Appendices 
Exhibit C.1 
Implementation Tasks 
Priorities and Costs
Pdf find and replace text - search text inside PDF file in C#.net, ASP.NET, MVC, Ajax, WinForms, WPF
Learn how to search text in PDF document and obtain text content and location information
how to select text in pdf reader; pdf text search tool
Pdf find and replace text - VB.NET PDF Text Search Library: search text inside PDF file in vb.net, ASP.NET, MVC, Ajax, WinForms, WPF
Learn How to Search Text in PDF Document and Obtain Text Content and Location Information in VB.NET application
searching pdf files for text; how to select text in pdf
Tasks, Priorities and Funding Sources
Task
Priority 
Code
Task Description
Estimated Cost
Possible 
Funding 
Source
2010
2015
2020
2025
2030
2035
TOTAL
1
TOTAL COST
$10,626,520 $12,309,370 $11,602,610
$10,265,650
$10,878,450
$10,128,250
$65,810,850
DT-28
1
Assign a minimum of six Law Enforcement officers and six maintenance 
workers to the Tortoise DWMAs.
Per officer: $100,000 for first year, $75,000/year thereafter.  
Officers:  2006 (0), 2007 (1), 2008 (2), 2009 (3), 2010 (4), 2011 
(5), 2012 (6)  
IA
$850,000
$2,225,000
$2,250,000
$2,250,000
$2,250,000
$2,250,000
$12,075,000
MV-9
1
Implementation of BLM's motorized vehicle access network
Each subregion will be addressed in two phases:  Phase I will 
focus on critical restoration issues and problem areas, and will 
be addressed in the first few years of Plan implementation; 
Phase II (a decade or more out) will involve continued resolution 
of minor problems and new circumstances.  Estimated cost of 
Phase I:  $350,000 per complex subregion (10), $250,000 for 
other areas (14).  Total Phase I cost:  $7,000,000.  By 2010, 
complete Phase I for following, in priority order:  Ord, Juniper, 
Superior, Red Mountain, Fremont, Kramer, El Paso, Newberry-
Rodman, Ridgecrest, El Mirage, Coyote ($3.75 million).  
Address most critical issues elsewhere pending Phase I 
completion ($0.5 million per year)
BLM, IA
$3,750,000
$2,500,000
$1,125,000
$750,000
$750,000
$750,000
$9,625,000
DT-28
1
Assign a minimum of six maintenance workers to the Tortoise DWMAs.
Per maintenance worker: $50,000/year.  Workers:  2006 (0), 
2007 (1), 2008 (2), 2009 (3), 2010 (4), 2011 (5), 2012 (6) 
IA
$500,000
$1,450,000
$1,500,000
$1,500,000
$1,500,000
$1,500,000
$7,950,000
DT-28
1
Assign a minimum of two Law Enforcement Rangers and two maintenance 
workers to the Tortoise DWMAs.
Per Ranger: $100,000 for first year, $75,000/year thereafter.  
Rangers:  2006 (0), 2007 (1), 2008 (1), 2009 (2), 2010 (2).
BLM
$500,000
$750,000
$750,000
$750,000
$750,000
$750,000
$4,250,000
DT-30+
1
Implement a raven management program 
Assume $150,000/year, ramping up as follows:  2006 ($30,000), 
2007 ($60,000), 2008 ($90,000), 2009 ($120,000) and 2010 
($150,000)
IA
$450,000
$750,000
$750,000
$750,000
$750,000
$750,000
$4,200,000
M-98
1
Desert tortoise:  (Population monitoring)·Line distance sampling  
(M-98) line distance sampling program in the DWMAs. (#1)
$150,000 per survey year over the 30 year period of the plan. 
Every year for first five years; every other years for the next five 
years; then every year for the next five years and so on for the 
30 years of the plan.  
BLM, IA
$750,000
$300,000
$750,000
$300,000
$750,000
$300,000
$3,150,000
DT-28
1
Assign a minimum of two maintenance workers to the Tortoise DWMAs.
Per maintenance worker: $50,000/year.  Workers:  2006 (0), 
2007 (1), 2008 (1), 2009 (2), 2010 (2).
BLM
$300,000
$500,000
$500,000
$500,000
$500,000
$500,000
$2,800,000
DT-17
4
Implement "Suggested Tortoise Disease Management Strategy."
Assume $100,000/year, ramping up as follows:  2006 ($20,000), 
2007 ($40,000), 2008 ($60,000), 2009 ($80,000) and 2010 
($100,000)
IA
$300,000
$500,000
$500,000
$500,000
$500,000
$500,000
$2,800,000
HCA-36
1
Establish land acquisition priorities and acquire private land and/or 
conservation easements on  private lands within the HCA
Acquisition budget:  Assume $100,000/year (ramp up:$30,000 in 
2006 and 2007, $70,000 in 2008, 2009 and 2010).  All 
acquisitions mentioned in this table would draw from this fund.
IA
$270,000
$500,000
$500,000
$500,000
$500,000
$500,000
$2,770,000
HCA-28
1
Staff and operating expenses for Implementing Authority.
In-house staff or contractor(s), reimbursement for hours 
involved in following roles:  Plan Administrator ($30,000/year); 
contract biologist ($30,000/year); clerical support 
($20,000/year); overhead & supplies ($10,000/year), a total of 
$100,000/year.  Assume $75,000/year in 2006 and 2007, 
$90,000/year thereafter.  
IA
$420,000
$450,000
$450,000
$450,000
$450,000
$450,000
$2,670,000
DT-26
1
Headstarting program.
Implement a pilot program on one site within 5 years.  "Fast 
track" approach costs estimated at $250,000 and $300,000 per 
site for two years.  The "slow track" would include these plus 
$100,000 to $120,000 for years three to five." If successful, 
establish up to two additional slow track sites. 
IA, BLM
$300,000
$300,000
$300,000
$300,000
$300,000
$300,000
$1,800,000
E-7
2
Education Program:  The education program should include the preparation, 
distribution and/or installation of signs, interpretive kiosks, displays, maps, 
videos, education packets and brochures.  
Estimate $50,000/year for education programs, with 
$5,000/year for maintenance of existing facilities.  Ramp-up:  
2006 ($20,000), 2007 ($30,000), 2008 ($40,000), 2009 
($40,000) and 2010 ($50,000). 
IA, PA, BLM
$160,000
$250,000
$250,000
$250,000
$250,000
$250,000
$1,410,000
Costs
VB.NET PDF replace text library: replace text in PDF content in vb
and ASP.NET webpage. Find and replace text in PDF file in preview without adobe PDF reader component installed. Able to pull text
how to search text in pdf document; find and replace text in pdf
VB.NET PDF File Merge Library: Merge, append PDF files in vb.net
When you have downloaded the RasterEdge Image SDK for .NET, you can unzip the package to find the RasterEdge.Imaging.PDF.dll in the bin folder under the root
convert pdf to word searchable text; text searchable pdf
HCA-28
1
GIS database support for plan implementation and monitoring.
