how to open pdf file on button click in c# : Search text in pdf image software application cloud windows html web page class SAP_TCOROI_Customers_Final3-part1141

TCO and ROI Analysis of SAP Landscapes  
using VMware Technology
WHITE PAPER / 31
Customer P2V SAP Migration Costs
All three reference customers planned their P2V projects together with a VMware partner who provides VMware 
Certified Professionals and SAP Certified Consultants.
The VMware Converter exists in two versions: stand-alone or integrated in vCenter. The stand-alone VMware 
Converter is available free of charge and can be used while the systems are running. When converting hosts with 
SAP systems, conversion takes place while the systems are down.
The number of consulting days and the costs are listed in the following table.
Initial Consulting and Service Costs for P2V Migration
CUSTOMER
NUMBER OF SAP 
SYSTEMS
CONSULTANT 
DAYS*
COST**
Customer 1
5
10
$24,000
Customer 2
3
6
$14,400
Customer 3
6
6
$14,400
*Consultant Day = 8 hours
**Consultant Fee = $2,400.00 per day
Search text in pdf image - search text inside PDF file in C#.net, ASP.NET, MVC, Ajax, WinForms, WPF
Learn how to search text in PDF document and obtain text content and location information
pdf text search tool; search pdf for text in multiple files
Search text in pdf image - VB.NET PDF Text Search Library: search text inside PDF file in vb.net, ASP.NET, MVC, Ajax, WinForms, WPF
Learn How to Search Text in PDF Document and Obtain Text Content and Location Information in VB.NET application
how to select text in pdf image; pdf searchable text converter
TCO and ROI Analysis of SAP Landscapes  
using VMware Technology
WHITE PAPER / 32
Use Case Scenarios Before and After 
Virtualization
In this chapter we describe some special SAP issues and procedures and explain how customers save costs with 
VMware tools. 
IT departments face two key challenges in change management: patch testing and testing upgrades for compatibility 
with standard corporate hardware, operating systems, and application configurations. IT organizations traditionally 
need to procure identical hardware and create testing environments that mirror the operating system and 
application configurations of the production environment. 
A typical and recommended SAP landscape consists of DEV, QAS and PRD systems.
Customers also host other SAP systems for training and testing purposes. With VMware infrastructure, SAP basis 
teams are able to clone productive systems on the fly and create a set of virtual machine libraries that mirror the 
productive environment. They can then be used for provisioning the test environment. The latest patches and 
upgrades can be tested on these virtual machines running SAP applications, eliminating the need to have 
dedicated hardware to perform these tests. Patches can be rolled into production with minimal interruption to 
end-users. In the event of problems, the virtual machines can be instantly rolled back using the VMware 
snapshot features.
For the purposes of clarification, a short explanation of SAP products and business solutions follows.
SAP Solution Architecture
The SAP Business Suite is one of the world’s most comprehensive families of adaptive business applications, 
providing best- of-breed functionality built for complete integration, industry-specific functionality, unlimited 
scalability, and easy collaboration over the Internet. Individually, SAP Business Suite applications help customers 
manage their most critical business processes. Collectively, they form a tightly-integrated suite that adds value 
to every facet of a customer’s business, including its interactions with partners, suppliers and end-customers. 
The core product from SAP is called SAP ERP. In addition to ERP software, other key SAP products and solutions 
are available:
• SAP NetWeaver Business Intelligence Suite (SAP BI)
• Customer Relationship Management (SAP CRM)
• Supply Chain Management (SAP SCM)
• Supplier Relationship Management (SAP SRM)
• Human Resource Management Systems (SAP HRMS)
• Product Life Cycle Management (SAP PLM)
• Process Integration (PI) – (Message broking, Message workflows)
• Enterprise Portal (EP)
• SAP Knowledge Warehouse (KW)
The SAP Business Suite applications are based on the SAP NetWeaver platform, a technology and integration 
platform. SAP NetWeaver enables rapid but controlled business process changes. Through its enterprise 
services repository, the platform incorporates business functionality in the form of ready-to-use enterprise 
services and process components. It also provides an integrated platform of composition technologies for 
orchestrating business processes, composing applications and deploying innovative solutions. SAP NetWeaver 
consists of an ABAP and/or J2EE Stack.
