Article II.  PUBLIC FIRE PROTECTION 
Section 2.01 Use of Fire Hydrants.  
Fire hydrants  are  for  use  by  organized  fire  protection agencies. Other  parties 
ies 
desiring to use fire hydrants for any purpose must first obtain written permission 
from the District prior to use and  shall operate the hydrant in accordance  with 
instructions issued by the District. 
Section 2.02 Penalties.  
The  Board  may  provide  penalties  for  the  unauthorized  use  of  hydrants. 
Unauthorized use of hydrants will be prosecuted according to law. 
Deleted: <#>
Formatted
Deleted:   
Deleted:   
Deleted:   
Deleted:   
Agenda:  2.4.16 
Item:  10a
114
141
Rotate one page in pdf - rotate PDF page permanently in C#.net, ASP.NET, MVC, Ajax, WinForms, WPF
Empower Users to Change the Rotation Angle of PDF File Page Using C#
rotate single page in pdf; how to rotate page in pdf and save
Rotate one page in pdf - VB.NET PDF Page Rotate Library: rotate PDF page permanently in vb.net, ASP.NET, MVC, Ajax, WinForms, WPF
PDF Document Page Rotation in Visual Basic .NET Class Application
how to rotate just one page in pdf; rotate pdf page few degrees
San Lorenzo Valley Water District 
Policies and Procedures
6 
Formatted: Justified, Right:  0.25"
Formatted: Right:  0", Tabs: 3.25", Centered +  6.5", Right
+ Not at  3.35"
Deleted: 
... [11]
Formatted: Font:9 pt
Article III.  SEWERAGE POLICIES
Section 3.01  Facilities 
(a)  Infiltration Test. Infiltration is the quantity  of water entering a sewer line 
line 
from the groundwater through such means as, but not limited to, defective 
pipe, pipe joints, connections or manhole walls. The infiltration test will be 
be 
used if  the  static groundwater level is above the top  of the constructed 
pipe. No pipe section will be accepted if the infiltration rate exceeds 100 
gallons per inch diameter of pipe per mile length of pipe per 24 hours. 
(b)  Leakage Test. Leakage is the quantity of water that has to be added to the 
he 
section of pipeline being tested to maintain the specified test head. With a 
minimum of four feet of water head on the pipe line, the allowable leakage 
will be computed by the formula E = 0.00002 * L * D * H where: 
H where: 
E=the allowable leakage in gallons per minute of pipe tested 
L=the length of pipe tested in feet. 
D=the internal diameter of the pipe in inches. 
H=the difference in elevation in the water surface in the upper manhole and the 
invert of the pipe at the lower manhole (feet). 
(a)  Manhole Testing. Each manhole is to be tested by either w1 or w2 above 
above 
depending  upon  the  groundwater  conditions  at  the  site  of  the  specific 
manhole.  
(i)  Manhole  Test—Infiltration.  All  laterals  or  mains  running  through  the  manhole 
hole 
will  be  plugged  with  gasket  caps  or  plugs  securely  fastened  or  blocked  to 
prohibit  water  from  leaving  the  manhole.  The  amount  of  infiltration  will  be 
measured  over  a  seven-day  period  and  if  the  amount  accumulated  does  not 
not 
exceed  1.7  percent  of  the  total  volume  of  the  structure,  the  test  will  be 
considered approved. 
(ii)  Manhole Test—Leakage: The test will be the same as for infiltration except the 
t the 
manhole  will be filled to the maximum water surface  level  and measurements 
made at the  beginning and end of the seven-day test period. If the water loss 
oss 
computed between the two water level readings does not exceed 0.7 percent of 
of 
the total volume of water in the structure, the test will be considered approved. 
(b)  Sewer laterals. All sewer laterals connected to existing sewer mains must 
st 
be compatible with the type of main line materials. Quality assurance will 
be  considered  met when:  (1)  the  District  receives  a  submittal from  the 
contractor  performing  the work noting  the  type and  class  of  pipe  to  be 
used for the lateral and connection to the main, (2) District personnel is 
present when attachment to the main is accomplished for visual inspection 
of the connection and (3) when an as-build drawing is  submitted by the 
Deleted: <#>
Deleted: RULES, REGULATIONS, RATES, AND 
CHARGES
Deleted:   
Deleted:   
Deleted:   
Deleted:   
Formatted: Heading 3, Outline numbered + Level: 3 +
Numbering Style: a, b, c, ... + Start at: 1 + Alignment: Left +
Aligned at:  0.2" + Indent at:  0.5"
Deleted:   
Deleted:    
Formatted: Heading 4
Deleted:   
Deleted:   
Deleted:   
Deleted:   
Deleted:   
Deleted:   
Deleted:    
Agenda:  2.4.16 
Item:  10a
115
142
VB.NET PDF Page Delete Library: remove PDF pages in vb.net, ASP.
If you are looking for a solution to conveniently delete one page from your PDF document, you can use this VB.NET PDF Library, which supports a variety of PDF