Estimate $40,000/year, beginning in 2006.
IA
$200,000
$200,000
$200,000
$200,000
$200,000
$200,000
$1,200,000
DT-18
1
Fence both sides of Highway 395 between Kramer Junction and Shadow 
Mountain Road (18 mi)
Estimated cost of $5.00 per foot or $26,400 per mile on one 
side or $52,800 on both sides.  Assume installed by following 
percentages for each 5-year block:  30, 30, 40, 0, 0, 0. 
CT, IA
$285,120
$285,120
$380,160
$0
$0
$0
$950,400
M-98
1
Desert tortoise:  Desert tortoise:  Conduct continued studies at specified 
intervals on pertinent BLM permanent study plots including Kramer, Lucerne, 
DTNA, Fremont Valley, and Fremont Peak. (#1)
Survey each plot every four years.  Past costs were approx 
$25,000 per survey plot.
BLM, IA
$150,000
$150,000
$150,000
$150,000
$150,000
$150,000
$900,000
M-241
1
Mohave ground squirrel: Establish long-term study plots throughout the 
range and annually monitor their MGS populations. (#1)  Mohave ground 
squirrel:Fund continued monitoring in the Coso Range to provide baseline 
population data. (#1)
Assume 3 sites (including Coso), $30,000/year ($20,000 in 2006 
and 2007).
$130,000
$150,000
$150,000
$150,000
$150,000
$150,000
$880,000
DT-15
1
Develop telephone tech support for the general public to deal with free-
roaming tortoises in the No Survey Areas
$18,000 per year (Assumes 2 hours per business day at $35 per 
hour)
IA
$90,000
$90,000
$90,000
$90,000
$90,000
$90,000
$540,000
3
Fence both sides of the remaining unfenced portions of Highway 58 
between Kramer Junction and Hinkley (10 mi).
Estimated cost of $5.00 per foot or $26,400 per mile on one 
side or $52,800 on both sides.  Assume installed by following 
percentages for each 5-year block:  0, 0, 30, 30, 40, 0.
CT, IA
$0
$0
$158,400
$158,400
$211,200
$0
$528,000
HCA-29
1
Mitigation fee fund management 
Estimate $15,000/year
IA
$75,000
$75,000
$75,000
$75,000
$75,000
$75,000
$450,000
HCA-27
ongoing Track acreage of new ground disturbance in HCA for each participating 
jurisdiction. 
$12,800 per year (Based on 16 hours per jurisdiction at $50 per 
hour).  
IA, PA
$64,000
$64,000
$64,000
$64,000
$64,000
$64,000
$384,000
MGS-4
1
Design and implement a MGS monitoring strategy. 
Assume $20,000 to design, and $10,000 per year to implement.  
Design in 2006.
IA, BLM
$60,000
$50,000
$50,000
$50,000
$50,000
$50,000
$310,000
E-3
ongoing Work with non-government organizations with an interest in the western 
Mojave Desert to better reach group members. The coordinator should 
work with off-highway vehicle groups to help fund existing programs and 
create new ones as needed to increase sensitivity to desert ecology. 
$10,200 annually (Assumes 120 hours of outreach at $85 per 
hour). 
IA
$51,000
$51,000
$51,000
$51,000
$51,000
$51,000
$306,000
HCA-27
1
Establish a base line aerial photo data set to identify those properties that 
were developed prior to the adoption of the HCP.
$300,000 PA
$300,000
$0
$0
$0
$0
$0
$300,000
A-48
Mojave fringe-toed lizard:  Prohibit vehicle traffic on conserved habitat. 
Estimated at $3,000 per incident.  Assuming 3 incidents per 
year, total cost would be $9,000 per year. (Weeks) 
$45,000
$45,000
$45,000
$45,000
$45,000
$45,000
$270,000
DT-23
1
Sign or otherwise designate DWMA boundaries
Estimated $50,000 for the initial installation.  Estimated 
maintenance costs of about $5,000 per year for the life of 
project.
IA, BLM
$75,000
$25,000
$25,000
$25,000
$25,000
$25,000
$200,000
MV-3
4
If monitoring or studies show that certain unimproved roads are causing 
increased tortoise mortality, the Implementation Team should coordinate 
with BLM, county road departments, and others to consider ways, including 
speed regulators, to reduce or avoid that mortality. 
Speed regulation equipment at $3,000 each at 10 sites equates 
to $30,000 one time cost.  Yearly maintenance costs would 
equate to $10,000 per year.  Assume installed at years 
3,5,7,9,11,13,16,19,22,26
BLM
$8,000
$20,000
$32,000
$40,000
$46,000
$51,000
$197,000
M-98
1
Desert tortoise:   To monitor OHV impacts, reinitiate studies at the Johnson 
Valley study plot. (#1)
Every 4 years, $25,000 each.
BLM, IA
$25,000
$25,000
$25,000
$50,000
$25,000
$25,000
$175,000
M-2
ongoing Keep records of newly permitted activities issued within the conservation 
areas. 
$5,000 per year.  Included within IA operating budget.
IA
$25,000
$25,000
$25,000
$25,000
$25,000
$25,000
$150,000
M-239
3
Mohave ground squirrel:Perform trapping studies in Kern County Study 
Area to see if MGS occurs west of Highway 14 and south of Highway 
58.(#3)
Estimated total cost:  $150,000
BLM, IA
$0
$75,000
$75,000
$0
$0
$0
$150,000
DT-3
ongoing Cities and counties would report take of tortoises annually to the 
Implementation Team.
$8,800  per jurisdiction. (assumes 80 hours of Planner III time at 
$110 per hour).  Assumes 15 jurisdictions. 
PA
$22,000
$22,000
$22,000
$22,000
$22,000
$22,000
$132,000
DT-25
2
Place a standard fence along identified portions of the western boundary of 
the Johnson Valley Open Area to prevent OHV use in the Ord-Rodman 
DWMA.
$5,000 per mile including material and labor.  Annual 
maintenance and replacement estimated at 5 to 10% of cost to 
install.  There are approx. 10 miles to be fenced, so initial 
fencing costs are approx. $50,000.  Annual maintenance and 
replacement costs are about $2,500 to $5,000.
BLM
$0
$0
$66,000
$20,000
$20,000
$20,000
$126,000
M-1
ongoing Maintain database of new occurrences and share annually with NDDB.
