Module 5 - 171
Field Specifications for Static Point Features
For standard static point features, occupation time must be at least 60
seconds AND there must be at least 15 individual position fixes for
each feature.
The reason that there is both a minimum occupation time and a minimum
number of fixes is the need to meet the accuracy requirements, yet still
remain productive.  Occupation time is the main factor affecting point
accuracy (after about 10 minutes, there is no appreciable difference), as
errors tend to average out over time.  Sixty seconds is enough that there
is some averaging effect, and that error trends can be recognised and
dealt with in the mapping stage.
However, in poor terrain conditions (such as under forest canopy) it is
often difficult to get 60 position fixes over a 60 second occupation.
There are often not sufficient satellites available, and users must move
the antenna around to get fixes.  A minimum of 15 fixes is required so
that there is enough information to give some reliable clues to the
quality,  even though occupation  time  is usually the  main  factor  in
accuracy.
Field operators should attempt to spread the 15 fixes over the 60
seconds as much as possible.  A good procedure would be to begin
counting the 60 seconds after the first position fix is recorded.  If the
receiver stops logging fixes, the operator moves the antenna around
(within  reason)  or  waits  until  it  begins  logging again.    After  both
conditions (60 seconds AND 15 fixes) are met, operators can end the
static point feature and move on.
Point Offsets
There are many instances where a point feature cannot be occupied
directly.  Either there is not enough GPS coverage around the point or the
point is not accessible (for example, on the other side of a fast-flowing
stream).  In these cases, a point offset can be used.  The point offset
method is also used in the variable offset traverse method described in
section 5.6.2.
For a point offset, a GPS point feature is collected wherever there is a
convenient location (i.e. accessible and has a GPS signal) and a direction
and distance (and perhaps slope) recorded to the actual point feature
(Fig. 5.8).  Some receivers allow operators to enter the offset information
directly - however the information should also be written down in a field
book, at least until the procedure is flawless.  The biggest cause of errors
in  offsets  and  other  non-standard  data  collection  procedures  is  a
misunderstanding between the field and the office, and clear field notes
can be very valuable.
Rotate individual pdf pages reader - rotate PDF page permanently in C#.net, ASP.NET, MVC, Ajax, WinForms, WPF
Empower Users to Change the Rotation Angle of PDF File Page Using C#
reverse page order pdf online; pdf rotate page
Rotate individual pdf pages reader - VB.NET PDF Page Rotate Library: rotate PDF page permanently in vb.net, ASP.NET, MVC, Ajax, WinForms, WPF
PDF Document Page Rotation in Visual Basic .NET Class Application
how to permanently rotate pdf pages; rotate pdf page few degrees
Module 5 - 172
Figure 5.8  An example of a point offset
Field Specifications for Point Offsets
The maximum distance for point offsets is 25 metres.  Directions must
be accurate to 2 degrees and distances accurate to 1 metre.  If the slope
is over  10  percent  and  over  10  metres  long,  slope  measurements
(accurate to 5 percent or 3 degrees) must be made.
A compass is used for the direction - azimuth (full circle or 360°), but
bearings (90° and a quadrant NE, SE, SW, or NW) are acceptable.  The
compass should read to at least 2° and all readings should be corrected
for magnetic declination - the correction may be done in the field (e.g.
setting declination on the compass bezel) or later in the office.  Some
receivers will  accept  magnetic  bearings and  convert them  using  an
internal model.
Some GPS receivers actually have internal compasses, however these are
seldom reliable even if they are the fluxgate type (a digital compass
module).  Internal compass displays should be carefully checked before
use.
Distance measurement should be to the nearest metre.  For very short
distances, a careful estimate or pacing may be sufficient.  For longer
distances, crews should carry a thread chain or a fibreglass tape to
measure distances.  Care should be taken to ensure that the tape is free
of all obstructions (e.g. branches) - known as clearing the chain or tight
chaining.
Usually, distance measurements are taken along the slope of the ground.
If that slope is significant (greater than 10%), the slope distance will be
greater than the actual map distance.  If the distance is very short (less
than 10 metres), the difference will be negligible in all but the most
extreme slopes.  If the line is long or the slope is significant, slope
measurements must be taken.  These should be accurate to at least 5% or
3°, meaning that a separate clinometer is usually required (clinometers
built into compasses are seldom accurate enough).
VB.NET PDF Page Delete Library: remove PDF pages in vb.net, ASP.
Page: Delete Existing PDF Pages. |. Home ›› XDoc.PDF ›› VB.NET PDF: Delete PDF Page. How to VB.NET: Delete Consecutive Pages from PDF.
rotate pages in pdf permanently; rotate pdf page and save
VB.NET PDF Page Insert Library: insert pages into PDF file in vb.
