page 81
WBS Schedule Pro
specified in the Constraint Date field.   
C
onst
r
a
i
nt 
D
ate
The constraint date is used along with the Constraint Type for scheduling tasks.
The “As Soon As Possible” and “As Late As Possible” constraint types do not use a
Constraint Date, thus allowing the task to be scheduled based on the dependencies
associated with a task. 
N
ote
: To remove a Constraint on a task, assign the “As Soon As Possible”
constraint to a task. This will remove the Constraint Date and allow the task to
schedule based on the dependencies. 
A
ctua
l
 Sta
r
t and 
A
ctua
l
Fi
n
i
sh
Entering an Actual Start and/or Actual Finish into a Task Information overrides any
of the above scheduling options. Once an Actual Start and/or Actual Finish is
entered that task will be scheduled on those dates. 
Pdf rearrange pages - re-order PDF pages in C#.net, ASP.NET, MVC, Ajax, WinForms, WPF
Support Customizing Page Order of PDF Document in C# Project
pdf reorder pages; reorder pages in a pdf
Pdf rearrange pages - VB.NET PDF Page Move Library: re-order PDF pages in vb.net, ASP.NET, MVC, Ajax, WinForms, WPF
Sort PDF Document Pages Using VB.NET Demo Code
how to rearrange pdf pages online; move pages in pdf document
page 82
WBS Schedule Pro
M
ov
i
ng 
&
R
epos
i
t
i
on
i
ng 
T
as
k
i
n a 
WB
C
ha
r
t
In the WBS Chart, tasks can be rearranged by several different ways. You can Cut
(move) or Copy a task or set of tasks from one part of the WBS chart to another area
in the WBS chart thus changes the structure of the chart. You can also Reposition
tasks in a WBS Chart that does not change the structure of the chart. 
The differences between Cutting/Copying tasks and Repositioning tasks are
demonstrated in the following examples and explained in greater detail below:
C
ut o
r
C
opy 
i
nvo
l
ves p
l
ac
i
ng the tas
k
i
n a d
i
ffe
r
ent pa
r
t of the 
WB
S cha
r
t
thus chang
i
ng the st
r
uctu
r
e.
Using C
ut
or C
opy
with the
above chart…
…Task 2 can be C
ut
and Pasted below
Task 3…
…or Task 2 can be C
op
i
ed
and Pasted below Task 3.
R
epos
i
t
i
on
i
ng 
i
nvo
l
ves mov
i
ng a tas
k
 o
r
 set of tas
k
s w
i
thout chang
i
ng the
st
r
uctu
r
e of the 
WB
S cha
r
t. 
Repositioning means to move
a task…
…to a new location by
dragging the edge of
the box.
C
ut
/
C
opy and 
P
aste 
T
as
k
i
WB
S Schedu
l
Pr
o
When working with an unlinked (standalone) WBS Chart you can select a single
task, summary task or multiple tasks to be Cut or Copied. WBS Charts that are
C# TIFF: How to Reorder, Rearrange & Sort TIFF Pages Using C# Code
C# TIFF - Sort TIFF File Pages Order in C#.NET. Reorder, Rearrange and Sort TIFF Document Pages in C#.NET Application. C# TIFF Page Sorting Overview.
move pages in pdf reader; change pdf page order online
VB.NET TIFF: Modify TIFF File by Adding, Deleting & Sort TIFF
you want to change or rearrange current TIFF &ltsummary> ''' Sort TIFF document pages in designed powerful & profession imaging controls, PDF document, image
reorder pages in pdf online; how to move pdf pages around
page 83
WBS Schedule Pro
linked to a Microsoft Project Plan are restricted to Copy and Cut actions on a single
task or a single summary task only. Performing a Cut or Copy action on a summary
task also includes all of the subtasks under the summary task in the action as
well. 
There are several ways to Cut and Copy tasks:   
Cli
c
k
 and 
Dr
ag - 
Place the cursor on a task, left-click the mouse, drag and drop
over another task. This C
uts
the selected task and places it relative to the
destination task based on the red directional arrow (the red up/down/left or
right arrow you see when you are over the destination task). 
C
t
rl
-
Cli
c
k
 and 
Dr
ag - 
Hold the Ctrl key down, place the cursor on a task,
left-click the mouse, drag and drop over another task. This C
op
i
es 
the selected
task and places it relative to the destination task based on the red directional
arrow (the red up/down/left or right arrow you see when you are over the
destination task). 