$4,000 per year (Assumes 80 hours annually at $50 per hour)   NA (cost 
included in 
funding of IA)
$20,000
$20,000
$20,000
$20,000
$20,000
$20,000
$120,000
VB.NET PDF File & Page Process Library SDK for vb.net, ASP.NET
document. If you find certain page in your PDF document is unnecessary, you may want to delete this page directly. Moreover, when
search pdf for text; search text in pdf using java
VB.NET Create PDF Library SDK to convert PDF from other file
Create writable PDF file from text (.txt) file in VB.NET project. you can download the RasterEdge .NET Image SDK and find the PDF processing component DLL
pdf searchable text; how to search pdf files for text
HCA-27
Rate of new ground disturbance and the success of restoration programs 
should be assessed on a periodic basis and the Plan amended as 
necessary.
$3,400 per year if performed annually.  (Based on 40 hours at 
$85 per hour)
NA (cost 
included in 
funding of IA)
$17,000
$17,000
$17,000
$17,000
$17,000
$17,000
$102,000
A-7
If newly-detected significant roosts for Townsend’s big-eared bat and 
California leaf-nosed bats are near open routes then provide case-by-case 
review of open routes within riparian and desert wash habitat.  If the new 
roosts are impacted by open routes then take corrective action within the 
foraging habitat or establish a new route avoiding the habitat.
$2,000 per project year cost (40 hours at $50 per hour). $5,000 
per average relocation costs, estimating three relocations per 
project year.  Total of $17,000 per project year.  To be done 
once every fiver years. 
BLM, IA
$17,000
$17,000
$17,000
$17,000
$17,000
$17,000
$102,000
MGS-5
3
Mohave ground squirrel: Conduct  presence/absence surveys in the 
northern portion of the Antelope Valley in Kern County. 
$100,000 
BLM, IA
$0
$0
$0
$0
$100,000
$0
$100,000
E-6
ongoing Provide support to the efforts of museums, zoos, and other public 
institutions to develop pertinent desert tortoise exhibits. 
$2,000 annually from 2006-2010, $3000 annually thereafter. 
IA
$10,000
$15,000
$15,000
$15,000
$15,000
$15,000
$85,000
M-3
1
Alkali Mariposa Lily:  (M-3)  Conduct presence absence surveys at other 
alkaline springs, seeps, and playas within one year of plan adoption. (#1)
$80,000 
IA
$10,000
$15,000
$10,000
$15,000
$15,000
$15,000
$80,000
M-208
2
Bendire's thrasher:  Monitor periodically population numbers and habitat 
disturbance in conservation areas. (#2)
$80,000 PA, FS, D, G
$0
$80,000
$0
$0
$0
$0
$80,000
MV-XX
2
Route designation on newly acquired lands would occur every five years (or 
sooner, if judged to be prudent by the Implementation Team), would comply 
with applicable federal regulations (i.e., NEPA), and be incorporated into the 
overall route implementation process.  
Estimate based on adding 5 new sections of land per year with 
an average of five miles per section.  Estimate 125 miles of new 
routes over 5 years.  Estimate cost of $125 per mile to survey, 
which equates to $15,625 every 5 years.
BLM
$0
$15,625
$15,625
$15,625
$15,625
$15,625
$78,125
HCA-3
ongoing Acquire occupied habitat within the conservation area (149 acres) assuming 
a willing seller.(Parish's phacelia) 
Undetermined, but estimated at $500/acre plus administrative 
fees
IA
$0
$0
$0
$0
$35,000
$40,000
$75,000
MV-8
1
El Paso CAPA:  Route designations in the El Paso Mountains and 
Ridgecrest subregions would be performed after completion of the West 
Mojave Plan through a community-based collaborative process utilizing the 
designation methodology developed for the West Mojave Plan.  
These two subregions have a relatively large number of routes.  
Cost including designations, meetings, ACCESS and GIS data 
base creation and QA/QC would include 3 technical staff in 
addition to Resource Staff time for 2 months. ($75/hr X 150 
hrs/mo X 2 months X 3 = $67,500).  
BLM
$67,500
$0
$0
$0
$0
$0
$67,500
HCA-33
ongoing Maintain a record of all HRCs awarded by the Implementing Authority
$2,000 per year (40 hrs at $50 per hour)
IA
$10,000
$10,000
$10,000
$10,000
$10,000
$10,000
$60,000
M-98, A-
206
ongoing Desert tortoise:  Review information regarding plan authorized take of 
tortoises to determine whether adjustments are needed to the Survey/No-
Survey Areas.  
$2,000 per year (assumes 40 hrs at $50 per hour)
NA (cost 
included in 
funding of IA)
$10,000
$10,000
$10,000
$10,000
$10,000
$10,000
$60,000
Rap-11
2
Target identified remnant grassland areas where burrowing owls are known 
for acquisition. 
Survey and analysis by consultant estimated at $50,000. 
IA
$0
$50,000
$0
$0
$0
$0
$50,000
Rap-12
1
Burrowing owl:  Complete baseline inventory of conserved habitat.  
$50,000 IA
$50,000
$0
$0
$0
$0
$0
$50,000
M-26
1
Prairie falcon:  (M-26) Conduct surveys to determine occupancy and threats 
at all nests present in 1979 (#1).   
$50,000 IA
$50,000
$0
$0
$0
$0
$0
$50,000
M-6
3
Townsend's big-eared bat:  (M-6)  Determine bat numbers in all significant 
roosts, using CDFG  approved methods.(#3)
Estimated at $8,000 per roost
IA
$8,000
$8,000
$8,000
$8,000
$8,000
$8,000
$48,000
P-1
1
Fence the eastern boundary of the proposed Carbonate ACEC to prevent 
cattle from trampling the listed plants on small portions of the Rattlesnake 
allotment and to prevent cattle from entering forest lands near Terrace 
Springs (along the east side of Arrastre Canyon). (Carbonate endemic 
plants)
Cost per mile to install smooth four-strand wire on five foot 
metal posts including material and labor is approximately $5,000 
per mile.  Annual maintenance and replacement estimated at 5 
to 10% of cost to install. 
IA
$20,000
$5,500
$5,500
$5,500
$5,500
$5,500
$47,500
Bat-1
3
Protect all significant roosts by installing gates over mine entrances and 
restricting human access. 
$5,000 per gate; assume 9 to be installed
IA, BLM
$0
$5,000
$10,000
$10,000
$10,000
$10,000
$45,000
(M-56)
2
Mojave tarplant : (M-56)  Census population at Short Canyon and Cross 
Mountain every five years. (#2)
20000.  Survey during third and fifth blocks.
BLM, IA
$0
$0
$20,000
$0
$20,000
$0
$40,000
A-54
Mojave tarplant:   If existing or new populations are threatened by vehicles 
or grazing, then protect them by providing barriers to vehicles or livestock.
