how to show pdf file in asp.net page c# : Search pdf documents for text application software utility azure windows winforms visual studio Vol-2-Complete-Bookmarks34-part2020

Appendices 
in a trailer and is operating under a plan of operations.  Another operator at Williams Well, to the 
northeast and outside of the proposed conservation area, uses a backhoe and is also under a plan 
of operations. 
Search pdf documents for text - search text inside PDF file in C#.net, ASP.NET, MVC, Ajax, WinForms, WPF
Learn how to search text in PDF document and obtain text content and location information
find text in pdf image; select text in pdf reader
Search pdf documents for text - VB.NET PDF Text Search Library: search text inside PDF file in vb.net, ASP.NET, MVC, Ajax, WinForms, WPF
Learn How to Search Text in PDF Document and Obtain Text Content and Location Information in VB.NET application
how to search a pdf document for text; searching pdf files for text
Appendices 
C# HTML5 Viewer: Load, View, Convert, Annotate and Edit PDF
For some important PDF documents, you may can select PDF text region, copy and paste PDF text for edit for C# .NET also supports to search PDF text, which help
can't select text in pdf file; how to select text in pdf
C# PDF File Compress Library: Compress reduce PDF size in C#.net
is designed to offer C# developers to compress existing PDF documents in .NET size, images size reducing can help to reduce PDF file size Embedded search index.
how to search pdf files for text; how to select all text in pdf file
Appendices 
APPENDIX Q 
UTILITIES: 
EXISTING BIOLOGICAL OPINIONS
C# PDF Print Library: Print PDF documents in C#.net, ASP.NET
XDoc.HTML5 Viewer. view, Annotate,Convert documents online using ASPX. Page: Rotate a PDF Page. PDF Read. Text: Extract Text from PDF. Text: Search Text in PDF.
convert pdf to searchable text online; how to make pdf text searchable
VB.NET PDF Print Library: Print PDF documents in vb.net, ASP.NET
view, Annotate,Convert documents online using ASPX. PDF Read. Text: Extract Text from PDF. Text: Search Text in PDF. Image: Extract Image from PDF.
how to select text in a pdf; pdf text search
Appendices 
C# WinForms Viewer: Load, View, Convert, Annotate and Edit PDF
C#.NET WinForms Viewer SDK provides C# WinForms Viewer, which is also an powerful documents and images Select PDF text on viewer. • Search PDF text in preview.
search multiple pdf files for text; how to select text in pdf image
C# WPF Viewer: Load, View, Convert, Annotate and Edit PDF
Overview. RasterEdge C#.NET WPF Viewer SDK is an powerful documents and images viewer. Select PDF text on viewer. • Search PDF text in preview.
convert pdf to word searchable text; pdf find highlighted text
Appendices 
UTILITIES:  EXISTING BIOLOGICAL OPINIONS 
Q.1  PIPELINES 
U.S. Fish and Wildlife Service.  1995. Biological opinion for on-going maintenance activities on 
Four Corners Pipeline Company’s crude oil pipelines in California (2880/6840 CA-
060.27 (CA-932)) (1-8-94-F-27).  Memorandum from Acting Field Supervisor, 
Ecological Services - Ventura Field Office, Ventura, CA to State Director, Bureau of 
Land Management, Sacramento, CA. 
Incidental Take:  (a) Two (2) desert tortoises per year in the form of direct mortality or 
injury through accidental death or injury during pipeline maintenance and repair activities, 
including use of access roads. 
Terms and Conditions: 
•  Class I - Regular operation and maintenance with no habitat disturbance.  (a) Reporting 
foreseeable projects at beginning of each year.  (b) Education program.  (c) Use only 
existing rights of travel.  (d) Speed limit of 10 mph.  (e) Check under vehicles.  (f) Litter 
free work place.  (g) No firearms.  (h) Remove equipment at end of activity.  (i) Alert 
supervisor and/or biologist to any tortoise sign; personnel not to handle tortoises. 
•  Class II - Activities resulting in minimal surface disturbance.  (a) Designate Field 
Contact Representative. (b) Confine activities to ROW.  (c) Survey areas for tortoises 
ahead of maintenance activities.  (d) Hire biologist if take is possible.  (e) Maintain 
biologist with each maintenance crew where tortoises may be affected; biologist 
maintains records; follows protocols.  (f) Expanded work areas need pre-activity surveys. 
