TEAM PROJECT MANAGEMENT
161
Repeat the above work flow until all data are coded and analyzed.
Benefits of this approach
• Facilitates team work.
• All documents are shared, no file duplication is necessary.
• Team members can work simultaneously at the same data source files (but 
not at the same HU).
• Modifications to a document are propagated to the HUs of other team 
members.
Drawbacks
• Requires that all team members have access to a shared drive.
• Team members can only work at locations that provides access to the shared 
drive. 
Option B: Working with the Textbank Folder -  the 
TBPATH setup
The TBPATH setup allows the HU files to be stored in a folder AWAY from the 
document folder hierarchy, e.g. on each individual computer. The computers of 
all team members however need to be in the same local area network.  
Examples
• Documents are stored on a central server with shared access. Users work on 
several independent projects using some shared documents as well as data 
material that is only relevant for their respective projects.
• Documents are stored in a location that does not allow the user full write 
access, e.g., on a CD-ROM, or on a server with restricted access permissions. 
Therefore, the user cannot create a HU in the document folder.
Project Setup - Tasks of the Project Administrator
As above, any of the team members can take on the role of the project 
administrator. Thus, one person may have two roles: project administrator and 
team member.
Create a new folder for the project data on the shared drive.
Copy all documents to be used in the project into this folder; use sub folders 
if you desire an added degree of structure.
Set your Textbank Path to this location (E
XTRAS
/ P
REFERENCES
/ G
ENERAL
P
REFERENCE
/ P
ATHS
). 
ATLAS.ti 6 USER MANUAL
Rotate pages in pdf online - rotate PDF page permanently in C#.net, ASP.NET, MVC, Ajax, WinForms, WPF
Empower Users to Change the Rotation Angle of PDF File Page Using C#
pdf reverse page order; pdf rotate pages separately
Rotate pages in pdf online - VB.NET PDF Page Rotate Library: rotate PDF page permanently in vb.net, ASP.NET, MVC, Ajax, WinForms, WPF
PDF Document Page Rotation in Visual Basic .NET Class Application
pdf page order reverse; rotate all pages in pdf
TEAM PROJECT MANAGEMENT
162
Open ATLAS.ti and assign the documents.
Save the HU (F
ILE
/ S
AVE
) to a location outside the project folder, e.g. on the 
desktop or a local drive. 
The resulting project has all documents assigned through the special 
<TBPATH> . To double check, open the PDoc Manager and look at the 
column “Origin”. If you find that documents were assigned differently, 
check the following:
If you find documents using the HUPATH, you have stored the HU 
somewhere in the “Textbank folder”.
Documents with an absolute path (if you see a long path name in the 
column  “origin”) indicate that these documents are outside the HU and the 
“Textbank folder”. If this is the case, it is best o start the project afresh, 
delete the HU file and start again.
If everything is correct and the documents are referenced by the <TBPATH>, 
send the HU file to each team member.
Instruct the team members about their tasks.
Project Setup - Tasks of Team Members
Create an ATLAS.ti user account on your computers and log in in under your 
own user name.
Set the Textbank Path to the project folder as instructed by the project 
administrator (E
XTRAS
/ P
REFERENCES
/ G
ENERAL
P
REFERENCE
/ P
ATHS
, see figure 85 
above).
Save the HU file, which was sent to you by the project administrator on your 
computer or laptop. Rename the HU file, e.g. by adding your name or initial. 
Each team member should use a unique name for their personal HU file.
Make sure that you are connected to the shared drive when working on the 
HU.
Do not change the order of the PDs, otherwise there will be a problem when 
merging the various sub projects. This means extra work for the project 
administrator as he or she needs to adjust the order of the documents in each 
affected HU. 
ATLAS.ti 6 USER MANUAL
Figure 85: Setting the Textbank Path under General Preferences
VB.NET PDF Page Delete Library: remove PDF pages in vb.net, ASP.
Enable specified pages deleting from PDF in Visual Basic .NET class. Free trial SDK library download for Visual Studio .NET program. Online source codes for
pdf rotate all pages; save pdf rotated pages
VB.NET PDF Page Insert Library: insert pages into PDF file in vb.
add and insert one or multiple pages to existing adobe PDF document in VB.NET. Ability to create a blank PDF page with related by using following online VB.NET
how to change page orientation in pdf document; how to rotate all pages in pdf in preview
TEAM PROJECT MANAGEMENT
163
Do not add new documents if they should be shared by all team members. 
This needs to be done by the project administrator.
After an agreed upon time interval, send the HU file to the project 
administrator so he / she can merge the various sub projects.
