water  
Habitat:  An ecological or environmental 
area where an animal naturally lives or a 
plant naturally grows 
Glossary: Water 
Glossary: Geology 
43 
Sellwood Bridge—Activity Book & Curriculum Guide  
44 
Sellwood Bridge—Activity Book & Curriculum Guide  
Answer Key for Did You Know (page 40):  
Prior to the construction of the existing Sellwood Bridge people used the 
Spokane Street Ferry to cross the river! 
1.  The existing Sellwood Bridge was made of recycled girders from which Portland bridge? 
a) Hawthorne Bridge      
c) Fremont Bridge    
 b) Macadam Bridge      
d) Burnside Bridge 
2.  Sixteen jacks were evenly distributed to lift the existing bridge. If the bridge weighs five 
million pounds, what lifting force was required by each jack? 
a) 250,500 lbs or 125.25 tons    
c) 375,500 lbs or 187.75 tons 
b) 312,500 lbs or 156.25 tons    
d) 210,750 lbs or 105.38 tons 
3.  What is the maximum depth below the riverbed the contractor will need to drill to install 
drilled shafts? 
a) 155 ft.    
c) 150 ft. 
b) 130 ft.    
d) 145 ft. 
4.   The new bridge is approximately 1780 ft. long. How long is the bridge in inches? 
a) 23,450    
c) 21,360 
b) 22,850    
d) 30,250 
Activity Outline 
Based on the following scenario, you must construct a persuasive argument to present to government officials.  
Scenario
A new bridge will be built in your city. The current bridge is 40 feet wide and it is old and falling apart. It is becoming a danger to 
those who travel on it. Also, the travel lanes are too narrow for large freight trucks to bring goods into and out of the city. Because 
the bridge is too narrow, there is no shoulder for vehicles to park if they are involved in an accident. When there is an accident, it can 
sometimes cause traffic jams for up to 2 hours. There are no bike lanes for bicyclists so they must share the one sidewalk with pedes-
trians; however, the sidewalk is too narrow for both bicyclists and pedestrians to pass each other.   
Your local government is planning to build a new bridge similar to the old bridge. How can you convince the government to consider 
your interest group's concerns while planning the width of the bridge. The government has $100 to build a bridge that aims to accom-
modate all the local interest groups. The new bridge cannot cost over $100 and cannot be less than 50 feet wide.  
Some questions to consider
Freight Truck Drivers--How will you deliver goods to the city if the travel lanes of the bridge aren't wide 
enough for your truck? How will a decision to widen or not widen the lanes affect you, your business, the 
residents of the city, and the business owners? Why should the government widen or not widen the lanes? 
Pedestrians and Bicyclists--How will you get across the bridge if there is only 
one sidewalk  for both pedestrians and bicyclists to share? What should the  
government do to make the bridge function effectively for both pedestrians and 
bicyclists? 
Commuters--How can the government build a bridge to accommodate all the commuters every day? What 
can they do to make the bridge more commuter-friendly and lessen traffic jams and commuter time? 
Business Owners--What can the government do to consider how people access your business? How can the 
government make the needed improvements to the bridge so that people coming into and going out of the city 
can do it in a timely and safe manner? Can improvements to the bridge bring in more patrons to your business?  
Government--How can you make decisions based on each interest group’s  argument? Will you be able to  
accommodate each of their requests? 
Sellwood Bridge—Activity Book & Curriculum Guide  
School Engagement Program 
Exploring the Sellwood Bridge Project 
45 
Narrow traffic lane—9’ wide 
$10 
Standard traffic lane—10’ wide 
$15 
Wide traffic lane—11’ wide 
$20 
Narrow sidewalk—6’ 
$10 
Standard sidewalk—8’ 
$15 
Multi-use/wide sidewalk—10’ 
$25 
Narrow bike lane—5’ 
$5 
Standard bike lane—6’ 
$10 
Wide bike lane—8’ 
$15 
The local government has $100 to build a bridge that is no less than 50 feet wide and aims to accommodate 
the local interest groups. 
Bridge Elements 
*remember, you need 2 of each*                                              
Hypothetical Cost 
Sellwood Bridge—Activity Book & Curriculum Guide  
46 
Created by: Lois D. Cohen Associates—2013 
Documents you may be interested
Documents you may be interested