c# view pdf : Change page order in pdf reader software control project winforms azure .net UWP WBSScheduleProUserGuide31-part928

page 311
WBS Schedule Pro
Change page order in pdf reader - re-order PDF pages in C#.net, ASP.NET, MVC, Ajax, WinForms, WPF
Support Customizing Page Order of PDF Document in C# Project
rearrange pages in pdf online; move pdf pages in preview
Change page order in pdf reader - VB.NET PDF Page Move Library: re-order PDF pages in vb.net, ASP.NET, MVC, Ajax, WinForms, WPF
Sort PDF Document Pages Using VB.NET Demo Code
how to move pages in pdf acrobat; how to move pages in pdf converter professional
page 312
WBS Schedule Pro
Arr
ange
Choose a general arrangement of boxes. Network Charts will always place Task boxes
from left to right based on their dependencies but you can choose to refine this by
selecting the Arrangement option and selecting one of the following: 
T
op 
D
own f
r
om 
L
eft
- Automatically positions boxes in the chart starting from the
upper left corner placing boxes to the right and down without regard to Critical Tasks. 
T
op 
D
own f
r
om 
L
eft, 
Cri
t
i
ca
l
Fir
st
- Automatically positions boxes in the chart
starting from the upper left corner placing boxes to the right and down with the
Critical Tasks positioned first. 
C
ente
r
ed a
r
ound 
Cri
t
i
ca
l
P
ath
- Attempts to place boxes above and below a central
row of Critical Tasks. Based on the complexities of the dependencies and the number
of critical paths that may be displayed in your project this option may not always
display the desired chart (ie: it's not perfect). 
VB.NET Word: Change Word Page Order & Sort Word Document Pages
Note: if you are trying to change the order of a you want to see other VB.NET Word document editing controls, please read this Word reading page which has
move pages in pdf reader; move pages in pdf acrobat
C# PDF File & Page Process Library SDK for C#.net, ASP.NET, MVC
PDF Document; Remove Password from PDF; Change PDF Permission Settings. Page: Insert PDF pages; VB.NET Page: Delete PDF VB.NET Annotate: PDF Markup & Drawing. XDoc
how to rearrange pdf pages in preview; how to rearrange pages in pdf using reader
page 313
WBS Schedule Pro
R
ows
Click to increase or decrease the spacing between rows in the chart.
C# Word - Process Word Document in C#
various Word document processing implementations using C# demo codes, such as add or delete Word document page, change Word document pages order, merge or
how to rearrange pages in a pdf file; how to rearrange pdf pages reader
VB.NET PDF File & Page Process Library SDK for vb.net, ASP.NET
VB.NET PDF - How to Modify PDF Document Page in VB.NET. VB.NET Guide for Processing PDF Document Page and Sorting PDF Pages Order.
reorder pdf pages reader; how to reorder pages in pdf preview
page 314
WBS Schedule Pro
C
o
l
umns
Click to increase or decrease the spacing between columns in the chart. 
C# PowerPoint - Sort PowerPoint Pages Order in C#.NET
control, developers can swap or adjust the order of all or several PowerPoint document pages, or just change the position of certain one PowerPoint page in an
rearrange pages in pdf document; how to reorder pages in pdf
C# Word - Sort Word Pages Order in C#.NET
library control, developers can swap or adjust the order of all or several Word document pages, or just change the position of certain one Word page in an
how to move pages within a pdf document; change pdf page order preview
page 315
WBS Schedule Pro
Ti
mesca
l
e
Select to turn 
O
n
the Timescale or deselect to turn 
O
ff
the Timescale in the Network
Chart. 
C# PDF: C# Code to Process PDF Document Page Using C#.NET PDF
Enable C#.NET developers to change the page order of source PDF document file; Allow C#.NET developers to add image to specified area of source PDF document
move pages within pdf; rearrange pages in pdf file
C# PDF Page Rotate Library: rotate PDF page permanently in C#.net
Empower C# Users to Change the Rotation Angle of PDF File DLLs for PDF Page Rotation in C#.NET Project. In order to run the sample code, the following steps
rearrange pdf pages; pdf change page order acrobat
page 316
WBS Schedule Pro
F
o
r
mat 
Ti
mesca
l
e
Displaying a Timescale in a Network Chart allows you to display tasks that 
Sta
r
t
or
Fi
n
i
sh
within a certain time period. 
Display time units such as Days, Weeks, Months, Quarters or Years (or every 3 days,
every two weeks, etc…).  You can specify different time units and whether you want to
view tasks that Start in this time period or Finish in this time period. 
T
o d
i
sp
l
ay a 
Ti
mesca
l
i
n the 
N
etwo
rk
C
ha
r
t
:
1.