Editing Primary Documents (all)
Editing primary documents can be allowed without restrictions as ATLAS.ti 
controls that no two persons edit the same primary document file at the same 
time. See the chapter on “Editing Primary Documents“ on page 136for further 
detail.
Merging  - A Task for the Project Administrator
The project administrator merges the sub projects according to previously 
agreed upon time intervals (e.g. in the evenings, first thing in the morning, 
every Friday, etc.). 
As all files in each sub HU are referenced by the TBPATH, the project 
administrator can download / store all HU files in one folder on his/her 
computer and start with one of the HUs to begin the merge process.
Depending on the way the work is distributed, the merge strategy may vary. 
See “Merging Hermeneutic Units“ on page 171 for more detail.
ATLAS.ti 6 USER MANUAL
Figure 86: Team project setup using the TBPATH
C# PDF Page Insert Library: insert pages into PDF file in C#.net
to merge PDF document files by C# code, how to rotate PDF document page to delete PDF page using C# .NET, how to reorganize PDF document pages and how
pdf rotate page and save; rotate pdf pages and save
VB.NET PDF- View PDF Online with VB.NET HTML5 PDF Viewer
PDF pages extract, copy, paste, C#.NET rotate PDF pages, C#.NET read barcodes from PDF, C#.NET OCR scan PDF. C# ASP.NET Document Viewer, C# Online Dicom Viewer
permanently rotate pdf pages; rotate single page in pdf
TEAM PROJECT MANAGEMENT
164
After merging, the project administrator saves he new Master HU and sends it 
to the team members. In order for team members to easily see which is the 
newest version, the date can be added.
All old versions (Master and sub HUs can be moved to a backup folder.
Tasks of team members after merging
Save the new Master HU file that is sent to you by the project administrator 
anywhere on your computer and rename the file by adding your name or 
initials to the file name.
Continue to work on the project.
Backup (all)
Team members: After each work session, the team members copy the HU file 
and store it at a secure location (e.g. on their local drive, a backup folder on the 
shared drive, or an external device). Keep three rolling copies of your backup 
files.
Project administrator: The project administrator creates a copy bundle file 
directly after setting up the project and after each merge operation and stores it 
at a secure location  (see “Create a Bundle“ on page 129).
Repeat the above work flow until all data are coded and analyzed.
Benefits of this approach
The HU is not tied to the location of its documents and may be copied and 
moved anywhere without losing functionality as long as the Textbank Path 
refers to the location of the documents. 
Migrating or backing up your project using the Copy Bundle function is easy. 
Drawbacks
This scenario relies on the user-configured textbank folder. If the user wishes to 
work on different projects with documents stored in different folder hierarchies, 
the textbank folder must be set to the path that was valid when the HU was 
created. 
ATLAS.ti 6 USER MANUAL
Figure 87: Master project file after merging
C# PDF Page Delete Library: remove PDF pages in C#.net, ASP.NET
Free online C# class source code for deleting specified PDF pages in .NET console application. Able to remove a single page from PDF document.
rotate single page in pdf reader; rotate individual pages in pdf
VB.NET PDF - WPF PDF Viewer for VB.NET Program
PDF pages extract, copy, paste, C#.NET rotate PDF pages, C#.NET read barcodes from PDF, C#.NET OCR scan PDF. C# ASP.NET Document Viewer, C# Online Dicom Viewer
how to rotate page in pdf and save; rotate pdf pages
TEAM PROJECT MANAGEMENT
165
Team Scenario 2: Teams that do not always or never have 
access to a shared drive
Peter, Tom, James and Mary work together on a project. All four want to code 
and analyze the documents and would like to work on their laptops at different 
locations. This means that they won’t be able to access a shared network drive 
at all times. In addition, all four would like to be able to edit the documents 
they analyze.
This also works if a shared drive is not available and team members are only 
connected via the Internet.
To realize this project scenario, it is recommended to use the HUPATH to assign 
documents.
ATLAS.ti 6 USER MANUAL
Figure 88: Team project scenario 2 for teams that want or need to work at different locations
Figure 89: Team project scenario 2 without a shared drive
VB.NET PDF - Create PDF Online with VB.NET HTML5 PDF Viewer
PDF pages extract, copy, paste, C#.NET rotate PDF pages, C#.NET read barcodes from PDF, C#.NET OCR scan PDF. C# ASP.NET Document Viewer, C# Online Dicom Viewer
saving rotated pdf pages; save pdf rotate pages
C# HTML5 PDF Viewer SDK to create PDF document from other file
PDF pages extract, copy, paste, C#.NET rotate PDF pages, C#.NET read barcodes from PDF, C#.NET OCR scan PDF. C# ASP.NET Document Viewer, C# Online Dicom Viewer
how to rotate a single page in a pdf document; pdf rotate single page and save
TEAM PROJECT MANAGEMENT
166
Project Setup – Tasks  of the Project Administrator
As was the case for team scenario 1, also here any of the team members can 
take on the role of the project administrator. 