Page: Insert PDF Pages. |. Home ›› XDoc.PDF ›› VB.NET PDF: Insert PDF Page. Add and Insert Multiple PDF Pages to PDF Document Using VB.
rotate all pages in pdf preview; pdf rotate just one page
Module 5 - 173
There are many small, light laser measuring devices available which can
measure accurate distances to objects many metres away.  Some of these
units have a built-in compass and clinometer as well.  Costs range from
about $350 to over $10,000.  The advantage of the laser is that longer
distances can be measured without a second crew member to run out a
tape.  Points that are inaccessible (for example in a stream with heavy
runoff) can also be measured easily.  However, the digital compasses in
laser instruments, although they usually measure bearings to fractions of
a degree, are no more accurate than hand-held compasses since the
magnetic declination often has local variations of two degrees or more.
5.6.2  Methods for Line Features
Dynamic Line Feature
The dynamic line is the most common method of surveying line features,
although there are other acceptable methods.  For a dynamic line survey,
the operator moves the antenna along the line to be surveyed (usually a
stream centreline).  At programmable intervals (e.g. every second), the
receiver logs a position fix, and those individual fixes are joined to create
a continuous line.
Figure 5.9:  An example of a dynamic line feature
Field Specifications for Dynamic Line Features
For  all  line  (and  polygon)  features,  all  significant  deflections  and
meanders of the feature must be mapped.
For line (and polygon) features surveyed in dynamic mode, the majority of
the individual position fixes must be no more than 2.5 metres apart.  The
maximum distance (gap) between successive position fixes is 15 metres.
The accuracy of a dynamic line is naturally a function of the accuracy of
the individual position fixes.  Under difficult conditions, it is possible for
the individual fixes to be quite a few metres in error at times.  If the line
is defined by very few fixes (e.g. one every 10 metres), a 10-20 metre
C# PDF Page Delete Library: remove PDF pages in C#.net, ASP.NET
Page: Delete Existing PDF Pages. Provide C# Users with Mature .NET PDF Document Manipulating Library for Deleting PDF Pages in C#.
rotate all pages in pdf file; rotate single page in pdf
C# PDF Page Insert Library: insert pages into PDF file in C#.net
how to merge PDF document files by C# code, how to rotate PDF document page, how to delete PDF page using C# .NET, how to reorganize PDF document pages and how
how to rotate one page in pdf document; rotate all pages in pdf
Module 5 - 174
error could easily go unnoticed.  It is essential that enough fixes are
collected so that these errors can be detected, even if those fixes are not
strictly necessary to define the line.  Field operators should strive to
collect as much data as possible - although the specifications say 2.5
metres, even closer should not be considered excessive.  The extra data
can never hurt and it will help ensure that the most accurate line is
generated during the mapping stages.
In some terrain conditions, like dense canopy or steep banks, there will
be unavoidable gaps  in the  position  fixes.    Field  operators  should
monitor when the receiver is logging and not logging data and ensure
that the gaps are never exceed 15 metres.  It is also very important that
all significant deflections of the stream are captured (Fig. 5.10).  If the
stream bends, the operator must ensure that there are sufficient position
fixes to define the deflection, even if the distance is less than 15 metres.
Figure 5.10  An example of surveying for dynamic line features for deflections
and gaps in stream centres.
In many streams, logs, deep pools, and other features,  can impose
obstacles on surveying.  Usually that means leaving the stream centreline
to avoid any obstacle and a pause feature when data logging should be
used to detour any obstacle and resume centreline surveying.  It is very
important that field operators suspend logging whenever varying from
the line being surveyed, for whatever reason.
C# TIFF: How to Rotate TIFF Using C# Code in .NET Imaging
Individual Products. XDoc.SDK for .NET. XImage.SDK for Page. |. Home ›› XDoc.Tiff ›› C# Tiff: Rotate Tiff Page. & pages edit, C#.NET PDF pages extract, copy
how to rotate just one page in pdf; pdf rotate single page
VB.NET PDF - WPF PDF Viewer for VB.NET Program
Individual Products. XDoc.SDK for .NET. XImage.SDK for .NET. Page: Replace PDF Pages. Page: Move Page Position. Page: Copy, Paste PDF Pages. Page: Rotate a PDF
pdf rotate pages separately; pdf rotate single page and save
Module 5 - 175
Figure 5.11  An example using the pause feature to detour around an obstacle
It is also a good idea to suspend logging if the field operator will be in
one place for  more  than 30  seconds.  This will help later in  data
interpretation,  and  will  help  minimize  significant  errors  in  the  GPS
positions  due to longer term  multipath  on  a  single  fixed  point  or
position.
