display pdf in mvc : How to save a pdf after rotating pages software application project winforms html .net UWP 2016.2.4.BoDAgenda%20with%20bookmarks31-part400

M E M O 
TO: 
Board of Directors 
FROM: 
District Manager 
PREPARED BY:   Environmental Programs Manager 
SUBJECT:  
Environmental Status Report 
DATE:  
February 4, 2016 
RECOMMENDATION: 
It is recommended that the Board of Directors review and file the Environmental 
Department status report. 
BACKGROUND: 
HYDROLOGICAL ASSESSMENT 
Staff has been working with Nick Johnson Principal Hydro-geologist, PhD, PG, CHg, to 
assess the current status of District groundwater and surface resources, in an effort to 
identify potential need for supplemental, optimized and more efficient water supply 
sources. Factors driving the District
s efforts include the following:  
A substitute water supply for the Felton Service Area is needed when water-rights 
criteria restrict Fall Creek diversions (i.e., when San Lorenzo River flows are 
below seasonal thresholds). 
 
A supplemental water supply for the South System is needed to allow groundwater 
levels in the vicinity of the Pasatiempo wells to recover and stabilize following 
fairly steady declines over the past 25 years. 
 
Supplemental supplies are needed during drought periods, given the supply 
limitations experienced during recent years (e.g., minimal available diversions, 
Olympia well field drawdown). 
 
Supplemental supplies are potentially needed to meet the additional water demands 
associated with SLVWD’s recent and expected annexation of other water supply 
systems (e.g., the Lompico Water District). 
 
Supplemental supplies, and/or increased optimization and efficiency of existing 
supplies, may be needed to offset potential future water-rights modifications that 
may limit stream diversions. 
 
Agenda:  2.4.16 
Item:  12a1iii
1
311
How to save a pdf after rotating pages - rotate PDF page permanently in C#.net, ASP.NET, MVC, Ajax, WinForms, WPF
Empower Users to Change the Rotation Angle of PDF File Page Using C#
rotate pdf page by page; how to rotate just one page in pdf
How to save a pdf after rotating pages - VB.NET PDF Page Rotate Library: rotate PDF page permanently in vb.net, ASP.NET, MVC, Ajax, WinForms, WPF
PDF Document Page Rotation in Visual Basic .NET Class Application
rotate pdf page; pdf expert rotate page
WATERSHED MANAGEMENT 
Staff is coordinating permits for the long-term broom management on the Olympia 
Watershed. Staff will be issuing an RFP for CEQA documents to be developed following 
the finalization of the Management Plan.  
NOAA MULTISPECIES PUBLIC DRAFT RECOVERY PLAN: CENTRAL CALIFORNIA 
COAST STEELHEAD DPS 
Staff has submitted comments on the Draft NOAA Multispecies Recovery Plan. 
Comment period closed on January 18, 2016. Don Alley provided comments which were 
discussed at the January Environmental Committee Meeting.  
2010 URBAN WATER MANAGEMENT PLAN (UWMP) 
In January, Staff met with DWR and our consultant Nick Johnson to discuss DWR
findings upon review of the 2010 UWMP. DWR identified a few items which were 
omitted from the adopted document and required that the District prepare an addendum, 
which will go through a public review period and adopted in a public hearing. Staff has 
provided the addendum in this agenda, and hopes to begin the public review process.  
2015 URBAN WATER MANAGEMENT PLAN (UWMP) 
An RFP for the 2015 UWMP is expected to be issued in February 2016.  
GRANT PROGRAMS 
Staff is preparing for the 2016 Classic Watershed Education Grant series, which will 
begin February 2016. 
PROBATION TANK MITIGATION 
Following unanimous board approval of the Draft HCP for the Probation tank 
replacement on August 20, 2015, it was submitted to the United States Fish and Wildlife 
Service (USFWS) for review. USFWS has confirmed the receipt of the HCP and notified 
the District that they are backlogged and will not complete review until August 2016. 