SAP enterprise applications can be deployed on a two- or three-tier architecture. In terms of software 
deployment, the three-tier client-server architecture consists of a presentation layer, an application layer, and a 
database layer. In terms of hardware deployment these three layers can run separately on different computers or 
together on the same computer, depending on the requirements and size of the SAP solutions being deployed 
VB.NET PDF Image Extract Library: Select, copy, paste PDF images
Home ›› XDoc.PDF ›› VB.NET PDF: Extract PDF Image. Support PDF Image Extraction from a Page, a Region on a Page, and PDF Document in VB.NET Project.
convert pdf to word searchable text; search text in multiple pdf
VB.NET PDF insert image library: insert images into PDF in vb.net
VB.NET code to add an image to the inputFilePath As String = Program.RootPath + "\\" 1.pdf" Dim doc New PDFDocument(inputFilePath) ' Get a text manager from
how to select text in pdf reader; search pdf documents for text
TCO and ROI Analysis of SAP Landscapes  
using VMware Technology
WHITE PAPER / 33
by each customer. The presentation and application server layers can be distributed over multiple computers. 
The three-tier architecture targets the support of large numbers of users. The two-tier architecture is usually 
sufficient for many small and midsize companies, as well as for sandbox, development, training and test systems.
A complete SAP implementation may consist of hundreds of systems with different SAP applications running on 
dedicated servers. Depending on the application and the time of monthly processing, many SAP environments 
may have a low server utilization rate. Those with low utilization rates may be worthwhile targets for 
virtualization with VMware virtualization technology.
Customer SAP Solution-Based Landscapes
In the following chapters we show, in detailed scenarios, what benefits the customers obtained with the 
virtualization of their SAP system landscapes. First we explain what the SAP landscape and systems included 
prior to being virtualized; then we show the reduction of physical infrastructure after virtualization.
SAP Landscapes Before Virtualization
All customers in this study drive an SAP ERP installation with additional dialog instances. As a result, we focus 
only on this kind of SAP solution-based landscape in this study.
Customer 1:
This customer’s company was founded as a family business in 1849 in Germany and has been a supplier to the 
automotive industry since 1920. This company operates in the automotive sector, with more than 3,000 
employees and more than 400 concurrent SAP users worldwide. This customer uses SAP ERP systems attached 
to SAP Content Server systems (file based) for its CAD drawings.
The SAP R/3 Release 4.7 landscape consists of five SAP systems: DEV, QAS, PRD, EDU, SOL.
DEV = SAP Development System
QAS = SAP Quality Assurance System
PRD = SAP Productive System
EDU = Education System
SOL = SAP Solution Manager
These SAP systems originally ran in a mainframe environment. After virtualization the systems were upgraded to 
SAP Release ECC 6.0.
Due to internal SLA (Reliability, High Availability) requirements, two hosts run in parallel as a cluster. The hosts 
run several SAP central instances with different port numbers. The SAP database files are located on a Fibre 
Channel SAN environment from the same vendor.
This customer has its own dedicated SAP / VMware infrastructure. The VMware ESX host servers are used 
exclusively for the SAP infrastructure.
C# PDF Image Extract Library: Select, copy, paste PDF images in C#
PDF ›› C# PDF: Extract PDF Image. How to C#: Extract Image from PDF Document. Support PDF Image Extraction from a Page, a Region on a Page, and PDF Document.
search multiple pdf files for text; search text in pdf image
C# Create PDF from images Library to convert Jpeg, png images to
If you want to turn PDF file into image file format in C# application, then RasterEdge XDoc.PDF for .NET can also help with this.
how to search pdf files for text; convert a scanned pdf to searchable text
TCO and ROI Analysis of SAP Landscapes  
using VMware Technology
WHITE PAPER / 34
Aggregated Annual Hardware, Storage, and Network Costs for One Mainframe Host
COSTS BEFORE VIRTUALIZATION
NO. OF UNITS
TOTAL COST
SAP Hardware Mainframe (4-way, 64 GB RAM)*
1
$219,000
Operating System (4 CPUs)**
1
$24,700
Hardware Maintenance
1
$46,000
Software Maintenance
1
$21,000
SAP Network
4 Network Cards
$767
SAP Storage (HBAs + Port)
2
$1,540
Console
1
$1,800
Total
-
$314,807
* The pre-virtualization hardware costs for this customer are based on a vendor quote of Q42007.