Constant Line Offsets
Many GPS receivers allow operators to collect line features as constant
offsets.  In this case, the antenna is moved along a line, which is a certain
constant distance from the true location of the line.  This can be very
useful in instances where it is not possible to walk down the actual line
(for safety or other reasons).  Unlike for point offsets, it is not possible to
measure the offset all the way along the line, so the field operator must
be  diligent  to  keep  the  offset  constant.    Because  the  operator  is
continually estimating the offset distance (after an initial measurement),
the offset distances should be kept small.
Figure 5.12  An example of a constant line offset.
C# PDF Page Extract Library: copy, paste, cut PDF pages in C#.net
C#.NET PDF Library - Copy and Paste PDF Pages in C#.NET. Easy to C#.NET Sample Code: Copy and Paste PDF Pages Using C#.NET. C# programming
how to rotate a single page in a pdf document; save pdf rotate pages
C# PDF: PDF Document Viewer & Reader SDK for Windows Forms
Rotate270: Rotate the currently displayed PDF page 90 degrees counterclockwise. for you to create and add a PDF document viewer & reader in Windows
rotate pdf pages; pdf save rotated pages
Module 5 - 176
Field Specifications for Constant Line Offsets
The maximum distance for constant line offsets is 5 metres.
Constant line offsets may work in certain circumstances such as roads
and other man-made features with a constant width.  However, for typical
stream surveys, a constant offset is seldom practical except for very short
sections.  Natural streams seldom are a constant width, and variations in
terrain, vegetation, and lighting make it very difficult for operators to
constantly estimate the offset.  Often, walking along the banks is more
difficult than actually walking in the stream due to scrambling over and
around deadfall, riparian vegetation, pools and side channels, and so on.
One stream-mapping scenario where a constant offset line may be useful
is for constricted channels such as drainage ditches.  In these cases,
there is usually a clearly defined channel width and it is usually not
difficult to walk on or near to the bank of the channel.  Often such
channels are deeper than natural streams and an offset line may be the
only way to safely survey them.  However, constricted channels are often
quite straight by design and a better way to survey them may be using
point offsets at the deflections.  They may also be completely visible on
aerial photographs and thus accurately mapped already - it may be more
efficient to use the existing maps for location and conventional means
(chaining) to get locations of features along the channel.
Traverse station method for line features
Another way of capturing line information is the traverse station method
(sometimes known as a point-to-point line feature).  This method is
analogous to a conventional, compass and chain style traverse.  Traverse
stations are set along the stream centreline as static point features.  The
line is created at the mapping stage by connecting the stations.  Stations
must be set at all significant deflections or bends in the stream.  It is also
important that there be a maximum  distance between  points,  even
though the stream may seem straight.
Figure 5.13  An example of a traverse station method for line features
Module 5 - 177
Field Specifications for the Traverse Station Method
For line  (and area)  features  surveyed  in  traverse station mode, the
maximum distance between stations is 15 metres.
The dynamic traverse method is usually used instead of the traverse
station method of surveying line features.  The main reason is that the
dynamic line method is usually more accurate and reliable than the
traverse station method.  Under forest canopy, point features tend to be
less  accurate  than  line  features,  contrary  to  popular  belief  (this
phenomenon is explained further in Appendix C).  If any point, especially
a deflection station is in error, the line adjacent to the station is also in
error - with line features, there are usually many more position fixes
adjacent to the errors and the fixes which are in error can be easily
identified and rejected.
Another disadvantage of the traverse station method is that the resulting
line has no attributes.  In addition to stations at deflections and every 15
metres, points must be taken whenever attributes change along the
stream (called a segment break).  Later the attributes for these points
must be transferred to the line feature generated at the mapping stage - a
procedure that must be carefully and methodically done to minimize
errors.  For line features, line segments are much easier to manage both
in the field and later during the mapping stage.
The traverse station method has some advantages, however.  There are
many situations where it is very difficult or impossible to actually walk
down the stream centreline - examples include freshet conditions, deep
water, and extensive debris in the stream.  Using the traverse station
method, the field operator can walk along the bank (or along whatever
path is best) and venture into the stream only at stations and segment
breaks.  If the field operator holds the antenna on a pole (versus mounted
on a backpack), he or she can just put the antenna over the stream
centreline and not have to walk entirely into the stream at stations.
Variable station offsets (as described below) make this method even more
flexible in difficult walking conditions.
There are also certain man-made features such as drainage ditches which
are intentionally straight and usually homogeneous (i.e. the attributes do
not change over long distances).  In these situations, it is probably best
to define the feature by static points at the beginning and end of the
feature, even if it is more than 15 metres long.  In these cases, though, it
is very important to make some form of sketch or field notes indicating
how the feature is to be created in the office.
Module 5 - 178
Variable Offset Traverse
A variable offset traverse simply combines the traverse station method
with point offsets.  It is presented here as a method because it may be
the most efficient method for very difficult stream conditions, more than
the traverse station method.  If it is difficult or impossible to walk the
centreline of the stream (the preferred method), it may also be just as
difficult to walk into the centre of the stream to  establish traverse
stations or segment breaks.  Using this method, you can remain on the
bank and get offsets to the stream centreline from the traverse stations
Figure 5.14  An example of a variable offset traverse.
