San Lorenzo Valley Water District 
Policies and Procedures
Article I.  GENERAL PROVISIONS 
Section 1.01  General 
(a)  The manager  shall institute  measures to continually monitor the  sources 
and facilities of the  District to assure the adequacy  of  such  sources and 
facilities  to  supply  the  customers  of  the  District,  both  present  and 
prospective.  Members  of  the  District’s  staff  shall  be  encouraged  and 
directed to report to the manager any changes in the sources and facilities 
which  might  affect  in  any  way  the  capability  of  the  District  to  supply  its 
customers,  present  and  prospective.  The  Manager  shall  report  to  the 
Board of Directors as required from time to time by the Board of Directors, 
the status of the capability of the District’s sources and facilities to supply 
the  District’s  customers  and  meet  the  demands  upon  the  waterworks 
system. 
(b)  The manager shall review all applications for water service connections to 
determine whether such connections can be made to the District’s system 
or  any subsystem thereof  without  impairing the system’s or  subsystem’s 
capability  of  supplying  water  in  accordance  with  good  waterworks 
management practices and shall report to the Board of Directors when, in 
his opinion, the addition of service connections to the District’s system or 
any sub system thereof will reduce the level and quality of service to the 
near minimum of good waterworks management practices. 
(c)  The planning and designing of repairs, replacement and improvements of 
of 
District  facilities  shall  be  accomplished  to  provide  for  the  orderly 
development of the waterworks system. Wherever feasible, such planning 
and  designing  shall  provide  for  the  orderly  expansion  of  the  District’s 
waterworks  system  when  it  is  foreseeable  that  such  expansion  is 
reasonably probable. 
(d)  The  manager  shall  communicate  and  consult  with  other  public  service 
ice 
agencies  so  that  the  District  might  cooperate  beneficially  with  other 
agencies in water, sanitation, fire protection, resources management and 
recreation matters. 
Section 1.02  Water System 
The District will operate and maintain a system plant, work and undertaking used 
for  and  useful  in  obtaining,  conserving  and  disposing  of  water  for  public  and 
private  uses,  including  all  parts  of  the  enterprise,  all  appurtenances  to  it,  and 
and 
lands, easements, rights in land, water rights, contract rights, franchises, and the 
water supply, storage and distribution facilities and equipment. 
Agenda:  2.4.16 
Item:  10a
124
151
How to save a pdf after rotating pages - rotate PDF page permanently in C#.net, ASP.NET, MVC, Ajax, WinForms, WPF
Empower Users to Change the Rotation Angle of PDF File Page Using C#
pdf page order reverse; rotate all pages in pdf preview
How to save a pdf after rotating pages - VB.NET PDF Page Rotate Library: rotate PDF page permanently in vb.net, ASP.NET, MVC, Ajax, WinForms, WPF
PDF Document Page Rotation in Visual Basic .NET Class Application
rotate pdf pages individually; pdf reverse page order preview
San Lorenzo Valley Water District 
Policies and Procedures
Section 1.03  Separability  
If  any  section,  subsection, sentence,  clause,  or  phrase of this  policy  is  for any 
reason  held  to  be unconstitutional  or  otherwise invalid,  such  decision  shall  not 
affect the validity of the remaining portions of this policy. 
Section 1.04  Records 
Current  records  shall be securely maintained in the  offices  of  the District. Only 
Only 
designated  employees  shall  have  access  to  said  records.  The  District  shall 
 shall 
control  access to  District  records and  maintain  the  records in  an  accurate  and 
and 
complete manner. 
The  District  will  establish  and  implement  a  record  control  system  designed  to 
prevent  the  loss,  misplacement  or  alteration  of  District  Records.  Any  person 
seeking to inspect public records shall comply with this record control system. 
In  compliance  with  the  Public  Record  Request  Act,  any  person,  including  a 
ing  a 
member of the Board, a District employee, a consultant or agent of the District, or 
a member of the public who desires to inspect District public records shall notify 
the District Manager.  
