display first page of pdf as image in c# : Rotate pdf pages by degrees control Library platform web page .net windows web browser analytics-desktop_user-guide27-part1094

MicroStrategy Analytics Desktop User Guide
Creating and Modifying Dashboards   
3
© 2014  MicroStrategy, Inc.
Creating a metric based on existing metrics: Derived metrics   
257
name of the metric to use to create the derived metric, then click the 
arrow icon on the right.
3 Point to New Metric, then Moving Totals.
4 From the drop-down list, select the function to use to calculate the 
moving total. For example, to calculate a moving sum, select Sum.
5 In the Window Size field, type the window size to use to calculate the 
moving total.
6 To specify additional parameters to define the function, click the 
Advanced arrow in the bottom right. The Function Arguments for New 
Metric dialog box opens. Enter the appropriate options to define the 
function. For a description of the available options, see Function 
Arguments for New Metric dialog box, page 441.
7 Click OK. The new metric is added to the dashboard.
To create a new metric by assigning a numeric rank to each value in a metric
When you rank each value in a metric, you can choose to break the rankings 
by a specific attribute. Breaking the rankings by an attribute restarts the 
ranking calculation for each element in that attribute. For example, a Grid 
visualization displays revenue data for each Call Center in a Region.
• If you choose to break the data by Region, the metric values for each Call 
Center will be assigned a number based on each value’s rank within its 
region.
• If you choose to break the data by Country, the metric values for each Call 
Center will be assigned a number based on each value’s rank within its 
country.
1 Click the name of the dashboard to run it.
2 When you create and add a derived metric to a dashboard, you can also 
add the derived metric immediately to a specific visualization to be 
displayed. Do one of the following:
• To create the metric without adding it to a visualization, from the 
Dataset Objects panel, hover the cursor over the name of the metric to 
use to create the derived metric, then click the arrow icon on the right.
Rotate pdf pages by degrees - rotate PDF page permanently in C#.net, ASP.NET, MVC, Ajax, WinForms, WPF
Empower Users to Change the Rotation Angle of PDF File Page Using C#
rotate pdf pages by degrees; how to rotate all pages in pdf
Rotate pdf pages by degrees - VB.NET PDF Page Rotate Library: rotate PDF page permanently in vb.net, ASP.NET, MVC, Ajax, WinForms, WPF
PDF Document Page Rotation in Visual Basic .NET Class Application
rotate pdf pages in reader; pdf rotate pages separately
Creating and Modifying Dashboards
MicroStrategy Analytics Desktop User Guide
3
258
Creating a metric based on existing metrics: Derived metrics
© 2014  MicroStrategy, Inc.
• To create the metric and add it immediately to a specific visualization, 
from the visualization’s Drop Zones panel, hover the cursor over the 
name of the metric to use to create the derived metric, then click the 
arrow icon on the right.
3 Point to New Rank Metric, then select one of the following:
• To display the metric values by rank in ascending order, select 
Ascending.
• To display the metric values by rank in descending order, select 
Descending.
4 Under Break By, select the check box next to each attribute to use to 
break the ranking data.
5 To specify additional parameters to define the function, click the 
Advanced arrow in the bottom right. The Function Arguments for New 
Metric dialog box opens. Enter the appropriate options to define the 
function. For a description of the available options, see Function 
Arguments for New Metric dialog box, page 441.
6 Click OK. The new metric is added to the dashboard.
To create a new metric by displaying metric values as percentages of a 
cumulative total
1 Click the name of the dashboard to run it.
2 When you create and add a derived metric to a dashboard, you can also 
add the derived metric immediately to a specific visualization to be 
displayed. Do one of the following:
• To create the metric without adding it to a visualization, from the 
Dataset Objects panel, hover the cursor over the name of the metric to 
use to create the derived metric, then click the arrow icon on the right.
• To create the metric and add it immediately to a specific visualization, 
from the visualization’s Drop Zones panel, hover the cursor over the 
name of the metric to use to create the derived metric, then click the 
arrow icon on the right.
3 Point to Percent to Total, then select one of the following:
The options available may vary depending on whether attributes 
have been added to the visualization and the location in which 
C# TIFF: How to Rotate TIFF Using C# Code in .NET Imaging
C#.NET PDF pages extract, copy, paste, C#.NET rotate PDF pages, C#.NET VB.NET How-to, VB.NET PDF, VB.NET Word, VB In general, you are able to rotate any page of
rotate pdf page; how to reverse page order in pdf
C# PDF: PDF Document Viewer & Reader SDK for Windows Forms
Roate90: Rotate the currently displayed PDF page 90 degrees clockwise. Rotate180: Rotate the currently displayed PDF page 180 degrees clockwise.
saving rotated pdf pages; rotate single page in pdf
MicroStrategy Analytics Desktop User Guide
Creating and Modifying Dashboards   
3
© 2014  MicroStrategy, Inc.
