asp.net pdf viewer control c# : Create thumbnail jpeg from pdf Library software class asp.net winforms .net ajax sle_user_manual13-part1733

How To.... 
127 
7.  If your project has possible updates, you will be presented with the Update Reminder 
dialog box. 
8.  The Summary Info dialog box opens.  
Notes: 
•  If the project that you are Loading from File is using a Project Template that is not 
currently in your Projects Database, that Project Template will be added to your Projects 
Database and will be automatically assigned to the project that you are loading. 
•  Load from File will also add any User Defined Tags, Project Note Images and User 
Added Global Terms that are not already in your Projects Database. 
•  If the project you are trying to load was saved in a later version of SLE, or using more up 
to date master data than you have, you will need to update your master data or SLE 
version before you can load the project. 
Making Backups of your Projects  
One of the most important things you can do to safeguard the work you have put into creating 
specification projects is to make regular backups of the projects database. While the SpecLink-E
software and master database files can be replaced by reinstalling, the only copies of the projects 
file you create are the ones you make. 
Unlikely though it may be, files can be deleted accidentally or hardware problems with your 
computer can serve to make your databases unusable. Recreating the project files can require a 
significant amount of work, even if hard copy printouts exist. You can avoid losing the file by 
making frequent backup copies that can be used to restore the data. 
Ideally, backup copies should be created each day that work is done on your specification files. It 
may even be desirable to keep backups at a site other than the one where you normally work. 
SLE Support Utilities 
SLE Support Utilities is a small application that is installed with the Server or Standalone 
installation. It is used for Backing up the Databases, Restoring the Databases, Running Server 
Maintenance, setting up Auto Check-ins, running Repair Data and updating your BSD Master 
data. 
To run this utility:  
•  In Windows, click on Start | All Programs | Building Systems Design, Inc. 
•  Right click on SLE Support Utilities and choose Run as administrator. 
Create thumbnail jpeg from pdf - Draw thumbnail images for PDF in C#.net, ASP.NET, MVC, Ajax, WinForms, WPF
Support Thumbnail Generation with Various Options for Quick PDF Navigation
pdf thumbnails; pdf thumbnail viewer
Create thumbnail jpeg from pdf - VB.NET PDF Thumbnail Create SDK: Draw thumbnail images for PDF in vb.net, ASP.NET, MVC, Ajax, WinForms, WPF
Support Thumbnail Generation with Various Options for Quick PDF Navigation
show pdf thumbnails; disable pdf thumbnails
SpecLink-E User Documentation 
128 
From this utility you can: 
•  Schedule or Back up the Databases  
•  Restore the Databases 
•  Schedule or Run Server Database Maintenance 
•  Enable Auto Checkins 
•  Use the Repair Data script 
•  Schedule or run online updating of your BSD Master (See Updating section for 
information on updating your BSD Master.) 
Backing up the Databases 
A backup of the databases includes the entire Projects Database, the Archive Database. the BSD 
master and the Security database (access key and System Roles). If you have LinkMan-E 
installed, the LinkMan-E master and groups database are also backed up. Backups can be 
scheduled to occur daily or weekly, or can be created on demand. Note that the update 
installation automatically creates a backup of all databases.  
Note on checked out sections during a backup. If you are doing a manual backup and there are 
checked out sections, you will see a message with a listing of the sections that are checked out. 
This is so that you can check those sections in before running the backup, if you want to. The 
scheduled backups will not generate a warning if sections are checked out. This is because the 
scheduled backups usually run at night when nobody is there to see the message.  
Scheduled Backups  
To schedule a recurring backup, perform the following steps:  
•  Be at the server or standalone machine. 
•  Click on Start | All Programs | Building Systems Design, Inc. | SLE Support Utilities. 
(Right click to run as Administrator.) 
•  The form initializes and then will display information. 
•  In the Schedule Backup tab, you will see the following fields: 
How to C#: Generate Thumbnail for Word
Convert Word to Jpeg. Convert Word to Png, Gif Images. Convert Word to ODT. Convert PDF to Word. Text Search. Insert Image. Thumbnail Create. Thumbnail Create. |.
how to view pdf thumbnails in; program to create thumbnail from pdf
VB.NET Image: Program for Creating Thumbnail from Documents and
language. It empowers VB developers to create thumbnail from multiple document and image formats, such as PDF, TIFF, GIF, BMP, etc. It
pdf first page thumbnail; create pdf thumbnails
How To.... 
