WBS Schedule Pro
Group Headers behave a lot like Summary Tasks. Information is rolled-up to the
Group Headers much like Summary Tasks roll up information. Tasks can be added
within the groups. Tasks can even be moved from one group to another. As you
move tasks from one group to the next the task is updated with the new group
value. This allows you to do things like Group by Resource Names and drag a task
from one Resource group to another to reassign it. 
Grouping is a great way to visually display the various hierarchies that exist in a
project. See the next section on the how to change groups and to work with
projects while grouped. 
How to move pages in a pdf - re-order PDF pages in C#.net, ASP.NET, MVC, Ajax, WinForms, WPF
Support Customizing Page Order of PDF Document in C# Project
how to move pages in a pdf document; change page order pdf acrobat
How to move pages in a pdf - VB.NET PDF Page Move Library: re-order PDF pages in vb.net, ASP.NET, MVC, Ajax, WinForms, WPF
Sort PDF Document Pages Using VB.NET Demo Code
how to rearrange pages in a pdf file; switch page order pdf
page 92
WBS Schedule Pro
C
hang
i
ng and 
E
d
i
t
i
ng 
Gr
oups
C
hang
i
ng the way p
r
o
j
ects a
r
Gr
ouped
The Grouping dialog allows you to change how the structure of the project is
displayed. 
There are three ways to Group the data in a project. They are:
1. T
he 
D
efau
l
O
ut
li
ne St
r
uctu
r
e
- This is the standard way to display a
hierarchy in WBS Schedule Pro. Creating a WBS Chart or Indenting Tasks in the
Gantt Chart or Task Sheet creates Tasks and Summary Tasks. For example, 
C# TIFF: How to Reorder, Rearrange & Sort TIFF Pages Using C# Code
Using this C#.NET Tiff image management library, you can easily change and move the position of any two or more Tiff file pages or make a totally new order for
how to move pages in a pdf; change pdf page order reader
C# Word - Sort Word Pages Order in C#.NET
page reorganizing library control, developers can swap or adjust the order of all or several Word document pages, or just C# DLLs: Move Word Page Position.
change pdf page order preview; pdf reorder pages
page 93
WBS Schedule Pro
o
r
The Default Outline Structure uses the Outline Number field to create the
hierarchy. The Outline Number field in WBS Schedule Pro can only be created by
Inserting or Moving Tasks and Summary Tasks. 
This is the same technique that Microsoft Project uses. Microsoft Project creates
the Outline by indenting tasks in a Gantt Chart. In WBS Schedule Pro, creating a
WBS Chart or Indenting/Outdenting tasks in the Gantt Chart or Task Sheet creates
the same Outline that you would see in Microsoft Project. 
2. U
s
i
ng a S
i
ng
l
Fi
e
l
d
- This refers to using a single field to define the structure
of the project. This single field must contain hierarchical information such as A,
A.1, A.1.1, A.1.2, etc. When you select this field on which to group, WBS Schedule
Pro will attempt to parse this field to determine a hierarchy. This is useful if you
have defined your own hierarchy using the WBS, Text or Outline Code fields. 
3. U
s
i
ng a Se
ri
es of 
Fi
e
l
ds
- This refers to using a non-hierarchical field to
display the structure of the project. This can be a single field with many of the
same values or several fields with various values to  define the structure. 
An example of this is the R
esou
r
ce 
N
ames
field. Grouping on Resource Names
would create a hierarchy of Resources and Tasks assigned to these Resources. Like
this: 
C# PowerPoint - Sort PowerPoint Pages Order in C#.NET
library control, developers can swap or adjust the order of all or several PowerPoint document pages, or just change the C# DLLs: Move PowerPoint Page Position.
how to change page order in pdf acrobat; pdf move pages
C# PDF File & Page Process Library SDK for C#.net, ASP.NET, MVC
RasterEdge XDoc.PDF allows you to easily move PDF document pages position, including sorting pages and swapping two pages. Copying and Pasting Pages.
reorder pages in pdf reader; pdf change page order
page 94
WBS Schedule Pro
The Text fields are another useful way to utilize this grouping feature. As a
example, if you used a Text field to store the Department names you may have
information like this: 
The current outline of the above uses the Default Outline Level to display the
structure. Selecting to Group on the Text 1 field would produce this result in a Task
Sheet: 
Or this in a WBS Chart: 
C# PDF insert text Library: insert text into PDF content in C#.net
int pageIndex = 0; // Move cursor to (400F, 100F). String outputFilePath = Program.RootPath + "\\" output.pdf"; doc.Save(outputFilePath);
pdf page order reverse; reorder pages in pdf file
C# PDF Image Extract Library: Select, copy, paste PDF images in C#
Get image information, such as its location, zonal information, metadata, and so on. Able to edit, add, delete, move, and output PDF document image.
rearrange pdf pages; how to move pdf pages around
page 95
WBS Schedule Pro
The above uses a single Text field but you can also use several or a combination of
fields that contain the breakdown of information you wish to display. 