(g) Personnel report all tortoise sightings to biologist.  (h) Avoid tortoise entrapment in 
pits and other excavations. (i) Cap pipes to prevent tortoise entry.  (j) Report dead or 
injured tortoises. (k) Complete restoration to ...assist in the re-establishment of original 
native plant communities within the disturbed ROW. (l) Avoid creating new raven 
nesting sites; secure salvage permits if nest found. 
•  Class III - Activities that result in major surface disturbance.  (a) Prior authorization 
before expanding the ROW.  (b) Reporting. 
•  Class IV - Activities that extend outside existing ROWS.  (a) Require independent review 
by BLM; new construction beyond scope of BO.  (b) Measures for emergency spills, 
including reporting.  (c) BLM suspends ROW permit if terms and conditions not 
implemented. 
U.S. Fish and Wildlife Service.  1993. Biological opinion for the construction and maintenance 
VB.NET PDF File Merge Library: Merge, append PDF files in vb.net
VB.NET Guide and Sample Codes to Merge PDF Documents in VB.NET Project. Batch merge PDF documents in Visual Basic .NET class program.
how to make a pdf file text searchable; how to search text in pdf document
C# Word - Search and Find Text in Word
view, Annotate,Convert documents online using ASPX. edit, C#.NET PDF pages extract, copy, paste, C#.NET rotate PDF pages, C#.NET search text in PDF, C#.NET
find and replace text in pdf; pdf find and replace text
Appendices 
of an underground crude oil pipeline extending from the Western Mojave Desert to the 
Los Angeles basin, San Bernardino and Los Angeles counties, California (6840/2880 
CDD-00-F-93-6 (CA-060.27)) (1-8-93-F-9).  Memorandum from Field Supervisor, 
Ecological Services - Ventura Field Office, Ventura, CA to State Director, Bureau of 
Land Management, Sacramento, CA. 
Incidental Take:  (a) Eight (8) desert tortoises in the form of direct mortality or injury 
through accidental death or injury during pipeline maintenance and repair activities, including 
use of access roads.  (b) An unknown number of desert tortoises in the form of harassment 
through the excavation of active burrows or the moving of desert tortoises out of harms way 
during construction activities. (c) Two (2) desert tortoises per year in the form of direct 
mortality or injury through accidental death or injury during pipeline maintenance activities, 
including use of access roads.  (d) Four (4) desert tortoises per year in the form of harassment 
through the excavation of active burrows or the moving of desert tortoises out of harms way 
during maintenance activities. 
Terms and Conditions:  (a) Provide authorized biologist; authority to halt activities.  (b) 
Maintain litter free workplace.  (c) No firearms.  (c) Check under vehicles for tortoises.  (d) Pre-
activity surveys within 48 hours; unavoidable burrows excavated and tortoises moved out of 
harms way.  (e) 50-foot buffer from tortoise burrows outside the ROW; erect temporary 
tortoise-proof fence, removed at the end of the activity.  (f) Education program.  (g) Stake 
boundaries and restrict activities to that area.  (h) Minimize unauthorized personnel by using 
fences or gates.  (i) Clear minimum ROW width possible.  (j) Stockpile soils and brush for 
revegetation; salvage spoil materials separately.  (j) Biological guidance on handling tortoises.  
(k) Proper disposal of dead or injured tortoises.  (l) Insofar as possible, restrict construction and 
maintenance activities to between October 15 and February 28.  (m) Speed limit of 20 mph.  (n) 
Avoid entrapping tortoises in excavations.  (o) Revegetate all disturbed desert tortoise habitat to 
pre-disturbance conditions, implementing site-specific revegetation plans approved by the 
USFWS, BLM, and CDFG.  Subject to the owners approval, a site-specific revegetation plan 
shall also be used on private lands.  (p) Guidelines for seeding; only native species used.  (q) 
Biologist present during revegetation activities.  (r) Reporting. 
U.S. Fish and Wildlife Service.  1993. Biological opinion for the maintenance of a right-of-way 
for an underground gas transmission pipeline in the Eastern Mojave Desert, San 
Bernardino County, California (6840/2880 CDD-00-F-93-02 (CA-060.27)) (1-8-93-F-9). 