129 
Last scheduled backup: This displays the date and time when the last scheduled 
backup was performed. It does not include the manual backups in this field. 
Next scheduled backup: This displays the date and time when the next backup is 
scheduled to be performed. 
•  Recurrence - Use this field to schedule the frequency and start time for the scheduled 
backups. 
•  Number of backups set to retain: The range is from 0 to 5.  If you set the number at 5, 
once you have 5 backups the next backup will overwrite the oldest backup. To prevent a 
backup from being overwritten you can move the file to a different location, but you must 
move it back to the Backup Directory displayed below before you can restore it. If you set 
the Number of backups to 0, you are disabling the scheduled backups.  
•  Backup Directory – You can select a different drive for your Projects Database backups. 
It must be a valid local hard drive on the server or standalone machine. You cannot 
choose an external hard drive. To make a change click on the browse button at the end 
of the Backup Directory line. Click on the drop down arrow to select a local drive. Your 
valid choices will be displayed. You can only select a different drive. The software will 
determine the folder name. When you select a new drive, click on Apply and then Close. 
If you need to restore a database that was backed up to a different folder than the one 
now references, the backup file must be copied to the new location. The BackupInfo.dat 
file must remain in the default location, however. 
•  Saving Changes - Once you have made changes in this form, click on Apply to save 
them. Click Cancel to discard any changes you have made. Click Close to close the form 
after clicking Apply. 
•  To determine if your scheduled backup has run, check the Event Viewer in Windows. 
•  Note that you must access the Schedule Backup dialog box once before any 
scheduled backups can begin. 
Manual Backups  
To backup the databases manually:  
•  Close SpecLink-E and make sure that all sections have been checked in, if desired. 
•  Click on Start | All Programs | Building Systems Design, Inc. | SLE Support Utilities, 
running as Administrator. 
•  Click on Backup Now. 
•  Once the databases have been backed up, you will see a message on the bottom left of 
the form. 
•  Click on Close to close the form. 
•  Note that the form must be closed in between each activity, such as a Backup and a 
Restore. 
Shrink Now - Click on this if you want to Shrink the Projects Database now.  
Additional notes:  
•  You can only make one change in the SLE Support Utilities dialog box at a time. You 
must click on Close after any change, and restart SLE Support Utilities to perform an 
additional task. 
•  The format of the backed up file is only usable after it is restored to SpecLink-E format. 
See Restore Databases.  
•  Backup files may be moved to a different folder so that they are not overwritten, but they 
must be moved back to the default folder before you can restore them. 
•  Backup files will not work if they are renamed.  
How to C#: Generate Thumbnail for PowerPoint
Conversion. Convert PowerPoint to PDF. Convert PowerPoint Tiff. Convert PowerPoint to Jpeg. Convert PowerPoint PowerPoint. Text Search. Insert Image. Thumbnail Create
create thumbnail from pdf c#; pdf thumbnail creator
How to C#: Generate Thumbnail for Raster
How to Create Thumbnail for Raster in C#. define and control the size of Raster thumbnail. RasterImage img = new RasterImage("input.jpeg"); Bitmap outputBitmap
cannot view pdf thumbnails in; pdf thumbnail
SpecLink-E User Documentation 
130 
Shrink Database  
In the Schedule Backup tab of the SLE Support Utilities, there is an option to Shrink database 
during scheduled backup. There is also a button called Shrink Now. If you check the option to 
Shrink the database during the scheduled backup, or if you click on Shrink Now, a process will 
run to recover as much space as possible in your Projects Database. All requests from SLE go to 
SQL Server which creates and maintains all data files and ultimately controls the size of the 
Projects database files.  
If you shrink a database repeatedly and notice that the database size grows again, this indicates 
that the space that was shrunk is required for regular operations. In these cases, repeatedly 
shrinking the database is a wasted operation.  
It is not recommended that you select to Shrink the database each time the scheduled backup is 
run. 
Restore Databases  
Once the Databases have been backed up using the SpecLink-E function of Backup Databases, 
to make use of it, it must be restored. Restoring must be done using SLE Support Utilities.  
To restore the databases:  
•  Make sure that nobody is using SpecLink-E or LinkMan-E. 
•  Sit at the server (or standalone machine) where the server part of SpecLink-E has been 
installed. 
•  Click on your Start Menu | All Programs | Building Systems Design, Inc. | SLE Support 
Utilities. 
•  Note that you need to right click and choose Run as administrator. 
