display pdf in asp.net page : Rotate single page in pdf file Library application API .net windows winforms sharepoint design_guidelines26-part1755

HigH Performance LandscaPe guideLines
|
aPPendices
|
261
Katie Lechelt
National Association of County & City  
Health Officials
Paul Mankiewicz
Executive Director, Gaia Institute
John McLaughlin
Dir. of Ecological Services,  
NYC Department of Environmental Protection
Dino Ng
NYC Department of Design & Construction
Signe Nielsen
Principal, Mathews Nielsen
Karen R. Nikolai
National Association of County & City  
Health Officials
John Orcutt
Senior Policy Advisor, NYC Department  
of Transportation
Linda Pollak
Principal, MP Architects
Joyce Rosenthal
Columbia University, GSAPP
Eric Rothstein
eDesign Dynamics
Margie Ruddick
Wallace Roberts & Todd LLC
Charles Rudesill
ADA Liaison, NYC Department of  
Parks & Recreation
Zach Schreiber
NYC Office of Environmental Remediation
Howard Slatkin
NYC Department of City Planning
Laura Starr 
Partner, Starr Whitehouse
Frederick Steiner
Dean, School of Architecture,  
University of Texas at Austin,  
Center for Sustainable Development
Andy Stone
Trust for Public Land
Carter Strickland
Deputy Commissioner for Sustainability,  
NYC Department of Environmental Protection
Margot Walker
Office of Stormwater Management  
Planning, NYC Department of  
Environmental Protection
Claire Weisz
Weisz + Yoes
Clark Wilson
US Environmental Protection Agency,  
Smart Growth Program
Steven Yavanian
Wallace Roberts & Todd LLC
IMAGE CONTRIBUTORS
AECOM
Hester Street Collaborative
Meliora Environmental Design
New York City Department of  
Parks & Recreation
Matthews Nielsen
Viridian Landscape Studio
Wallace Roberts & Todd
Rotate single page in pdf file - rotate PDF page permanently in C#.net, ASP.NET, MVC, Ajax, WinForms, WPF
Empower Users to Change the Rotation Angle of PDF File Page Using C#
change orientation of pdf page; pdf rotate one page
Rotate single page in pdf file - VB.NET PDF Page Rotate Library: rotate PDF page permanently in vb.net, ASP.NET, MVC, Ajax, WinForms, WPF
PDF Document Page Rotation in Visual Basic .NET Class Application
how to reverse page order in pdf; pdf reverse page order online
262
indeX
a
absorbent landscapes, 70, 164, 
167, 168-171
absorptive capacity, 25
ACBFS (Air Cooled Blast 
Furnace Slag), 74, 75-76
accelerated bids, 87
accessibility
and active recreational uses, 
40-41
and connectivity, 57, 58
and design process, 62-65
passive landscapes, 39
playgrounds, 43, 64, 65
active diesel particulate filters 
(Active DPF), 95
active recreational uses, 40-41
brownfields/recovered sites, 31
case study, 233-235
and connectivity, 57
and engineered soils, 151
and infiltration beds, 172
and natural hydrology, 164
passive landscapes, 38
and public health, 66
and soil contamination, 146
synthetic turf for, 41, 80-83
ADA (Americans with Disabilities 
Act), 62, 63, 64
adjacent land owner payments, 
106, 107
aeration, 137, 170
aesthetics
and connectivity, 200
and ecological approach to plant 
selection, 206
and existing vegetation, 194
and green roofs, 186
and invasive plant species, 207
and landscape diversity, 211, 212
and maintenance/operations, 
55, 105
and natural hydrology, 164
and passive landscapes, 38
and recycled/reclaimed materials, 
72
and turfgrass reduction, 215
and vegetation management, 193
and water efficient landscapes, 203
aggregates
and absorbent landscapes, 170
and engineered soils, 149, 150
for infiltration beds, 172, 173, 
174
and porous surfacing, 181
and recycled/reclaimed materials, 
73, 74, 136
see also asphalt; concrete; 
subbase applications
agricultural waste, 71
Ailanthius altissima (Tree of 
Heaven), 207
air conditioning, 12
Air Cooled Blast Furnace Slag 
(ACBFS), 74, 75-76
air pollution, see air quality
air quality
and absorbent landscapes, 168
and green/blue roofs, 184
and high performance landscape 
benefits, 14
and landscape diversity, 211
NYC Community Air Survey, 66
and parks over structures, 50
and public health, 66, 68
and rain gardens, 175
and soil reuse/rejuvenation, 134
and streetscapes, 47
and urban heat island effect, 12
air tilling, 138
albedo, 68, 72, 74, 75, 254
algae, 190
alkaline leachates, 75
allées, 27, 48, 254
alleopathic plants, 254
alpine gardens, 213
aluminum, 77
amenities
and accessibility, 63
and active recreational uses, 40
concessions, 106, 107
and connectivity, 58
playgrounds, 42-43
pocket parks/plazas, 46
and public health, 68
Americans with Disabilities Act 
(ADA), 62, 63, 64
AmeriCorps, 100
anaerobic soils, 21, 155
annual rye grass, 132
antiidling equipment, 95
approvals, see permitting issues
arborists, 194, 196
archaeological investigation, 39
area drains, 172
art, 61. see also signage
artificial turf, see synthetic turf
Asian longhorned beetle, 209
asphalt, 69, 72, 74-75, 181, 
257
asphalt millings, 230, 232
asthma, 66
ASTM standards, 43, 73, 82, 
144, 174
athletic fields, see active 
recreational uses
B
Back Bay Fens (Boston), 14
Barretto Point Park, 57
Battery Park City, 87, 106, 120, 
149, 151
Battery Park City Conservancy 
(BPCPC), 120
bedrock, 20, 125
benches, see seating
berms
and compost, 132
defined, 254
and infiltration beds, 174
and natural hydrology, 164, 165
and porous surfacing, 183
best practices (BPs), 254. 
see also best practices 
implementation
best practices implementation, 
246-253
citywide integration, 250-252
design process, 246
internal implementation, 247-249
bicycles
parking/storage, 44, 57, 58
paths for, 37, 44, 57, 58, 66
rentals, 107
BIDs (Business Improvement 
Districts), 48, 106, 111, 
112
biobased products, plastics, 77
biodiversity, 193
case studies, 224
and connectivity, 200, 201
defined, 254
and ecological approach to plant 
selection, 206
and existing vegetation, 194
and green roofs, 184, 185, 186
and invasive plant species, 198
and irrigation, 205
and landscape diversity, 212
and natural hydrology, 162
and passive landscapes, 39
and pest management, 119
and rain gardens, 176
and street trees, 218, 221
and turfgrass reduction, 215
biofiltration, 151, 254
biointensive integrated pest 
management (BIPM), 
119-121, 216, 256
bioremediation, 146, 254
bioretention, 35, 150, 175, 
254. see also rain 
gardens
bioswales
and absorbent landscapes, 169, 
170
case studies, 228
defined, 254
and infiltration beds, 174
and natural hydrology, 162, 164
and sewer overflows, 167
for streetscapes, 48
biotic vectors, 34
BIPM (biointensive integrated 
pest management), 119-
121, 216, 256
black locust, 77
black tarps, 198
Bloomberg, Michael, 12, 250. 
see also PlaNYC
blue roofs, 184, 187-188, 254
bluebelts, 57, 254
bluestone, 55
boardwalks, 65, 77
boat rentals, 107
booster pumps, 205
Borough Commissioner’s offices, 
34, 60, 61, 63, 111
Borough Forestry Office, 196
Boston, 14, 95
botanists, 194, 209
BPs, see best practices
Bronx River Alliance, 112
Bronx River tidal marsh, 227
Brooklyn Bridge Park, 106, 149, 
151
brownfields/recovered sites, 30-
32, 224-226, 254. see 
also soil contamination
Bryant Park, 106, 112
Bryant Park Corporation, 112
budgeting, see costs
buffers, 254
buildings, see structures
bulk density testing, 25, 131
bulkheads, 37
buried streams, 24, 25. see also 
natural hydrology
Business Improvement Districts 
(BIDs), 48, 106, 111, 
112
butterfly gardens, 213
c
C&D waste management, see 
waste management
Calkins, Meg, 71
Calvert Vaux Park, 233-235
Canarsie Park, 100, 212, 230-
232
canopy cover, 57-58, 66, 68. 