The  charge  for  researching,  producing  and  identifying  District  records  shall  be 
the  actual  cost  to  the  District.  Said  rates  shall  be  made  available  to  the 
requesting party following receipt by the District of the request for said services. 
The  charge  for  photocopying  any  District  document  or  record  shall  be  fifteen 
cents per standard or legal size page. 
Section 1.05  Employer-Employee Relations.  
Policies for the administration of employer-employee relations under the Meyers-
rs-
Milias-Brown Act  entitled “Policies of  the San  Lorenzo  Valley Water  District for 
ct for 
the  Administration  of  Employer-Employee  Relations”  are  hereby  adopted  and 
made a part of these policies.  
Section 1.06  Policy Regarding Access to Personnel Files. 
It is the policy of the District to maintain the confidentiality of employee personnel 
files and records. Such files and records are not public records and access shall 
ll 
be  limited  to  legitimate  administrative  and judicial  purposes  as  set  forth  in  this 
ordinance.  Information  contained  in  personnel  files,  which  by  law  is  of  public 
record, such as compensation, shall also be maintained as a public record which 
the District shall maintain separately from the personnel files. 
Agenda:  2.4.16 
Item:  10a
125
152
VB.NET Word: VB.NET Code to Rotate Word Page Within .NET Imaging
Here, we can recommend you VB.NET PDF page rotating tutorial Without losing any original quality during or after the Word page rotating; Save the rotated
rotate pdf pages on ipad; how to rotate just one page in pdf
VB.NET Image: Image Rotator SDK; .NET Document Image Rotation
rotator control SDK allows developers to save rotated image That is to say, after you run following powerful & profession imaging controls, PDF document, tiff
rotate pages in pdf expert; pdf expert rotate page
San Lorenzo Valley Water District 
Policies and Procedures
(a)  The  District  shall  maintain  all  personnel  files  and  records  in  a  secured 
location with restricted access. 
(b)  Upon  request  an  employee  shall  be  entitled  to  a  copy  of  his  or  her 
complete personnel file and records. 
(c)  No  personnel  files or records  shall be  removed  from  the  District offices, 
except as compelled by judicial or administrative process or by any other 
specific provision of law. 
(d)  Copies  of  such  files  or  records  may  be  made  and/or  released  only  in 
in 
compliance with these Policies and Procedures. 
(e)  The  District  shall  not  use  or  disclose  or  permit  its  employees,  agents, 
members of the Board, or members of the public to have access to, or to 
use or disclose information contained in an employee’s  personnel  file  or 
records except as follows: 
(i)  The information may be disclosed  to third parties  if  the  employee  (or his/her 
legal  representative)  signs  a  written,  dated  authorization  for  the  District  to 
disclose such information. Such authorization may state limitations of the type 
or  use  of  information  to  be  disclosed,  and  the  names  or  functions  of  the 
person(s) or entities authorized to obtain such information. 
(ii)  Such information which is relevant in a lawsuit, arbitration, grievance, or other 
claim or challenge to which the District and the employee are parties may be 
used or disclosed in connection with that proceeding. 
(iii)  Information which is relevant to the administration of the District, including the 
administration and maintenance of employee benefit plans, health care plans, 
disability  plans,  worker’s  compensation,  insurance  plans,  financial  and/or 
retirement  plans,  and  other  similar  programs,  may  be  used  or  disclosed  for 
such  purpose  by  the  designated  District  employee(s)  responsible  for 
administering and maintaining such plan or program. 
(iv)  The designation of such employee(s) authorized to have access to personnel 
files  of  non-classified  employees  for  any  stated  purposes  shall  be  by  Board 
rd 
resolution. 
(v)  A  Personnel  Action  Form  shall  be  used  to  document  administrative  actions 
regarding employment status, compensation, benefits, and payroll deductions. 
Said forms shall be distributed to the employees responsible for administering 
such programs. 