Create a new folder for the project on your personal computer or on the 
shared drive. 
Copy all files to be analyzed into this folder (or in one or more sub folders, 
see figures 52 and 53 on page 109). 
Start ATLAS.ti and assign the documents.
Save the HU to the project folder. All files are saved to the special HUPATH 
(see page 108 for further detail).
To distribute the project, you have the following options: 
a) create a copy bundle file and send it to the team members (see page 
129),or 
b) use a program like WinZip or WinRar, compress the project folder and 
send the zip or rar file to the team members, or 
c) ask each team member to copy the project folder from the shared drive to 
their individual computers.
Instruct the team members about their tasks.
Project Setup - Tasks of Team Members
Create an ATLAS.ti user account on your computer and log in under your 
name (see page 151).
Depending on whether the project administrator has chosen option a, b or c 
for distributing the project folder, you either need to install the bundle file on 
your computers (see “Install a Bundle“ on page 131 for further detail), or 
unzip the zipped file and store the extracted folder on your computer, or 
make a copy of the project folder on the shared drive and store it on your 
computer.
Rename the Hermeneutic Unit file by adding your name or initials to the file 
name.
ATLAS.ti 6 USER MANUAL
Figure 90: Project folder on the computer of a team member (data could also be contained in sub 
folders within the main project folder)
TEAM PROJECT MANAGEMENT
167
Always save the HU to the project folder on your individual computer when 
working on your part of the project.
Do not change the order of the PDs, otherwise there will be a problem when 
merging the sub projects. This means extra work for the project administrator 
as he or she needs to adjust the order of the documents in each affected HU. 
After an agreed upon time interval, either upload the HU or a copy bundle 
file to the shared drive or send it to the project administrator so he / she can 
merge the various sub projects. Whether it is sufficient to upload / send the 
HU file or whether a copy bundle file is needed depends on the permission to 
edit documents (see below).
Migrating projects to a Second Computer – for Team 
Members
If you want to migrate your project to a different computer, e.g. back and forth 
between a laptop and a PC, then you need to do the following:
When moving the project for the first time
Either copy the entire project folder to an external device like a USB stick and 
move it to the second computer. Or create a copy bundle file, save it for 
instance on a USB stick or send it to yourself via email and install it on the 
second computer (see “Install a Bundle“ on page 131 for further detail).
When moving consecutive times and none of the documents has been edited
You simply need to move the HU file back and forth and overwrite the 
previous version.
When moving consecutive times and at least one of the documents has been 
edited
Either move the entire project folder and overwrite the previous version on the 
second computer, or create a copy bundle file and install it (see page 131). 
During the installation of the copy bundle file, ATLAS.ti checks whether there is 
a newer version of a file and if so overwrites the old version.
Editing Primary Documents (all)
Editing primary documents can only be allowed with restrictions. A decision 
could be that only the project administrator is allowed to edit documents. 
Another option is to allow individual team members to edit a sub set of 
documents, but not any of the other documents.
• If none of the primary documents are edited, it is sufficient to upload / send 
the HU file to the project administrator for merging. After merging, the 
project administrator just needs to distribute the new Master HU file to all 
team members.  
• If team members are allowed to edit a specific sub set of documents, they 
need to upload / send a copy bundle file to the project administrator for 
merging. After merging, the project administrator needs to distribute a 
bundle file or a zipped version of the project folder.
ATLAS.ti 6 USER MANUAL
TEAM PROJECT MANAGEMENT
168
• If the project administrator is the only person allowed to edit the documents, 
it is sufficient to send the HU file for merging. After merging, the project 
administrator needs to distribute a bundle file or a zipped version of the 
project folder.
If two people edit the same document at two different locations, one 
version  - this includes the coded version as well – is lost!! See “Editing
Primary Documents“ on page 136. If you want the benefits of working with 
rtf files, but don't want team members to edit the files, set the rtf files in the 
Windows File Manger to “read only” (file properties).
Merging – A Task for the Project Administrator
The project administrator merges the sub projects according to previously 
agreed time intervals (e.g. in the evenings, first thing in the morning, every 
Friday, etc.). 
If documents are not edited
Team members only need to upload or send their HU file.
• If team members have uploaded their HU files to the shared drive, the 
project administrator can start with the merging process right away on the 
shared drive.
• If team member send their HU files via email, then the project administrator 
needs to save all HUs file to the project folder on his or her computer or on 
the shared drive before merging.