see also trees
carbon dioxide (CO
2
)
and concrete, 72
defined, 254
and design process, 69
and materials selection, 71
and soil management, 123
and streetscapes, 47
see also climate change
carbon footprints, and climate 
change, 70
carbon sequestration offsets, 
13, 123
case studies
active recreational uses, 233-235
brownfields/recovered sites, 
224-226
green roofs, 242-243
passive landscapes, 230-232
playgrounds, 236-238
pocket parks/plazas, 239-241
restoration areas, 227
waterfronts, 228-229
catalyzed diesel particulate 
filters (DPFs), 95
catch basins, 132, 172, 174
cation exchange capacity (CEC), 
138
CEC (cation exchange capacity), 
138
cellular confinement systems, 
227
cement, 72, 158
Central Artery/Tunnel Project 
(Big Dig) (Boston), 95
Central Park, 9, 80, 106, 112, 
113, 149
Central Park Conservancy, 112, 
113
CEqR (City Environmental 
quality Review), 143, 
144, 147
certification, 99
certified irrigation designers 
(CIDs), 205
check dams, 164, 165
check valves, 205
children
and accessibility, 43, 62, 63, 
VB.NET PDF Page Delete Library: remove PDF pages in vb.net, ASP.
using RasterEdge.XDoc.PDF; How to VB.NET: Delete a Single PDF Page from PDF File. This is a VB .NET example for how to delete a single page from a PDF document.
rotate pdf pages individually; rotate a pdf page
C# PDF Page Delete Library: remove PDF pages in C#.net, ASP.NET
x86. Demo Code: How to Delete a Single PDF Page from PDF File in C#.NET. How to delete a single page from a PDF document. String
rotate all pages in pdf and save; save pdf rotated pages
HigH Performance LandscaPe guideLines
|
aPPendices
|
263
64, 65
fitness opportunities for, 66
playgrounds, 42-44, 64, 65, 
236-238
see also active recreational uses
chisel plowing, 137
chloride, 73
chlorosis, 75
choker base course, 174, 183
CIDs (certified irrigation 
designers), 205
cisterns, 166, 185, 189, 254
citizen stewardship, see 
community participation
Citizens Budget Commission, 
106
City Environmental quality 
Review (CEqR), 143, 
144, 147
Clarke, Gilmore D., 38
clean fill, see soil capping
cleanup days, 112
Clegg test, 82
Climate Adaptation Plans, 70
climate change, 12-13
and concrete, 72, 73
defined, 254
and design process, 69-70
and ecological approach to plant 
selection, 207
and high performance landscape 
benefits, 14
and materials selection, 71
and soil management, 123
CM (construction manager), 87
Coastal Consistency 
Certification, 144
Coastal Management Program, 
37
code issues, 25, 72, 86, 168
coir mats, 227
collaboration
and best practices 
implementation, 249, 253
case studies, 239, 240, 241
and maintenance/operations, 54, 
108-109
and PlaNYC, 14
and soil contamination, 146
and streetscapes, 47-48
see also community participation
college campuses, 57
coloring pigments for concrete, 
74
Columbia University Center 
for Climate Systems 
Research, 12
combined sewer overflows 
(CSOs), 254. see also 
sewer overflows
comfort stations
and accessibility, 63, 64
and connectivity, 58
and green roofs, 184
playgrounds, 43
and runoff, 179
Community District managers, 
111
community participation
and accessibility, 62, 63
and aesthetics, 200, 206, 211
case studies, 227, 230, 237-238, 
239
and climate change, 70
and connectivity, 200, 201
and construction, 61, 85, 102-
103
and design process, 53, 60-62, 
112, 238
and maintenance/operations, 60, 
61, 110-114
passive landscapes, 38
playgrounds, 42
and public health, 68
restoration areas, 34
and synthetic turf, 234
and waterfronts, 36
and wildlife habitat, 39
see also educational features
community service days, 117
compost, 120, 121
and absorbent landscapes, 169, 
170
and best practices 
implementation, 251
case studies, 230, 232
defined, 254
overview, 138-142
and pest management, 119
and rain gardens, 176
and soil compaction, 137, 138
and soil disturbance, 132
and soil reuse/rejuvenation, 135-
136
testing/analysis, 126, 141
and water efficient landscapes, 
203
compost berms, 132
compost blankets, 132
compost socks, 176
concessions, 106, 107
concrete, 72-74, 75, 77, 136, 
181, 257
Concrete Plant Park, 32, 201
Coney Island, 73
connectivity, 57-58, 200-202
defined, 255
and landscape diversity, 212
and pocket parks/plazas, 46
and public health, 66
and streetscapes, 48, 58
and vegetation management, 
200-202
and waterfronts, 37
and wildlife habitat, 37, 57, 201
Connetquot State Park, 230
constructability reviews, 86-87, 
246
constructed wetlands, 37, 149, 
151, 254, 255
construction
and absorbent landscapes, 170
asphalt, 75
and blue roofs, 188
case studies, 228-229, 236-237, 
239-240
and climate change, 70
and community participation, 61, 
85, 102-103
and connectivity, 58
constructability reviews, 86-87, 
246
contractor/staff training, 99-101
and design process, 59
diesel emission reduction, 94-95
and ecological approach to plant 
selection, 210
and engineered soils, 151-152
and existing vegetation, 91, 119, 
133, 196-197
and green roofs, 93, 186-187
and infiltration beds, 174
and low impact irrigation systems, 
205
and maintenance/operations staff 
training, 117-118
and materials selection, 71
and native/naturalized plant 
species, 200
and natural hydrology, 164
overview, 85
and porous surfacing, 182-183
procurement policies, 88-90, 149
and rain gardens, 176
for restoration areas, 34
and rooftop runoff, 191
and signage, 61, 102, 133
site preservation and protection 
plans, 28, 59, 163, 169
and soil assessment, 22, 125, 
126
and soil contamination, 59, 147, 
158
and soil management, 59, 91, 
123, 124, 127-134
and soil reuse/rejuvenation, 137
staging and sequencing plans, 
90-94, 136, 147, 183, 
187, 188, 190
and stormwater management, 93, 
128-129
and stormwater planters, 180
and synthetic turf, 82
and trees, 44, 58, 91, 93, 102, 221
and turfgrass reduction, 216
waste management, 91, 96-98
and water efficient landscapes, 
203
construction manager (CM), 87
Construction Works, 98
contaminated soils, see soil 
contamination
continuity, see connectivity
contract documents
and existing vegetation, 195
overview, 85
site preservation and protection 
plans, 28, 59, 163, 169
soil placement plans, 91, 151, 
155, 156-159, 258
and soil reuse/rejuvenation, 136-
137
staging and sequencing plans, 
90-94, 136, 147, 183, 
187, 188, 190
and waste management, 96
contractor training, 99-101
contractors, see construction; 
contractor training; 
procurement
Cornell University Cooperative 
Extension, 198
Cornell University Urban 
Horticulture Institute 
(CUUHI), 150, 169
corners/intersections, 15
costs
engineered soils, 149, 150
green roofs, 184
life cycle, 256
low impact irrigation systems, 204
maintenance/operations, 54, 55, 
104, 106-107
and rooftop runoff, 188
soil capping, 31
soil reuse/rejuvenation, 134-135
and soil volume/depth, 155
street trees, 218
turfgrass reduction, 215
utility infrastructure, 214
Council for Tree and Landscape 
Appraisal (CTLA), 27, 
195
cover crops, 169
cover soil, see soil capping
critical root zones
assessment of, 27
defined, 255
and existing vegetation, 195, 196
and grading, 128
and infiltration beds, 173
and playgrounds, 44
and soil capping, 146
and staging and sequencing 
plans, 91
and storm sewers, 166
cross-programming, 57
crumb rubber, 80
crushed glass, 150
crushed stone storage reservoirs, 
48
CSOs, see combined sewer 
overflows
CTLA (Council for Tree and 
Landscape Appraisal), 
27, 195
CU soils, 150, 169
cultural considerations, 38-39, 
60, 61, 238. see also site 
history
cultural sites, 57
culverts, 164, 165
curb cuts, 48, 58, 166, 255
curb-ramps, 64
CUUHI (Cornell University Urban 
Horticulture Institute), 
150, 169
cypress, 77
d
DAM (New York State 
Department of Agriculture 
and Markets), 140
daycare centers, 40
DDC (NYC Department of Design 
and Construction), 89, 
247, 250
de-icing procedures, 21, 180, 
183
debris, 21
VB.NET PDF File Merge Library: Merge, append PDF files in vb.net
This guiding page will help you merge two or more PDF documents into a single one in a Visual Basic .NET imaging application.
pdf rotate page; permanently rotate pdf pages
C# PDF File Merge Library: Merge, append PDF files in C#.net, ASP.