Some minor changes have occurred to the design footprint of the project area, which 
resulted in minor changes to the HCP. Modifications have been made and the HCP was 
resubmitted to USFWS. The agency has confirmed receipt and assured the District that 
changes incurred will not affect our place in line and will not change our timeline for 
review. Revised HCP will be available on the website.  
WATER CONSERVATION 
The District is partnering with the California Native Grasslands Association and the 
State Department of Water Resources and the Water Conservation Coalition of Santa 
Cruz County to offer a lawn replacement workshop called California
s New Front Yard: 
Creating a Low Water Landscape. The workshop will take place on Thursday, February 
11, 2016 at the UCSC Arboretum. The workshop is suitable for homeowners and 
landscape professionals alike. Morning talks will be followed by instructor-led activities 
and arboretum tours. Cost is $25-30. More information is available on our website. 
SLVWD.COM. 
The first quarter of fiscal year 2015/16 proved to be extremely successful for the water 
conservation rebate program. So much that the budget of $20,000 was expended and 
the Board voted to add an additional $41,000 to the budget to cover the rebate 
applications already accepted and in process. On October 15
th
the board voted to 
Agenda:  2.4.16 
Item:  12a1iii
2
312
VB.NET Word: VB.NET Code to Rotate Word Page Within .NET Imaging
Here, we can recommend you VB.NET PDF page rotating tutorial Without losing any original quality during or after the Word page rotating; Save the rotated
rotate pdf pages by degrees; save pdf after rotating pages
VB.NET Image: Image Rotator SDK; .NET Document Image Rotation
rotator control SDK allows developers to save rotated image That is to say, after you run following powerful & profession imaging controls, PDF document, tiff
save pdf rotated pages; rotate pdf pages individually
suspend the Water Conservation Rebate program until fiscal year 2016/17. 
Nevertheless, customers have continued to contact the District requesting rebates, and 
are being asked to come back in July 2016. This will result in another flood of rebate 
applications in the first quarter of the coming fiscal year when the rebate program is 
reinstated.  
2015 being the 4
th
consecutive year of drought, and the 7
th
year of drought in the past 
nine years, the District realized water resources in the Valley are extremely strained. 
Having the rebate program suspended for most of the year presents a missed 
opportunity in a time when our customers are highly motivated to use water efficiently, 
and are most prepared to invest in infrastructure improvements to see water savings in 
their homes.  
Staff continues to coordinate with the Water Conservation Coalition for a collaborative 
regional public outreach campaign. The District continues to support Cabrillo College 
water conservation/landscape course work. Spring classes are scheduled to begin in 
March. Registration deadline is February 29
th
at: 
http://www.cabrillo.edu/services/extension/green.html  
FALL CREEK FISH LADDER 
Staff met with regulatory agencies including CDFW and NMFS, planning agencies 
including the County, RCD and the design consultants to coordinate the finalization of 
the 100% specifications for modifications to the Fall Creek Fish Ladder. Modifications 
are required to meet required six inch jump heights to allow juvenile steelhead passage 
upstream of the districts diversion. In the final stretch of a 3 year planning process, 
NOAA National Marine Fisheries Service announced that the district will not be allowed 
to move forward with construction of the fish ladder modifications until we acquire a 
biological opinion through individual consultation through NMFS. This will require the 
Army Corps of Engineers to be the lead federal agency on the project. This permit 
requirement means we will not be able to take advantage of the RCD
s streamlined 
permit coordination program. Notification of such requirements at such a late time, 2 
months before the District was to go to bid for the project, will delay the project for an 
unknown term until all permits can be acquired from various agencies. The District is 
committed to providing juvenile passage to steelhead in Fall Creek and will continue to 
pursue permits to implement construction in summer 2017.  
PUBLIC OUTREACH/ DROUGHT OUTREACH 
Staff help to coordinate and participated in Connecting the Drops, a county wide 
forum on Water issues in Santa Cruz County on January 28, 2016. 