** Cluster is part of the operating system
The objective of this customer was to reduce the cost of hardware, hardware maintenance, and software maintenance.
Customer 2:
Customer 2 operates in the pharmaceutical sector. The company is located in Germany and has more than 2,300 
employees. Its SAP PRD systems handles more than 200 concurrent SAP users on a UNIX cluster, all running on 
the same cluster with different port numbers. The initial SAP release was 4.6C. Since then the SAP systems have 
been upgraded to SAP ECC 6.0 within the virtualized infrastructure.
The DEV, QAS and PRD SAP systems for the commercial SAP modules were hosted on one Unix cluster with two 
hosts. The SAP database files are located on a SAN box attached via Fibre Channel.
Aggregated Annual Hardware, Storage, and Network Costs for One UNIX Host
COSTS BEFORE VIRTUALIZATION 
NO. OF UNITS
TOTAL COST
SAP Hardware Unix Cluster (4-way, 32 GB RAM)*
1
$88,500
Operating System (4 CPUs)
1
$3,050
Cluster Software
$20,000
Hardware Maintenance
1
$8,000
Software Maintenance
1
$780
SAP Network
2 Network Cards
$300
SAP Storage (HBAs + Port)
2
$1,480
Total
-
$122,110
* The pre-virtualization hardware costs for this customer are based on the original purchase price rather than today’s price, since this type of hardware is 
not available anymore.
The objective of this customer was to reduce the costs for hardware, hardware maintenance, and cluster software.
C# PDF insert image Library: insert images into PDF in C#.net, ASP
Free PDF image processing SDK library for Visual Studio .NET program. Powerful .NET PDF image edit control, enable users to insert vector images to PDF file.
find and replace text in pdf; how to make pdf text searchable
C# PDF insert text Library: insert text into PDF content in C#.net
Text to PDF. C#.NET PDF SDK - Insert Text to PDF Document in C#.NET. Providing C# Demo Code for Adding and Inserting Text to PDF File Page with .NET PDF Library.
pdf find text; converting pdf to searchable text format
TCO and ROI Analysis of SAP Landscapes  
using VMware Technology
WHITE PAPER / 35
Customer 3:
Customer 3 is a federal government institution for policy, research and practice in the field of vocational education 
and training. The SAP systems, based on release SAP ECC 6.0, originally ran on x86 hosts used by 100 SAP end users. 
The SAP landscape consists of DEV, PRD and SAP Solution Manager together with SAP Enterprise Portal 7.0 for 
using the SAP package “Employee Self Service.” The SAP Enterprise Portal landscape also includes DEV and PRD 
systems. In addition, the customer works with an SAP BW landscape, with DEV and PRD, attached to the SAP 
portal enterprise for BEX queries. Each SAP solution originally ran on a dedicated server.
Aggregated Annual Hardware, Storage and Network Costs for One x86 Host
COSTS BEFORE VIRTUALIZATION 
NO. OF UNITS
TOTAL COST
SAP Hardware X86 (2-way, 8 GB RAM)
1
$7,500
Operating System 
1
$1,000
Cluster Software
1
$2,000
Hardware Maintenance (24/7)
1
$1,100
Software Maintenance
1
$0
SAP Network
2 Network Cards
$250
SAP Storage (HBAs + Port)
1
$1,400
Total
-
$13,250
The customer’s objective was to reduce costs for the cluster software for productive SAP BW, SAP Enterprise 
Portal, and SAP ERP. A further objective was saving external consultant know-how for other SAP projects.
SAP Landscapes After Virtualization
Customer 1:
Previously on two mainframes, the virtualized SAP systems were distributed to three VMware ESX hosts based 
on x86 technology. The customer also virtualized some of the network services including domains, DNS, WINS, 
DHCP, and so forth. (Analyses of these other virtualized services are not included in this documentation.) This 
customer has its own dedicated SAP / VMware infrastructure – that is, the VMware ESX hosts run the SAP 
infrastructure exclusively.
