PROJECT PLANNING & CONTROL USING PRIMAVERA
®  
P6
TM
© Eastwood Harris Pty Ltd    
PROJECT PLANNING & SCHEDULING 
USING 
PRIMAVERA
®
P6
TM
For all industries including Versions 4 to 6 
Planning and Progressing Project Schedules  
With and Without Roles and Resources  
in an  
Established Enterprise Environment  
BY 
PAUL EASTWOOD HARRIS 
Find and replace text in pdf - search text inside PDF file in C#.net, ASP.NET, MVC, Ajax, WinForms, WPF
Learn how to search text in PDF document and obtain text content and location information
search text in pdf image; select text in pdf file
Find and replace text in pdf - VB.NET PDF Text Search Library: search text inside PDF file in vb.net, ASP.NET, MVC, Ajax, WinForms, WPF
Learn How to Search Text in PDF Document and Obtain Text Content and Location Information in VB.NET application
how to select all text in pdf file; search pdf files for text
PROJECT PLANNING & CONTROL USING PRIMAVERA
®  
P6
TM
© Eastwood Harris Pty Ltd    
ii 
Copyright 2008 by Eastwood Harris Pty Ltd. No part of this publication may be 
reproduced or used in any form or by any method without the written permission of the 
author. 
Primavera, the Primavera sundial logo, P3, P3e, P3e/c, Primavera Enterprise, Primavera 
Expedition, Primavera Project Planner, Primavera TeamPlay, P6, Primavision, 
PrimeContract, and SureTrak are either registered trademarks or trademarks of Primavera 
Systems, Inc. in the United States and/or other countries.  
Windows, Microsoft
Office Project Standard 2007, Microsoft
Office Project Professional 
2007, Microsoft
Project Standard 2003, Microsoft
Project Professional 2003, Microsoft
Project Standard 2002, Microsoft
Project Professional 2002, Microsoft
Project 2000, 
Microsoft Project
98 and Excel are registered trademarks of Microsoft Corporation. 
Asta Powerproject is a registered trademark of Asta Developments plc. 
Adobe
and Acrobat
are registered trademarks of Adobe Systems Incorporated. 
All other company or product names may be trademarks of their respective owners. 
Screen captures were reprinted with authorization from Primavera Systems Inc. 
This publication was created by Eastwood Harris Pty Ltd and is not a product of Primavera 
Systems Inc. 
DISCLAIMER 
The information contained in this book is to the best of the author’s knowledge true and 
correct. The author has made every effort to ensure accuracy of this publication, but may 
not be held responsible for any loss or damage arising from any information in this book. 
Furthermore Primavera Systems Inc reserve the right in their documentation to make 
changes to any products to improve reliability, function, or design. Thus the application of 
Service Packs or the use of upgraded software may operate differently to the descriptions in 
this book. 
AUTHOR AND PUBLISHER 
Paul E Harris 
Eastwood Harris Pty Ltd 
PO Box 4032 
Doncaster Heights 3109 
Victoria, Australia 
Email: 
harrispe@eh.com.au 
Web: 
http://www.eh.com.au 
Tel: 
+61 (0)4 1118 7701 
Fax: 
+61 (0)3 9846 7700 
Please send any comments on this publication to the author. 