E Newsletters are sent out to over 3000 customer email addresses monthly or bi-
monthly.  
The District Facebook page and website are updated regularly (3-5 times per 
week). 
Media Alerts have been published in local papers regarding:   
1.
SLVWD Provides Safe Reliable Drinking Water  
Agenda:  2.4.16 
Item:  12a1iii
3
313
VB.NET Image: Web Image and Document Viewer Creation & Design
and print such documents and images as JPEG, BMP, GIF, PNG, TIFF, PDF, etc. Upload, Open, Save & Download Images & Docs with Web Viewer. After creating a
pdf rotate just one page; rotate pdf page permanently
VB.NET Image: Image Cropping SDK to Cut Out Image, Picture and
of this VB.NET image cropping process: decode the source image file to bitmap, crop bitmap and save cropped bitmap to original image format. After you run this
pdf reverse page order preview; rotate pdf page few degrees
Page 1 
Agenda:  2.4.16 
Item:  12a1iii
4
314
VB.NET Image: How to Process & Edit Image Using VB.NET Image
Q 2: After I apply various image processing functions to source image file editor control SDK allows developers process target image file and save edited image
pdf reverse page order online; pdf rotate single page
VB.NET Image: Creating Hotspot Annotation for Visual Basic .NET
hotspot annotation styles before and after its activation img = obj.CreateAnnotation() img.Save(folderName & & profession imaging controls, PDF document, tiff
rotate a pdf page; reverse page order pdf online
DWA Comments on Draft Multispecies Recovery Plan- San Lorenzo River 
Page 2 
January 2016 
Comments and Recommendations to the Draft Multispecies Recovery Plan for 
the San Lorenzo River Watershed 
18 January 2016 
(We wish to acknowledge the San Lorenzo Valley Water District for funding the preparation of 
recommendations and comments in this review. The District is in full support of the contents of 
this review.) 
TABLE OF CONTENTS 
SUMMARY .......................................................................................................................................... 4
ADDITIONAL RECOMMENDED RECOVERY ACTIONS ..................................................... 6
RESPONSE FORMAT ...................................................................................................................... 9
A. Volume I. Comments on Methods Section and Tables for Viability and Threats ............... 10
Habitat Complexity ........................................................................................................................... 10
Impervious Surfaces .......................................................................................................................... 11
Agriculture ......................................................................................................................................... 11
Timber Harvest .................................................................................................................................. 12
Urbanization....................................................................................................................................... 13
Canopy Cover (Stream Shading) ..................................................................................................... 14
Water Temperature .......................................................................................................................... 15
Juvenile Densities ............................................................................................................................... 18
B. Volume IV. Comments for Description of San Lorenzo River Steelhead Population ......... 21
C. Volume IV. Comments on Santa Cruz Mountains Diversity Stratum Results .................... 24
D. Review of Tables 3 and 4 of DPS CAP Viability Results ........................................................ 30
E. Review of Steelhead Historical Intrinsic Potential ................................................................... 33
F. Review of the San Lorenzo River CAP Threat Results Table ................................................ 39
G. Review and Comment on San Lorenzo River Recovery Action Table ................................. 40
Agenda:  2.4.16 
Item:  12a1iii
5
315
VB.NET Image: VB.NET Code to Add Rubber Stamp Annotation to Image
on image or document files; Able to save created rubber Suitable for VB.NET PDF, Word & TIFF document Method for Drawing Rubber Stamp Annotation. After you have
pdf save rotated pages; rotate individual pages in pdf reader