$1000 study (20 hours at $50 per hour); expected two route 
relocations per year, $3,000 per incident.  This totals to $7,000 
per year at five year increments. 
$0
$7,000
$7,000
$7,000
$7,000
$7,000
$35,000
C# HTML5 PDF Viewer SDK deployment on Visual Studio .NET
Unzip the download package and you can find a project XDoc.PDF.HTML5 Viewer Demo or XDoc.PDF.HTML5 Editor Once done debugging with x86 dlls, replace the x86
pdf text select tool; search pdf documents for text
VB.NET PDF - Deploy VB.NET HTML5 PDF Viewer on Visual Studio.NET
to How to Build Online VB.NET PDF Viewer in Unzip the download package and you can find a project named XDoc Once done debugging with x86 dlls, replace the x86
pdf search and replace text; text select tool pdf
E-5
Develop displays, programs, and materials that can be provided to school 
districts in the West Mojave planning area.  Fund and/or cooperate with 
existing programs to provide for enhanced outreach to schools in desert 
communities. 
$30,000 (Estimate)
IA
$5,000
$5,000
$5,000
$5,000
$5,000
$5,000
$30,000
DT-11
2
Develop a standardized revegetation plan (for utilities).
$30,000 if done by consultant.  Currently done case-by-case.  
Reduced costs to utilities when standardized plan takes effect.
IA
$0
$30,000
$0
$0
$0
$0
$30,000
P-28
Fence and sign approved open routes as necessary within the Coolgardie 
and West Paradise CA. 
1,000 feet to cover a site on two sides at $10 a foot.  3 sites per 
year; totals $30,000 (this is a one time cost).
BLM
$0
$30,000
$0
$0
$0
$0
$30,000
E-12
2
Develop local television outreach that talks about the plight of the tortoise 
and implementation of the West Mojave Plan. 
$30,000 (Estimate)
IA
$5,000
$5,000
$5,000
$5,000
$5,000
$5,000
$30,000
M-7
ongoing Bats:  (M-7)  Approved projects that impact bats under the take limit would 
be reported annually to the CDFG and the USFWS.  (Ongoing)
No additional cost.
BLM
$5,000
$5,000
$5,000
$5,000
$5,000
$5,000
$30,000
M-8
2
Townsend's big-eared bat:  (M-8)  Conduct periodic surveys in the northern 
part of planning area with high potential for containing significant roosts.  
(#2)
$500 per site.
BLM
$5,000
$5,000
$5,000
$5,000
$5,000
$5,000
$30,000
M-6
3
California leaf-nosed bat: (M-6)  Determine bat numbers in all significant 
roosts, using CDFG  approved methods.(#3)
IA
$5,000
$5,000
$5,000
$5,000
$5,000
$5,000
$30,000
M-207
1
California leaf-nosed bat:Monitor population numbers using bat houses if 
installed. (#1)
IA
$5,000
$5,000
$5,000
$5,000
$5,000
$5,000
$30,000
M-16
3
Burrowing owl:  (M-16)  Survey sites in Antelope Valley and along Mojave 
River (#3).
$30,000 IA
$30,000
$0
$0
$0
$0
$0
$30,000
DT-19
3
Desert tortoise:(DT-19) IT monitor mortality along roads and identify 
measures such as fencing, culverts, signs, or speed regulators to be used 
to reduce or avoid unacceptable mortality levels.(#3)
$10,000 per survey to be done every ten years. 
BLM, IA
$0
$10,000
$0
$10,000
$0
$10,000
$30,000
M-26
1
Golden eagle:  (M-26)  Conduct surveys to determine occupancy and 
threats at all nests present in 1979 (#1).  
One-time survey, $30,000
IA
$30,000
$0
$0
$0
$0
$0
$30,000
M-27
ongoing Golden eagle:  Compile record of electrocutions from incidental 
observations and reports from the public and utilities.
$1,000 per year (Assumes 20 hours at $50 per hour)
NA (cost 
included in 
funding of IA)
$5,000
$5,000
$5,000
$5,000
$5,000
$5,000
$30,000
A-33
Kelso Creek monkeyflower:   If open routes threaten occupied habitat, then 
change route designation in area.  
$1,000 per year for monitoring (Assumes 20 hours at $50 per 
hour); $3,000 per incident for sign installation and materials, 
estimate three incidents per year ($9,000).  One year cost will 
include $1,000 for monitoring and $9,000 for sign 
implememntation totaly $10,000 per year.  Fund monitoring only.  
Rest absorbed in route implementation task.
$5,000
$5,000
$5,000
$5,000
$5,000
$5,000
$30,000
HCA-3
1
Place signs at edge of playas closed to motor vehicle traffic within the 
Parish's Phacelia CA. 
$25 per sign; 5 signs per incident; 5 sites per year equals about 
$625 per year. $500 per year for maintenance and relocation of 
signs. 
IA, BLM
$0
$5,625
$5,625
$5,625
$5,625
$5,625
$28,125
Bat-5
ongoing Fence around (but not over) open abandoned mine shafts to provide bats 
access to roosts and to reduce public hazards
$500 per adit; assume 1/year, then 2/year beginning in 2011.
IA
$2,500
$5,000
$5,000
$5,000
$5,000
$5,000
$27,500
A-84
Western snowy plover:  If nest sites are disturbed, then close playa edges 
to vehicular traffic in spring and provide temporary fencing of nest sites if 
warranted.
Closure and detail signs; cost of $300 per route;  average of 
three routes.  Total of $900 per year for each site. 
$4,500
$4,500
$4,500
$4,500
$4,500
$4,500
$27,000
A-230
LeConte's thrasher:  If there are OHV conflicts then more intensive 
management is needed (signing, seasonal restrictions, law enforcement)
$1000 per year (20 hours at $50 per hour), starting with second 
budget block.
$0
$5,000
$5,000
$5,000
$5,000
$5,000
$25,000
E-8
ongoing Provide annual training for consultants and others working at construction 
sites to ensure that they have a foundation in training for monitoring. 
One day seminar, costing $750 plus facilities cost.
IA
$3,750
$3,750
$3,750
$3,750
$3,750
$3,750
$22,500
E-11
2
Develop specific outreach plans to 1) maximize the effectiveness of fences 
constructed along the interface between urbanizing communities and the 
HCA. 2) to discourage poaching. 3) To reduce raven/tortoise conflicts.
$20,000 (Estimate)
IA
$0
$20,000
$0
$0
$0
$0
$20,000
M-252
2
Yellow-eared pocket mouse: A trapping survey would be conducted in Kelso 
Valley as part of the Monitoring Plan
One-time survey, $20,000.