Memorandum from Field Supervisor, Ecological Services - Ventura Field Office, 
Ventura, CA to State Director, Bureau of Land Management, Sacramento, CA. 
Incidental Take:  (a) One (1) desert tortoise in the form of direct mortality or injury 
through accidental death or injury during line maintenance activities, including use of access 
roads.  (b) An unknown number of desert tortoises in the form of harassment through the 
excavation of active burrows or the moving of desert tortoises out of the project area. 
Terms and Conditions:  (a) Biologists performs pre-activity survey; present during all 
Appendices 
ground disturbing activities.  (b) Place water bars so as to avoid impacts to tortoises.  (c) 
Guidance for handling tortoises.  (d) Speed limit of 20 mph, and restrict travel to existing roads.  
(e) Litter free workplace.  (f) No surface disturbance outside ROW; storage and parking 
restricted to ROW.  (g) Fill for washouts obtained from appropriate offsite location.  (h) 
Education program.  (i) Check under vehicle.  (j) No firearms or pets.  (k) Procedures for 
reporting tortoise mortality.  (l) Biologist maintains records of tortoises; authority to halt 
activities; close-out report.  (m) BLM revoke Southern California Gas Companys ROW permit 
if terms and conditions not being implemented. 
U.S. Fish and Wildlife Service.  1992. Biological opinion for the maintenance of an 
underground gas transmission pipeline in the Eastern Mojave Desert, San Bernardino 
County, California (6840/2880 CDD-00-F-93-01 (CA-060.27)) (1-8-93-F-6).  
Memorandum from Acting Field Supervisor, Ecological Services - Ventura Field Office, 
Ventura, CA to State Director, Bureau of Land Management, Sacramento, CA. 
Incidental Take:  (a) Two (2) desert tortoises per year in the form of direct mortality or 
injury through accidental death or injury during line maintenance activities on all three 
segments, including use of access roads.  (b) Four (4) desert tortoises in the form of harassment 
through the excavation of active burrows or the moving of desert tortoises out of the project area. 
Terms and Conditions:  During pipeline maintenance the following measures shall be 
implemented to minimize disturbance to native habitats and the desert tortoise: (a) Flag and stay 
with ROW.  (b) Stockpile in disturbed areas.  (c) Erect temporary fencing or gates to minimize 
unauthorized use.  (d) Vehicle travel restricted to existing routes.  (e) Litter free workplace.  (f) 
Speed limit of 20 mph.  (g) Avoid entrapment.  (h) No firearms.  (i) No pets.  (j) Check under 
vehicles.  (k) Report sightings to biologist.  (l) Pre-activity surveys; biologist present at all times 
take may occur; maintain records; personnel do not handle tortoises; minimum of one biologist 
per maintenance activity; handling guidelines; authority to halt project.  (m) Education program. 
(n) Off-site compensation for lost habitat. (o) Post project assessment. 
U.S. Fish and Wildlife Service.  1991. Biological opinion for the repair of a natural gas 
pipeline, Edwards Air Force Base, California (XAE) (1-6-91-F-26).  Memorandum from 
Field Supervisor, Southern California Field Station, Laguna Niguel, CA to Gregory 
Spencer, P.E., Ames Research Center, Dryden Flight Research Facility, Edwards, CA. 
Incidental Take:  (a) One (1) desert tortoise in the form of direct mortality through 
accidental death during construction.  (b) Ten (10) desert tortoises in the form of harassment 
through the excavation of burrows occupied by desert tortoises and the removal of desert 
tortoises found above ground in the project area during construction activities.  (c) 
Approximately 1.5 acres of desert tortoise habitat will be permanently or temporarily disturbed. 
Terms and Conditions:  (a) Authorized biologists can handle tortoises only.  (b) 
Preconstruction and construction activities monitored.  (c) Avoid entrapment.  (d) 10 mph speed 
limit.  (e) Stake boundary, restrict impacts to ROW.  (f) Education program.  (g) Construction 
Appendices 
restricted to between October and February.  (h) Litter free workplace.  (i) Escape ramps in 
trenches every 150 meters apart.  (j) Revegetate pipeline ROW.  (k) Preconstruction surveys.  (l) 
Guidance for burrow avoidance and excavation, and tortoise handling.  (m) No construction 
between dusk and dawn in native vegetation. 