C# PDF Convert to Text SDK: Convert PDF to txt files in C#.net
be converted to plain text. Text can be extracted from scanned PDF image with OCR component. Professional PDF to text converting library
how to select text in pdf; pdf searchable text
C# PDF replace text Library: replace text in PDF content in C#.net
The following demo code will show how to replace text in specified PDF page. PDFDocument doc = new PDFDocument(inputFilePath); // Set the search options.
how to search text in pdf document; find text in pdf files
TCO and ROI Analysis of SAP Landscapes  
using VMware Technology
WHITE PAPER / 36
Aggregated Annual Hardware, Storage, and Network Costs for One x86 VMware ESX 
Host for Customer 1
COSTS AFTER VIRTUALIZATION 
NO. OF UNITS
TOTAL COST
ESX x86 Server (4 Socket)
1
$17,300
Operating System 
1
$0
Cluster Software
$0
VMware Enterprise Edition
2
$3,834
Hardware Maintenance (24/7)
1
$1,100
Software Maintenance
1
$2,800
SAP Network
2 Network Cards
$300
SAP Storage (HBAs + Port)
2
$1,480
Total
-
$26,814
Customer 2:
Two UNIX clusters were replaced by two ESX host systems. The following diagram shows the distribution of the 
SAP systems and the SAP instances to the VMware Infrastructure. The systems are distributed to different 
systems in case of a failover.
Figure 3: SAP Distribution
TCO and ROI Analysis of SAP Landscapes  
using VMware Technology
WHITE PAPER / 37
Aggregated Annual Hardware, Storage, and Network Costs for One x86 VMware ESX 
Host for Customer 2
COSTS AFTER VIRTUALIZATION 
NO. OF UNITS
TOTAL COST
ESX x86 Server (2 Socket)
1
$7,500
Operating System 
1
$0
Cluster Software
$0
VMware Enterprise Edition
2
$1,917
Hardware Maintenance (24/7)
1
$1,100
Software Maintenance
1
$1,400
SAP Network
2 Network Cards
$300
SAP Storage (HBAs + Port)
2
$1,480
Total
-
$13,697
Customer 3:
This customer also virtualized all running SAP systems to two ESX host servers, implemented in a VMware cluster.
Aggregated Annual Hardware, Storage, and Network Costs for One x86 VMware ESX 
Host for Customer 3
COSTS AFTER VIRTUALIZATION 
NO. OF UNITS
TOTAL COST
ESX x86 Server (2 Socket)
1
$7,500
Operating System 
1
$0
Cluster Software
$0
VMware Enterprise Edition
2
$1,917
Hardware Maintenance (24/7)
1
$1,100
Software Maintenance
1
$1,400
SAP Network
2 Network Cards
$300
SAP Storage (HBAs + Port)
2
$1,480
Total
-
$13,697
TCO and ROI Analysis of SAP Landscapes  
using VMware Technology
WHITE PAPER / 38
Annual Hardware and Software Cost Savings 
The following table summarizes the cost savings experienced by all three customers for SAP hardware and 
software after virtualizing, as well as the savings resulting from replacement of the cluster environment with 
VMware HA. 
Annual Cost Savings for Customer Hardware and Software for SAP Solution Landscape
PHYSICAL ARCHITECTURE
VMWARE ARCHITECTURE
Hardware and 
Software Costs
No. of 
Servers
Cost
No. of 
Servers
Cost
Savings
Savings in %
Customer 1
2
$629,614
3
$80,442
$549,172
87
Customer 2
2
$244,220
2
$27,394
$216,826
89
Customer 3*
5
$66,250
2
$27,394
$38,856
59
* The x86 hardware was three years old.
The new hardware generation offers more cores with better performance results. The new server models today 
contain 10 times more memory capacity compared to the older models.
Annual A/C and Power Savings 
The next table shows the power costs and savings for each customer. 
Annual Power Costs and Savings*
PHYSICAL ARCHITECTURE
VMWARE ARCHITECTURE
No. of Servers
Cost 
No. of Servers
Cost
Savings
Savings in %
Customer 1**
2
$9,021
3
$8,462
   559
6
Customer 2***
2
$5,641
2
$2,698
$2,943
52
Customer 3
5
$6,745
2
$2,698
$4,047
60
* Cost $0.28 KW/h
** Mainframes use more power than x86 systems
*** Different number of CPUs
Annual Cooling Costs for SAP Servers
To eliminate the heat produced by an SAP server, an investment of almost the same amount of energy is required.