Select the F
o
r
mat
Tab and select the Ti
mesca
l
e
checkbox. This displays the
Timescale with the last used settings.
or 
2.
Select the F
o
r
mat
Tab and then F
o
r
mat 
Ti
mesca
l
e
. Modify the settings and
click OK.  
T
o tu
r
n off the 
Ti
mesca
l
i
n the 
N
etwo
rk
C
ha
r
t
:
1.
Select the F
o
r
mat
Tab and deselect the Ti
mesca
l
e
checkbox. 
or
2.
Select the F
o
r
mat
Tab and then
F
o
r
mat 
Ti
mesca
l
e
. Click N
Ti
mesca
l
e
.
or
3.
Right-click on the Timescale and deselect the
 Show 
Ti
mesca
l
e
option. 
page 317
WBS Schedule Pro
Ti
me 
B
ands
B
and 
B
y
– Select the field to use when placing a task in the time band. If you
select Start, all tasks that Start during the time period are displayed in the time
band. If you select Finish then all tasks that finish within that time period are
displayed in the time band. 
U
n
i
ts
– Select to display the timescale by Hour, Day, Week, Month, Quarter, Half
Year or Year time units. 
C
ount
– Select the time interval between units. Enter 1 to display every time
period, 2 to display every other time period and so on. For example, if you were
displaying Weeks as the Units, entering 2 in the Count would display a time band
every two weeks.  
D
on
t Show 
E
mpty 
Ti
me 
B
ands
– Hides the time bands in the chart that do not
contain tasks. 
Di
v
i
d
i
ng 
Li
nes
– Defines the line style and color of the vertical dividing lines. 
L
abe
l
s
P
os
i
t
i
on
– Select to display the timescale labels at the Top, Bottom or both Top
and Bottom.
page 318
WBS Schedule Pro
C
ount 
Fr
om
– This option only applies when you choose to display dates as Day 1,
Day 2… or Week 1, Week 2, etc… The Pr
o
j
ect Sta
r
t
option uses the Project Start
Date to start counting up from this date, eg: Day 1, Day 2, etc. Pr
o
j
ect 
Fi
n
i
sh
uses the Project Finish Date to start counting down from this date eg: Day –5, Day
–4, etc... E
a
rli
est 
T
as
k uses the earliest task displayed on the screen to start
counting. L
atest 
T
as
k uses the latest task displayed on the screen to start counting
down from this date. T
oday
uses today’s date to start counting. 
F
o
r
mat
– Select the date format for the timescale.   
Show 
F
u
ll
D
ate 
R
ange
– Displays the full range of dates when applicable. For
example, if  a two week period is selected, the full date range would display dates
as J
an 1, 2016 
J
an 14, 2016
instead of J
an 1, 2014
F
ont
– Select the font size for the timescale labels. 
Ali
gn
– Select to align the labels within the time band either left, right or center.   
S
i
ze
– Select the font size of the timescale label.   
T
ext
– Select this to define the color of the timescale label text. 
Fill – Select this to define the background color of the timescale labels. 
M
a
r
g
i
ns
– Select to adjust the margins around the timescale label.   
page 319
WBS Schedule Pro
Tr
ace
Select to turn 
O
n
the 
Tr
ace
feature or deselect to turn 
O
ff
the 
Tr
ace
feature. 
page 320
WBS Schedule Pro
Tr
ace 
O
pt
i
ons
Select a Task or Tasks in the Network Chart and display only those tasks that
lead up to and/or follow the selected task(s). You can also specify that only
Critical Tasks are included in the trace and that the trace be limited to so many
tasks forward or backwards from the selected task(s). 
T
o pe
r
fo
r
m a 
Tr
ace 
i
n the 
N
etwo
rk
C
ha
r
t
:
1.
Select a task or multiple tasks (ctrl-click) in the Network Chart. 
2.
Select the F
o
r
mat
Tab and select the Tr
ace
checkbox. This Traces the
selected task(s) with the last used settings.
or 
3.
Select the F
o
r
mat
Tab and then Tr
ace 
O
pt
i
ons
. Modify the settings
and click OK.  
Dir
ect
i
on f
r
om se
l
ected tas
k
s
– Select one of the three options to trace
tasks Forward from the selected task, Backwards from the selected task or both
Forwards and Backwards from the selected task. 
Tr
ace on
l
y c
ri
t
i
ca
l
 tas
k
s
– Select to display only the Critical tasks when the
Trace is applied. Deselect this option to include Critical and Noncritical tasks
when the Trace is applied. 
Li
m
i
t t
r
ace to x tas
k
s fo
r
wa
r
d o
r
 bac
k
wa
r
d
– Select to display only x
number of tasks forward or backward from the selected task when the trace is