Ri
ght-
Cli
c
k
– Place your cursor on a task and right-click. This displays a menu
allowing you to choose to Cut or Copy the selected task. Right-click on another
task to display the menu for Pasting. 
Ri
bbon 
B
uttons 
– Select a task and choose the Cut or Copy button on the
Home tab to Cut or Copy the selected task. Press the Paste button to Paste
Before the selected task or choose the drop down arrow below the Paste button
to Paste After or as a Subtask to the selected task. 
Ri
ght-
Cli
c
k
 and 
Dr
ag 
Place your cursor on a summary task or task, click the
Right Mouse button, Drag and place it over the destination task box. This
displays the following menu, prompting you to Move or Copy the selected Task
relative to the destination task (before, after, or as a subtask). You also have
the option of copying the Custom Box Settings from one task box to another.
The Custom Box Settings define the box style and color.
R
epos
i
t
i
on
i
ng 
T
as
k
i
WB
S Schedu
l
Pr
o
Repositioning a task box to another area of the chart means to move it without
changing the structure of the chart. To reposition a summary task or task in the
WBS chart, position the mouse over the edge of the box in order to get the
up-down arrow or left-right arrow, then:
Click and Drag on the top or bottom edge of a Summary Task or Task box to
move its position up or down in the chart.  
Click and Drag on the left or right edge of a Summary Task or Task box to move
its position left or right in the chart.  
N
ote
: Summary tasks and tasks are repositioned relative to the task to their left
VB.NET PDF File & Page Process Library SDK for vb.net, ASP.NET
page directly. Moreover, when you get a PDF document which is out of order, you need to rearrange the PDF document pages. In these
rearrange pages in pdf document; rearrange pdf pages online
Online Merge PDF files. Best free online merge PDF tool.
the button below and download your PDF. The perfect conversion tool. By dragging your pages in the editor area you can rearrange them or delete single pages.
change page order in pdf file; reverse page order pdf
page 84
WBS Schedule Pro
by increasing/decreasing this distance. Therefore, some tasks cannot be
repositioned if they are the left-most task at that level.
C# PowerPoint - How to Process PowerPoint
pages simply with a few lines of C# code. C# Codes to Sort Slides Order. If you want to use a very easy PPT slide dealing solution to sort and rearrange
pdf move pages; how to move pages in pdf converter professional
VB.NET Word: How to Process MS Word in VB.NET Library in .NET
well programmed Word pages sorter to rearrange Word pages in extracting single or multiple Word pages at one & profession imaging controls, PDF document, image
how to change page order in pdf acrobat; rearrange pages in pdf
page 85
WBS Schedule Pro
M
ov
i
ng 
&
R
epos
i
t
i
on
i
ng 
T
as
k
i
n a 
N
etwo
rk
C
ha
r
t
A
utomat
i
c vs. 
M
anua
l
B
ox 
P
os
i
t
i
on
i
ng
Tasks in a Network Chart are either Automatically or Manually positioned based.
Before you begin clicking and dragging to move tasks around, it is a good idea to
understand these two concepts. 
A
utomat
i
B
ox 
P
os
i
t
i
on
i
ng 
Automatic Box Positioning means that WBS Schedule Pro determines the best
location for positioning boxes in the Network Chart based on the dependencies
defined in the project. In general it tries to place a Successor task directly to the
right of its Predecessor task but there are many other rules for placing boxes to
account for tasks without dependencies, multiple successors and different types of
dependencies (like Start to Start, etc). 
By default, all boxes are positioned Automatically until you manually move a box (by
clicking and dragging the box edge). Once you move a box the entire Network Char
becomes “locked” and boxes are no longer automatically positioned. When locked,
the word LOCKED will appear in the Status Bar at the bottom of the screen.
To Unlock the entire Network Chart and automatically position boxes in the chart,
choose the Format tab and select A
uto 
L
ayout
. Or, select a group of tasks on the
screen and choose L
ayout Se
l
ected
from the Format tab to automatically position
only the selected tasks relative to their dependencies. 
N
ote
: When you create a Network Chart from Microsoft Project, the tasks are
automatically positioned by default. If you move a task and the chart becomes “
locked”, any new tasks added in Microsoft Project are automatically placed in the
most logical position relative to the locked boxes. 