(vi)  In  an  emergency  situation,  or  when  the  employee  is  incompetent  or 
incapacitated,  medical  information  may  be  disclosed  to  a  health  care 
professional or facility to aid in the diagnosis or treatment of an employee. 
(vii)  Except as otherwise provided in these policies and procedures, access to the 
the 
personnel files of non-classified employees shall be limited to the members of 
Agenda:  2.4.16 
Item:  10a
126
153
VB.NET Image: Web Image and Document Viewer Creation & Design
and print such documents and images as JPEG, BMP, GIF, PNG, TIFF, PDF, etc. Upload, Open, Save & Download Images & Docs with Web Viewer. After creating a
how to rotate pdf pages and save; rotate individual pdf pages reader
VB.NET Image: Image Cropping SDK to Cut Out Image, Picture and
of this VB.NET image cropping process: decode the source image file to bitmap, crop bitmap and save cropped bitmap to original image format. After you run this
how to rotate a single page in a pdf document; change orientation of pdf page
San Lorenzo Valley Water District 
Policies and Procedures
the  Board  of  Directors.  Such  access  shall  be  limited  to  that  part  of  the 
information  contained  in personnel files  which is relevant to job qualification, 
performance,  or  evaluation.  Access  by  the  members  of  the  Board  to  other 
information  contained  in  a  non-classified  employee’s  file  is  permissible  only 
upon  a  prior  finding  by  the  Board,  except  in  an  emergency,  that  there  is  a 
legitimate purpose for such disclosure. Such finding and subsequent authorized 
ed 
access by the Board may limit the manner, type, or use of the access or the 
disclosure. 
(viii)  Except as otherwise provided in these policies and procedures, access to the 
the 
personnel files of classified employees shall be limited to the manager and the 
employee’s supervisor or supervisors. 
Agenda:  2.4.16 
Item:  10a
127
154
VB.NET Image: How to Process & Edit Image Using VB.NET Image
Q 2: After I apply various image processing functions to source image file editor control SDK allows developers process target image file and save edited image
rotate single page in pdf; rotate pages in pdf
VB.NET Image: Creating Hotspot Annotation for Visual Basic .NET
hotspot annotation styles before and after its activation img = obj.CreateAnnotation() img.Save(folderName & & profession imaging controls, PDF document, tiff
rotate pdf pages and save; rotate individual pages in pdf
San Lorenzo Valley Water District 
Policies and Procedures
Article II.  PUBLIC FIRE PROTECTION 
Section 2.01  Use of Fire Hydrants.  
Fire  hydrants  are  for  use  by  organized  fire  protection  agencies.  Other  parties 
ies 
desiring to use fire hydrants for any purpose must first obtain written permission 
from  the  District  prior to  use  and  shall operate the  hydrant  in  accordance with 
instructions issued by the District. 
Section 2.02  Penalties.  
The  Board  may  provide  penalties  for  the  unauthorized  use  of  hydrants. 
Unauthorized use of hydrants will be prosecuted according to law. 
Agenda:  2.4.16 
Item:  10a
128
155
VB.NET Image: VB.NET Code to Add Rubber Stamp Annotation to Image
on image or document files; Able to save created rubber Suitable for VB.NET PDF, Word & TIFF document Method for Drawing Rubber Stamp Annotation. After you have
rotate individual pages in pdf reader; save pdf after rotating pages
VB.NET PDF: VB Code to Create PDF Windows Viewer Using DocImage
What's more, after you have created a basic PDF document viewer in your VB.NET Windows application, more imaging viewer Save current PDF page or the
how to rotate all pages in pdf; rotate pdf pages in reader
San Lorenzo Valley Water District 
Policies and Procedures
Article III.  SEWERAGE POLICIES. 