ISBN 978-1-921059-20-9 (1-921059-20-6) - B5 Paperback 
ISBN 978-1-921059-21-6 (1-921059-21-4) - A4 Spiral 
7 February 2008 
VB.NET PDF replace text library: replace text in PDF content in vb
and ASP.NET webpage. Find and replace text in PDF file in preview without adobe PDF reader component installed. Able to pull text
pdf editor with search and replace text; converting pdf to searchable text format
VB.NET PDF File Merge Library: Merge, append PDF files in vb.net
When you have downloaded the RasterEdge Image SDK for .NET, you can unzip the package to find the RasterEdge.Imaging.PDF.dll in the bin folder under the root
pdf find text; pdf searchable text converter
PROJECT PLANNING & CONTROL USING PRIMAVERA
®  
P6
TM
© Eastwood Harris Pty Ltd    
iii 
INTRODUCTION 
This book is an upgrade of the Project Planning & Scheduling Using Primavera Version 
5.0 for Engineering & Construction and Maintenance & Turnover book and has been 
written to enable new users to learn the planning and scheduling functions of Primavera 
Versions 3.5 to 6.0.  Version 6.1 was due to be released after this book was published but 
the prerelease notes indicated that none of the functions outlined in this book were to 
change and most changes were in the web access software and timesheeting. 
Many users will have prior experience with SureTrak, P3, Asta Powerproject or Microsoft 
Project and the author explains where there are differences in the products’ functionality.  
The author would appreciate any constructive comments on how this book may be 
improved. 
SUMMARY 
The book was written so it may be used as: 
¾  A training manual for a three-day training course, or 
¾  A self teach book, or 
¾  A reference manual. 
The screen shots for the book are taken from Primavera Version 6.0 but this book may be 
used to learn Primavera Version 3.5, 4.1, 5.0 or 6.0. 
The book has been written to be used as the basis for a three-day training course and 
includes exercises for the students to complete at the end of each chapter. After the course 
book may then be used by the students as a reference book. 
This publication is ideal for people who would like to quickly gain an understanding of how 
the software operates and explains how the software differs from Primavera P3, SureTrak 
and Microsoft Project, thus making it ideal for people who wish to convert from these 
products. 
CUSTOMIZATION FOR TRAINING COURSES 
Training organizations or companies that wish to conduct their own training may have this 
book tailored to suit their requirements. This may be achieved removing, reordering or 
adding content to the book and by writing their own exercises. Please contact the author to 
discuss this service. 
AUTHOR’S COMMENT 
As a project controls consultant I have used a number of planning and scheduling software 
packages for the management of a range of project types and sizes. The first books I 
published were user guides/training manuals for Primavera SureTrak, P3 and Microsoft 
Project users. These were well received by professional project managers and schedulers, so 
I decided to turn my attention to Primavera Enterprise. This book follows the same proven 
layout of my previous books. I trust this book will assist you in understanding how to use 