PDF file to the end of another and save to a single PDF file. NET document imaging toolkit, also offers other advanced PDF document page processing and
rotate single page in pdf reader; pdf rotate page and save
264
DEC, see New York State 
Department of 
Environmental 
Conservation
decking, 77
decorative pavers, 77
deep jetting, 137
demarcation layers, 31, 143
DEP (NYC Department 
of Environmental 
Protection), 30, 48, 50, 
129, 174, 224, 251
derelict soil materials, 149, 150
Design and Construction 
Excellence (D+CE) 
Program, 101
design charrettes, 255
design process
and absorbent landscapes, 169-
170
accessibility, 62-65
and best practices 
implementation, 246
and blue roofs, 187-188
and climate change, 69-70
and community participation, 53, 
60-62, 112, 238
connectivity, 57-58
and connectivity, 201-202
constructability reviews, 86-87
and ecological approach to plant 
selection, 207, 209-210
and engineered soils, 150-151
and existing vegetation, 194-196
and green roofs, 185-186
and infiltration beds, 172-174
and invasive plant species, 198, 
200
and maintenance/operations, 54-
56, 105, 108-110
materials selection, 71-79
and natural hydrology, 163-164
overview, 53
and porous surfacing, 181-182
and public health, 66-68
and rooftop runoff, 189-191
and site preservation and 
protection plans, 59, 163
and soil assessment, 124-125
and soil contamination, 146-147
and soil disturbance 
minimization, 128-129
and soil placement plans, 157-
159
and soil volume/depth, 153, 
155-156
and staging and sequencing 
plans, 90, 92-93, 136, 190
and storm sewers, 166-167
and street trees, 219, 221
synthetic turf, 80-83
and turfgrass reduction, 215-216
and water efficient landscapes, 
202-203
see also site assessment
desire lines, 46, 119, 167
detention systems
blue roofs, 184, 187-188, 254
for parks over structures, 51
and porous surfacing, 181
and sewer overflows, 166
see also stormwater management
diesel emission reduction, 94-95
diesel oxideation catalysts 
(DOC), 95
disabilities, people with, see 
accessibility
disease
and anaerobic soils, 155
and biodiversity, 39, 119, 193, 
201
and biointensive integrated pest 
management, 119, 120
and climate change, 69
and connectivity, 200
and ecological approach to plant 
selection, 209
and landscape diversity, 213
and soil management, 123, 130
street trees, 48
DOB (NYC Department of 
Buildings), 144
document search, 144
DOH (New York State 
Department of Health), 
145, 146
DOHMH (NYC Department 
of Health & Mental 
Hygiene), 30, 66, 80, 
250-251
downspouts, 165, 166-167, 
172, 189. see also 
rooftop runoff
DPFs (catalyzed diesel 
particulate filters), 95
DPR, see NYC Department of 
Parks & Recreation
drainage
and climate change, 69
and compost, 138
and engineered soils, 152
and existing vegetation, 195
and green roofs, 185, 186
and parks over structures, 51
and soil assessment, 20
and soil placement plans, 157
and soil volume/depth, 156
and street trees, 218, 221
and subbase applications, 75, 76
and synthetic turf, 82
and turfgrass reduction, 215
and utility infrastructure, 214
and water assessment, 26
and water efficient landscapes, 
203
see also stormwater 
management; watersheds
drawdown, 190
drinking fountains, see water 
fountains
drought tolerant plant species, 
44, 203, 215, 216
dry wells, 172, 188, 189, 190, 
191, 255
e
EAS (Environmental Assessment 
Statement), 144
easements, for pocket parks/
plazas, 46
ecological connectivity, see 
connectivity
ecological succession, 207, 
209-210, 215
ecologists, 194
economic development, 14
ecosystems, 255
ecotones, 255
ECU (Environmental Control 
Unit), 124, 143
educational features
and absorbent landscapes, 170
and blue roofs, 188
for brownfields/recovered sites, 
32
case studies, 236
and climate change, 70
and construction, 61, 85, 102-
103
and green roofs, 186
and maintenance/operations, 
105, 116
playgrounds, 43
and porous surfacing, 182
and rain gardens, 175
for restoration areas, 34
and reused materials, 72
and rooftop runoff, 188
see also signage
ELAP (Environmental Laboratory 
Approval Program), 145
elderly people, 41, 60, 63, 66
elevated planters, 64
Elmhurst Gas Tank Park, 32
emerald ash borer, 209
emergency access, 58, 151
employees
and accessibility, 64
and public health, 68
training for, 105, 114, 115, 117-
118, 205, 249
see also maintenance/operations
energy efficiency
and climate change, 70
and design process, 69
and existing vegetation, 194
and green roofs, 184
and landscape diversity, 211
and materials selection, 71, 72, 
73
and street trees, 218
synthetic turf, 80
engineered soils, 149-152
case studies, 120
for green roofs, 149, 151, 186
and infiltration beds, 172
for rain gardens, 176
and soil assessment, 124, 151, 
152
for street trees, 218, 221
for turfgrass, 149-150
engineered systems, for parks 
over structures, 51
entrances, 58, 64
Environmental Assessment 
Statement (EAS), 144
Environmental Control Unit 
(ECU), 124, 143
Environmental Laboratory 
Approval Program (ELAP), 
145
Environmental Remediation 
staff, 144, 145, 146
environmentally preferable 
products/services, 89, 
255
Environmentally Preferred 
Purchasing law, 89
EPA (US Environmental 
Protection Agency), 94, 
95, 139, 140, 205, 251
ephemeral pools, 163
erosion
and construction, 124
defined, 255
and infiltration beds, 0
and landscape diversity, 211
and natural hydrology, 162, 163, 
164, 165
and pest management, 119
and porous surfacing, 182
and rain gardens, 175
and sewer overflows, 167
and soil compaction, 130
and soil disturbance, 128, 129-131
and soil reuse/rejuvenation, 134
and soil stockpiling, 135
and soil volume/depth, 156
and turfgrass, 215
see also runoff
eutrophication, 163, 255
evapotranspiration
and absorbent landscapes, 168, 
169
defined, 255
and green roofs, 51, 186
and landscape diversity, 211
and rain gardens, 175
excavation, 24, 31, 48. see also 
construction
exercise, see fitness 
opportunities
existing plans, 36, 60
existing structure reuse, 32
existing vegetation, 194-197
and active recreational uses, 41
assessment of, 20, 27, 194, 201
brownfields/recovered sites, 31
and compost, 138
and connectivity, 58
and construction, 91, 119, 133, 
196-197
passive landscapes, 39
and public health, 68
restoration areas, 35
riverbanks, 35
and soil assessment, 21
and soil compaction, 130
and soil contamination, 146
and soil disturbance, 127
and soil disturbance 
minimization, 128, 194
and soil reuse/rejuvenation, 134
and utility infrastructure, 214
f
fencing/barriers
for brownfields/recovered sites, 
31, 32
for construction, 91, 92, 131, 
133, 164
How to C#: Basic SDK Concept of XDoc.PDF for .NET
insert, delete, re-order, copy, paste, cut, rotate, and save or query data and save the PDF document. The PDFPage class presents a single page in a PDFDocument
rotate all pages in pdf; how to rotate a single page in a pdf document
VB.NET PDF- View PDF Online with VB.NET HTML5 PDF Viewer
C#.NET PDF file & pages edit, C#.NET PDF pages extract, copy, paste, C#.NET rotate PDF pages, C# Users can view PDF document in single page or continue
save pdf after rotating pages; reverse page order pdf online
HigH Performance LandscaPe guideLines
|
aPPendices
|
265
and existing vegetation, 195
for playgrounds, 44
for restoration areas, 33, 34
and street trees, 221
see also security issues
fertilization
and green roofs, 186
and invasive plant species, 198
and soil assessment, 126
and soil compaction, 130
and soil volume/depth, 152
and turfgrass reduction, 215, 216
see also soil reuse/rejuvenation
fescue turfgrass, 216
fiberglass, 78
field marking, 82
fill, 255. see also soil 
management
filter fabric, 198
fire management, 198
fire protection, 189
fish ladders, 37
fish migration, 37