$0
$0
$20,000
$0
$0
$0
$20,000
P-25
2
Fence both sides of the road near the Sweet Ridge population.  A vehicle 
turnaround and parking area will be restored so that traffic passes by, rather 
than on, the buckwheat habitat. (Kern buckwheat)
Two-sides  of roads at 300 feet (equals 600 feet) at $10 per 
foot equals $6,000.  If barrier is rebuilt once every 10 years, 
total estimated cost over 30 years would be $18,000.
IA,
$0
$6,000
$0
$6,000
$0
$6,000
$18,000
C# PDF File Permission Library: add, remove, update PDF file
Text: Replace Text in PDF. Image: Insert Image to PDF. Image: Remove Image from using RasterEdge.XDoc.PDF; In the following code table, you will find a piece of
pdf text search tool; search text in pdf image
VB.NET PDF File Permission Library: add, remove, update PDF file
to PDF. Text: Delete Text from PDF. Text: Replace Text in PDF. In the following code table, you will find a VB NET code sample for how to set PDF file permissions
can't select text in pdf file; how to select all text in pdf
HCA-33
ongoing Identify degraded habitat within the HCA suitable for rehabilitation.
Three work months - $15,000
IA
$0
$0
$15,000
$0
$0
$0
$15,000
M-8
2
California leaf-nosed bat: (M-8)  Conduct periodic surveys of mine 
openings in Pinto Mountains for Leaf-nosed bats in areas with high potential 
for containing significant roosts.  (#2)
IA
$0
$5,000
$0
$5,000
$0
$5,000
$15,000
M-34
2
Kelso Creek monkeyflower:  (M-34)  Conduct presence absence surveys on 
public land identified as potential habitat (#2).  
One-time survey, $15,000.
BLM, IA
$0
$15,000
$0
$0
$0
$0
$15,000
E-2
2
Develop an education program consistent with the goals identified in 
Section 3.8.1 and that "fills the gaps" of existing education programs. 
$13,600 (Assumes 160 hours at $85 per hour)
IA
$6,800
$0
$6,800
$0
$0
$0
$13,600
M-98
ongoing Desert tortoise:·Monitor integrity of new and old fences between BLM open 
areas and adjacent DWMAs (e.g., El Mirage’s existing fence, Camp Rock 
Road’s new fence).(ongoing)
$2,000 (40 hours at $50 per hour) at 5 year increments. 
BLM, IA
$2,000
$2,000
$2,000
$2,000
$2,000
$2,000
$12,000
M-98, DT-
22
1
Desert tortoise:(DT-22) Monitor efficacy of solution worked out with Silver 
Lakes Association to address impacts on the Fremont-Kramer DWMA.(#1)
$2,000 (40 hours at $50) at 5 year increments. 
BLM, IA
$2,000
$2,000
$2,000
$2,000
$2,000
$2,000
$12,000
M-67
ongoing Red rock poppy:  Conduct periodic review of potential effects of OHV use 
on known populations.
$2,000 (40 hours at $50 per hour) at 5 year increments. 
BLM, IA
$2,000
$2,000
$2,000
$2,000
$2,000
$2,000
$12,000
M-67
ongoing Red rock tarplant:  Conduct periodic review of potential effects of OHV use 
on known populations. 
$2,000 (40 hours at$50 per hour) at 5 year increments. 
BLM, IA
$2,000
$2,000
$2,000
$2,000
$2,000
$2,000
$12,000
Rap-5
1
In areas where no desert tortoise clearance survey is required, provide 
applicants for discretionary permits with an educational brochure. 
(Burrowing owl)
$10,000 to prepare brochure (assumes approx 3 weeks at $85 
per hour)
IA
$10,000
$0
$0
$0
$0
$0
$10,000
M-75
2
Short-joint beavertail cactus:   (M-75)  Establish baseline population 
numbers for Big Rock Creek and Mescal Creek areas.  (#2)
One-time survey, $10,000.
IA
$0
$10,000
$0
$0
$0
$0
$10,000
M-84
3
Western snowy plover:  (M-84)  Conduct periodic censuses to determine 
number of nesting pairs at Harper Dry Lake, and Dale, Koehn, and Searles 
lakes. (#3)
$10,000 for census.
BLM, IA
$0
$0
$10,000
$0
$0
$0
$10,000
E-4
2
Prepare a single, programmatic education program to be given to 
construction workers.  Review files maintained by USFWS and CDFG to 
see the range of education materials that have been used since the listing of 
the tortoise.
$8,500 (Assumes 100 hours at $85 per hour)
IA
$8,500
$0
$0
$0
$0
$0
$8,500
DT-13, E-10
1
Establish a "Hotline" number to contact the Implementation Team in the 
event a tortoise is found within a Non Survey area at the time of ground 
disturbance.
Approx. $250 per year (minimal installation costs plus 3.5 cents 
per minute.  Assumes 30 min. per business day for 260 days)
IA
$1,250
$1,250
$1,250
$1,250
$1,250
$1,250
$7,500
E-2
2
Determine environmental education programs that already exist, and 
determine "gaps" in the program.
$6800 (Assumes 80 hours at $85 per hour)
IA
$6,800
$0
$0
$0
$0
$0
$6,800
DT-2
2
Filming: 1)Develop a brochure, to be provided to the proponent (likely 
location manager), showing DWMAs and higher density areas within 
DWMAs that filming activities should avoid. 2) Where filming activities may 
occur equally well on alternatives sites, direct proponents to lands outside 
DWMAs or to lower density DWMA areas. 3)BLM biologist's expertise to 
help the location manager choose sites where the fewest and least 
significant impacts exist. 
1)  $6800 (based on 80 hours at $85 per hour)  2)  No new cost. 
3) No new cost.                        
IA, BLM
$6,800
$0
$0
$0
$0
$0
$6,800
DT-4
1
Develop a Feral Dog Management Plan.
$6,000 for plan.  Implementation cost to be determined by plan.  IA
$6,000
$0
$0
$0
$0
$0
$6,000
M-88
2
White-margined beardtongue:  Monitor vehicle use of Argos Wash. (#2)
$1,000 (assumes 20 hours at $50 per hour), to be done once 
every 5 years. 
RA, FS, D, G
$1,000
$1,000
$1,000
$1,000
$1,000
$1,000
$6,000
P-24
1
Construct vehicle barriers along the main access road where it adjoins 
occupied habitat. (Kern buckwheat)
Estimated at $5,000 plus minimal maintenance
BLM
$5,000
$0
$0
$0
$0
$0
$5,000
Rap-9
Provide all applicants for discretionary permits with an informational 
brochure with an illustration of a burrowing owl, a description of its burrows 
and how they can be recognized, and a summary of the bird's life history.  