VB.NET PDF: VB Code to Create PDF Windows Viewer Using DocImage
What's more, after you have created a basic PDF document viewer in your VB.NET Windows application, more imaging viewer Save current PDF page or the
how to rotate a pdf page in reader; how to rotate one page in pdf document
DWA Comments on Draft Multispecies Recovery Plan- San Lorenzo River 
Page 3 
January 2016 
REFERENCES CITED .................................................................................................................... 47
Appendix A. Board Feet of Timber Harvested 1994-2009 in Santa Cruz County ................... 51
Appendix B. Timber Production Zoning ....................................................................................... 52
Appendix C. Photographs of Logging Operations in the Santa Cruz Mountains .................... 55
Agenda:  2.4.16 
Item:  12a1iii
6
316
VB.NET Word: VB.NET Code to Draw and Write Text and Graphics on
After creating text on Word page, users are able doc, fileNameadd, New WordEncoder()) 'save word End powerful & profession imaging controls, PDF document, tiff
how to rotate all pages in pdf in preview; pdf rotate single page and save
D.W. ALLEY & ASSOCIATES Review and Comments    
Re: Draft Multispecies Recovery Plan for the San Lorenzo River Watershed- January 2015- Public Version 
DWA Comments on Draft Multispecies Recovery Plan- San Lorenzo River 
Page 4 
January 2016 
SUMMARY
We greatly appreciate the restoration efforts of NOAA fishery biologists in the San Lorenzo River. It is 
a daunting task to guide coastal Chinook salmon and steelhead recovery in our coastal watersheds, 
with 38 independent and 22 dependent steelhead populations identified along the Central California 
Coast. The authors did an outstanding job of identifying the following key aspects of habitat 
improvement needed for successful steelhead recovery;  
1) Improve estuary/lagoon function, 2) increase stream baseflows, 3) increase channel complexity, 4) 
reduce sediment input, and 5) improve fish passage conditions. 
The most important areas of recommended revision for steelhead recovery in the Plan include the 
following;  
1.  Make the estuary/lagoon the highest priority recovery area to protect inflow for rapid 
freshwater conversion and to construct an outlet structure to prevent the necessity for artificial 
sandbar breaching and to maximize depth of a freshwater lagoon. Increase to priority 1 all 
recovery actions directed at reducing artificial breaching, increasing lagoon depth and 
constructing an outlet structure at the rivermouth. Increase all recovery actions directed to 
speeding lagoon formation and/or freshwater conversion to priority 1. Increase all other 
recovery actions directed to improving lagoon habitat to priority 2.  
2.   No core recovery area was denoted in the Plan, upstream of the estuary/lagoon to focus 
recovery efforts on. The core area for recovery should include 1) the Zayante Creek sub-
watershed (including Bean Creek) to recover summer baseflow, increase instream wood and 
reduce sedimentation, 2) the Branciforte sub-watershed to improve fish passage through the 
flood-control channel and remnant dam abutments/ walls and to increase channel complexity 
with instream wood, 3) the middle mainstem to improve fish passage and 4) all Timber 
Preserve lands within and upstream of the recovery areas to reduce sedimentation and increase 
recruitment of large instream wood. 
3.  In order to better direct recovery efforts to important core areas, accurately identify reaches 
with the highest intrinsic potential and lesser potential and to re-calculate the steelhead 
recovery target. Increase the historical intrinsic potential in all of the lower and middle 
Mainstem River and much of Zayante and Bean creeks to highest historic intrinsic potential, 
while downgrading it in Gold and Lockhart gulches, Bull, Love, Kings, much of Carbonera, 
Glenwood, Granite and Crystal creeks to lowest potential due to their small size and/or very 
limited baseflow and in some cases, limited accessibility by spawning adults. Reduce historical 
Agenda:  2.4.16 
Item:  12a1iii
7
317
D.W. ALLEY & ASSOCIATES Review and Comments    
Re: Draft Multispecies Recovery Plan for the San Lorenzo River Watershed- January 2015- Public Version 
DWA Comments on Draft Multispecies Recovery Plan- San Lorenzo River 
Page 5 
January 2016 
potential in upper Fall Creek from high to medium due to limited baseflow, high gradient with 
poor pool development and limited food supply towards the headwaters. 
