c# pdf viewer windows form : Rearrange pdf pages online software Library dll winforms asp.net web page web forms WSSC_ePlan_Review_Applicant_Manual2-part2013

WSSC ePlan Review Applicant Guide  
22    
Revised 6-3-15 
2.
Click on your project, then click the “Drawings” folder to upload your plan drawings or 
“Documents” folder to upload supporting project documents.  
3.
Upon entering either folder, you will be presented with two buttons, View Folders and Upload 
Files. 
4.
Click the “Upload Files” button. “Select Files for Uploading” box will automatically display. 
Double click on the Browse button to go to the file location on your computer and select or 
highlight files you want to upload; multiple files can be selected by using your Shift or Ctrl keys. 
You can also drag and drop files into the upload window list. Click the “Open” button and the 
files selected will then be copied to the upload window.  
Rearrange pdf pages online - re-order PDF pages in C#.net, ASP.NET, MVC, Ajax, WinForms, WPF
Support Customizing Page Order of PDF Document in C# Project
change pdf page order preview; reorder pdf pages in preview
Rearrange pdf pages online - VB.NET PDF Page Move Library: re-order PDF pages in vb.net, ASP.NET, MVC, Ajax, WinForms, WPF
Sort PDF Document Pages Using VB.NET Demo Code
reorder pdf pages online; reorder pages in pdf online
WSSC ePlan Review Applicant Guide  
23    
Revised 6-3-15 
C# TIFF: How to Reorder, Rearrange & Sort TIFF Pages Using C# Code
C# TIFF - Sort TIFF File Pages Order in C#.NET. Reorder, Rearrange and Sort TIFF Document Pages in C#.NET Application. C# TIFF Page Sorting Overview.
pdf reorder pages online; how to move pages in pdf files
Online Merge PDF files. Best free online merge PDF tool.
Then press the button below and download your PDF. By dragging your pages in the editor area you can rearrange them or delete single pages.
how to reorder pages in pdf online; how to reverse pages in pdf
WSSC ePlan Review Applicant Guide  
24    
Revised 6-3-15 
5.
Click the “Upload” button and a pop-up will appear stating the number of files that are to be 
uploaded and ask if you want to continue. 
VB.NET TIFF: Modify TIFF File by Adding, Deleting & Sort TIFF
you want to change or rearrange current TIFF &ltsummary> ''' Sort TIFF document pages in designed powerful & profession imaging controls, PDF document, image
rearrange pages in pdf document; move pages in pdf reader
VB.NET PDF File & Page Process Library SDK for vb.net, ASP.NET
a PDF document which is out of order, you need to rearrange the PDF you with examples for adding an (empty) page to a PDF and adding empty pages to a
how to rearrange pdf pages; reorder pages pdf
WSSC ePlan Review Applicant Guide  
25    
Revised 6-3-15 
A new window will open stating “Your files have been uploaded” with a list of those files. Click 
the “Close” button underneath the upload results window and this will complete the file upload 
for this cycle.  
6.
Once the files are uploaded to the folder, the folder list is replaced by thumbnail images of each 
file contained in the folder. Next to each thumbnail, the file name, author, date uploaded, file 
size, and History icon displays. 
C# PowerPoint - How to Process PowerPoint
the simplest procedures, for instance, using online clear C# out useless PowerPoint document pages simply with solution to sort and rearrange PowerPoint slides
move pages in pdf document; reorder pages in pdf reader
VB.NET Word: How to Process MS Word in VB.NET Library in .NET
well programmed Word pages sorter to rearrange Word pages in extracting single or multiple Word pages at one & profession imaging controls, PDF document, image
reorder pages in pdf document; how to reorder pdf pages
WSSC ePlan Review Applicant Guide  
26    
Revised 6-3-15 
7.
Ensure all your files have uploaded completely before completing the ‘Applicant Upload’ task. 
You must click on the Applicant Upload task link to accept the task, complete the task by clicking 
on the ‘Upload Process Complete’ button at the bottom of the task eForm. This action will 
submit the project to WSSC. (NOTE: You must complete the Applicant Upload task in order to 
send the project to WSSC.) 
8.
Congratulations! You have successfully finished part one of submitting your plans electronically. 
Please logout after your session is complete. A notification has been sent to WSSC to start the 
prescreening process to determine if the submittal requirements have been met.  
Security Timeout 
Due to security and resource concerns, the system will automatically sign you out after 60 minutes of 
inactivity. When you are ready to resume working with the system, click any button on the screen. The 
system automatically loads the login page for you. You can also close the web browser window and 
reload the login page manually in a new browser window.  