Section 3.01   Facilities 
(a)  Infiltration  Test.  Infiltration  is  the  quantity  of  water  entering  a  sewer  line 
line 
from the groundwater through such means as, but not limited to, defective 
pipe, pipe joints, connections or manhole walls. The infiltration test will be 
be 
used  if  the  static  groundwater  level  is  above  the  top  of  the  constructed 
pipe. No  pipe section will be accepted if  the infiltration  rate exceeds 100 
gallons per inch diameter of pipe per mile length of pipe per 24 hours. 
(b)  Leakage Test. Leakage is the quantity of water that has to be added to the 
he 
section of pipeline being tested to maintain the specified test head. With a 
minimum of four feet of water head on the pipe line, the allowable leakage 
will be computed by the formula E = 0.00002 * L * D * H where: 
H where: 
E=the allowable leakage in gallons per minute of pipe tested 
L=the length of pipe tested in feet. 
D=the internal diameter of the pipe in inches. 
H=the difference in elevation in the water surface in the upper manhole and the 
invert of the pipe at the lower manhole (feet). 
(a)  Manhole Testing. Each manhole is to be tested by either w1 or w2 above 
above 
depending  upon  the  groundwater  conditions  at  the  site  of  the  specific 
manhole.  
(i)  Manhole  Test—Infiltration.  All  laterals  or  mains  running  through  the  manhole 
hole 
will  be  plugged  with  gasket  caps  or  plugs  securely  fastened  or  blocked  to 
prohibit  water  from  leaving  the  manhole.  The  amount  of  infiltration  will  be 
measured over a seven-day period  and if the amount  accumulated does  not 
not 
exceed  1.7  percent  of  the  total  volume  of  the  structure,  the  test  will  be 
considered approved. 
(ii)  Manhole Test—Leakage: The test will be the same as for infiltration except the 
t the 
manhole will be filled to the maximum water surface level and measurements 
made at the beginning and end of the seven-day test period. If the water loss 
oss 
computed between the two water level readings does not exceed 0.7 percent of 
of 
the total volume of water in the structure, the test will be considered approved. 
(b)  Sewer laterals. All sewer laterals connected to existing sewer mains must 
st 
be compatible with the type of main line materials. Quality assurance will 
be  considered  met  when:  (1)  the  District  receives  a  submittal  from  the 
contractor  performing  the  work  noting  the  type  and  class  of  pipe  to  be 
used for  the  lateral  and  connection  to  the  main,  (2)  District personnel is 
present when attachment to the main is accomplished for visual inspection 
of  the  connection  and  (3)  when  an as-build  drawing  is  submitted  by  the 
Agenda:  2.4.16 
Item:  10a
129
156
VB.NET Word: VB.NET Code to Draw and Write Text and Graphics on
After creating text on Word page, users are able doc, fileNameadd, New WordEncoder()) 'save word End powerful & profession imaging controls, PDF document, tiff
how to rotate one page in a pdf file; rotate pdf page and save
San Lorenzo Valley Water District 
Policies and Procedures
contractor to the District showing the location of laterals connected to the 
main and all invert elevations of the work performed. 
(c)  Obstruction Test. The obstruction test is to verify that the constructed main 
in 
or lateral is constantly sloping to the treatment facility and that no physical 
damage  has  taken  place  during  construction  of  the  pipe  line.  The 
obstruction  test  will  be accomplished  by  either  method  below by  District 
personnel.  
(i)  Light  Inspection. Examine the  pipe internally by means of a light held at  one 
one 
end  and  a  mirror  held  at  the  other.  Repeat  test  with  light  and  mirror 
interchanged.  Repair  or  correction  of  any  misalignments,  protuberances, 
defective portions or other defect will be required. 
(ii)  Ball  Test.  When  light  test  is  not  feasible,  a  ball  test  can  be  conducted  by 
 by 
passing through the pipeline a round non-compressible ball which is one inch 
less in diameter than the internal diameter of the pipeline. In the event the ball 
is not able t pass through the pipeline, repair of defective pipe section will be 
required. 