4.  Remove reaches of misrepresented historic anadromy in most of Love and all of Fritch Creek 
above a natural barrier near Love Creek’s mouth. Exclude from anadromy much of Jamison 
and Granite creeks due to high gradient and limited accessibility, upper Kings Creek above a 
natural waterfall, all northern tributaries to Bear Creek below Deer Creek confluence due to 
their ephemeral nature and limited accessibility and all of Lompico, Bennett, Foreman and 
Peavine creeks above natural barriers to anadromy at their mouths. 
5.  Increase restoration emphasis to improve adult steelhead spawning access through 5 stream 
segments during drier years in order of priority- 1) Lower Branciforte flood control channel, 2) 
the middle mainstem of the San Lorenzo River from Zayante Creek confluence to Boulder 
Creek confluence (especially Barker’s Dam), 3) lower Bear Creek (remnant dam abutment in 
first mile), 4) the San Lorenzo River Gorge from Paradise Park to Eagle Creek confluence 
(Rincon riffle and Four Rock), and 5) upper mainstem from Boulder Creek confluence to 
Waterman Gap (several remnant dam abutments that collect wood and impede adult passage). 
6.  Increase restoration emphasis to priority 1 for Scotts Valley to expand its water reclamation 
system and storage. 
7.  Increase restoration emphasis to priority 1 for Scotts Valley to expand its water reclamation 
system, evaluate and implement storage of  excess winter stormflow in off-stream reservoirs 
(such as abandoned quarry ponds) and to actively recharge overdrawn aquifers through 
injection wells. The intent is to eventually increase baseflows in Bean and Carbonera creeks.  
8.  Increase restoration emphasis in timberlands throughout the watershed by pressing for no-
harvest riparian buffer zones to reduce erosion and increase recruitment of large fallen wood to 
stream channels. 
9.  Increase all restoration emphasis directed at reducing logging threats to priority 1 because of 
the high potential threat from logging activities.  
10. Increase restoration emphasis directed at removing existing summer dams and remnant 
(inactive) summer dam abutments that create passage impediments to migrating adults or 
smolts to priority 1. These potentially create serious passage problems in dry years. 
11. Provide financial and permitting incentives to local governmental and water agencies to 
incorporate the recovery actions of this Recovery Plan into their own planning documents. 
Agenda:  2.4.16 
Item:  12a1iii
8
318
D.W. ALLEY & ASSOCIATES Review and Comments    
Re: Draft Multispecies Recovery Plan for the San Lorenzo River Watershed- January 2015- Public Version 
DWA Comments on Draft Multispecies Recovery Plan- San Lorenzo River 
Page 6 
January 2016 
In Section G below, comments on recovery actions are provided, the six most important actions being;   
1.  Construct an outlet structure at the rivermouth that makes artificial sandbar breaching 
unnecessary, and make it the highest priority. 
2.  Provide adequate bypass flows at water diversions at Tait Street and Felton to insure successful 
adult and smolt passage, even in dry years.  
3.  Improve aquifer recharge to the Santa Margarita and Lompico Aquifers by upgrading 
requirements of new development to minimize impermeable surfaces, prevent storm runoff and 
require storage and detention basins, filtration and enhanced percolation into the groundwater. 
Additionally, require from new development that there be no net increase in water demand by 
offsetting demand with water conservation and recycling. Convert existing impermeable 
surfaces (parking lots) to a combination of impermeable surfaces that direct runoff into zones 
of permeability, detention, filtration and groundwater percolation. Reduce storm runoff from 
existing development with construction of water and sediment catchment basins. Increase water 
reclamation and storage of reclaimed water and excess winter stormflow in off-stream 
reservoirs for well injection into aquifers. The goal will be to restore perennial streamflow to 
Bean and Carbonera creeks adjacent to Scotts Valley and to increase baseflow downstream.  
4.  Educate residents and County/city staff to retain large wood once it is naturally recruited to 
streams, so that when the next episodic influx of instream wood occurs, retention may be 
maximized.  