Restoring backups. 
•  If you are restoring a database that was backed up in the fall 2011 version or later, click 
on the Restore tab. 
•  After a few seconds, the list of backups will display the available backups. As you click on 
each one, information about that backup will be displayed in the box below. 
•  If you need to restore a database that was backed up to a different folder than the one 
now referenced, it must be copied to the current backup location.  
•  Click on the backup that you want to restore. 
•  Make sure that the bottom left prompt says Backup is ready. 
•  Deselect Restore Archive DB if you do not want to replace your current Archive Database 
with the version that was backed up with the Projects Database that you are restoring. 
•  See below for Restoring System Roles. 
•  Click on Restore. 
•  When you see the confirmation that the databases have been restored, click on Close. 
Restoring older backups. 
•  If you are restoring a database that was backed up prior to the fall 2011 release, click on 
the Restore Old tab. 
•  Click on the Browse box to select the database file to be restored. 
•  When you locate the file, click on Open or double click on the file to select it. 
•  Verify that you have selected the correct database to be restored. 
•  Make sure the bottom left prompt says Backup is ready. 
•  See below for Restoring System Roles. 
Create Thumbnail in Web Image Viewer | Online Tutorials
You Wish; Annotate & Redact Documents or Images; Create Thumbnail; RasterEdge OCR Engine; PDF Reading; Encode & Decode 2 Files; Compress & Decompress JPEG 2000 Files
show pdf thumbnail in; pdf thumbnail fix
How to C#: Set Image Thumbnail in C#.NET
Viewer, C# Online Dicom Viewer, C# Online Jpeg images Viewer How to C#: Set Image Thumbnail in C#.NET. With XImage.Raster SDK library, you can create an image
no pdf thumbnails in; how to make a thumbnail from pdf
How To.... 
131 
•  Click on Restore. 
•  When you see the confirmation that the databases have been restored, click on Close. 
If you have LinkMan-E installed, that projects database will be restored also.  
To include the System Roles (Corporate Edition) check the Restore System Roles check box. 
This would be appropriate for a Corporate Edition user who is moving the application from one 
server to another.  
Notes: 
•  If any sections are checked out to users, you will receive a warning. If you continue, the 
user who has the section checked out will not be able to check her changes in. 
•  You cannot restore a database from a version later (higher) than the version you are 
restoring in. 
•  If you have renamed a backup, you need to change the name back to the original name 
to restore it. 
•  If you need to restore a database that was backed up to a different folder than the one 
now referenced, it must be copied to the new location. The BackupInfo.dat file must 
remain in the default location, however. 
Restore System Roles 
Restoring System Roles will restore the information from the Assign System Roles screen 
(Corporate edition), the Define System Roles screen (Corporate edition), as well as licensing 
information. 
If you restore the System Roles, they will be restored to the state that they were in when the 
backup was created. 
If you restore the System Roles, any changes made to your access key will be restored to the 
state it was in when the backup was created. If you restore to a new location, the access key will 
be invalidated and you will require a new one. See Moving the Software. 
Archive Database  
On the Tools tab, in the Copy and Archive Group, click on Project Archive to send one or more 
projects to the Archive Database. Up to 5 projects can be archived or activated at a time. Projects 
may be moved to the Archive Database to free space in the Projects Database. They must be 
retrieved from the Archive Database to be opened in SLE again. The Archive Database can grow 
Create Thumbnail Winforms | Online Tutorials
Create Thumbnail; Generate Barcodes on Your Documents; Read Tiff Processing; RasterEdge OCR Engine; PDF Reading; Encode Compress & Decompress JPEG 2000 Files; Twain
pdf files thumbnail preview; pdf thumbnails in
How to C#: Overview of Using XImage.Raster
You may edit the tiff document easily. Create Thumbnail. See this C# guide to learn how to use RasterEdge XImage SDK for .NET to perform quick file navigation.
enable pdf thumbnails; create thumbnail from pdf
SpecLink-E User Documentation 
132 
to 10 GB in the Professional version: the size is unlimited in the Corporate version. Archiving 
differs from Save to File in that the projects are archived to one database, so archived projects 
are not designed for sending projects to other offices. Project Archive is available on the Tools 
menu when no projects are open. The Project Archive database will be automatically backed up 
when your Projects Database is backed up. When you restore your Projects Database you have 
the option of restoring the Archive database or not.  
Do not move your Archive Database. 
To archive or activate one or more projects:  
•  Close all open projects. 