Provide a phone number to reach member of Implementation Team if owl 
sighted. 
Cost of educational brochure estimated at $5,000 including 
printing; to be used by all jurisdictions. 
IA
$5,000
$0
$0
$0
$0
$0
$5,000
M-76
3
Short-joint beavertail cactus:   (M-76)  Determine numbers and identity of 
beavertail cacti in eastern part of the range. (#3)
One-time survey, $5,000.
IA
$0
$0
$0
$5,000
$0
$0
$5,000
DT-200
1
Desert tortoise:  Establish a feed-back loop between law enforcement and 
the Implementation Team to identify problem areas and to identify issue 
specific solutions. 
$4,000 (Assumes 80 hours at $50 per hour)
NA (cost 
included in 
funding of IA)
$0
$4,000
$0
$0
$0
$0
$4,000
M-98
ongoing  Desert tortoise: The efficacy of route closures to minimize impacts to 
tortoises must be monitored to determine if new roads are being created, 
closed routes are being used, route proliferation is resulting, etc.(ongoing)
40 hours at $50 per hour;  2 surveys, to occur 5 years 
apart;total estimated cost $4,000.  
BLM, IA
$0
$2,000
$2,000
$0
$0
$0
$4,000
DT-22
1
Initiate a working group with the Silver Lakes Association to determine if 
fencing or public education is the best means to eliminate impacts for OHV 
use in the Fremont-Kramer DWMA.
$3,300 (Based on 10 meetings - 3 hours each at $110 per hour 
plus meeting arrangement time)
BLM
$3,300
$0
$0
$0
$0
$0
$3,300
E-1
1
Identify a coordinator of educational programs. 
$1700 (Assumes 20 hours at $85 per hour)
IA
$1,700
$0
$0
$0
$0
$0
$1,700
DT-13
1
Develop a standard data sheet to record how many, if any, tortoises are 
moved from harm's way during clearance surveys.
$1,000 
IA
$1,000
$0
$0
$0
$0
$0
$1,000
M-47
1
Mojave monkeyflower:  (M-47)  Monitor vehicle tracks to assess spillover 
effects, if any, from OHV open areas (#1) 
$1,000 (Assumes 20 hours at $50 per hour)
BLM, IA
$0
$1,000
$0
$0
$0
$0
$1,000
M-53
1
Mojave fringe-toed lizard: Monitor disturbance of occupied habitat by 
OHVs.  (#1)
$1,000 (Assumes 20 hours at $50 per hour)
COVHC
$0
$0
$1,000
$0
$0
$0
$1,000
DT-201
Complete assessment of public land health.  Identify and implement 
corrective measures to ensure compliance. 
Covered by BLM livestock grazing budget.
BLM
$0
$0
$0
$0
$0
$0
$0
ongoing San Diego horned lizard:  Acquire lands within Antelope Valley Significant 
Ecological Area. 
IA
$0
DT-14
ongoing Implement the Plan's standardized set of BMPs for Survey Areas outside of 
DWMAs.
No new cost, already developed, just need to be implemented. IA
$0
$0
$0
$0
$0
$0
$0
HCA-6
Clearance surveys within SRAs (and possible protective fencing in absence 
of biological monitor).
$500 (approximate cost for a 40 acre-parcel)
PP
$0
HCA-2
ongoing Project review within Sierra Foothills Habitat Connector.
Undetermined.  Potential additional costs to BLM and local 
jurisditions to review project proposals, and to project proponent 
if redesign is required. 
PA, BLM
$0
HCA-2
ongoing Project review within SEAs
No new cost.  L.A. County already conducting review. 
PA
$0
HCA-33
ongoing Determine whether a property constitutes "degraded habitat" eligible for an 
award of HRCs.
No extra cost.
NA (cost 
included in 
funding of IA)
$0
HCA-33
ongoing Review rehabilitation projects to determine whether identified success 
criteria have been met prior to awarding HRCs and/or whether partial credit 
will be awarded.
$200 per project
NA (cost 
included in 
funding of IA)
$0
HCA-36
ongoing Acquisition of private lands within the HCA must be followed immediately by 
meaningful land management actions.
Dependent on management action, e.g. fencing, route 
rehabilitation, signing.
BLM
$0
DT-3
ongoing On private lands, CEQA Lead would continue to ensure that filming 
activities do not constitute a significant impact to species covered by the 
Plan.  
No new cost
PA, PP
$0
DT-3
ongoing Special filming activities that require pyrotechnics, cross-country travel, and 
habitat loss will be referred by the lead agency to the Implementation Team 
for review and recommendation prior to permit issuance. 
Undetermined.  Cost to IA for reviewing proposals.  Potential 
costs to applicant if review requires revision to proposal.  
NA (cost 
included in 
funding of IA)
$0
DT-7
ongoing 1) Highway maintenance operators must be aware of tortoises and avoid 
them.  2)  If the Implementation Team judges that these or other measures 
are not avoiding take of tortoises, a biological monitor may be necessary. 
1) No new cost  2)  $330 - $750 per day.
1)  NA               
2)  PP
$0
DT-8
ongoing Roadbeds should not be lowered and berms should not exceed 12 inches or 
a slope of 30 degrees.  Helendale Road, Fossil Bed Road, Camp Rock 
Road, and Copper City toad were identified as particular problems.  
Undetermined.  Potential additional costs to BLM and local 
jurisditions to maintain roads to this standard. 
RA
$0
DT-11
ongoing Review new linear utility projects within the HCA at the time they are 
proposed for consistency with guidelines contained within the HCP.
No new cost
NA (cost 
included in 
funding of IA)
$0
DT-11
1
Facilitate issuance of applicable salvage permits to participating utility 
companies to enable them to remove raven nests from transmission lines 
and other facilities
No additional cost
NA 
$0
DT-12
ongoing Clearance and presence-absence surveys within Tortoise DWMAs.
Approx. cost for 40 acre parcel:  Clearance survey = $500 (4 
acres per hour at rate of $50 per hour) presence/absence 
survey = $1530 (4 acres per hour ar rate of $85 per hour, plus 8 
hours report prep time)
PP
$0
DT-13
ongoing Clearance surveys outside of DWMAs and No Survey Areas
$500 (approximate cost for a 40 acre-parcel)
PP
$0
DT-14
ongoing Require implementation of BMPs for specified construction projects.
No new cost (Standardization of current management)
PP
$0
DT-14
ongoing Ensure project compliance with BMPs and Handling Guidelines
Undetermined.  Potential additional costs to BLM and local 
jurisditions to review project proposals, and to project proponent 
if redesign is required. 