fitness opportunities, 40, 42, 
66, 67, 230
Five Boroughs, 50, 51, 186-
187. see also Randall’s 
Island
flooding
and design process, 69
and ecological approach to plant 
selection, 207, 209
estimates, 70
and natural hydrology, 162
and sewer overflows, 167
and soil disturbance, 127, 129
and synthetic turf, 81
see also climate change
floodplains, 24, 25
flow paths, 162-165
flowable fill, 76
Flushing Meadows-Corona Park, 
81
fly ash, 73
food concessions, 106, 107
Forest Stewardship Council 
(FSC), 74, 76
forested sites, 146, 194, 212, 
230
Forever Wild sites, 33, 34, 194
formaldehyde, 77
Fountain Avenue Landfill, 143, 
224-226
fragrance gardens, 213
Fraxinus, 209
free play, 43
frost heave, 20
FSC (Forest Stewardship 
Council), 74, 76
fumigants, 215
g
Gaia Institute, 228-229
Gantry Park, 32
gap graded gravel subbases, 169
gardening, 43, 61
Garguillo, Marge, 209
Gateway National Recreation 
Area, 224
geocomposite, 155
geofibers, 151
geographic information systems 
(GISs), 202
geogrids, 74, 227
geotextiles
case studies, 236
for infiltration beds, 173, 174
and leachates, 75
and pavement thickness, 74
and porous surfacing, 181
for rain gardens, 176
and soil contamination, 143
and soil disturbance 
minimization, 132
GISs (geographic information 
systems), 202
glass cullet, 74, 76
global warming, 255. see also 
climate change
Gmax testing, 82, 83
golf courses, 149
Google Earth, 24
grading
and accessibility, 64
and climate change, 70
defined, 255
and existing vegetation, 195
and infiltration beds, 173
and natural hydrology, 162, 164
and passive landscapes, 39
for playgrounds, 44
pocket parks/plazas, 46
and sewer overflows, 166
and soil assessment, 126
and soil disturbance, 39, 128, 
129, 130, 132
and soil placement plans, 157-
158
and soil reuse/rejuvenation, 136
for synthetic turf, 41
and synthetic turf, 82
and water efficient landscapes, 
203
grass, see turfgrass
Green Apple Corps, 100, 186
Green Paks, 242
green roofs, 51, 184-187
case study, 242-243
and construction, 93, 186-187
defined, 255
engineered soils for, 149, 151, 186
funding for, 106
and landscape diversity, 213
and soil volume/depth, 153
and storm sewers, 166
training for, 100
see also parks over structures
Green Roofs for Healthy Cities, 
242
green walls, 228
Greenbelt Native Plant Center, 
209
greenhouse effect, 255. see also 
climate change
Greenstreets program, 47, 48, 
49, 203, 221, 251, 255
greenways, 37, 57, 58, 67
greywater, 185, 204-205, 236, 
251, 255. see also water 
reuse
ground cover, 215
groundlevel ozone, 47, 94
groundwater depth testing, 125
groundwater levels, 24, 155, 
179
groundwater recharge, 165, 188
guard rails, 186, 188
Guidelines for the Treatment of 
Cultural Landscapes, 38
gutters, 170
H
habitat, 255. see also wildlife 
habitat
habitat movement corridors, 201
hand rollers, 133
handrails, 64
Harlem River Greenway, 37
hay, 198
hazardous waste sites, 31, 71, 
119, 143, 144, 145
headwater streams, 162. see 
also streams
health impact assessment (HIA), 
68
heat, 80, 82, 209, 214. see 
also urban heat island 
(UHI) effect
herbaceous species, 255
herbicides, 198, 200
Hester Street Collaborative, 61, 
237-238
Hester Street Playground, 237-
238
hex block, 75
high performance landscape 
benefits, 14-15
high volume purchasing, 78
Highline, 87
historic (urban) fill sites, 143, 
149
hose bibs, 51, 55
hot spots, 181-182
Hudson River Park, 87, 89-90, 
95, 149
Hugo Neu Metal Management 
Recycling Facility, 228-
229
hybrid electric vehicles, 95
hydro-injection, 137
hydrology, 256. see also runoff; 
stormwater management; 
water management
hydroseeding, 132
hydrozone approach, 203
hyporheic zone, 256
i
idling, 95
illegal dumping, 142, 143
immigrants, 60, 63, 66
impermeable capping, 31-32, 
143, 145, 146, 168
impervious surfaces
for brownfields/recovered sites, 
31, 32
and climate change, 12
defined, 256
and infiltration beds, 173
and natural hydrology, 162, 163
and passive landscapes, 39
and restoration areas, 33
as soil capping, 31, 32, 146
and storm sewers, 165
and water assessment, 25
and water efficient landscapes, 
203
see also runoff
infiltration
and absorbent landscapes, 168
defined, 256
infiltration beds, 172-174, 182, 
189, 190, 256
infiltration pavers, 236, 237
and natural hydrology, 162
and parks over structures, 51
and rain gardens, 175, 176
and soil disturbance, 127
and stormwater planters, 44, 
179, 180
see also infiltration rates
infiltration beds, 172-174, 182, 
189, 190, 256
infiltration pavers, 236, 237
infiltration rates
and absorbent landscapes, 169
assessment of, 125
and compost, 138
and natural hydrology, 164
and pavement size, 72
and porous surfacing, 181
and rain gardens, 175
and rooftop runoff, 188, 189
soil analysis for, 25
and soil compaction, 130
and soil reuse/rejuvenation, 134
and soil volume/depth, 156
streetscapes, 47
insect breeding, 175, 188, 189
inspections
and best practices 
implementation, 248-249
and blue roofs, 188
and green roofs, 187
Parks Inspection Program, 206, 
215-216, 232, 248-249
and soil placement plans, 158
and staging and sequencing 
plans, 91, 93
see also maintenance/operations
integrated pest management, 
119-121, 216, 256
International Dark-Sky 
Association, 39
International Society for 
Arboriculture, 100
interpretive signage, see signage
inundation tolerant plant 
species, 12, 70, 203
invasive plant species, 198-200
and aesthetics, 207
case studies, 226, 227
and climate change, 69, 70
and connectivity, 37, 57, 200
defined, 256
and ecological approach to plant 
selection, 207
and landscape diversity, 212
and natural hydrology, 162
overview, 193
VB.NET PDF File & Page Process Library SDK for vb.net, ASP.NET
With VB.NET PDF SDK, PDF document page can be rotated to 90, 180, and 270 in clockwise. Both a single page and whole file pages can be rotated and saved as
how to rotate one pdf page; pdf rotate pages separately
C# PDF Convert to Tiff SDK: Convert PDF to tiff images in C#.net
TIFF conversion control, C# developers can render and convert PDF document to TIFF image file with no loss in original file quality. Both single page and multi
pdf rotate just one page; pdf rotate single page reader
266
passive landscapes, 39
and pest management, 119
removal of, 196
and soil contamination, 144
and soil disturbance, 127
and soil reuse/rejuvenation, 134
and turfgrass reduction, 215, 216
Inwood Park, 33
irrigation, 121
and absorbent landscapes, 168
and green roofs, 184, 185
and infiltration beds, 172
low impact systems, 204-206
for parks over structures, 50, 51
and rooftop runoff, 188, 189
and soil compaction, 130
and soil disturbance, 133
and storm sewers, 165
for streetscapes, 47
and turfgrass reduction, 215
and water efficient landscapes, 
202, 203
It’s My Park Day, 61
j
junipers, 209
k
kayaking, 37
L
land lease payments, 106, 107
landfills, 146-147
case studies, 224-226
and engineered soils, 149
and park feature location, 31
and soil assessment, 20, 143
and trees, 31-32
see also brownfields/recovered 
sites; soil contamination
Lands Underwater, 34
landscape views, 31, 34, 39, 58
laser guided grading equipment, 
82
lawns, see turfgrass
layered landscapes, see 
multitiered plantings
leachates, 75, 76
Leadership in Energy and 
Environment (LEED), 72
leaf litter, 139, 170
LEED (Leadership in Energy and 
Environment), 72
level spreaders, 164
levels of service, see 
maintenance/operations
life cycle assessment, 256
life cycle cost, 256
life cycles, 256
light pollution, 256. see also 
lighting
lighting, 39, 46, 58, 241
liquidated damages, 99, 196, 
256
LMDC (Lower Manhattan 
Development 
Corporation), 95
local development corporations, 
106, 107
Local Law 77, 70, 94, 95
locally manufactured materials, 
70, 71, 73, 88-89, 256. 