pdf expert rotate page; pdf save rotated pages
C# PDF File Merge Library: Merge, append PDF files in C#.net, ASP.
C# developers can easily merge and append one PDF document to document imaging toolkit, also offers other advanced PDF document page processing and
pdf rotate single page and save; rotate pdf pages in reader
San Lorenzo Valley Water District 
Policies and Procedures
7 
Formatted: Justified, Right:  0.25"
Formatted: Right:  0", Tabs: 3.25", Centered +  6.5", Right
+ Not at  3.35"
Deleted: 
... [12]
Formatted: Font:9 pt
contractor to the District showing the location of laterals connected to the 
main and all invert elevations of the work performed. 
(c) Obstruction Test. The obstruction test is to verify that the constructed main 
in 
or lateral is constantly sloping to the treatment facility and that no physical 
damage  has  taken  place  during  construction  of  the  pipe  line.  The 
obstruction test will be  accomplished by either method below  by District 
personnel.  
(i)  Light  Inspection.  Examine  the  pipe internally  by means  of  a  light held  at  one 
one 
end  and  a  mirror  held  at  the  other.  Repeat  test  with  light  and  mirror 
interchanged.  Repair  or  correction  of  any  misalignments,  protuberances, 
defective portions or other defect will be required. 
(ii)  Ball  Test.  When  light  test  is  not  feasible,  a  ball  test  can  be  conducted  by 
d  by 
passing through the  pipeline a round non-compressible ball which is one  inch 
less in diameter than the internal diameter of the pipeline. In the event the ball 
is not able t  pass through  the pipeline,  repair of  defective pipe section will  be 
required. 
(d)  Quality  assurance  of  the  constructed  lateral,  main  or  manhole  will  be 
considered approved  when  the  above tests  are  performed  and all  tests 
pass  respective  constraints  and  limits.  Any  deficiencies  are  to  be 
corrected within five working days after the respective test. If the test fails 
after  repairs  are  made  the  first  time,  the  District  Manager  may,  at  his 
discretion,  require  the  complete  replacement  of  the  constructed  lateral, 
main or manhole. 
All  contractor  test  procedures  and  replacements  will  be  carried  out  by  the 
contractor at his own expense. 
(a)  Determination  of  Components.  The  determination  of  estimation  of 
of 
suspended  solids  or  other  components  contained  in  sewage  and  liquid 
waste discharges shall be by one of the following methods. 
(i)  Sampling and analysis by District personnel. 
(ii) Estimates determined by a study of waste producing operations leading to the 
discharge. 
Deleted:   
Deleted: 
Deleted:   
Deleted:   
Deleted:   
Deleted:   
Deleted:   
Deleted:   
Deleted:   
Formatted: Heading 3, Outline numbered + Level: 3 +
Numbering Style: a, b, c, ... + Start at: 1 + Alignment: Left +
Aligned at:  0.2" + Indent at:  0.5"
Formatted: Heading 4
Agenda:  2.4.16 
Item:  10a
116
143
VB.NET PDF File Merge Library: Merge, append PDF files in vb.net
all. This guiding page will help you merge two or more PDF documents into a single one in a Visual Basic .NET imaging application.
how to rotate all pages in pdf; permanently rotate pdf pages
VB.NET PDF Annotate Library: Draw, edit PDF annotation, markups in
to display it. Thus, PDFPage, derived from REPage, is a programming abstraction for representing one PDF page. Annotating Process.
pdf rotate page; rotate pages in pdf online
San Lorenzo Valley Water District 
Policies and Procedures
8 
Formatted: Justified, Right:  0.25"
Formatted: Right:  0", Tabs: 3.25", Centered +  6.5", Right
+ Not at  3.35"
Deleted: 
... [13]
Formatted: Font:9 pt
Article IV.  CONTRACTS AND PURCHASING 
Section 4.01 Qualification of Bidders.  
The District may, and on contracts for which the estimated cost exceeds $50,000 
(Fifty Thousand Dollars) the District shall require that bidders establish that they 
are  qualified  and  responsible  to  provide  the  services,  equipment,  and/or 
materials to perform the contract in a safe, efficient, reliable and timely manner. 
In order to evaluate those qualifications and to determine which  low bid offers 
best response in quality, fitness and capacity to the District’s requirements, prior 
to the award of the contract, the District shall require the low bidder or bidders to 
provide  certain  information  as  follows:  (a)  answer  to  questions  contained in a 
standard form questionnaire and financial statement; (b) evidence of bonds and 
nd 
liability  and  workers’  compensation  insurance  satisfactory  to  the  District;  (c) 