M
anua
l
B
ox 
P
os
i
t
i
on
i
ng
You can click and drag the edge of a box and place it anywhere in the Network
Chart. When you manually position boxes this way the automatic positioning of
boxes is turned off and all boxes are locked into position. With a Manually Positioned
chart, the schedule is still calculated and the dependency lines are still drawn
between boxes, it's just that a task box may not appear next to its predecessor or
successor task because it has been moved.
To move a task in a Network Chart:
1. Place the cursor on the edge of a box until you see a four-way arrow. 
2. Click and drag this box to a new location in the chart.
VB.NET PowerPoint: Sort and Reorder PowerPoint Slides by Using VB.
page will teach you to rearrange and readjust amount of robust PPT slides/pages editing methods and powerful & profession imaging controls, PDF document, image
reorder pages in a pdf; how to reorder pages in pdf preview
Process Images in Web Image Viewer | Online Tutorials
used document types are supported, including PDF, multi-page easy to process image and file pages with the deleting a thumbnail, and you can rearrange the file
change page order in pdf online; how to reorder pages in pdf file
page 86
WBS Schedule Pro
You can also highlight and move multiple tasks at once. 
Any new tasks that are added are placed in the location where you create them and
stay there until you move them or select to Automatically position boxes. 
N
ote
: Certain features like Grouping and applying a Timescale may rearrange the
tasks in the chart thus overriding any manual box positions. If you have manually
positioned tasks in the chart and you wish to apply a Group or Timescale, try
making a copy of the current View or try switching Views. Each View maintains box
positions separately therefore you can have one view where your boxes are
positioned exactly where you want them and another View using the Group or
Timescale feature with automatic box positions.
M
ov
i
ng 
T
as
k
s when 
Gr
ouped
If the Network Chart is Grouped and you move a task from one group to another it
will move that task into the other group 
and
Lock the chart so it no longer
automatically positions tasks. Selecting Auto Layout will automatically position tasks
including the task that you moved to the new group. In other words, it positions the
recently moved tasks around the tasks in its new group. 
page 87
WBS Schedule Pro
M
ov
i
ng 
&
R
epos
i
t
i
on
i
ng 
T
as
k
i
n a 
T
as
k
 Sheet
Moving and repositioning Tasks in the Task Sheet can be done two ways: 
1. You can Cut/Copy and Paste by clicking the leftmost column in the chart and selecting
Cut or Copy from the Ribbon. Then select another task in the Sheet and press Paste to
move or copy the tasks above the selected one. 
2. You can click the leftmost column and drag to move tasks from one row in the Task
Sheet to another. Select multiple tasks to move more than one. 
Once the entire row is selected you can also use Ctrl-C to copy, Ctrl-X to Cut and Ctrl-V to Paste
tasks. 
page 88
WBS Schedule Pro
Gr
oups and 
O
ut
li
n
i
ng 
D
ef
i
ned
Gr
oup
i
ng 
D
ef
i
ned
Grouping is a very powerful feature in WBS Schedule Pro. It offers a completely
different way to visually organize, display and manage your projects. 
Grouping (also referred to as Outlining) defines the structure or hierarchy of a
project. By default a project is grouped by Outline. If you use MS Project, this
outline corresponds to the "Indenting" that you do in a Gantt Chart. In WBS
Schedule Pro, grouping by Outline looks like this in a WBS Chart: 
Like this in a Network Chart: 
And like this in the Task Sheet:
page 89
WBS Schedule Pro
Grouping by O
ut
li
ne
is the most common way to organize a project. As you define
the structure of the project, 
Summa
r
T
as
k
s
are created. A Summary Task is
defined as anything with a subordinate. This is the way MS Project works by
default and this is the way WBS Schedule Pro works by default. 
WBS Schedule Pro can also be used to display a different structure or hierarchy in
a project. You can "Group" by a variety of fields to produce a top-down, WBS-style
view, a horizontally-banded Network Chart or an indented Task list. As you Group
by other fields in WBS Schedule Pro, Summary Tasks are replaced by Gr
oup
H
eade
r
s
. A Group Header appears like a Summary Task but is not an entity like a
Summary Task, it simply represents the items being displayed under it. 
As an example, this Task Sheet uses the Text1 field to add Department values:
If you now "Grouped" this Task Sheet by Text1 it would look like this: 
page 90
WBS Schedule Pro
As you can see the Summary Tasks are replaced by Group Headers that represent
the different Department values.  
The WBS Chart would look like this: 
And the Network Chart would look like this: 