(d)  Quality  assurance  of  the  constructed  lateral,  main  or  manhole  will  be 
considered  approved  when  the  above  tests  are  performed  and  all  tests 
pass  respective  constraints  and  limits.  Any  deficiencies  are  to  be 
corrected within five working days after the respective test. If the test fails 
after  repairs  are  made  the  first  time,  the  District  Manager  may,  at  his 
discretion,  require  the  complete  replacement  of  the  constructed  lateral, 
main or manhole. 
All  contractor  test  procedures  and  replacements  will  be  carried  out  by  the 
contractor at his own expense. 
(a)  Determination  of  Components.  The  determination  of  estimation  of 
of 
suspended  solids  or  other  components  contained  in  sewage  and  liquid 
waste discharges shall be by one of the following methods. 
(i)  Sampling and analysis by District personnel. 
(ii)  Estimates determined by a study of waste producing operations leading to the 
discharge. 
Agenda:  2.4.16 
Item:  10a
130
157
San Lorenzo Valley Water District 
Policies and Procedures
Article IV.  CONTRACTS AND PURCHASING 
Section 4.01  Qualification of Bidders.  
The District may, and on contracts for which the estimated cost exceeds $50,000 
(Fifty Thousand Dollars) the District shall require that bidders establish that they 
are  qualified  and  responsible  to  provide  the  services,  equipment,  and/or 
materials to perform the contract in a safe, efficient, reliable and timely manner. 
In  order to  evaluate  those  qualifications  and  to  determine  which  low  bid  offers 
best response in quality, fitness and capacity to the District’s requirements, prior 
to the award of the contract, the District shall require the low bidder or bidders to 
provide  certain  information  as  follows:  (a)  answer  to  questions  contained  in  a 
standard form questionnaire and financial statement; (b) evidence of bonds and 
nd 
liability  and  workers’  compensation  insurance  satisfactory  to  the  District;  (c) 
Evidence  of  a  safety  record  acceptable  to  the  District;  (d)  Necessary  or 
appropriate  licenses  or  certificates;  and  (e)  an  acceptable  performance  record 
with the District or any other public agency. 
(a)  Questionnaire.  The  questionnaire  shall  include  questions  which  will 
ll 
provide  information which  will provide a  basis  for  the District  to evaluate 
the bidder. Such information shall include, among other things, information 
relating to the experience of the bidder in projects of a similar type as the 
proposed project, and shall include references of previous employers. The 
questionnaire  shall  be  signed  by  the  bidder  or  an  authorized  designee 
under penalty of perjury. 
(b)  Financial Statement. The financial statement shall  include  information as 
as 
required  by  the  District  for  the  District’s  use  in  determining  the  bidder’s 
financial ability to perform the contract satisfactorily and shall be signed by 
the bidder or an authorized designee under penalty of perjury. 
(c)  Safety Record. The District may disqualify  a  bidder on the basis that the 
he 
bidder’s safety record is unacceptable. In evaluating the safety record, the 
he 
District  shall  consider  any  violations  of  the  CAL  OSHA  standards,  the 
issuance  of  CAL  OSHA  citations,  and  the  severity  or  liability  exposure 
resulting from such citations. 
(d)  Performance  Record  with  the  District  or  Other  Public  Agencies.  In 
In 
evaluating  the  qualifications  of  a  bidder,  the  District  shall  consider  the 
bidders’  performance  record  with  the  District  or  other  public  agencies. 
Such  evaluation  shall  include,  among  other  things,  consideration  of  the 
bidder’s  overall  performance,  safety,  quality,  timeliness  and  compliance 
with  the  contract.  Such  evaluation  shall  also  consider  any  outstanding 
ng 
claims or lawsuits involving the District and the bidder. 
(e)  Prequalification  of Bidders. A prospective bidder shall have the  option  of 
of 
prequalifying  as  a  bidder  on  a  given  project.  To  exercise  this  option,  a 
Agenda:  2.4.16 
Item:  10a
131
158
San Lorenzo Valley Water District 
Policies and Procedures
bidder  must  complete  and  submit a package  of the  required qualification 
information,  statements  and  evidences  as  set  forth  herein  no  later  than 
fifteen  days  prior  to  the  bid  opening.  The  District  Manager  will  issue  a 
preliminary finding as to whether the prospective bidder is qualified within 
10 days after the completed qualification package is received. 