Evidence  of  a  safety  record  acceptable  to  the  District;  (d)  Necessary  or 
appropriate licenses  or certificates; and  (e)  an  acceptable performance record 
with the District or any other public agency. 
(a)  Questionnaire.  The  questionnaire  shall  include  questions  which  will 
ll 
provide information which will provide a basis for the District to evaluate 
the bidder. Such information shall include, among other things, information 
relating to the experience of the bidder in projects of a similar type as the 
proposed project, and shall include references of previous employers. The 
questionnaire  shall  be  signed  by  the  bidder or  an  authorized  designee 
under penalty of perjury. 
(b)  Financial Statement. The financial statement shall include information as 
as 
required by  the  District  for the District’s use  in  determining  the  bidder’s 
financial ability to perform the contract satisfactorily and shall be signed by 
the bidder or an authorized designee under penalty of perjury. 
(c)  Safety Record. The District may disqualify a bidder on the basis that the 
he 
bidder’s safety record is unacceptable. In evaluating the safety record, the 
he 
District  shall  consider  any  violations  of  the  CAL  OSHA  standards,  the 
issuance  of  CAL  OSHA  citations,  and  the  severity  or  liability  exposure 
resulting from such citations. 
(d)  Performance  Record  with  the  District  or  Other  Public  Agencies.  In 
In 
evaluating  the  qualifications  of  a  bidder,  the  District  shall  consider  the 
bidders’  performance  record  with  the  District  or  other  public  agencies. 
Such  evaluation shall  include, among  other  things,  consideration  of the 
bidder’s  overall  performance, safety,  quality, timeliness and  compliance 
with  the  contract.  Such  evaluation  shall  also  consider  any  outstanding 
ng 
claims or lawsuits involving the District and the bidder. 
(e)  Prequalification of Bidders. A prospective bidder shall have the option of 
of 
prequalifying  as  a bidder  on  a given  project.  To exercise this  option, a 
Deleted: <#>
Formatted
Deleted:   
Deleted:   
Deleted:   
Deleted:   
Deleted:   
Deleted:   
Deleted:   
Deleted:   
Deleted:   
Deleted:   
Deleted:   
Deleted:   
Deleted:   
Deleted:   
Agenda:  2.4.16 
Item:  10a
117
144
C# PDF Page Extract Library: copy, paste, cut PDF pages in C#.net
Extract PDF Pages, Copy Pages from One PDF File and Paste into Others in C#.NET Program. Free PDF document processing SDK supports PDF page extraction, copying
save pdf rotated pages; rotate pages in pdf and save
C# PDF Page Delete Library: remove PDF pages in C#.net, ASP.NET
Using RasterEdge Visual C# .NET PDF page deletion component, developers can easily select one or more PDF pages and delete it/them in both .NET web and Windows
pdf rotate just one page; pdf rotate pages and save
San Lorenzo Valley Water District 
Policies and Procedures
9 
Formatted: Justified, Right:  0.25"
Formatted: Right:  0", Tabs: 3.25", Centered +  6.5", Right
+ Not at  3.35"
Deleted: 
... [14]
Formatted: Font:9 pt
bidder must complete and submit a package of the required qualification 
information, statements and  evidences as set  forth herein no  later  than 
fifteen days  prior to  the  bid opening.  The  District  Manager  will  issue a 
preliminary finding as to whether the prospective bidder is qualified within 
10 days after the completed qualification package is received. 
(f)  Appeal  of  Preliminary  Findings.  A  bidder  may  appeal  the  District 
ct 
Manager’s preliminary finding of disqualification to the Bard of Directors. A 
disqualified bidder may submit a bid pending a determination by the Board 
f that bidder’s qualifications. If that bidder is the low bidder the Board will 
consider the bidder’s qualification and issue a finding prior to award of the 
contract. 
(g)  Disqualification of Bidders. The Board may disqualify any bidder who fails 
ls 
to  submit  the  completed  questionnaire,  financial  statement,  licenses, 
safety record, bonds, insurances, or other required information in a timely 
manner.  The  Board  may  disqualify  any  bidder  whose  information  as 
required is not satisfactory and acceptable to the Board. A bidder may be 
disqualified on the basis that the bidder, any officer of such bidder, or any 
employee of  such bidder who  has a proprietary interest  in  such bidder, 
has  been  disqualified  or  prevented  from  bidding  on  or  completing  a 
federal,  state, or  local  project because of  a  violation of law  or  a  safety 
regulation. 
(h)  Rejection of Bid. Upon disqualification of a bidder as set forth herein, the 
he 