Creating a metric based on existing metrics: Derived metrics   
259
attributes have been added. For example, if the Year attribute is 
added to the Rows area of a Grid visualization, you can select Over 
Rows to display the metric values as percentages of the 
accumulated row total. If the Category and Month attributes are 
added to the visualization, you can choose to create the 
percent-to-total metric based on Category or Month.
• To display the metric values as percentages of an accumulated row or 
column total, select Over Rows or Over Columns.
• To display the metric values as percentages of a grand total, select 
Grand Total.
• To display the metric values as percentages of a cumulative total for 
each element of an attribute in the visualization, select the name of 
the attribute.
The new metric is added to the dashboard.
To create a new metric by combining the values of two or more metrics
1 Click the name of the dashboard to run it.
2 When you create and add a derived metric to a dashboard, you can also 
add the derived metric immediately to a specific visualization to be 
displayed. Do one of the following:
• To create the metric without adding it to a visualization, from the 
Dataset Objects panel, press CTRL and click the names of the metrics 
to use to create the derived metric. Hover the cursor over the names of 
the metrics, then click the arrow icon on the right.
• To create the metric and add it immediately to a specific visualization, 
from the visualization’s Drop Zones panel, press CTRL and click the 
names of the metrics to use to create the derived metric. Hover the 
cursor over the names of the metrics, then click the arrow icon on the 
right.
3 Point to New Metric, then select the function to use to combine the 
metrics. The options are:
• To add the metrics together, select Add.
• To calculate the average of the selected metrics, select Average.
• To calculate the maximum across each of the selected metrics, select 
Greatest.
VB.NET TIFF: Rotate TIFF Page by Using RaterEdge .NET TIFF
formats are: JPEG, PNG, GIF, BMP, PDF, Word (Docx reImage1, 100) REFile.SaveImageFile( reImage1, "c:/rotate.png", New TIFF page(s), reorder TIFF pages ordered or
how to rotate one page in a pdf file; pdf rotate just one page
C# Word: C#.NET Word Rotator, How to Rotate and Reorient Word Page
to rotate all MS Word document pages by 90 viewer application which can help me rotate Word page by powerful & profession imaging controls, PDF document, image
how to rotate all pages in pdf in preview; pdf rotate single page and save
Creating and Modifying Dashboards
MicroStrategy Analytics Desktop User Guide
3
260
Creating a metric based on existing metrics: Derived metrics
© 2014  MicroStrategy, Inc.
• To calculate the minimum across each of the selected metrics, select 
Least.
• To calculate the product of the selected metrics, select Multiply.
The options below are available if you have selected two metrics.
• To divide the first metric that you selected by the second, select 
Metric1/Metric2.
• To divide the second metric that you selected by the first, select 
Metric2/Metric1.
• To subtract the second metric that you selected from the first, select 
Metric1-Metric2.
• To subtract the first metric that you selected from the second, select 
Metric2-Metric1.
• To calculate the difference between the metrics as a percentage of the 
second metric that you selected, select (Metric1-Metric2)/Metric2.
• To calculate the difference between the metrics as a percentage of the 
first metric that you selected, select (Metric2-Metric1)/Metric1.
The metric is created and added to the dashboard.
To create a new metric based on an attribute
1 Click the name of the dashboard to run it.
2 When you create and add a derived metric to a dashboard, you can also 
add the derived metric immediately to a specific visualization to be 
displayed. Do one of the following:
• To create the metric without adding it to a visualization, from the 
Dataset Objects panel, hover the cursor over the name of the attribute 
to use to create the derived metric, then click the arrow icon on the 
right.
• To create the metric and add it immediately to a specific visualization, 
from the visualization’s Drop Zones panel, hover the cursor over the 
name of the attribute to use to create the derived metric, then click the 
arrow icon on the right.
VB.NET Word: VB.NET Code to Rotate Word Page Within .NET Imaging
Here, we can recommend you VB.NET PDF page rotating tutorial and multi 0 to 360 degrees using VB code; Able to rotate multiple desired Word pages at the
pdf rotate all pages; rotate a pdf page
C# HTML5 Viewer: Load, View, Convert, Annotate and Edit PDF
web viewer, users can click rotation button to rotate PDF page 90, 180 and 270 degrees in clockwise erase PDF text, erase PDF images and erase PDF pages online
how to reverse pages in pdf; how to permanently rotate pdf pages
MicroStrategy Analytics Desktop User Guide
Creating and Modifying Dashboards   
3
© 2014  MicroStrategy, Inc.