Process Images in Web Image Viewer | Online Tutorials
used document types are supported, including PDF, multi-page easy to process image and file pages with the deleting a thumbnail, and you can rearrange the file
reordering pages in pdf; change page order in pdf online
VB.NET PowerPoint: Sort and Reorder PowerPoint Slides by Using VB.
page will teach you to rearrange and readjust amount of robust PPT slides/pages editing methods and powerful & profession imaging controls, PDF document, image
how to rearrange pdf pages online; moving pages in pdf
WSSC ePlan Review Applicant Guide  
27    
Revised 6-3-15 
Prescreening 
Prescreening is a cursory review of your uploaded documents in preparation for formal review. This will 
be performed by WSSC for all project submittals. Allow a minimum of three (3) working days after you 
have uploaded your documents and completed the Applicant Upload task for the Prescreening process 
to take place. If there are questions or missing items from your submittal, you will receive a 
“Prescreening Corrections Request” e-mail with instructions on the changes requested and how to 
resubmit.  
1.
Click the link in the e-mail to access the ePlan Review (ProjectDox) site and login into ePlan 
Review. 
2.
The CorrectionComplete task will appear at the bottom of the Projects screen.  Click on this task 
and this will launch one Internet Explorer screen with the Corrections eForm and another screen 
with the Drawings and Document folders you saw in the original upload request. 
WSSC ePlan Review Applicant Guide  
28    
Revised 6-3-15 
Close the Corrections eForm, (you will re-open the eForm later when you want to resubmit 
the project back to WSSC after you have made the required corrections to the submittal). 
3.
Review WSSC’s comments to identify which requirements were noted as missing. 
WSSC’s comments will always be provided via ‘Markup comments’ (to view a plan markup, 
click on the icon next to the drawing as shown here.) 
Note: when incorrect file naming convention was used on a file(s), the file will need to be 
deleted (see the “Deleting Files” section for instructions).  
4.
After you have identified the missing or corrected drawings and/or documents to upload, login 
to ePlan Review (if not already logged in) and enter the project. 
5.
Upload the missing and/or corrected drawings and documents (see the “Uploading Your Files” 
section for instructions). 
Note: when a file has a ‘markup comment’ on it, a new version of that file must be uploaded 
by the applicant (continue to use the same file name when uploading corrected plans). 
WSSC ePlan Review Applicant Guide  
29    
Revised 6-3-15 
6.
Click back to the Corrections eForm with your task assignment as shown below. 
7.
When the eForm opens, place a checkmark for the following statement “I have uploaded the 
corrected…” and the Corrections Complete button will display for you to click to complete your 
task. Reminder: If the Pre-Screen Re-Submission Fee for Design Review is due, please ensure the 
current re-submission fee has been submitted and received by the WSSC Permit Services Unit 
before clicking the Corrections Complete button to return your project to WSSC. 
Upon completion, the WSSC will be notified that the files have been completed or corrected and 
will continue with the Prescreening process.  
Acceptance 
If your submittal passes the Prescreen process and is accepted, it will immediately move into the formal 
review process. You will receive a notification email when the project has moved into the formal review 
process. 
WSSC ePlan Review Applicant Guide  
30    
Revised 6-3-15 
Delete Files 
The applicant (engineer) does not have the ability to delete a file from the ePlan Review (ProjectDox) 
System, only the WSSC Intake group has this ability. Therefore, when a submittal is rejected because an 
incorrect file naming convention was used on a file(s), the file(s) will need to be deleted. The applicant 
(engineer) will need to send an OUTLOOK email request to WSSC Intake group specifying the exact 
name of the file, the date of the file, and the folder location (Drawings or Documents) of the file to be 
deleted. Please send the OUTLOOK email to the following WSSC Intake group email address:  
#dsgintake@wsscwater.com 
NOTE: please always use the above email address so as to prevent a delay in the file deletion process if 
one of the contact persons is unavailable or out of the office. 
Email Example: 
WSSC ePlan Review Applicant Guide  
31    
Revised 6-3-15 
Project Status 
Once you have logged into ePlan Review (ProjectDox) the projects screen will display. This is also your 
home screen. The projects screen will list all projects at the top and all tasks at the bottom. The status of 
each project is displayed under the Status column on the projects screen. A more detailed timeline of 
the project reviews (prescreen and formal) which have taken place can be found under the Current 
Project – Workflow Routing Slip report. 
The Current Project - Workflow Routing Slip report is a very useful tool to enable you to see at all times 
exactly where your project reviews stand.  Below are the instructions on how to access this report. 
1)
Click on the Project Number on the projects screen to enter the project. Example: 12OS1311 
Documents you may be interested
Documents you may be interested