Board may reject that bidder’s bid for the contract award. 
(i)  Questionnaires  and  Financial  Statements  Are  Not  Public  Records.  The 
he 
questionnaire  and  financial  statements  required  herein  are  not  public 
records and are not open to public inspection. 
Section 4.02 Sealed Bids 
(a)  Solicitation of Sealed Bids. Sealed bids shall be solicited by posting on the 
the 
District’s bulletin board, or by mailing to at least three or more prospective 
bidders, bid forms listing materials and specifications or services desired. 
The Board of Directors may also direct that additional solicitation or public 
ic 
notice be provided. 
(b)  Contents of Bid Forms for Sealed Bids. In addition to stating the amount, 
t, 
quality and specifications of materials or contractual services desired, bid 
forms  shall  contain  or be accompanied  by written statements indicating 
the latest date  when  sealed  bids will be  received;  the  date  they  will  be 
opened; the amount, if any, f good faith deposit or bid bond to accompany 
the bid; whether or not a completion or delivery date bond will be required, 
and  an envelope  clearly  marked “Sealed Bid” in  which the bid  is to  be 
returned. 
Deleted:   
Deleted:   
Deleted:   
Deleted:   
Deleted:   
Deleted:   
Deleted:   
Deleted:   
Deleted:   
Deleted:   
Deleted:   
Deleted:   
Agenda:  2.4.16 
Item:  10a
118
145
C# PDF copy, paste image Library: copy, paste, cut PDF images in
This C#.NET example describes how to copy an image from one page of PDF document and paste it into another page. // Define input and output documents.
rotate all pages in pdf preview; pdf rotate all pages
C# PDF: C# Code to Process PDF Document Page Using C#.NET PDF
for developers on how to rotate PDF page in different two different PDF documents into one large PDF C# PDF Page Processing: Split PDF Document - C#.NET PDF
reverse pdf page order online; how to rotate all pages in pdf at once
San Lorenzo Valley Water District 
Policies and Procedures
10 
Formatted: Justified, Right:  0.25"
Formatted: Right:  0", Tabs: 3.25", Centered +  6.5", Right
+ Not at  3.35"
Deleted: 
... [15]
Formatted: Font:9 pt
(c)  Submission of Sealed Bids. Sealed bids shall be submitted or mailed to 
to 
the  Secretary  of  the  District,  sealed  in  the  envelope  furnished  by  the 
District, accompanied with the amount of  good faith deposit, if  required, 
and accompanied by a statement under oath that the bidder has not been 
a party to any uniform or fixed price agreement. 
(d)  Opening and Tabulation of Bids. All sealed bids shall be opened on the 
he 
date  set  for  opening  and  shall  be  tabulated  and  available  for  public 
inspection  during  regular  business  hours  for  a  period  of  30  days  after 
opening. 
(e)  Failure to Enter into Contract. Any successful bidder who fails to furnish 
sh 
an acceptable completion or delivery date bond as required or who fails to 
enter into a written contract with the District for a period of 10 days after 
notice  of its  approval by the  District  Counsel shall  forfeit his  good faith 
deposit or become  liable to the District  on his  bid bond, if any, and the 
District may award the contract to the next lowest responsible bidder. 
Deleted:   
Deleted:   
Deleted:   
Agenda:  2.4.16 
Item:  10a
119
146
Page - 1 -: [1] Deleted 
ed 
Brian Lee 
1/22/16 1:24 PM 
POLICIES AND PROCEDURES OF THE SAN LORENZO VALLEY WATER DISTRICT  
(Adopted December XX, 2015) 
Page - 1 -: [2] Deleted 
ed 
Brian Lee 
1/22/16 1:27 PM 
Page a: [3] Deleted 
Brian Lee 
1/22/16 1:27 PM 
Page i: [4] Deleted 
Brian Lee 
1/22/16 1:40 PM 
POLICIES AND PROCEDURES OF THE SAN LORENZO VALLEY WATER DISTRICT  
(Adopted December XX, 2015) 
Page i: [5] Deleted 
Brian Lee 
1/22/16 1:27 PM 
Page 1: [6] Deleted 
Brian Lee 
1/22/16 1:27 PM 
Page 1: [7] Deleted 
Brian Lee 
1/22/16 1:27 PM 
Page 1: [8] Deleted 
Brian Lee 
1/22/16 1:27 PM 
Page 1: [9] Deleted 
Brian Lee 
1/22/16 1:27 PM 
Page 1: [10] Deleted 
Brian Lee 
1/22/16 1:27 PM 
Page 1: [11] Deleted 
Brian Lee 
1/22/16 1:27 PM 
Page 1: [12] Deleted 
Brian Lee 
1/22/16 1:27 PM 
Page 1: [13] Deleted 
Brian Lee 
1/22/16 1:27 PM 
Page 1: [14] Deleted 
Brian Lee 
1/22/16 1:27 PM 
Page 1: [15] Deleted 
Brian Lee 
1/22/16 1:27 PM 
Agenda:  2.4.16 
Item:  10a
120
147
POLICIES AND PROCEDURES OF THE SAN LORENZO VALLEY WATER 
DISTRICT  
(Adopted FEBRUARY 4, 2016) 
Agenda:  2.4.16 
Item:  10a
121
148
San Lorenzo Valley Water District 
Policies and Procedures
REVISIONS 
•  02/04/2016 - Policies and Procedures adopted by Resolution 27 (15-16) 
-16) 
Agenda:  2.4.16 
Item:  10a
122
149
San Lorenzo Valley Water District 
Policies and Procedures
TABLE OF CONTENT 
ARTICLE I.
 