Creating a metric based on existing metrics: Derived metrics   
261
3 Point to New Metric, then select the calculation to perform on each 
element in the attribute, such as Sum or Maximum. The new metric is 
added to the dashboard.
To replace an object in a visualization with a derived metric
If the area in the Drop Zones panel in which the object is placed does 
not accept metrics, this option is not available.
1 Click the name of the dashboard to open it.
2 In the visualization’s Drop Zones panel, click the name of the object that 
you want to convert. A list of options is displayed.
3 Select one of the following:
• To replace the object with a derived metric created on-the fly, select 
the appropriate options to define the metric, as described in the tasks 
above.
• To replace the object with a derived metric that already exists, select 
the derived metric to replace the object with.
Related topics
• Adding derived metrics to a dashboard, page 252
• Creating derived metrics based on a function in a dashboard, page 261
• Creating a new derived metric in a dashboard from scratch, page 263
• Providing statistical analysis from R analytics, page 269
• Editing or deleting derived metrics in a dashboard, page 271
• Creating a dashboard, page 106
Creating derived metrics based on a function in a dashboard
You can quickly create a new derived metric based on a MicroStrategy 
function, such as the absolute value and sine functions. To do this, you must 
specify the function that you want to create the derived metric based on, then 
provide the required arguments for the function from data in the dashboard.
Customize, Process Image in .NET Winforms| Online Tutorials
Click "Flip Vertical" to rotate images 180 degrees vertically; More Tutorials! Find more user guides with RasteEdge .NET Image in .NET Winforms applications!
reverse page order pdf online; rotate pdf pages on ipad
Process Images in Web Image Viewer | Online Tutorials
the order of images & file pages by dragging & used document types are supported, including PDF, multi-page This JavaScript API is used to rotate the current
pdf rotate page; pdf expert rotate page
Creating and Modifying Dashboards
MicroStrategy Analytics Desktop User Guide
3
262
Creating a metric based on existing metrics: Derived metrics
© 2014  MicroStrategy, Inc.
For detailed information about the functions available with Analytics 
Desktop, when you are selecting a function for a derived metric, click Details 
to open the Functions Reference.
You can deploy R analytics from the R statistical environment by creating 
derived metrics based on several functions available in Analytics Desktop. 
For steps to perform statistical analysis by creating derived metrics based on 
R analytics, see Providing statistical analysis from R analytics, page 269.
For background information on derived metrics, see About derived metrics, 
page 252
Prerequisite
• The steps below assume that you have already created the dashboard to 
add the derived metric to.
To create a derived metric based on a MicroStrategy function
1 Click the name of the dashboard to open it.
2 When you create and add a derived metric to a dashboard, you can also 
add the derived metric immediately to a specific visualization to be 
displayed. Do one of the following:
• To create the metric without adding it to a visualization, from the 
Dataset Objects panel, hover the cursor over the name of the metric to 
use to create the derived metric, then click the arrow icon on the right.
• To create the metric and add it immediately to a specific visualization, 
from the visualization’s Drop Zones panel, hover the cursor over the 
name of the metric to use to create the derived metric, then click the 
arrow icon on the right.
3 Point to New Metric, then select More Functions. The Select a Function 
dialog box opens.
4 A list of functions is displayed in the bottom pane. From the pane, select 
the function that you want to use to create the derived metric.
• To display only functions from a specific category in the pane, select 
the category from the Select a Category drop-down list.
• To search for a function, type a function name in the Select a 
Function field.
C# Image: C# Image Web Viewer Processing Tutorial; Process Web Doc
Basic .NET program and process web pages within image In order to rotate a current web image or powerful & profession imaging controls, PDF document, tiff
rotate all pages in pdf file; pdf reverse page order online
MicroStrategy Analytics Desktop User Guide
Creating and Modifying Dashboards   
3
© 2014  MicroStrategy, Inc.
Creating a metric based on existing metrics: Derived metrics   
263
• To view a description of the function, syntax information, and 
examples, click Details to open the Functions Reference.
5 Click Next. A list of arguments, which provide the inputs to functions, is 
displayed. Select the required arguments for each function. You can hover 
the cursor over the name of each argument to display a tooltip showing 
what type of argument is required.
6 Type a name for the metric in the Metric Name field, then click Finish. 
The new metric is added to the dashboard.