•  Click on the Tools tab and select Project Archive. 
•  The list of active projects in your Projects Database is displayed on the left side. 
•  The list of archived projects in your Archive Database is displayed on the right side. 
•  To send active projects to the Archive Database, check them in the left side and then 
click on Archive. 
•  You can archive up to 5 projects at one time. 
•  You will receive a confirmation when the process is complete. 
•  To activate archived projects, check them in the list on the right side and then click on 
Activate. 
•  You can activate up to 5 projects at one time. 
•  You will receive a confirmation when the process is complete.  
•  Click Close when done. 
Notes on Activated projects:  
•  Note that projects will not preserve their former system generated Project ID when 
activated, If an activated project was formerly linked to a LinkMan-E group, you will need 
to reconnect it in LinkMan-E.  
•  If you delete user added images used in Project Notes in an archived project, they will not 
be re-added when you activate the project. 
•  If you delete User Defined Tags from the list of User Defined Tags that are used by an 
archived project, they will not be re-added when you activate the project. 
•  If you delete Global User Terms from the list of Global User Terms that are used in an 
archived project, they will not be re-added to the list of Global User Terms when you 
activate the project. 
•  If you delete a custom Project Template, it will not be re-added when you activate the 
project that was using it.  
Server Database Maintenance 
A process runs automatically during the night, if the server or standalone computer is running. 
This process is designed to optimize the SpecLink-E and LinkMan-E databases. To verify that the 
process has run, you can check the event log by running the Event Viewer in Windows. The 
description will be that the SLE Maintenance was invoked. There will be no event log generated if 
you start the process manually as outlined below.  
When running in standalone mode, it is possible to invoke this process at any time. To run this in 
a multi-user situation, you must make sure that all users have exited the software. To run this in a 
multi-user situation you must be sitting at the server.  
To run the Server Maintenance:  
How To.... 
133 
1.  Close all instances of SLE. 
2.  Click on your Start Menu | All Programs | Building Systems Design, Inc. | SLE Support 
Utilities. Note that you need to right click and choose Run as Administrator.  
3.  Click on the Maintenance tab. 
4.  Choose Run Now. 
5.  Click OK to the confirmation. 
6.  When complete, you will see "Database maintenance has completed successfully." on 
the bottom left corner of the application window. 
7.  Click Close. 
To change the time of the automatic Server Maintenance:  
1.  Click on your Start Menu | All Programs | Building Systems Design, Inc. | SLE 
Support Utilities. 
2.  Note that you need to right click and choose Run as Administrator.  
3.  Click on the Maintenance tab. 
4.  Under Daily Recurrence change the start time to the desired time. 
5.  Click Apply. 
6. 
Click Close.
Auto Check-ins  
The Auto Check-ins feature allows you to automatically check in sections that have not been 
worked on for a specified amount of time. A dormant section is a section that is checked out but 
has not been edited within a specified interval of time. Since changes are saved to the projects 
database immediately, no work will be lost by being automatically checked in. The purpose of this 
feature is to prevent licenses from being tied up when users unintentionally leave a section 
checked out. The SLE Server will check for dormant sections every 15 minutes, so if the interval 
is set to 15 minutes, it can be up to 30 minutes before a dormant section is checked in. 
To enable this feature:  
•  Run SLE Support Utilities (using Run as Administrator) from the server or standalone 
computer.  
•  Click on the Auto Check-ins tab.  
•  Check Enable Auto Check-ins.  
•  Set the Interval that constitutes the length of time that SLE should wait before checking in 
a dormant section. 
•  Click Apply and then Close. 
You can click on Check In Now to check in any sections that are dormant. If a section is still open 
on a user’s machine, but it has been checked in by the Auto Check-in process, the next time they 
try to work in it they will receive a message that it has been checked in by another process. The 
section is then read-only. The user must close the section and then reopen it to work on it again.  
Uncheck Enable Auto Check-ins to disable this feature: 
Repair Data  
Repair Data is designed to fix sections that will not display in the Document Panel, as well as 
some issues that have surfaced when marking the updates in projects.  
To use Repair Data:  
•  Ask all users to close all open projects. 
SpecLink-E User Documentation 
134 
•  Start the SLE Support Utilities (on the server or standalone computer) by right clicking 
and choosing Run as administrator. 
•  Click on the Repair Data tab and then click on Repair data.  
• 
Allow this to finish before users open projects. It can take up to a half hour or more for 
large Projects Databases.