The 
So
r
t by
options allow you to change the order in which the detail items
appear. The Sort options only apply when you are grouped by a Single
non-hierarchical field or Series of Fields. 
The 
Show 
E
mpty 
Gr
oups
option displays a group header when there are no items
assigned to that group. For example, if you have Resources defined and are
Grouped by Resource Names, selecting this checkbox would display all Resources
in the chart including Resources that don't have Task assignments. De-selecting
this option would only display Resources that have been assigned to Tasks. 
The Grouping defined in the Groups dialog applies across WBS Charts, Network
Charts, Gantt Charts and Task Sheets unless you select the Independent checkbox
in the Home tab. Selecting the Independent checkbox applies the Grouping
changes only to the current view. 
VB.NET PDF insert text library: insert text into PDF content in vb
Dim pageIndex As Integer = 0 ' Move cursor to (400F, 100F). Dim outputFilePath As String = Program.RootPath + "\\" output.pdf" doc.Save(outputFilePath).
how to change page order in pdf document; change page order pdf reader
VB.NET PDF Library SDK to view, edit, convert, process PDF file
Rapidly and multiple PDF document (pages) creation and edit methods file formats; merge, append, and split PDF files; insert, delete, move, rotate, copy
change page order pdf preview; how to reorder pages in pdf
page 96
WBS Schedule Pro
Tr
ansfe
rri
ng a p
r
o
j
ect to 
Mi
c
r
osoft 
Pr
o
j
ect
You can use WBS Schedule Pro to create your projects first and then transfer these to
Microsoft Project for further scheduling. 
If you create a new project in WBS Schedule Pro it is considered a “standalone”
project. This means that the project (the .wbs file) is a self-contained file with 
a
ll
 of
the data and fo
r
matt
i
ng opt
i
ons
embedded into this file. 
To transfer the current WBS Schedule Pro standalone project to Microsoft Project,
select the MS Project button on the Home tab.
Transferring a standalone WBS Schedule Pro project to Microsoft Project means that
the 
data that ex
i
sts 
i
n the 
WB
S Schedu
l
Pr
o p
r
o
j
ect cha
r
t w
ill
 be t
r
ansfe
rr
ed
to the 
Mi
c
r
osoft 
Pr
o
j
ect p
l
an
. The  WBS Schedule Pro project then becomes
"linked" to this Microsoft Project plan. 
During this process you are prompted to save the data to the Microsoft Project plan.
Once this happens you will then have two files; the Microsoft Project file (*.mpp)
containing the data and the WBS Schedule Pro project (*.wbs) containing the
formatting options. Opening a WBS Schedule Pro file that is linked to a Microsoft
Project plan opens the WBS chart with all the formatting and also opens the
corresponding Microsoft Project file to which it is linked. 
N
ote
: Do not delete a Microsoft Plan that is linked to a WBS Schedule Pro plan. If you
do this your data will be lost. 
If you have configured Microsoft Project to integrate with WBS Schedule Pro you can
also open the Microsoft Project plan first and select the WBS Chart, Network Chart or
Task Sheet buttons to go to the saved chart corresponding to the Microsoft Project
plan.  
page 97
WBS Schedule Pro
Cr
eat
i
ng cha
r
ts f
r
om 
Mi
c
r
osoft 
Pr
o
j
ect
If you have configured Microsoft Project to include the integration to WBS Schedule
Pro you can create WBS Schedule Pro charts from existing Microsoft Project plans. 
To set this up: 
See: Configuring Microsoft Project 98 to Project 2007
See: Configring Microsoft Project 2010, 2013 and 2016
To create a WBS Schedule Pro chart from an existing Microsoft Project plan: 
1. Start Microsoft Project. 
2. Click the WBS Chart, Network Chart or Task Sheet button from within MS
Project to go to that chart. 