GENERAL PROVISIONS ........................................................................................ 1
 1
 
S
ECTION 
1.01
 
G
ENERAL
 ............................................................................................................. 1
 1
 
S
ECTION 
1.02
 
W
ATER 
S
YSTEM
 .................................................................................................... 1
 1
 
S
ECTION 
1.03
 
S
EPARABILITY
 ........................................................................................................ 2
 2
 
S
ECTION 
1.04
 
R
ECORDS
 ............................................................................................................. 2
 2
 
S
ECTION 
1.05
 
E
MPLOYER
-E
MPLOYEE 
R
ELATIONS
. ........................................................................... 2
 2
 
S
ECTION 
1.06
 
P
OLICY 
R
EGARDING 
A
CCESS TO 
P
ERSONNEL 
F
ILES
. ...................................................... 2
 2
 
ARTICLE II.
 
PUBLIC FIRE PROTECTION ............................................................................... 5
 5
 
S
ECTION 
2.01
 
U
SE OF 
F
IRE 
H
YDRANTS
. ......................................................................................... 5
 5
 
S
ECTION 
2.02
 
P
ENALTIES
. ........................................................................................................... 5
 5
 
ARTICLE III.
 
SEWERAGE POLICIES. ...................................................................................... 6
 6
 
S
ECTION 
3.01
 
F
ACILITIES
 ............................................................................................................ 6
 6
 
ARTICLE IV.
 
CONTRACTS AND PURCHASING ....................................................................... 8
 8
 
S
ECTION 
4.01
 
Q
UALIFICATION OF 
B
IDDERS
. ................................................................................... 8
 8
 
S
ECTION 
4.02
 
S
EALED 
B
IDS
 ......................................................................................................... 9
 9
 
Agenda:  2.4.16 
Item:  10a
123
150
Documents you may be interested
Documents you may be interested