Annual Cooling Costs and Savings for SAP Server and Mainframe*
PHYSICAL ARCHITECTURE
VMWARE ARCHITECTURE
No. of Servers
Cost 
No. of Servers
Cost
Savings 
Savings in %
Customer 1**
2
$9,021
3
$8,462
   559
6
Customer 2***
2
$5,641
2
$2,698
$2,943
52
Customer 3
5
$6,745
2
$2,698
$4,047
60
* Cost $0.28 KW/h
** Mainframes use more power than x86 systems
*** Different number of CPUs
TCO and ROI Analysis of SAP Landscapes  
using VMware Technology
WHITE PAPER / 39
Deploying an SAP Solution with VMware Templates
Once the decision to install an SAP ERP solution is made, the SAP landscape must be installed and deployed. 
Typically, initial installation and deployment occurs only once. Upgrade and patch scenarios occur later on a 
regular basis. 
Sometimes, however, the SAP technologies make it necessary to install additional SAP solutions together with the 
central SAP ERP system. SAP Business Warehouse (BI) and SAP Solution Manager are good examples. With SAP 
BW, an SAP Enterprise Portal is helpful for creating new queries with the SAP Business Query Designer and 
Explorer (SAP BEx). To obtain the latest SAP patch stacks from the SAP Service Marketplace on a regular basis, it is 
mandatory to use the SAP Solution Manager with the feature “Maintenance Optimizer” (MOPZ). The SAP Solution 
Manager is based on the SAP NetWeaver Platform and has the same technical platform as an SAP ERP system. 
Cost of Deploying a Solution Before Virtualization
Typically, an installation of an SAP solution takes at least two days. The customers use different numbers of SAP 
systems per SAP landscape.
Aggregated SAP Server, Administrative and Deployment Costs per Clustered SAP 
Solution Landscape Before Virtualization
PHYSICAL PROVISIONING AND ADMINISTRATIVE COST FOR ONE SAP SOLUTION LANDSCAPE
Customer
Provisioning
Number 
No. of SAP CI 
Hours
Total Hours 
Cost
Customer 1
Setup Host
2
3
6
$270
OS + DB
5
5
25
$1,125
SAP Software 
5
16
80
$3,600
SAP Cluster
1
40
40
$1,800
Administrative 
Costs
2
8
16
$720
Total
$7,515
Customer 2
Server HW
2
3
6
$270
OS + DB
3
5
15
$675
SAP Software
3
16
48
$2,160
SAP Cluster
1
40
40
$1,800
Administrative 
Costs
2
8
16
$720
Total
$5,625
TCO and ROI Analysis of SAP Landscapes  
using VMware Technology
WHITE PAPER / 40
PHYSICAL PROVISIONING AND ADMINISTRATIVE COST FOR ONE SAP SOLUTION LANDSCAPE
Customer
Provisioning
Number 
No. of SAP CI 
Hours
Total Hours 
Cost
Customer 3
Server HW
5
3
15
$675
OS + DB
6
5
30
$1,350
SAP Software
6
16
96
$4,320
SAP Cluster
3
40
120
$5,400
Administrative 
Costs
5
8
40
$1,800
Total
$13,545
Average hourly labor rate = $45
OS=Operating system 
DB=Database 
HW=Hardware  
Customer 3 runs three SAP solutions: SAP ERP, SAP BW and SAP Portal. To save cluster nodes, the SAP DEV 
systems also run as cluster nodes. The SAP BW solution ran as a single ABAP Java Stack Application together 
with SAP Portal.
Aggregated SAP Server, Administrative and Deployment Costs for Clustered SAP 
Solutions Before Virtualization
CUSTOMER
NUMBER OF SAP 
LANDSCAPES
TOTAL COSTS FOR SAP
ANNUAL COSTS FOR ALL 
SAP SYSTEM LANDSCAPES 
(3 YEARS LIFETIME)
Customer 1
1
$7,515
$2,505
Customer 2
1
$5,625
$1,875
Customer 3
3
$13,545
$4,515
Cost of Deploying a Solution After Virtualization
With VMware virtualization technology, the time needed for setting up a complete SAP landscape can be 
dramatically reduced with VMware templates. In a virtualized environment the initial installation time for the first 
SAP system in the SAP landscape remains the same as in the physical world. Once the first system is set up, it 
can become an SAP template, allowing downstream SAP systems to be deployed in half a day. Overall, an initial 
three-system SAP landscape can be deployed and adjusted in three days.
Documents you may be interested
Documents you may be interested