A variable offset traverse would follow the same field specifications as the
traverse station method, and for point offsets.
Supplementary (Fill-in) Surveys
There are times and locations where it may be very difficult or impossible
to productively survey a stream using GPS methods.  This is due to a
combination of tree cover, local terrain (e.g. steep stream banks), and
time of day (poor satellite geometry).  Sometimes with careful planning,
these difficult sections can be avoided, but often it is more productive to
do a fill-in survey using conventional methods (e.g. compass and chain).
Module 5 - 179
Figure 5.15  An example of a supplementary survey
Field Specifications for Supplementary Surveys
Supplementary traverses (using compass and chain) must begin (Point of
Commencement) and end (Point of Termination) on static GPS point
features or on survey control monuments of 1 metre or better accuracy.
Directions for supplementary traverses must be accurate to 2 degrees
and distances accurate to 1 metre.  If the slope is greater than 10
percent, slope measurements accurate to 5 percent or 2.5 degrees must
be made.  The maximum length of an individual traverse leg is 50
metres.  There is no limit on the total length of a supplementary traverse.
All supplementary traverses must begin and end at known locations.
Usually, these locations would be static points obtained with the GPS
receiver.  For example, if satellite coverage is poor in an area, an operator
may find an open area or else go back up the stream a short distance to
the last area of good coverage to establish a point.  At times of poor
satellite coverage (usually short periods), it may be necessary to mark the
start point for a GPS position later when coverage is better.
From the GPS start point or Point of Commencement (PoC), traverse
stations and section breaks are established using conventional means,
until the GPS coverage is adequate once more.  The same guidelines as
for the traverse station method should be followed.  Since GPS is usually
more productive than conventional traverses and much more accurate
over distances, it is preferable to use GPS as much as possible, and only
use supplementary conventional traverses where necessary.
Conventional traverses are closed during the mapping stage.  To close a
traverse means that the calculated end point or Point of Termination
(PoT) must be close to the surveyed end point from GPS or previous
surveys.  Small errors in the field, especially errors in bearings, will
Module 5 - 180
accumulate throughout the traverse but they can be adjusted or spread
out between the two known GPS positions.
The conventional survey notes must clearly identify the PoC and PoT, and
the static points in the GPS file they correspond to.  It is a good practice
to mark these points in the field so that the traverse can be re-done if it
does not close.  If the points are not marked, a GPS receiver will be
required to re-do the section, a needless expense.
Bearings must be referred to true North and accurate to 2 degrees.  Most
sighting compasses (i.e. those with a folding mirror or other sighting
device) will achieve this precision.  Most laser traverse instruments will
also provide the required precision.
All magnetic compasses (including digital compasses) refer to magnetic
North rather than true North.  The difference between the two is known
as  magnetic  declination,  and  it  must  be  accounted  for  (in  British
Columbia, this difference varies from about 17° to about 27°).  On most
compasses, declination can be set so that field measurements refer to
true North.  On others, the correction must be made in the office later.
Magnetic declination is usually printed in the margin of maps and charts
(including TRIM maps).  Since the location of the North magnetic pole
varies over time, the time differences from the published date must also
be accounted for.  Users can also obtain magnetic declination for a
location and year on-line from Natural Resources Canada’s web site:
http://www.geolab.nrcan.gc.ca/geomag/e_cgrf.html
Magnetic declination is only known to one or two degrees over land –
although some manufacturers of digital compasses claim accuracy of
better than a degree, this is relative to the magnetic pole, not the
geographic North Pole.
Another factor to be considered is local attraction, where large bodies of
metal next to the observer can cause large errors (often more than 5°).
This is especially a problem in urban and suburban streams where hydro
lines, water pipes, and other man-made objects can cause problems.  To
minimize the chance of local attraction causing errors in co-ordinates,
bearings can be read both ways, that is, reading compass bearing at both
ends of a measured line.  If the bearings do not agree (they should be
180° different), there is local attraction at one or the other end of the
line.  Which end the error is at becomes obvious when looking at bearings
on the previous and next lines.
Distances must be accurate to one metre.  Tools capable of this accuracy
include fibreglass and steel tapes (chain), laser and sonic measuring
devices, and even thread chain over short distances (less than 20m).  All
taped distances must be tight-chained, that is, the chain must be clear of
all obstacles between the two traverse stations.  The best way to tight-
chain is for both users to pull on the chain so that it is suspended
between the stations and off the ground.
If there is a significant slope (over 10% or 6°) to the line being measured,
a slope measurement must also be recorded.  Otherwise, the measured
slope distance will be longer than the horizontal (map) distance.  This