Update BSD Master  
See the Updating section of this document for information about online updating of your BSD 
Master.  
Deleting a Project  
To permanently remove a project from your projects database: 
1.  With your project closed, from the File menu choose Delete Project.  
2.  When the Project Selection for Delete dialog box opens, select the project to delete.  
3.  Click Delete.  
4.  You will be asked to confirm the deletion.  
Note that if any sections are currently checked out in the project that you are trying to delete, you 
must either check them in or release them using Unlock Documents.
Note: If you are trying to reduce the size of your Projects Database, you may want to follow 
deleting projects with running the Server Database Maintenance
 
Unlock Documents 
Unlock Documents, available from the System Manager group on the Tools tab, allows you to 
view all checked out sections in the Projects Database. It lists the Project Name, system assigned 
Project ID, Section ID and acronym, Section Name, the name of the user who has the section 
checked out, their computer name, the date that it was last checked out, as well as the date and 
time it was last edited. To release a section, so that it is no longer checked out to that user, click 
in the checkbox before the section(s), and then click on Undo Document Checkout. This function 
should only be used when there is an issue that prevents the user from checking his or her 
section in. 
Unlock Documents is not designed to check in any sections that you have checked out yourself. 
To check in your own sections use Pending Check-Ins. 
Other Locks 
The Unlock Documents dialog box can also be used to unlock the Project Templates, the Project 
Hierarchy (changes to the Project Tree) and the Summary Info dialog box. Unlocking these would 
only be necessary if they were locked by a user who is unable to unlock them. 
How To.... 
135 
LinkMan-E  
BSD LinkMan-E (short for "link manager") is a linking software product that allows you to easily 
create, monitor and modify relationships between various representations of a building design 
project -- as drawn using Autodesk Revit and as specified using BSD SpecLink-E. This linking 
software is referred to as LinkMan-E or LME. The LME user interface is a set of ”Dashboards,” 
together constituting a monitoring station that allows the user to identify, control and coordinate 
relevant  discrepancies between the two software applications. In short, LME is a tool for 
coordinating the Revit building model (the BIM) and its specifications.
LinkMan-E can also be used as a keynote editor, organizer, and assignment tool. Think of Revit 
as a keynote placement and updating tool. Together, they comprise a coordinated system for 
keynoting.  
For more information go to LinkMan-E on our web page.
SpecLink-E User Documentation 
136 
Create an Office Master Project 
Office Master Project Concepts  
Creating an Office Master Project is as simple as creating a new project or copying an existing 
one, naming it something that identifies it as a Master, and then editing the project. An Office 
Master Project is actually a normal project, saved and kept aside for this purpose. A master 
contains any and all changes you would make for the types of projects normally encountered. 
These "pre-edits" can consist of pre-selections of sections and/or paragraphs that are commonly 
used, as well as preferred language. 
More than one master project can be developed for different building types, different owners, or 
different code jurisdictions. You can take advantage of the concepts of Office Master Projects by 
creating multiple master projects that reflect the type of projects your firm typically designs. 
Methods Of Developing Masters
Developing the master that contains the sections can be a deliberate effort or it can be done 
piecemeal over time. If you have a specifications specialist you may decide to devote time to 
developing a master project or projects, because it saves the project team's time and reduces 
errors. Or you can build a master over time by making a note of relevant sections done in 
representative projects and copying those sections to an Office Master Project made for that 
purpose. 
Whether you choose to dedicate time to creating an Office Master Project or use multiple Master 
Projects, the concept is an exceptionally effective method for saving time and reducing errors. 
Tip: Keep in mind that the process of creating an office master is exactly the same as when you 
are creating a project. 
Creating a new project, using your office master.  
•  Create a new project to use as a template for all new projects. 
•  Apply your desired Project Template for formatting. 
•  Edit the header and footer in your desired style. 
•  Save this project and name it so that all users know to use it for new projects. Do not 
check out any sections in this project. 
•  Copy this empty formatted project each time you need to create a new project. 
•  Use Import from Project to import sections from your Office Master or any project that has 
your edited sections in it. 
Some Types of Office Masters  
The most common type of office master project is one based on a single building type, such as a 
high-rise office building, a hospital, or a parking garage. 
You can also prepare: 
•  Master projects containing only a few sections for highly specialized work. In this case, 
the master project is not used to start a new project. Instead, its sections are imported 
into relevant projects.  
Documents you may be interested
Documents you may be interested