• Depending on the way the work is distributed, the merge strategy may vary. 
See “Merging Hermeneutic Units“ on page 171 for more detail.
• After merging, the project administrator saves the new Master HU. For team 
members to easily see which is the newest version, the date can be added to 
the file name.  All old versions (Master and sub HUs) can be moved to a 
backup folder.
Tasks of team members after merging
Copy the new Master HU from the shared drive, or the new Master file is 
sent to you by the project administrator. 
Store the new Master HU file in your local project folder.
Rename the new Master HU file  by adding your name or initials to the file 
name.
Continue to work on the project.
ATLAS.ti 6 USER MANUAL
Figure 91: Master project file after merging
TEAM PROJECT MANAGEMENT
169
If documents are edited
The project administrator needs to install the various copy bundle files sent or 
uploaded by the team members. 
• It is best to install all bundle files into a new project folder. Add the date to 
the name of the new folder so that is clear to everyone which is the newest 
version of the project. 
• The old project folder can be moved to a backup folder.
• In the Copy Bundle Install window, the HU Path needs to be set to the 
location of the new project folder (see figure ) before installing the bundle 
files. 
• Select “Migrate”a s unbundling strategy as then ATLAS.ti controls that older 
files are only overwritten if a newer version exists.
• After installing all copy bundle files, the new project folder will contain all 
HU files of the team members, all documents, plus a log file for each 
modified document (see “Creation of Log files“ on page 139). The project 
administrator can now begin with the merge process, or can first open each 
individual HU for synchronization. If this is not done prior to merging, 
ATLAS.ti will request synchronization during the merge process. 
• Depending on the way the work is distributed, the merge strategy may vary. 
See “Merging Hermeneutic Units“ on page 171 for more detail.
• After merging, the project administrator saves the new Master HU. For team 
members to easily see which is the newest version, the date can be added to 
the file name (see figure 87).
• As some or all data source files were modified by one or more team 
members, the project administrator can a) store the new project folder on a 
shared drive, or b) send the new project folder as WinZip or WinRar file to 
team members, or c) send a copy bundle file. 
Tasks of team members after merging
• Either copy the latest version of the project folder from the shared drive. If a 
shared drive is not available, the project administrator sends a WinZip / 
WinRar or a copy bundle file of the newest project version. This file needs to 
be unpacked or installed (see “Install a Bundle“ on page 131).
• The old project folder can be deleted (see “Backup (all)“ below).
• Rename the new Master HU file (contained within the new project folder) by 
adding your name or initials to the file name.
• Continue to work on the project.
If only the project administrator is allowed to edit documents 
Team members only need to upload or sent their HU file. 
ATLAS.ti 6 USER MANUAL
Figure 92: Project file of a team member after 
merging
TEAM PROJECT MANAGEMENT
170
• The first step is to merge all sub projects. The project administrator can 
proceed as explained above in the section “If documents are not edited“ on 
page 168.
• After all HU files are merged, the project administrator can make the 
necessary changes to the documents in edit mode. The project folder then 
contains the new Master HU, the documents and log files for all modified 
documents. In order for team members to easily recognize the updated 
project folder, add the current date to the name of the project folder.
• As some or all data source files were modified, the project administrator can 
a) store the new project folder on a shared drive, or b) send the new project 
folder as WinZip or WinRar file to team members, or c) send a copy bundle 
file.
• The old project folder can be moved to a backup folder.
Tasks of team members after merging
Either download the latest version of the project folder from the shared drive. 
If a shared drive is not available, the project administrator sends a WinZip / 
WinRar or copy bundle file of the newest project version. This file needs to 
be unpacked or installed (see page 131).
The old project folder can be deleted (see Backup (all) below).
Rename the new Master HU file (contained within the new project folder) by 
adding your name or initials to the file name.
Continue to work on the project.
Backup (all)
After each work session, each team member copies the HU file (or if 
documents were edited, creates a copy bundle file, see page 129) and stores it 
at a secure location. Keep three rolling copies of your backup files / folders.
The project administrator creates a copy bundle file immediately after setting 
up the project and after each merge operation and stores it at a secure location.
Repeat the above work flow until all data are coded and analyzed.
Benefits of this approach
• Facilitates team work and distributed work organization.
T
eam members are flexible and can work at different work locations.
• Team members can work simultaneously at the same project. If editing rights 
are negotiated, this also includes simultaneous work on primary documents.
• The project folder can be completely copied/moved to another location and 
all documents remain accessible.
• Migrating or backing up your project using the Copy Bundle function is easy. 
• Unpacking the copy bundle file can be done anywhere on the target 
computer.
ATLAS.ti 6 USER MANUAL
Documents you may be interested
Documents you may be interested