Primavera Enterprise on your projects.  
APPRECIATION 
I would like thank my daughter Samantha Harris, Andrew Dick and editor Susan Aaron for 
their assistance in the production of this publication.
VB.NET PDF File & Page Process Library SDK for vb.net, ASP.NET
document. If you find certain page in your PDF document is unnecessary, you may want to delete this page directly. Moreover, when
find text in pdf files; how to select text in pdf reader
VB.NET Create PDF Library SDK to convert PDF from other file
Create writable PDF file from text (.txt) file in VB.NET To get this RasterEdge PDF document file creator library the RasterEdge .NET Image SDK and find the PDF
find and replace text in pdf; find and replace text in pdf file
PROJECT PLANNING & CONTROL USING PRIMAVERA
®  
P6
TM
© Eastwood Harris Pty Ltd    
iv 
CURRENT BOOKS PUBLISHED BY EASTWOOD HARRIS
99 Tricks and Traps for Microsoft® Office Project  
Including Microsoft® Project 2000 to 2007, published May 2007 
ISBN 978-1-921059-19-3 - A5 - Paperback 
Planning and Scheduling Using Microsoft Office Project 2007 
Including Microsoft Project 2000 to 2003, published March 2007 
ISBN 978-1-921059-15-5 - B5 Paperback, ISBN 978-1-921059-16-2 - A4 Spiral 
PRINCE2 Planning & Control Using Microsoft Project 
Updated for Microsoft Office Project 2007, published March 2007 
ISBN978-1-921059-17-9 - B5 Paperback 
Planning and Control Using Microsoft Project and PMBOK
®
Guide Third Edition  
Updated for Microsoft Office Project 2007, published March 2007 
ISBN 978-1-921059-18-6 - B5 Paperback 
Planning Using Primavera
®
Project Planner P3
®
Version 3.1  
Revised 2006, published March 2006 
ISBN 1-921059-13-3 - A4 Spiral Bound 
Planning Using Primavera
®
SureTrak Project Manager Version  
3.0 Revised 2006, published June 2006 
ISBN 1-921059-14-1 - A4 Spiral Bound 
Project Planning and Scheduling Using Primavera
® 
Contractor Version 4.1 
For the Construction Industry, published January 2005 
ISBN 1-921059-04-4 - A4 Paperback, ISBN 1-921059-05-2 A4 Spiral Bound 
Project Planning and Control Using Primavera
® 
Contractor Version 6.0 
For the Construction Industry, planned early 2008 
SUPERSEDED BOOKS BY THE AUTHOR 
Planning and Scheduling Using Microsoft® Project 2000 
Planning and Scheduling Using Microsoft® Project 2002 
Planning and Scheduling Using Microsoft® Project 2003 
PRINCE2 TM Planning and Control Using Microsoft® Project  
Planning and Control Using Microsoft® Project and PMBOK® Guide Third Edition 
Project Planning and Scheduling Using Primavera Enterprise - Team Play Version 3.5 
Project Planning and Scheduling Using Primavera Enterprise - P3e & P3e/c Version 3.5 
Project Planning and Scheduling Using Primavera® Version 4.1 for IT Project  
Project Planning and Scheduling Using Primavera® Version 4.1 or E&C 
Planning Using Primavera Project Planner P3 Version 2.0 
Planning Using Primavera Project Planner P3 Version 3.0 
Planning Using Primavera Project Planner P3 Version 3.1 
Project Planning Using SureTrak for Windows Version 2.0 
Planning Using Primavera SureTrak Project Manager Version 3.0 
Planning and Scheduling Using Primavera
®
Version 5.0 For Engineering & Construction 