see also native/naturalized 
plant species
loose parts for play, 43
low-emitting materials, 71
Lower Manhattan Development 
Corporation (LMDC), 95
m
M&O Capital Project Input Form, 
56
macropores, 128, 134, 135, 
168, 257-256
maintenance/operations
and absorbent landscapes, 168, 
170
and accessibility, 64
and best practices 
implementation, 249
and blue roofs, 188
for brownfields/recovered sites, 31
case studies, 232, 233, 241
and climate change, 70
and community participation, 60, 
61, 110-114
and compost, 138
and connectivity, 202
costs, 54, 55, 104, 106-107
defined, 256
and design process, 54-56, 105, 
108-110
and ecological approach to plant 
selection, 206, 210
and educational features, 105, 
116
and engineered soils, 149, 152
and existing vegetation, 194
funding sources, 106-107, 110-
114
and green roofs, 187
and infiltration beds, 174
and low impact irrigation systems, 
205-206
maintenance plans, 108-110
and materials selection, 71
and native/naturalized plant 
species, 200
and natural hydrology, 164-165
overview, 104-105
for parks over structures, 50, 51
partnerships, 110-114
and pest management, 119-120
for playgrounds, 44
and porous surfacing, 180, 183
pre-maintenance needs, 106, 
114-115
preventative, 75
and public health, 66, 68
and rain gardens, 176
remedial, 112
and remediation, 145
and rooftop runoff, 191
and sewer overflows, 167
and soil assessment, 126-127
staff training, 114, 115, 117-118, 
205
and storm sewers, 165
and stormwater planters, 180
and synthetic turf, 80, 82-83
and turfgrass, 80
and turfgrass reduction, 215, 216
and utility infrastructure, 56, 214
and vegetation management, 
109, 193
and water efficient landscapes, 
202, 203
map boards, 48
maps
and climate change, 70
and connectivity, 202
restoration areas, 34
and soil assessment, 20
and soil contamination, 144
and water assessment, 24, 25, 
163
materials selection, 71-79
asphalt, 74-75
concrete, 72-74
flowable fill, 76
and invasive plant species, 198
pavement, 72
plastics, 77-78
subbase applications, 75-76, 170
and waste management, 98
wood, 76-77
Mayor’s Office of Environmental 
Remediation (OER), 30, 
31, 144
Mayor’s Office of Long Term 
Planning & sustainability 
(MOLTPS), 250
media, 63
medians, 221
methicillin-resistant 
Staphylcoccus aureus 
(MRSA), 80
metrics, 248
Metropolitan Transport Authority 
(MTA), 48, 50
Metrotec Center, 149
microclimates, 45-46, 68, 186, 
203, 211, 212
Millenium Skate Park, 41
Million Tree program, 103, 117
mining, 71
misting posts, 41, 44, 82
modular planting systems, 242
MOLTPS (Mayor’s Office of 
Long Term Planning & 
sustainability), 250
monoculture planting, 256. see 
also biodiversity
mosquitoes, 175, 188, 189
moveable seating, 46
mowing
alternative practices, 215-216, 
217
case studies, 232
and energy efficiency, 80
and invasive plant species 
eradication, 198
and maintenance/operations 
costs, 55
and natural hydrology, 162-163, 
165
and soil compaction, 167
MRSA (methicillin-resistant 
Staphylcoccus aureus), 
80
MTA (Metropolitan Transport 
Authority), 48, 50
Mulally Park, 175
mulch matting, 132
mulching
and absorbent landscapes, 169, 
170
and compost, 139
and construction, 91
defined, 256
and existing vegetation, 196
and green roofs, 185
and pest management, 119
and rain gardens, 176
and soil disturbance, 132
and turfgrass reduction, 215
vertical, 138, 169
and water efficient landscapes, 
203
multitiered plantings, 193, 200, 
206, 207-211, 212, 213
n
National Asphalt Pavement 
Association, 181, 183
National Ready Mix Concrete 
Association, 183
National Recreation and Parks 
Association (NRPA), 54, 
110
native/naturalized plant species
and connectivity, 37, 57, 201
defined, 256
and ecological approach to plant 
selection, 206, 207, 209
Native Plant Center, 194, 201
and natural hydrology, 163
overview, 193
passive landscapes, 39
and pest management, 119
and turfgrass reduction, 215, 216
Native Plant Center (NPC), 194, 
201
Natural Area Restoration, 34
natural hydrology, 162-164
restoration areas, 34
and site history, 24, 25
and soil assessment, 20, 164
and soil disturbance 
minimization, 129, 130
natural play opportunities, 43
natural recharge areas, 163
Natural Resources Conservation 
Service, 125
Natural Resources Group (NRG)
case studies, 227, 230
and connectivity, 202
and ecological approach to plant 
selection, 207
and existing vegetation, 194
and invasive plant species, 198
and native/naturalized plant 
species, 209
and natural hydrology, 163, 164
and restoration areas, 34
and soil assessment, 125
natural shoreline edges, 37
nature-based recreational uses, 
31, 146
nature trails, 66
HigH Performance LandscaPe guideLines
|
aPPendices
|
267
navigable waters, 37
navigable waters permit, 144
netting, 132
New York Invasive Species 
Clearinghouse, 198
New York Invasive Species 
Information, 198
New York State Department of 
Agriculture and Markets 
(NYSDAM), 140
New York State Department 
of Environmental 
Conservation (DEC)
and brownfields/recovered sites, 
30, 31
case studies, 233
and compost, 139, 140
and soil assessment, 126
and soil contamination, 144, 145, 
146, 147
and soil reuse/rejuvenation, 136
and stormwater management, 
129
and waterfronts, 37
New York State Department of 
Health (NYSDOH), 145, 
146
New York State Department of 
State, 37, 144
New York State Office of General 
Services (NYSOGS), 34
New York State Superfund 
Program, 224
nitrogen oxide (NO
x
), 256
noise, 46, 63, 68, 211
nonprofit groups, 106, 111-112
NPC (Native Plant Center), 194, 
201
NPS (US National Parks 
Service), 107
NRG, see Natural Resources 
Group
NRPA (National Recreation and 
Parks Association), 54, 
110
nutrient cycling, 123, 134
NYC Community Air Survey 
(NYCCAS), 66
NYC Department of Buildings 
(DOB), 144
NYC Department of City 
Planning, 239, 240
NYC Department of Design and 
Construction (DDC), 89, 
247, 250
NYC Department of 
Environmental Protection 
(DEP), 30, 48, 50, 129, 
174, 224, 251
NYC Department of Finance, 48
NYC Department of Health 
& Mental Hygiene 
(DOHMH), 30, 66, 80, 
250-251
NYC Department of Parks & 
Recreation (DPR)
and accessibility, 64
budget, 106
Capital Projects office, 31, 124, 
142, 144, 145
case studies, 242-243
and climate change, 12
and community participation, 60
Forestry & Horticulture Division, 
48, 49, 50, 51, 66, 201
and invasive plant species 
eradication, 198
and soil contamination, 145
Specifications Office, 247
and streetscapes, 47-48
Technical Services Division, 242
see also best practices 
implementation
NYC Department of Sanitation 
(DSNY), 251
NYC Department of 
Transportation (DOT), 47-
48, 150, 250, 251
Nyc Economic Development 
Corporation, 240
NYC Green Codes Task Force, 
219, 250
NYC Office of Management & 
Budget (OMB), 250
NYC Panel on Climate Change, 
69
NYC Soil and Water Conservation 
District, 125
NYCCAS (NYC Community Air 
Survey), 66
o
obesity, 66
OER (Mayor’s Office of 
Environmental 
Remediation), 30, 31, 
144
OGS (New York State Office of 
General Services), 34
older people, 41, 60, 63, 66
Olmsted, Frederick Law, 14, 
38, 207
One Call, 48
197a plans, 36, 60
opacity (smoke) testing, 95
opening celebrations, 61
operations, see maintenance/
operations
Owl’s Head Park, 41
ozone, see groundlevel ozone
P
packaging materials, 97, 98
park feature location
brownfields/recovered sites, 
31-32
and climate change, 70
passive landscapes, 39
and sewer overflows, 167
and soil disturbance 
minimization, 128
Park Improvement Districts 