Q.2  ELECTRICAL TRANSMISSION LINES 
U.S. Fish and Wildlife Service.  1994. Biological opinion for minor electrical utility actions in 
Imperial, Kern, Los Angeles, Riverside, and San Bernardino counties, California (6840 
CA-063.50) (1-8-94-F-53).  Memorandum from Acting Field Supervisor, Ecological 
Services - Ventura Field Office, Ventura, CA to State Director, Bureau of Land 
Management, Sacramento, CA. 
Incidental Take:  (a) Two (2) desert tortoises per year in the form of direct mortality or 
injury resulting from maintenance and construction activities.  (b) Twenty (20) desert tortoise 
per year in the form of harassment through moving desert tortoises from harms way during 
construction and maintenance activities. 
Terms and Conditions:  (a) Designate FCR.  (b) Education program.  (c) Authorized 
biologists handle tortoises, only.  (d) Survey and monitor all construction activities.  (e) 
Guidance for handling tortoises, marking them, and recording data. (f) Stockpile in existing 
disturbed areas.  (g) Existing routes of travel.  (h) Check under vehicles.  (i) No firearms or pets. 
(j) Litter free workplace.  (k) Salvage permits for removing raven nests.  (l) Annual reporting.  
(m) Habitat disturbance is limited to no more than five acres per year. 
U.S. Fish and Wildlife Service.  1991. Biological opinion for the proposed Meade/McCullough-
Victorville/Adelanto transmission line (CA-932.5) (1-6-90-F-46).  Memorandum from 
Field Supervisor, Southern California Field Station, Laguna Niguel, CA to State 
Director, Bureau of Land Management, Sacramento, CA. 
Incidental Take:  (a) Five (5) tortoises in the form of direct mortality through accidental 
death during construction.  (b) One hundred (100) tortoises in the form of harassment through 
the excavation of active burrows or through the removal of tortoises found above ground in the 
construction area during construction activities [Note: This 100-animal harassment level was 
exceeded, and the BO amended to allow for more animals to be handled.].  (c) Approximately 
1,100 acres of habitat.  (d) Five (5) tortoises in the form of direct mortality through accidental 
death by crushing during routine inspection and emergency situations for the life of the 
project. 
Terms and Conditions:  (a) Suspend ROW grant if terms and conditions not followed.  
(b) Designate FCR.  (c) Biological monitoring; avoid entrapment.  (d) No permanent widening or 
upgrading of existing access roads will be undertaken in areas of biological concern.  (e) New 
access roads follow landform contours.  (f) Close all access roads not needed for maintenance.  
Appendices 
(g) Place towers to minimize ground disturbance.  (h) Education program.  (i) Preconstruction 
surveys; handling guidelines; tortoise relocation and burrow excavation; personnel report 
sightings. (j) Park in previously disturbed areas.  (k) Existing routes.  (l) Blade only where 
necessary. (m) Litter free workplace. (n) No firearms.  (o) 25 mph speed limit.  (p) Close-out 
report.  (q) 1,603 acres in California (Category I or II habitats) and 274 acres in Nevada.  (r) 
Construct tortoise-proof fence around substation.  (s) Pay $63,224.40 in compensation funds to 
Clark County, prior to initiating construction. 
Fish and Wildlife Service.  1991. Biological opinion for the proposed Kramer-Victor 220 kV 
transmission line project by Southern California Edison, San Bernardino County, 
California (CART 310 2800 (CA-068.23)) (1-6-91-F-8).  Memorandum from Field 
Supervisor, Southern California Field Station, Laguna Niguel, CA to State Director, 
Bureau of Land Management, Sacramento, CA. 
Incidental Take:  (a) One (1) tortoise in the form of direct mortality through accidental 
death during construction of the transmission line.  (b) Ten (10) tortoises in the form of 
harassment through the excavation of active burrows or through the removal of tortoises found 
above ground within the right-of-way during construction activities for the transmission line.  
(c) Five (5) tortoises in the form of direct mortality through collisions with vehicles during 
routine maintenance activities for the life of the project (30 years).  (d) Approximately 111 
acres of habitat (107 acres of temporary impact and 4 acres permanent). 