BLM
$0
DT-15
2
Consider establishing translocation sites for wild tortoises removed from 
impact zones if determined that other alternatives are unable to 
accommodate all displaced tortoises
IA
$0
DT-18
ongoing Coordinate placement of fences along paved roadways to ensure that 
access is provided to those routes identified as "open" that intersect with 
roads to be fenced.  Ensure that the latest, state-of the art gate designs are 
used at designated portals
Undetermined.  Potential additional costs to BLM, Caltrans,  and 
local jurisdictions in meeting and coordination time. 
BLM
$0
DT-20
ongoing Install culverts of appropriate design and spacing to allow desert tortoises 
to pass under the road within DWMAS when roads are fenced to preclude 
entry by desert tortoises. 
RA, FS, D, G
$0
DT-24
1
Use additional law enforcement and education to inform the public of 
appropriate and inappropriate activities in conservation areas. 
See DT-28 and E-2
RA, FS, D, G
$0
DT-27
ongoing Counties and cities shall ensure that no new landfills are constructed inside 
DWMAs or within five miles of them (except Barstow Landfill).
Undetermined.  Potential costs to counties and cities to review 
and amend Integrated Waste Management Plans as necessary.
RA
$0
DT-26
1
Ensure that predation by ravens and other predators does not compromise 
the headstarting program. 
Included in overall cost of headstarting program
IA
$0
DT-30
1
Reduce availability of anthropogenic sources of food and water to ravens 
and coyotes by modifying landfill operation practices in the desert. 
Undetermined.  Varies by jurisdiction 
IA
$0
DT-31
1
Take steps to reduce the availability of organic wastes to ravens outside of 
landfills. 
Undetermined
IA
$0
DT-32
Reduce the availability of carcasses of road-killed animals along highways 
in tortoise habitat. 
the only way to reduce carcasses is with fencing along roads.  IA
$0
DT-33
1
Reduce the population density of ravens and number of birds that may take 
tortoises by reducing the availability of water while being mindful of the 
needs of other species.
Undetermined.  Primarily education for jurisdiction project 
review, agriculture, etc.
IA
$0
DT-34
1
Remove active raven nests from specific areas )
IA
$0
DT-35
ongoing Avoid constructing new nesting structures and reduce the number of existing 
nesting structures in areas where natural or anthropogenic substrates are 
lacking.
IA
$0
DT-36
1
Remove ravens from specific areas where tortoise mortality from several 
sources is high, raven predation is known to occur, and the tortoise 
population has a chance of benefiting from raven removal. 
IA
$0
DT-37
3
Implement raven research measures  
IA
$0
DT-38
1
Establish two work groups to oversee raven management direction, review 
information, coordinate with other agencies/groups, solicit funding for 
implementation of specific management measures and distribute 
information/data. 
IA
$0
DT-40
ongoing Cooperate with known weed abatement specialists and organizations and 
facilitate weed abatement/management programs that contribute to the 
conservation of plant or animal species covered by the plan.
Undetermined.  Costs involve Implementation Team staff time 
to contact and coordinate with others.
NA (cost 
included in 
funding of IA)
$0
MGS-200
ongoing Mohave ground squirrel: ·Cooperate with military installations by sharing 
scientific information and reviewing management plans.
Undetermined.  Costs involve Implementation Team staff time 
to contact and coordinate with others.
NA (cost 
included in 
funding of IA)
$0
MR-1
ongoing Determine whether groundwater criterion are met in order to obtain 
coverage for riparian habitat dependant species.  
No cost.
NA (cost 
included in 
funding of IA)
$0
Bat-3
ongoing Protect riparian habitat within five miles of known or newly discovered 
maternity roosts for Townsend's big-eared bat, including monitoring of 
grazing, if present.  
Undetermined.  Potential additional costs to agencies to monitor 
and identify/implement projects. 
IA, BLM
$0
Bat-4
ongoing Protect desert wash vegetation within three miles of known or newly 
discovered maternity and hibernation roosts of California leaf-nosed bats.  
Assess motorized vehicle use of washes in these locations on a case-by-
case basis.  Develop alternative access routes if problem is determined.  
Undetermined.  Potential additional costs to agencies to assess 
vehicle use of washes and identify/implement projects.   Involve 
OHV user groups.
IA, BLM
$0
Bat-6
ongoing Project surveys for discretionary permits where potential for significant bat 
roosts exists. 
$500 
PP
$0
Bat-7
ongoing Prior to disturbance or removal of a non-significant roost, a project sponsor 
would provide for safe eviction of any bats present by a qualified biologist 
in consultation with CDFG. 
$2,000 
PP
$0
Rap-1
ongoing All construction of new electric utility lines throughout the planning area must 
be raptor-safe. 
No new costs.  Included within design.
$0
Rap-3
ongoing Ensure controls on blasting for new mines where raptor are potentially 
affected. 
Application of this standard involves no new costs.
pp
$0
Rap-6
ongoing In areas where a desert tortoise clearance survey is required, discretionary 
projects will be required to conduct a concurrent abbreviated survey for the 
burrowing owl. 
Cost included within tortoise clearance survey cost (see DT-12 
& 13)
PP
$0
Rap-7
ongoing Discretionary projects within DWMAs will conduct a survey utilizing the four-
visit CDFG protocol for burrowing owl. 
$2,000 
PP
$0
Rap-8
ongoing If survey shows burrowing owl to be present, applicant is required to 
institute the minimization measures of eviction and burrow closure. 
$6,000 
PP
$0
Rap-12
ongoing Track all new sightings and new nest locations of burrowing owls as they are 
detected in the future.  
Included within IA staff budget.
IA
$0
Rap-14
3
Retrofit existing electrical transmission and distribution lines identified as 
"'problem poles" (or as part of voluntary proactive programs by utilities) 
located near regular ferruginous hawk wintering areas to meet current 
design standards to prevent electrocution.
Cost dependent on pole configuration.
PP
$0
Rap-19
ongoing Enforce seasonal road closures where practical and necessary to protect 
nesting prairie falcons. 
No additional cost.  Included in BLM operating budget.
BLM
$0
Rap-19
ongoing Conduct a site-specific evaluation to determine if prairie falcon nest 
locations are within the line-of-sight of vehicles and if seasonal closures are 
necessary. 
No additional cost.  Included in BLM operating budget.
BLM
$0
B-2
4
Consolidate public land in the Kelso Valley through land exchanges with 
willing sellers (Bendire's thrasher)
Include with HCA acquisition priorities.  Cost included in IA staff 
budget.
IA
$0
B-8
ongoing Review land division and other development proposals in the Oak Hills area 
to insure minimization of impacts to gray vireo habitat
Undetermined.  Potential additional costs to San Bernardino 
County and the city of Hesperia to review project proposals, and 
to project proponent if redesign is required. 