(PIDs), 111
Park Management Plans (San 
Francisco), 109
parking
and absorbent landscapes, 170
and accessibility, 64
for bicycles, 44, 57, 58
case studies, 228
and engineered soils, 151
and infiltration beds, 172-173
for passive landscapes, 39
and pavement size, 72
and stormwater management, 130
and water assessment, 25
Parks and Trails New York 
(PTNY), 107
Parks Inspection Program (PIP), 
206, 215-216, 232, 
248-249
parks over structures, 50-51
case study, 242-243
construction, 93
and engineered soils, 149
see also green roofs
partnerships, 110-114. see also 
community participation; 
Partnerships for Parks
Partnerships for Parks (PfP), 34, 
60, 61, 63, 111
passive landscapes, 38-39, 
230-232
passive recreational uses, 31, 
34, 66, 146, 184
pastoral landscapes, see 
landscape views
paths
and accessibility, 63, 64, 65
and connectivity, 37, 57, 58
and maintenance/operations, 55
and playgrounds, 44
and public health, 66
see also greenways
pavement
albedo maximization, 68, 72, 
74, 75
color of, 44
and engineered soils, 150
removal of, 128, 196
size of, 25, 39, 72
and structural soils, 150
and trees, 44
see also impervious surfaces; 
porous surfacing
pavement bridging, 155
pedestrian refuge islands, 48
Pelham Bay Park, 33
Pennsylvania Avenue Landfill, 
143, 224-226
People Make Parks, 238
percolation tests, 25, 48, 125, 
169
perennial rye grass, 132
perforated pipes, 182
permeable interlocking concrete 
pavements (PICP), 181, 
257
permeable surfaces, see porous 
surfacing
permitting issues
case studies, 234
and community participation, 60
and soil assessment, 124
and soil contamination, 143, 
144-145
streetscapes, 47-48
pervious curbs, 170
pervious surfaces, see porous 
surfacing
pest management
biointensive integrated pest 
management, 119-121, 
216, 256
and connectivity, 200
and landscape diversity, 213
and plant selection, 39, 48, 119, 
120, 207, 209
and plantings, 119, 121
and turfgrass reduction, 215, 216
petroleum, 74, 77
PfP (Partnerships for Parks), 34, 
60, 61, 63, 111
phytoremediation, 31, 146, 257
picnic tables, 43, 64
PICP (permeable interlocking 
concrete pavements), 
181, 257
PIDs (Park Improvement 
Districts), 111
piles/piers, 69
pilot landscapes, 13
pilot projects, 247
pipe inlets, 48
piping
and infiltration beds, 172
and natural hydrology, 162, 164
and porous surfacing, 182
and rooftop runoff, 190
and sewer overflows, 166
plant establishment period, 193
and absorbent landscapes, 170
case studies, 226
and ecological approach to plant 
selection, 206
funding for, 106, 114-115
and low impact irrigation systems, 
205
street trees, 221
and turfgrass reduction, 215
and water efficient landscapes, 
203
plant palette, see plant selection
plant selection, 120
and absorbent landscapes, 168, 
169
and alkaline leachates, 75
case studies, 230
and climate change, 70
and connectivity, 201
design process, 207, 209-210
ecological approach, 206-211
for green roofs, 186
and landscape views, 39
overview, 193
for parks over structures, 51
for passive landscapes, 39
and pest management, 39, 48, 
119, 120, 207, 209
for playgrounds, 44
for rain gardens, 176
and soil assessment, 124, 207
and soil volume/depth, 155
and staff training, 118
and stormwater planters, 180
and street trees, 221
for streetscapes, 48
and water efficient landscapes, 
203
see also biodiversity
268
planter boxes, 179-180, 257
plantings, 121
and absorbent landscapes, 169
and climate change, 12
and natural hydrology, 163
and pest management, 119, 121
pocket parks/plazas, 46
and pre-maintenance, 106, 114-
115
and public health, 68
and soil capping, 145, 148
and soil compaction, 130
and soil disturbance, 132
and soil reuse/rejuvenation, 135
and staff training, 118
for streetscapes, 47, 48
see also plant selection; 
vegetation management
PlaNYC
and best practices 
implementation, 248, 250
on climate change, 12
Million Tree program, 103, 117
overview, 14
Reforestation initiative, 88, 104
plastics, 77-78, 181, 182
playgrounds, 42-44, 64, 65, 
236-238
pneumatic soil replacement, 137
pocket parks/plazas, 45-46, 
239-241
polyethylene, 78
polypropylene, 78
polystyrene, 77, 78
Poole, Kathy, 14
porous bituminous asphalt, 181, 
257
porous concrete, 74, 181, 257
porous surfacing, 72, 180-183
and absorbent landscapes, 169-
170
asphalt, 74-75, 181
case studies, 236, 237, 240
concrete, 74, 181, 257
defined, 257
and infiltration beds, 172, 173, 
174
for passive landscapes, 39
and public health, 68
and synthetic turf, 41
and trees, 72, 220, 221
Port Authority of New York and 
New Jersey, 95
post-consumer recycled content, 
257. see also recycled/
reclaimed materials
potable water, 161, 188, 189
powerwashing, 182
pre-consumer recycled content, 
257. see also recycled/
reclaimed materials
pre-maintenance needs, 106, 
114-115
prescoping, 246
pressure regulators, 205
preventative maintenance, 75
Printers Park Playground, 236-
237, 253
private sector participation, 106, 
110-114
processed dredge material, 136
procurement, 88-90, 149, 151, 
209, 250
Procurement Policy Board, 86, 
89
product reviews, 246
product take-back programs, 71
Project for Public Spaces, 46
property lines, 46
proprietary soil mixes, see 
engineered soils
Prospect Park, 106, 112
Prospect Park Alliance, 112
pruning, 27, 121, 219
PTNY (Parks and Trails New 
York), 107
public health, 66-68, 94, 102, 
211
public information, see 
educational features
public meetings, 60-61, 102-
103. see also community 
participation
public participation, see 
community participation
public private partnerships, 
257. see also community 
participation
public transportation, 57
Pugsley Creek Park, 208
pumps, 190
PVC, 77, 78, 185
q
quality of life, 14
queens Plaza, 240-241
quiet, see noise
quinn, Christine C., 250
r
radial trenching, 128, 137
rain barrels, 189
rain gardens, 175-178
and absorbent landscapes, 169
case studies, 233
defined, 257
and landscape diversity, 213
for playgrounds, 44
raised beds, 43
ramps, 58, 64
Randall’s Island, 106, 112, 
166, 186, 199, 242-243
Randall’s Island Sports 
Foundation, 112
RAP (reclaimed asphalt 
pavement), 74, 75
RCA (recycled concrete 
aggregate), 75, 136
reclaimed asphalt pavement 
(RAP), 74, 75
recreational fields, see active 
recreational uses
recycled concrete aggregate 
(RCA), 75, 136
recycled/reclaimed materials, 
71, 73-74, 74
case studies, 228
concrete aggregate, 75, 136
definitions, 257
and engineered soils, 149, 150
plastics, 77, 78
subbase applications, 75-76, 136
and synthetic turf, 80, 82
wood, 77
recycled tire aggregate, 74
recycling, 80, 96-98, 251, 
257. see also recycled/
reclaimed materials
red oak, 77
reference plant community, 194
reflectivity, see albedo
Regional Plan Association, 111
regulatory issues
brownfields/recovered sites, 30, 
31
and community participation, 61
and constructability reviews, 86
and infiltration beds, 172
pest management, 120
and porous surfacing, 180
restoration areas, 33
and rooftop runoff, 188
soil contamination, 143
waterfronts, 37
see also code issues; zoning
reinforced turf, 180, 181, 257
remedial maintenance, 112
remediation, 144-145
bioremediation, 146, 254
and brownfields/recovered sites, 
30
and climate change, 70
permitting issues, 144-145
phytoremediation, 31, 146, 257
and soil assessment, 22, 124, 
125, 142, 143
renewable energy, 71
renewable materials, 71
reradiated heat, 68
research, 247
restoration areas, 33-35, 227
restrooms, see comfort stations
reused materials, 71, 72, 76, 