Planning and Scheduling Using Primavera
®
Version 5.0 For IT Project Office 
C# HTML5 PDF Viewer SDK deployment on Visual Studio .NET
C#.NET rotate PDF pages, C#.NET search text in PDF, C# Unzip the download package and you can find a project Once done debugging with x86 dlls, replace the x86
pdf text search tool; how to select text in pdf and copy
VB.NET PDF - Deploy VB.NET HTML5 PDF Viewer on Visual Studio.NET
C#.NET rotate PDF pages, C#.NET search text in PDF, C# Unzip the download package and you can find a project Once done debugging with x86 dlls, replace the x86
can't select text in pdf file; select text pdf file
PROJECT PLANNING & CONTROL USING PRIMAVERA
®  
P6
TM
© Eastwood Harris Pty Ltd    
INTRODUCTION 
1-1 
1.1 
Purpose 
1-1 
1.2 
Required Background Knowledge 
1-2 
1.3 
Purpose of Planning 
1-2 
1.4 
Project Planning Metrics 
1-3 
1.5 
Planning Cycle 
1-4 
1.6 
Levels of Planning 
1-5 
1.7 
Monitoring and Controlling a Project 
1-7 
CREATING A PROJECT PLAN 
2-1 
2.1 
Understanding Planning and Scheduling Software 
2-1 
2.2 
Enterprise Project Management 
2-1 
2.3 
Understanding Your Project 
2-2 
2.4 
Level 1 – Planning Without Resources 
2-3 
2.4.1  Creating Projects 
2-3 
2.4.2  Defining the Calendars 
2-3 
2.4.3  Defining the Project Breakdown Structures 
2-3 
2.4.4  Adding Activities 
2-4 
2.4.5  Adding the Logic Links 
2-5 
2.4.6  Constraints 
2-6 
2.4.7  Risk Analysis 
2-6 
2.4.8  Contingent Time 
2-6 
2.4.9  Scheduling the Project 
2-6 
2.4.10  Formatting the Display – Layouts and Filters 
2-7 
2.4.11  Printing and Reports 
2-7 
2.4.12  Issuing the Plan 
2-7 
2.5 
Level 2 – Monitoring Progress Without Resources 
2-8 
2.5.1  Setting the Baseline 
2-8 
2.5.2  Tracking Progress 
2-8 
2.5.3  Corrective Action 
2-9 
2.6 
Level 3 – Scheduling With Resources, Roles & Budgets 
2-9 
2.6.1  Estimating or Planning for Control 
2-9 
2.6.2  The Balance Between the Number of Activities and Resources 
2-9 
2.6.3  Creating and Using Resources 
2-10 
2.6.4  Creating and Using Roles 
2-10 
2.6.5  The Relationship Between Resources and Roles 
2-10 
2.6.6  Activity Type and Duration Type 
2-10 
2.6.7  Budgets 
2-10 
2.6.8  Resource Usage Profiles and Tables 
2-11 
2.6.9  Resource Optimization 
2-11 
C# PDF File Permission Library: add, remove, update PDF file
Text: Replace Text in PDF. Image: Insert Image to PDF. Image: Remove read PDF, VB.NET convert PDF to text, VB.NET the following code table, you will find a piece
text select tool pdf; how to select text in pdf image
VB.NET PDF File Permission Library: add, remove, update PDF file
Text to PDF. Text: Delete Text from PDF. Text: Replace Text in PDF. NET rotate PDF pages, C#.NET search text in PDF In the following code table, you will find a VB
pdf select text; pdf search and replace text
PROJECT PLANNING & CONTROL USING PRIMAVERA
®  
P6
TM
© Eastwood Harris Pty Ltd    
vi 
2.7 
Level 4 – Monitoring and Controlling a Resourced Schedule 
2-11 
2.7.1  Monitoring Projects with Resources 
2-11 
2.7.2  Controlling a Project with resources 
2-11 
STARTING UP AND NAVIGATION 
3-1 
3.1 
Logging In 
3-1 
3.2 
Welcome Form 
3-1 
3.3 
The Home Workspace 
3-2 
3.4 
The Projects Workspace 
3-2 
3.4.1  Project Workspace Top Pane 
3-2 