PP
$0
B-11
2
Remove salt cedar and Phragmites at designated springs and replant with 
native willows. (Inyo California towhee)
Undetermined.  Cost is site specific.
IA, BLM
$0
B-12
ongoing Continue removal of feral burros from the Argus Mountains with a goal of 
zero. (Inyo California towhee)
No additional cost.  Part of ongoinf BLM program.
BLM
$0
B-13
1
Install signs indicating the China Lake NAWC boundary at Benko Spring and 
Ruby Spring (in cooperation with China Lake NAWS).  (Inyo California 
towhee)
Minimal cost for signs.  Boundary surveys are underway.
BLM
$0
B-15
ongoing Remove invasive riparian plants from the Mojave River.
Undetermined and variable depending on implementing agency. BLM
$0
B-17
ongoing LeConte's thrasher: Prevent disturbance of nest sites during nesting 
season. 
No additional cost.
PP
$0
R-1
ongoing Prohibit flood control structures that will impede sand transport at Big Rock 
Creek, Sheep Creek, and the Mojave River.  (Mojave fringe-toed lizard)
No new cost. 
NA
$0
R-2
ongoing Regulate aggregate mining in Big Rock Creek, Sheep Creek, and the 
Mojave River to assure continued passage of sand downstream during 
flood flows.  (Mojave fringe-toed lizard)
Undetermined.  Potential additional costs to local jurisditions to 
review project proposals, and to project proponent if redesign is 
required. 
PP
$0
R-3
3
Widen the bridge over Big Rock Creek when Highway 138 is improved to 
allow better sand and water flow and enhance the wildlife corridor between 
the desert and the San Gabriel Mountains.  Convert the existing double 
channel into a single long and high span.  (Mojave fringe-toed lizard)
Cost included within bridge design.  Potentially higher 
construction costs.
PP
$0
P-202
ongoing Continue BLM program of education of trail maintenance volunteers. 
(Southern Sierra plants)
No new cost.
BLM
$0
P-203
ongoing Acquire lands and relinquish mining claims consistent with the options 
contained in the Carbonate Habitat Management Strategy. 
Included with acquisition priorities.  
BLM
$0
P-3
ongoing Retain the flood discharge capability of Amargosa Creek to the extend 
feasible and retain the capacity for sheet flow over the alkali flood plain 
north of Lancaster and west of EAFB. (Alkali mariposa lily)
No new cost. 
NA
$0
P-2, P-3
1
Acquire or otherwise ensure the conservation of Paradise Spring and 
Rabbit Springs. (Alkali mariposa lily)
Include in acquisition priorities
IA
$0
P-9
ongoing Review proposals for development, mining or water extraction near springs 
located along the Helendale Fault for compatibility with protection of the 
mariposa lilies and the surface water supply.  Require botanical surveys in 
these areas. (alkali mariposa lily)
Undetermined.  Potential additional costs to San Bernardino 
County to review project proposals, and to project proponent if 
redesign is required. Cost of botanical survey is approximately  
$2,000 per site.
IA
$0
P-11
2
BLM will exchange lands with CDFG so that a contiguous state ownership 
of occupied Barstow woolly sunflower habitat is achieved. 
No new cost; included within BLM operating budget.
BLM
$0
P-14
4
Secure a conservation easement from U.S. Borax and other landowners 
(between Highway 58 and EAFB, and adjacent to the solar facility north of 
Highway 58) as a secondary reserve for the Barstow woolly sunflower.
Dependent on final configuation of conservation area.
IA
$0
P-15
ongoing Require botanical surveys in the North Edwards Conservation Area until 
such time as a permanent boundary is established.  (Barstow woolly 
sunflower)
Estimated at $2000 per 40 acres for spring surveys.
PP
$0
P-15
3
Establish permanent boundary for the North Edwards Conservation Area 
once additional information is known. (Barstow woolly sunflower) 
No additional cost.  Part of adaptive management.
RA
$0
P-17
ongoing Prior to new construction within the utility corridors located in the Barstow 
woolly sunflower CA and NECA, botanical surveys shall be conducted and 
existing populations avoided to the maximum extent practicable.
Cost dependent on project scope.
BLM
$0
P-18
ongoing Review Plans of Operation for proposed mines to achieve compatibility 
between mining and conservation of existing Barstow woolly sunflower 
sites.  Existing populations will be avoided to the maximum extent 
practicable. 
Undetermined.  Potential additional costs to San Bernardino 
County and BLM  to review project proposals, and to project 
proponent if redesign is required. 
PP
$0
P-18
2
Initiate mineral withdrawals for occupied habitat of Lane Mountain Milkvetch 
Undetermined.
Army
$0
P-19
1
Charlotte's phacelia : Designate routes of travel in the El Paso Mountains.  No new cost; included within BLM  and State Parks operating 
budget.
BLM
$0
P-20
2
Sign the larger populations of crucifixion thorn to notify campers that 
firewood harvesting is prohibited. 
Minimal costs for signs.
BLM
$0
P-21
ongoing Require botanical surveys for new projects within identified suitable habitat 
for desert cymopterus.
Estimated at $2,000 for 40 acres for spring surveys.
PP
$0
HCA-3
3
Avoidance of this species would be required for any public or private land 
ground-disturbing projects in the proposed Middle Knob Conservation Area. 
(Flax-like monardella)
Undetermined.  Potential additional costs to Kern County and 
BLM  to review project proposals, and to project proponent if 
redesign is required. 
$0
P-30
3
Compensate claimholders within Coolgardie and West Paradise CA mineral 
withdrawal areas.
Undetermined.  Dependent on claim validity.
Army
$0
P-32
1
Notify claimholders of the presence of endangered plants.  Restrictions on 
casual use that involves ground disturbance within the Lane Mountain 
Milkvetch CA will be developed as necessary. 
Undetermined mailing costs to claimholders.
BLM
$0
P-33
ongoing Require applicants for discretionary permits within 100' of existing stream 
channels within the SRA established for the Little San Bernardino Mountains 
gilia to protect the integrity of the stream channels.  Require setbacks of 
100' from the outer banks of washes, and establish flood control and 
conservation easements on private lands containing this species. 
Undetermined.  Potential additional costs to San Bernardino 
County and BLM  to review project proposals, and to project 
proponent if redesign is required. 
PP
$0
P-34
ongoing Prohibit channelization of upper Big Morongo Creek, Little Morongo Creek, 
and Dry Morongo Creek northwest of Highway 62 in order to maintain fluvial 
processes supporting occurrences of the Little San Bernardino Mountains 
Gilia in the Coachella Valley.  Upstream improvements (e.g. culverts) within 
1/4 mile of Highway 62 in these washes will be allowed. 
No new costs.
NA
$0