96. see also recycled/
reclaimed materials; soil 
reuse/rejuvenation
riparian corridors, 257
ripping, 137, 169
riser pipes, 176
riverbanks, 35. see also streams; 
waterfronts
Riverside Park, 106
road/walkway widths
and accessibility, 39
and code issues, 72
and maintenance/operations, 55
and reinforced turf, 181
for streetscapes, 48
and water assessment, 25
roofs, see green roofs; parks over 
structures; rooftop runoff
rooftop runoff, 165, 166-167, 
172, 179, 188-191, 189
root barrier technologies, 214
root paths, 257
rot resistant woods, 77
rototilling, 128, 137, 138
runoff
and absorbent landscapes, 168
and active recreational uses, 41
and connectivity, 200
defined, 257
and grading, 39
and green/blue roofs, 184
and materials selection, 71, 74
and natural hydrology, 162, 163
overview, 161
and porous surfacing, 180, 182
and rain gardens, 175
rooftop, 165, 166-167, 172, 179, 
188-191, 189
and soil assessment, 21
and soil compaction, 130
and soil contamination, 32
and soil disturbance, 127, 128
and soil reuse/rejuvenation, 134
and soil volume/depth, 155-156
and storm sewers, 165
for streetscapes, 48
and water efficient landscapes, 
202
see also erosion; stormwater 
management
s
safety issues, 58, 80
safety surfacing, 43, 44, 51
salt, see de-icing procedures
salt marshes, 35
salt tolerant plant species, 70, 
209
salvage, 76, 77, 96
San Francisco, 109
sand areas, 43, 64
Sara Delano Roosevelt Park, 
237-238
scheduling, see staging and 
sequencing plans
schools, 34, 43, 57, 58, 60, 61
Schoolyards to Playgrounds 
Program, 104
science play, 43
SCMs (supplementary 
cementitious materials), 
73
sea level rise, 12, 69, 209. see 
also tidal conditions
seasonal timing
construction, 91, 92, 93
and existing vegetation, 196
invasive plant species eradication, 
198
maintenance/operations, 55
playgrounds, 43
procurement, 89
staff training, 118
vegetation management, 35, 92
seating
and accessibility, 63, 64
and connectivity, 58
materials for, 77
playgrounds, 43
pocket parks/plazas, 46
and public health, 68
Seattle Parks and Recreation 
Department, 109
security issues, 32, 91, 112. 
see also fencing/barriers
sediment basins, 132
sediment traps, 172, 182, 190
HigH Performance LandscaPe guideLines
|
aPPendices
|
269
sedimentation
and construction, 124
defined, 257
and natural hydrology, 162, 163, 
164
and porous surfacing, 182
restoration areas, 35
and soil disturbance, 127, 129
and soil stockpiling, 135
and water assessment, 24
seniors, see elderly people
SEqR (State Environmental 
quality Review), 144
service life, 72
setbacks, streetscapes, 48
sewer overflows, 165-167, 254
and climate change, 12
and natural hydrology, 162, 164
and playgrounds, 44
and porous surfacing, 180
and rain gardens, 175
and rooftop runoff, 188
and water assessment, 24
and water efficient landscapes, 
202
see also stormwater management
sewers, 24. see also sewer 
overflows
shade
and climate change, 69
defined, 257
and ecological approach to plant 
selection, 209
and invasive plant species 
eradication, 198
and landscape diversity, 211
and parks over structures, 51
and pocket parks/plazas, 45-46
and public health, 66, 68
for restoration areas, 33
and street trees, 218
and synthetic turf, 80, 82
and urban heat island effect, 72
shade gardens, 213
shearing, 203
shrinkage/creep, 73
sidewalks, see paths; pavement; 
road/walkway widths
sight lines, 219
signage
and accessibility, 58, 64
and blue roofs, 188
for brownfields/recovered sites, 
32
and community participation, 
61, 102
and connectivity, 37
and construction, 61, 102, 133
and green roofs, 186
and maintenance/operations, 116
playgrounds, 43
and rooftop runoff, 190
and streetscapes, 48
and synthetic turf, 80
see also educational features
silica fume, 73
Singer, Michael, 240
sink holes, 20
site assessment, 17-27
and absorbent landscapes,  
168-169
and accessibility, 63
and air quality, 68
checklist for, 19
and climate change, 69-70
and community participation, 60
and compost, 138
and ecological approach to plant 
selection, 207
existing vegetation assessment, 
20, 27, 194, 201
overview, 18
and porous surfacing, 181-182
soil assessment overview, 20-23
and soil contamination, 143-144
water assessment, 24-26, 163, 
201
see also design process; site 
types; soil assessment
site history, 18
and accessibility, 63, 64
brownfields/recovered sites, 32
case studies, 236
checklist for, 19
and climate change, 69
and community participation, 61
and maintenance/operations, 55
passive landscapes, 38, 39
restoration areas, 33-34
and soil assessment, 20
and water assessment, 24
site preservation and protection 
plans, 28, 59, 163, 169
site types, 29-51
active recreation uses overview, 
40-41
brownfields/recovered sites, 30-
32, 224-226, 254
parks over structures, 50-51, 93, 
149, 242-243
passive landscapes, 38-39, 230-
232
playgrounds, 42-44, 64, 65, 
236-238
pocket parks/plazas, 45-46, 
239-241
restoration areas, 33-35, 227
streetscapes, 47-49, 58
waterfronts overview, 36-37
slag, see Air Cooled Blast 
Furnace Slag
slag cement, 73
slope failure, 124
smell, 21
smoke (opacity) testing, 95
snow/ice removal, 183. see also 
de-icing procedures
social uses, 45, 46, 62
Society for Ecological 
Restoration International, 
198
soil amendments, see compost; 
fertilization; soil reuse/
rejuvenation
soil assessment, 20-23, 124-
127
case studies, 234-235
clean fill, 148
and compost, 138
and connectivity, 200
and construction, 22, 125, 126
and design process, 124-125
and disturbance minimization, 
128
and engineered soils, 124, 151, 
152
and infiltration beds, 172
and natural hydrology, 20, 164
and plant selection, 124, 207
and porous surfacing, 181
for restoration areas, 34
and reuse/rejuvenation, 22, 126, 
135
and rooftop runoff, 189
and soil contamination, 20, 21, 
22, 124, 125, 142, 143-
144, 145
for streetscapes, 48
soil bearing capacity testing, 
125
soil borings, 21, 48, 125
soil capping
and absorbent landscapes, 168
case studies, 224
and engineered soils, 149
impermeable, 31-32, 143, 145, 
146, 168
and procurement, 147
Soil Cleanup Objectives (SCOs), 
146
soil compaction
and absorbent landscapes, 169
assessment of, 20, 21, 22
and compost, 137, 138
and construction, 91
and ecological approach to plant 
selection, 209
and engineered soils, 149, 150-
151
and infiltration beds, 174
minimization of, 130-131, 133
and natural hydrology, 162, 163
and porous surfacing, 180, 181, 
182
and rain gardens, 176
and sewer overflows, 167
and soil disturbance, 127, 128
and soil reuse/rejuvenation, 136
and storm sewers, 165
and stormwater management, 
130
streetscapes, 47
treatments for, 136-137, 163, 
169
and turfgrass, 80
and utility infrastructure, 155, 
214
and water assessment, 25
soil contamination, 142-148
and absorbent landscapes, 168
assessment of, 20, 21, 22, 124, 
125, 142, 143-144, 145
brownfields/recovered sites, 31
case studies, 227
and construction, 59, 147, 158
and design process, 146-147
and disposal, 124, 145
and engineered soils, 149
and excavation, 31
permitting issues, 143, 144-145
and porous surfacing, 180, 182
and reuse/rejuvenation, 125
and rooftop runoff, 188
and synthetic turf, 81
and water assessment, 24
see also remediation
soil disturbance minimization, 
127-134
brownfields/recovered sites, 32
and climate change, 70
and existing vegetation, 128, 194
and grading, 39
restoration areas, 35
soil freezing, 51
soil management, 120
and absorbent landscapes, 169
case studies, 224, 227
compost overview, 138-142