Related topics
• Adding derived metrics to a dashboard, page 252
• Adding derived metrics to a dashboard on-the-fly, page 253
• Creating a new derived metric in a dashboard from scratch, page 263
• Providing statistical analysis from R analytics, page 269
• Editing or deleting derived metrics in a dashboard, page 271
• Creating a dashboard, page 106
Creating a new derived metric in a dashboard from scratch
You can create new metrics (called derived metrics) based on attributes and 
metrics that have already been added to a dashboard. For example, you can 
create a new metric by subtracting the values of one metric from the values of 
another metric, such as Revenue Forecast - Revenue. You can rank a metric’s 
value from least to greatest, or display metric values as percentages of an 
accumulated total. Follow the steps below to create complex derived metrics 
from scratch, using attributes, metrics, functions, and arithmetic operators.
For background information on derived metrics, see About derived metrics, 
page 252.
Prerequisite
• The steps below assume you have already created the dashboard to add 
the derived metric to.
Creating and Modifying Dashboards
MicroStrategy Analytics Desktop User Guide
3
264
Creating a metric based on existing metrics: Derived metrics
© 2014  MicroStrategy, Inc.
To create a derived metric from scratch
1 Click the name of the dashboard to open it.
2 When you create and add a derived metric to a dashboard, you can also 
add the derived metric immediately to a specific visualization to be 
displayed. Do one of the following:
• To create the metric without adding it to a visualization, from the 
Dataset Objects panel, hover the cursor over the name of the metric to 
use to create the derived metric, then click the arrow icon on the right.
• To create the metric and add it immediately to a specific visualization, 
from the visualization’s Drop Zones panel, hover the cursor over the 
name of the metric to use to create the derived metric, then click the 
arrow icon on the right.
3 Point to New Metric, then select Enter Formula. The New Metric dialog 
box opens.
4 Type a name for the metric in the Metric Name field.
5 Type the metric formula in the Formula field. You can type arithmetic 
operators and values directly into the Formula field. You can quickly add 
attributes, metrics, and functions to the metric by choosing from the 
following:
• To add an attribute or metric, from the Available Objects list to the 
right, double-click an object to add it to the Formula field.
• To add a function, click the Functions icon  . The Select a Function 
dialog box opens. Perform the following steps:
a A list of functions is displayed in the bottom pane. From the pane, 
select the function that you want to use to create the derived 
metric. To display only functions from a specific category in the 
pane, select the category from the Select a Category drop-down 
list. You can search for a function by typing a function name in the 
Select a Function field and clicking the Search icon. You can 
click Details to see a description of the function, examples, and 
syntax information.
b Click Next. A list of arguments, which provide the inputs to 
functions, is displayed. Select the required arguments for each 
function. For a list of functions and their required arguments, see 
the Functions Reference. You can hover the cursor over the name 
MicroStrategy Analytics Desktop User Guide
Creating and Modifying Dashboards   
3
© 2014  MicroStrategy, Inc.
Creating a metric based on existing metrics: Derived metrics   
265
of each argument to display a tooltip showing what type of 
argument is required.
c Click Finish to apply your changes. The metric formula, including 
the arguments you provided, is displayed in the Formula field.
6 When finished, click OK. The new metric is added to the dashboard.
Performing conditional calculations: If and Case functions
Conditional calculations can be used to supplement the conditional analysis 
provided with filtering and thresholds in Analytics Desktop. For example, 
you can provide conditional analysis by combining data into different groups 
based on the value of one or more metrics in a dashboard.
For example, Analytics Desktop comes with the Airline Flight Analysis 
sample dashboard, which includes the following Day of the Week Stats 
visualization:
You can assess the performance of flights based on the average on-time 
percentage. For example, an average on-time percentage of 60% or lower is 
considered poor performance, while anything else is considered good 
performance. You can create a new Performance metric that includes a 
conditional analysis based on the Avg On-time (%) metric, as shown below.
Creating and Modifying Dashboards
MicroStrategy Analytics Desktop User Guide
3
266
Creating a metric based on existing metrics: Derived metrics
© 2014  MicroStrategy, Inc.
This conditional analysis can be done by creating a derived metric that uses 
the If conditional function. The Performance metric shown above uses the 
following formula:
IF(([Avg On-time (%)] <= .6),"Poor","Good")
You can then continue this analysis by selecting the cell that says Good in the 
row for Sunday, then from the drop-down list point to Keep Only and 
Show, and select Origin Airport Name. This updates the visualization to 
include the origin airport and display data for Sunday only, as shown below.
If you want to qualify the values of a metric into more than two groups, you 
can create a derived metric using the Case function. For example, you can 
modify the Performance metric to use the following expression, which 
qualifies performance into three groups rather than only two groups:
Case(([Avg On-time (%)] <= 0.6),"Poor",([Avg On-time 
(%)] > 0.65),"Excellent","Good")
Documents you may be interested
Documents you may be interested