(f)  Appeal  of  Preliminary  Findings.  A  bidder  may  appeal  the  District 
ct 
Manager’s preliminary finding of disqualification to the Bard of Directors. A 
disqualified bidder may submit a bid pending a determination by the Board 
f that bidder’s qualifications. If that bidder is the low bidder the Board will 
consider the bidder’s qualification and issue a finding prior to award of the 
contract. 
(g)  Disqualification of Bidders. The Board may disqualify any bidder who fails 
ls 
to  submit  the  completed  questionnaire,  financial  statement,  licenses, 
safety record, bonds, insurances, or other required information in a timely 
manner.  The  Board  may  disqualify  any  bidder  whose  information  as 
required is not satisfactory and acceptable to the Board. A bidder may be 
disqualified on the basis that the bidder, any officer of such bidder, or any 
employee  of  such  bidder  who  has  a  proprietary  interest  in  such  bidder, 
has  been  disqualified  or  prevented  from  bidding  on  or  completing  a 
federal,  state,  or  local  project  because  of  a  violation  of  law  or  a  safety 
regulation. 
(h)  Rejection of Bid. Upon disqualification of a bidder as set forth herein, the 
he 
Board may reject that bidder’s bid for the contract award. 
(i)  Questionnaires  and  Financial  Statements  Are  Not  Public  Records.  The 
he 
questionnaire  and  financial  statements  required  herein  are  not  public 
records and are not open to public inspection. 
Section 4.02  Sealed Bids 
(a)  Solicitation of Sealed Bids. Sealed bids shall be solicited by posting on the 
the 
District’s bulletin board, or by mailing to at least three or more prospective 
bidders, bid forms listing materials and specifications or services desired. 
The Board of Directors may also direct that additional solicitation or public 
ic 
notice be provided. 
(b)  Contents of Bid Forms for Sealed Bids. In addition to stating the amount, 
t, 
quality and specifications of materials or contractual services desired, bid 
forms  shall  contain  or  be  accompanied  by  written  statements  indicating 
the  latest  date  when  sealed  bids  will  be  received;  the  date  they  will  be 
opened; the amount, if any, f good faith deposit or bid bond to accompany 
the bid; whether or not a completion or delivery date bond will be required, 
and  an  envelope  clearly  marked  “Sealed  Bid”  in  which  the  bid  is  to  be 
returned. 
Agenda:  2.4.16 
Item:  10a
132
159
San Lorenzo Valley Water District 
Policies and Procedures
10 
(c)  Submission of Sealed  Bids.  Sealed bids shall  be  submitted  or  mailed  to 
to 
the  Secretary  of  the  District,  sealed  in  the  envelope  furnished  by  the 
District,  accompanied  with  the  amount  of  good  faith  deposit,  if  required, 
and accompanied by a statement under oath that the bidder has not been 
a party to any uniform or fixed price agreement. 
(d)  Opening  and Tabulation  of Bids.  All  sealed  bids  shall  be opened on  the 
he 
date  set  for  opening  and  shall  be  tabulated  and  available  for  public 
inspection  during  regular  business  hours  for  a  period  of  30  days  after 
opening. 
(e)  Failure to Enter  into Contract. Any successful  bidder who fails to  furnish 
sh 
an acceptable completion or delivery date bond as required or who fails to 
enter into a written contract with the District for a period of 10 days after 
notice  of  its  approval  by  the  District  Counsel  shall  forfeit  his  good  faith 
deposit or  become liable  to  the  District  on  his  bid  bond,  if  any,  and  the 
District may award the contract to the next lowest responsible bidder. 
Agenda:  2.4.16 
Item:  10a
133