and construction, 59, 91, 123, 
124, 127-134
disposal, 124, 145
and ecological approach to plant 
selection, 206
exposure, 132
and green roofs, 186
overview, 123
procurement, 88, 149, 151
soil particles, 257-258
soil placement plans, 91, 151, 
155, 156-159, 258
and staff training, 118
stockpiling, 135-136
structural soils, 150, 155, 169
and turfgrass reduction, 215
and vegetation management, 193
volume/depth, 152-158
and water efficient landscapes, 
203
see also engineered soils; 
soil assessment; soil 
contamination; soil reuse/
rejuvenation
soil particles, 257-258
soil placement plans, 91, 151, 
155, 156-159, 258
soil reuse/rejuvenation, 124, 
125, 134-137
and absorbent landscapes, 169
contaminated soils, 143, 145, 
146
and soil assessment, 22, 126, 
135
soil scientists, 125, 145, 149, 
150
solar reflectance index (SRI), 
see albedo
SPDES (State Pollutant 
Discharge Elimination 
System), 129, 144
special needs users, 40-41, 57, 
58. see also accessibility
spillways, 176
sports fields, see active 
recreational uses
spray features, 41, 44
spray showers, 236
SRI (solar reflectance index), 
see albedo
St. Simon Stock School, 186
stabilized grass paving, 72
270
staging and sequencing plans, 
90-94, 136, 147, 183, 
187, 188, 190
stairs, 66
Stalite soils, 169
State Environmental quality 
Review (SEqR), 144
State Pollutant Discharge 
Elimination System 
(SPDES), 129, 144
steel furniture, 77
step pools, 164
storm intensity/frequency, 12, 
69, 70
StormChambers, 228, 229
stormwalls, 70
stormwater management
and absorbent landscapes, 168, 
169
best management practices, 258
and best practices 
implementation, 251
case studies, 224, 228-229, 232, 
233-234, 236, 240, 241
and climate change, 12, 70
and compost, 138
and connectivity, 201
and construction, 93, 128-129
costs, 106
and ecological approach to plant 
selection, 207
and engineered soils, 149, 150, 
151
and existing vegetation, 194
and green/blue roofs, 184, 185
and high performance landscape 
benefits, 14
importance of, 161
infiltration beds, 172-174
and landscape diversity, 211
and low impact irrigation systems, 
204
and maintenance/operations, 55
and natural hydrology, 163
and parks over structures, 50
and pavement size, 72
for playgrounds, 44
for pocket parks/plazas, 46
and porous surfacing, 74-75, 
180, 181
and rain gardens, 175, 176
for restoration areas, 34-35
and rooftop runoff, 190
and sewer overflows, 166
and soil assessment, 22, 124, 
126
and soil disturbance 
minimization, 129, 132-
133
and soil volume/depth, 155
and staff training, 118
stormwater planters, 44, 179-180
and street trees, 218, 221
and streetscapes, 48
and synthetic turf, 80, 81-82
and turfgrass reduction, 215
and water efficient landscapes, 
202, 203
waterfronts, 37
see also runoff; sewer overflows; 
water management
stormwater planters, 44, 179-
180
Stormwater Pollution Prevention 
Plans (SWPPPs), 128, 
144, 258
streams, 35, 162-165. see also 
natural hydrology; water 
management
street bump-outs, 169
street-level commerce, and 
connectivity, 57
street trees, 14, 47, 48, 59, 
154, 201, 218-221. see 
also trees
streetscapes, 47-49, 58
structural soils, 150, 155, 169
structures
and accessibility, 64
and blue roofs, 184, 187-188
and climate change, 69
and construction, 93
on contaminated soils, 31
downspouts, 165, 166-167, 172
and infiltration beds, 173
parks over, 50-51
passive landscapes, 39
and pocket parks/plazas, 45-46
and rain gardens, 175
reuse, 32
shading from, 33
and water assessment, 24, 25
see also green roofs
styrenebutadinestyrene (SBS), 
181
styrofoam, 186
subbase applications, 75-76, 
170
for infiltration beds, 172, 173, 
174
for porous surfacing, 182, 183
see also aggregates
subgrade grading plans, 157-
158
subsoiling, 137
subsurface ripping, 137
subways, 240
successional landscapes, see 
ecological succession
sulfur dioxide (SOx), 258
sulfurous leachates, 76
sump inlets, 172
sumps, 172, 190
supplementary cementitious 
materials (SCMs), 73
surface permeability, see 
impervious surfaces; 
porous surfacing
sustainable forest products, 71, 
76, 258
Sustainable Sites Initiative, 123
swales, see bioswales
synergy, 57-58. see also 
connectivity
synthetic turf, 41, 80-83, 146, 
172, 233-234
t
TAGM #4046 standards, 147-
148, 235
tanks, 189
Teardrop Park, 151
temperature, 12
10 Principles for Successful 
Squares (Project for 
Public Spaces), 46
Test Methods for the 
Examination of 
Composting and Compost 
(TMECC), 140
test pits, 21
testing protocols
compost, 141
soil, 22-23, 234-235
see also soil assessment; water 
assessment
34th Street Partnership, 112
tidal conditions, 21, 25, 35, 
70, 209. see also sea 
level rise
tidal wetlands permit, 144
top dressing, 138
topography, 24, 39
torrified wood, 76-77
total suspended solids (TSS), 
175, 180, 258
toxic chemicals, see soil 
contamination
traditional parks, see passive 
landscapes
training, 99-101, 105, 114, 
115, 117-118, 205, 249
transfer platforms, 64
transplants, 196
tree gator bags, 203
Tree of Heaven (Ailanthius 
altissima), 207
tree pits, 218, 219
tree tags, 27
tree trenches, 169, 172
trees
and absorbent landscapes, 169
and active recreational uses, 41
and alkaline leachates, 75
assessment of, 27
case studies, 225, 226, 239, 240
and climate change, 70
community planting, 61, 117
and connectivity, 57-58, 201
and construction, 44, 58, 91, 93, 
102, 221
dead/dying, 13, 70
and landscape diversity, 211
and landscape views, 39
and mowing, 215
in paved areas, 150
for playgrounds, 44
and porous surfacing, 72, 220, 
221
procurement, 88
and public health, 66, 68
removal of, 102, 116, 195-196
and soil capping, 31, 146
and soil compaction, 130
and soil volume/depth, 153, 154
street trees, 14, 47, 48, 59, 154, 
201, 218-221
and turfgrass reduction, 215
see also critical root zones
trench drains, 48
trenchless technologies, 258
tropical wood, 76, 77
TSS (total suspended solids), 
175, 180, 258
Tsuga canadensis, 209
turbidity, 258
turfgrass
engineered soils for, 149-150
and natural hydrology, 162-163
and reinforced turf, 180, 181, 
257
substitutes for, 216
vs. synthetic turf, 80
and water efficient landscapes, 
203
typical cross sections, 157
u
UHI, see urban heat island 
(UHI) effect
ultralow sulfur diesel (ULSD) 
fuel, 94, 95
underdrains, 175, 176, 179, 
219
understory planting, 13, 70
United Nations, 87
Urban, James, 153, 155
urban heat island (UHI) effect
and absorbent landscapes, 168
and climate change, 12, 70
defined, 258
and existing vegetation, 194
and green roofs, 184
and landscape diversity, 211
and materials selection, 71, 72, 
74, 75
and parks over structures, 50
and pocket parks/plazas, 45
and public health, 66, 68
and street trees, 218
and streetscapes, 47
urban (historic) fill sites, 143, 
149
US Army Corps of Engineers (US 
ACE), 30, 37, 136, 144
US Composting Council (USCC), 
139, 140
US Department of Agriculture 
(USDA), 13, 140, 198
US Environmental Protection 
Agency (EPA), 94, 95, 
139, 140, 205, 251
US EPA Clean Air Nonroad 
Diesel rule, 94
US Green Building Council, 72
US National Parks Service 
(NPS), 107
utility infrastructure, 258
and climate change, 69
and construction, 91
and maintenance/operations, 
56, 214
and parks over structures, 51
for passive landscapes, 39
for pocket parks/plazas, 46
and soil disturbance 
minimization, 128, 129
and soil placement plans, 157
and soil volume/depth, 155
and stormwater planters, 179
Documents you may be interested
Documents you may be interested