3.4.2  Project Workspace Bottom Pane 
3-3 
3.5 
Opening One or More Projects 
3-3 
3.6 
Opening a Portfolio 
3-4 
3.7 
Navigating Around a Project 
3-4 
3.7.1  Command Toolbar 
3-4 
3.7.2  Activities Toolbar 
3-4 
3.7.3  Navigation Toolbar 
3-5 
3.7.4  Directory Toolbar 
3-5 
3.7.5  Top and Bottom Panes of Workspaces 
3-5 
3.8 
User Preferences - Date and Time Display 
3-6 
3.9 
Right-clicking with the Mouse 
3-6 
3.10 
Accessing Help 
3-6 
3.11 
Application of Options within Forms 
3-7 
3.12 
Closing Down 
3-8 
3.13 
Terminology Differences between Industry Versions 
3-8 
CREATING A NEW PROJECT 
4-1 
4.1 
File Types 
4-1 
4.2 
Creating a Blank Project 
4-2 
4.3 
Setting Up a New Project 
4-2 
4.4 
Project Architect Wizard and Methodology Manager 
4-3 
4.5 
Importing a Project 
4-3 
4.6 
Copy an Existing Project 
4-4 
4.7 
Project Dates 
4-5 
4.8 
Saving Additional Project and EPS Information - Notebook Topics 
4-6 
DEFINING CALENDARS 
5-1 
5.1 
Accessing Global and Project Calendars 
5-2 
5.2 
Assigning the Project Default Project Calendar 
5-2 
5.3 
Creating a New Calendar 
5-3 
5.4 
Copying Calendars 
5-3 
5.5 
Renaming a Calendar 
5-3 
5.6 
Deleting a Calendar 
5-3 
PROJECT PLANNING & CONTROL USING PRIMAVERA
®  
P6
TM
© Eastwood Harris Pty Ltd    
vii 
5.7 
Resource Calendars 
5-3 
5.8 
Editing Calendar Working Days of an Existing Calendar 
5-4 
5.9 
Adjusting Working Hours 
5-5 
5.9.1  Editing Calendar Weekly Hours 
5-5 
5.9.2  Editing Selected Days Working Hours 
5-5 
5.9.3  Editing Detailed Work Hours/Day 
5-6 
5.10 
Inherit Holidays and Exceptions from a Global Calendar 
5-6 
5.11 
Calculation of Activity Summary Duration in Days 
5-7 
5.12 
Database Default Calendar, WBS and Project Durations 
5-8 
CREATING A PRIMAVERA PROJECT WBS 
6-1 
6.1 
Opening and Navigating the WBS Workspace 
6-2 
6.2 
Creating and Deleting a WBS Node 
6-3 
6.3 
WBS Node Separator 
6-3 
6.4 
Work Breakdown Structure Lower Pane Details 
6-4 
6.5 
WBS Categories 
6-5 
6.6 
Why a Primavera WBS is Important 
6-6 
ADDING ACTIVITIES & ORGANIZING UNDER THE WBS 
7-1 
7.1 
New Activity Defaults 
7-2 
7.1.1  Duration Type 
7-2 
7.1.2  Percent Complete Type 
7-2 
7.1.3  Activity Types and Milestones 
7-4 
7.1.4  Cost Account 
7-5 
7.1.5  Calendar 
7-5 
7.1.6  Auto-numbering Defaults 
7-5 
7.2 
Adding New Activities 
7-5 
7.3 
Default Activity Duration 
7-5 
7.4 
Copying Activities in Primavera 
7-6 
7.5 
Copying Activities from other Programs 
7-6 
7.6 
Elapsed Durations 
7-6 
7.7 
Finding the Bars in the Gantt Chart 
7-6 
7.8 
Activity Information – Bottom Layout 
7-7 
7.9 
Assigning Calendars to Activities 
7-8 
7.9.1  Assigning a Calendar Using General Tab of the Bottom Layout Form  7-8 
7.9.2  Assigning a Calendar Using a Column 
7-8 
7.10 
Undo 
7-8 
7.11 
Assigning Activities to a WBS Node 
7-9 
7.12 
Reordering or Sorting Activities 
7-10 
7.13 
Summarizing Activities Using WBS 
7-11 
7.14 
Spell Check 
7-11 
PROJECT PLANNING & CONTROL USING PRIMAVERA
®  
P6
TM
© Eastwood Harris Pty Ltd    
viii 
FORMATTING THE DISPLAY 
8-1 
8.1 
Formatting the Project Workspace 
8-2 
8.2 
Understanding Forms 
8-2 
8.3 
Formatting Columns 
8-3 
8.3.1  Selecting the Columns to be Displayed 
8-3 
8.3.2  Column Header Alignment 
8-3 