Terms and Conditions:  (a) Suspension of permit if conditions not implemented.  (b) 
Biological preconstruction surveys and monitoring.  (c) No tower placement or permanent 
widening of existing access roads in areas with biological concerns.  (d) Follow landform 
contours for new access roads.  (e) Minimize impacts.  (f) Education program.  (g) Designate 
FCR.  (h) Handling and excavation guidelines.  (i) Park in previously disturbed areas.  (j) Flag 
designated areas, restrict activities to flagged areas.  (k) Construct routes of travel without 
blading to promote resprouting of native shrubs.  (l) 25 mph speed limit.  (m) Monitoring plan to 
evaluate raven use along Highway 395.  (n) Close-out report.  (o) Compensation for 107 acres 
temporary and 4 acres permanent impacts.  (p) Develop road closure plan.  (q) No firearms or 
dogs. 
Q.3  FIBER OPTIC CABLES 
U.S. Fish and Wildlife Service.  1993. Biological opinion for an American Telephone and 
Telegraph Victorville to Bakersfield fiber optic cable line (1-8-93-F-12).  Memorandum 
from Field Supervisor, Ecological Services - Ventura Field Office, Ventura, CA to State 
Director, Bureau of Land Management, Sacramento, CA. 
Incidental Take:  (a) Four desert tortoises in the form of direct mortality resulting from 
project construction, operation, and maintenance. 
Terms and Conditions:  (a) Stockpile in disturbed areas.  (b) Confine impact to smallest 
Appendices 
practical area, flag boundaries, restrict activities. (c) Existing routes of travel.  (d) Litter free 
workplace.  (e) Avoid post-construction erosion.  (f) No domestic dogs, unless restrained.  (g) 
Stabilize soils.  (h) No firearms.  (i) Escape ramps in trenches at intervals of no more than a 
quarter mile.  (j) Education program.  (k) Minimize blading to promote resprouting; revegetate 
all impact areas off of roads.  (l) Designate FCR.  (m) Authorize handling only.  (n) Monitors 
with each construction crew; maintain records.  (o) Remove flagging and other markers upon 
completion.  (p) Post-construction report.  (q) On-site inspection by regulatory agencies, if 
requested by the USFWS.  (r) Preconstruction surveys; avoid burrows; handling guidelines; 
records and data.  (s) Check under vehicles.  (t) Acquire compensation lands (281.4 acres) in 
BLM Category I Habitat. 
U.S. Fish and Wildlife Service.  1991. Biological opinion for the proposed Contel fiber optics 
line from Bishop to Inyokern, California (6840 (CA-063.50)) (1-6-91-F-13).  
Memorandum from Field Supervisor, Southern California Field Station, Laguna Niguel, 
CA to State Director, Bureau of Land Management, Sacramento, CA. 
Incidental Take:  (a) One (1) desert tortoise in the form of direct mortality through 
accidental death during installation of the fiber optic cable.  (b) Five (5) desert tortoises in the 
form of harassment through the removal of desert tortoises found above ground within the right-
of-way during installation activities for the fiber optic cable.  (c) One (1) desert tortoise in the 
form of excavation of its burrow in the event it cannot be avoided during construction.  (d) One 
(1) desert tortoise in the form of direct mortality through collision with a vehicle during routine 
maintenance activities for the life of the project.  (e) Approximately 16 acres of habitat lost. 
Terms and Conditions:  (a) BLM suspends ROW permit if terms and conditions not 
followed.  (b) Construction monitored by biologist.  (c) Confine vehicles and equipment to 
previously disturbed areas.  (d) Bury cable in center of unpaved roads and along bare shoulders 
of paved roads.  (e) Will be patrolled periodically to repair eroded areas.  (f) Preconstruction 
surveys.  (g) Education program.  (h) Designate FCR.  (i) Avoid entrapment.  (j) Tortoise 
handling guidelines; burrow excavation.  (k) Park in disturbed areas.  (l) Existing routes of 
travel.  (m) Litter free workplace.  (n) 20 mph speed limit.  (o) Avoid tortoises and burrows 
during maintenance; surveys prior to maintenance and repair activities by biologist.  (o) Close-
out report. 
Documents you may be interested
Documents you may be interested