5.  Reducing habitat degradation from eroding rural roads and logging (sedimentation and loss of 
large wood recruitment)  by increasing environmental regulation in Timber Preserve Lands to 
include maintenance of erosion control measures continuously between logging re-entry 
periods, by initiating a  no-harvest riparian buffers along all stream courses and/or by 
purchasing environmental easements along stream courses to protect large conifers as future 
sources of in-channel wood,  
6.  To implement the Recovery Plan, provide financial and permitting incentives for all water 
agencies to incorporate the recovery plan’s actions into their own planning documents. 
ADDITIONAL RECOMMENDED RECOVERY ACTIONS
Add recovery step SLR-CCCS-1.1.2.5-  under Estuary as follows; “Evaluate and implement a possible 
structural improvement (flume/ outlet pipe) to maintain the lagoon at a water surface elevation during 
the summer/fall at a level below which flooding occurs in lagoon-side storm drains and basements in 
order to eliminate the need to artificially breach the sandbar.” This should have a priority of 1 and a 
Agenda:  2.4.16 
Item:  12a1iii
9
319
D.W. ALLEY & ASSOCIATES Review and Comments    
Re: Draft Multispecies Recovery Plan for the San Lorenzo River Watershed- January 2015- Public Version 
DWA Comments on Draft Multispecies Recovery Plan- San Lorenzo River 
Page 7 
January 2016 
time frame of 3-5 years for completion. This recovery action calls out the benefit of a flume to not only 
increase the elevation of a freshwater lagoon (recovery step 1.1.6.1) but also to reduce flooding and 
artificial breaching. 
Add recovery step SLR-CCCS-1.1.4.3 under Estuary as follows- “Work out an agreement with the city 
of Santa Cruz to minimize water diversion at Tait Street immediately after the sandbar closes at the 
rivermouth and continue to maximize lagoon inflow past their diversion until the lagoon has undergone 
freshwater conversion.”  
Add recovery step SLR-CCCS-3.1.3.4 under Hydrology as follows- “Investigate illegal water 
diversion and well pumping related to marijuana propagation or other agricultural activities and 
prosecute violations accordingly.” 
Add recovery step SLR-CCCS-6.1.1.8 regarding habitat complexity. It should have the action 
description as follows: “Change the California Forest Practice Rules to provide a no-harvest buffer 
zone along all ephemeral and perennial streams within timber harvest areas.” This will allow 
restoration of large conifers adjacent to stream channels with eventual recruitment as LWD. This 
should have a priority of 1 and a 5-year timeline to get the rule change and a 100-year duration of the 
rule. 
Add recovery step SLR-CCCS-8.1.2.8 regarding sediment.  It should have the action description, 
“Replace imperviously surfaced parking lots in Scotts Valley with permeable surfaces, detention 
basins, filtration and storage for rain percolation into the groundwater.” The Santa Margarita aquifer is 
drastically overdrawn beneath Scotts Valley, and Bean Creek and Carbonera creeks have become 
increasingly flashy during stormflows, increasing streambank erosion and sedimentation. It should 
have a priority of 1 and under a 20-year time frame to make it happen. 
Add action step SLR-CCCS-8.1.2.9 under Sediment to read, “Discourage land conversion to vineyards 
or other land-clearing agriculture, such as marijuana propagation, on potentially unstable, steep slopes 
with County Ordinances.” 
Add recovery action step SLR-CCCS-13.1.2.2 under Channel Modification to read, “Institute an 
ongoing, effective educational program with city and county staff and streamside residents regarding 
the importance of maintaining large instream wood for juvenile steelhead survival and recovery of the 
steelhead population.” 
Add action step SLR-CCCS-13.1.2.3 under Channel Modification to read, “Replace the Highway 1 
Bridge over the San Lorenzo River near River Street with a larger, freespan bridge with increased 
Agenda:  2.4.16 
Item:  12a1iii
10
320
Documents you may be interested
Documents you may be interested