WBS Schedule Pro is started and the current project plan from Microsoft Project is
displayed in the corresponding chart. 
When you create a WBS chart from an existing Microsoft Project plan, the WBS chart
is dynamically linked to this Microsoft Project plan. If you add, modify or delete tasks
in the WBS chart, this information is immediately sent to Microsoft Project. 
Ti
p
:
When a WBS chart is dynamically linked to a Microsoft Project plan the word
L
I
NKED appears in the lower right corner of the screen. 
Sav
i
ng a 
WB
S Schedu
l
Pr
o p
r
o
j
ect 
li
n
k
ed to a 
Mi
c
r
osoft 
Pr
o
j
ect p
l
an
In a WBS Schedule Pro project that is linked to MS Project, keep in mind that the data
is stored in Microsoft Project (a .MPP file) and the WBS chart formatting is stored in
the WBS chart file (a .WBS file). When you save a WBS Schedule Pro project that is
linked to a Microsoft Project plan, it saves both the WBS Schedule Pro file (.WBS) 
and
the corresponding Microsoft Project plan (.MPP). 
The saved WBS Schedule Pro project contains the formatting of the chart, and a link
to the Microsoft Project plan where the data is stored. 
To save the WBS Schedule Pro project, select the File menu and choose Save (or Save
As). Specify a filename and click OK.
O
pen
i
ng a 
WB
S cha
r
li
n
k
ed to a 
Mi
c
r
osoft 
Pr
o
j
ect p
l
an
There are two ways to open a WBS Schedule Pro project that is linked to a Microsoft
Project plan. They are: 
page 98
WBS Schedule Pro
1. From within Microsoft Project, click a WBS Schedule Pro button. If you have
previously created a project from this Microsoft Project plan and saved it, it will
remember this and automatically open this chart for you to continue working. If
it does not open the previously saved chart, see the Note below. 
2. From within WBS Schedule Pro, if you open the WBS Schedule Pro project
(*.WBS file) that is linked to the Microsoft Project plan it will automatically open
Microsoft Project and the corresponding Microsoft Project plan. 
N
ote
:
If you rename or move a Microsoft Project plan that is linked to a WBS
Schedule Pro project, Microsoft Project may not be able to locate the WBS Schedule
Pro project the next time you try to load  it  from the Microsoft Project plan. If you
move or rename a Microsoft Project plan that is linked to a particular WBS Schedule
Pro file, perform the following to relink the MS Project plan to the WBS Schedule Pro
file: 
1.
Open WBS Schedule Pro. 
2.
Select File-Open.
3.
Click on the WBS Schedule Pro file (the .WBS file) that was linked to the
Microsoft Project plan. 
4.
Select Li
n
k
 to anothe
r
 datasou
r
ce
and click Open.
5.
Locate the Microsoft Project plan and select Open.
page 99
WBS Schedule Pro
When you save the WBS Schedule Pro project it will remember the new name and
location of the Microsoft Project plan to which it is linked. 
page 100
WBS Schedule Pro
Ti
ps fo
r
 us
i
ng 
WB
S Schedu
l
Pr
o w
i
th 
M
Pr
o
j
ect
When you create a chart from an existing Microsoft Project plan you must remember
that you are dynamically linked to this plan and any changes made in WBS Schedule
Pro are immediately reflected in Microsoft Project. If you add or delete tasks in WBS
Schedule Pro, these tasks are immediately added or deleted in Microsoft Project. 
A chart created from an existing Microsoft Project can be saved but this does not save
the data into the .wbs file. All project data is still maintained in Microsoft Project.
Saving a chart that is linked to a Microsoft Project plan only saves the link and any
chart-specific items that cannot be saved in Microsoft Project like box placement,
custom box colors and formatting options.
If you create a chart from an existing Microsoft Project plan and you do not want this
chart to be dynamically linked to the corresponding Microsoft Project plan you can 
U
n
li
n
k the chart. In WBS Schedule Pro, to Unlink a plan from a MS Project plan,
choose Project-Unlink. Unlinking the chart from the Microsoft Project plan will save all
of the data to the WBS Schedule Pro file. Once you save as a standalone chart, this
chart cannot be linked back to the original Microsoft Project plan from which it was
created. You can only use this standalone chart to create a 
new
Microsoft Project
plan.
See also Saving charts