8.3.3  Adjusting the Width of Columns 
8-4 
8.3.4  Setting the Order of the Columns from Left to Right on the Screen 
8-4 
8.4 
Formatting the Bars 
8-4 
8.4.1  Formatting Activity Bars 
8-4 
8.4.2  Bar Style Tab 
8-6 
8.4.3  Bar Settings Tab 
8-6 
8.4.4  Bar Labels Tab 
8-7 
8.4.5  Bar Chart Options Form 
8-8 
8.5 
Row Height 
8-9 
8.6 
Format Fonts and Font Colors 
8-10 
8.7 
Format Colors 
8-10 
8.8 
Format Timescale 
8-11 
8.8.1  Moving and Rescaling the Timescale 
8-11 
8.8.2  Format Timescale Command 
8-11 
8.8.3  Non Work Period Shading in Timescale 
8-13 
8.9 
Inserting Attachments - Text Boxes and Curtain 
8-13 
8.9.1  Adding a Text Box 
8-13 
8.9.2  Adding a Curtain 
8-14 
ADDING RELATIONSHIPS 
9-1 
9.1 
Understanding Relationships 
9-2 
9.2 
Understanding Lags and Leads 
9-3 
9.3 
Formatting the Relationships 
9-4 
9.4 
Adding and Removing Relationships 
9-4 
9.4.1  Graphically Adding a Relationship 
9-4 
9.4.2  Graphically Deleting a Relationship 
9-5 
9.4.3  Adding and Deleting Relationships with the Activity Details Form 
9-5 
9.4.4  Chain Linking 
9-6 
9.5 
Using the Command Toolbar Buttons to Assign Relationships 
9-7 
9.6 
Dissolving Activities 
9-7 
9.7 
Circular Relationships 
9-7 
9.8 
Scheduling the Project 
9-7 
9.9 
Critical Activities Definition 
9-8 
PROJECT PLANNING & CONTROL USING PRIMAVERA
®  
P6
TM
© Eastwood Harris Pty Ltd    
ix 
10 
ACTIVITY NETWORK VIEW 
10-1 
10.1 
Viewing a Project Using the Activity Network View 
10-2 
10.2 
Adding, Deleting and Dissolving Activities in the Activity Network View 10-2 
10.3 
Adding, Editing and Deleting Relationships 
10-2 
10.3.1  Graphically Adding a Relationship. 
10-2 
10.3.2  Using the Activity Details Form 
10-2 
10.4 
Formatting the Activity Boxes 
10-3 
10.5 
Reorganizing the Activity Network 
10-3 
10.6 
Saving and Opening Activity network Positions 
10-3 
10.7 
Early Date, Late Date and Float Calculations 
10-4 
11 
CONSTRAINTS 
11-1 
11.1 
Assigning Constraints 
11-3 
11.1.1  Number of Constraints per Activity 
11-3 
11.1.2  Setting a Primary Constraint Using the Activity Details Form 
11-3 
11.1.3  Setting a Secondary Constraint Using the Activity Details Form 
11-3 
11.1.4  Expected Finish Constraint 
11-3 
11.1.5  Setting Constraints Using Columns 
11-4 
11.1.6  Typing in a Start Date 
11-4 
11.1.7  Expected Finish Date 
11-4 
11.2 
Project Must Finish By Date 
11-5 
11.3 
Activity Notebook 
11-6 
11.3.1  Creating Notebook Topics 
11-6 
11.3.2  Adding Notes 
11-6 
12 
FILTERS 
12-1 
12.1 
Understanding Filters 
12-1 
12.2 
Applying a Filter 
12-2 
12.2.1  Filters Form 
12-2 
12.2.2  Applying a Single Filter 
12-2 
12.2.3  Applying a Combination Filter 
12-2 
12.3 
Creating a New Filter 
12-3 
12.4 
Modifying a Filter 
12-3 
12.4.1  One Parameter Filter 
12-3 
12.4.2  Two Parameter Filter 
12-4 
12.4.3  Multiple Parameter Filter 
12-4 
12.4.4  Editing and Organizing Filter Parameters 
12-5 
PROJECT PLANNING & CONTROL USING PRIMAVERA
®  
P6
TM
© Eastwood Harris Pty Ltd    
13 
GROUP, SORT AND LAYOUTS 
13-1 
13.1 
Group and Sort Activities 
13-2 
13.1.1  Display Options 
13-2 
13.1.2  Group By 
13-4 
13.1.3  Group By Options 
13-5 
13.1.4  Sorting 
13-6 
13.1.5  Reorganize Automatically 
13-6 
13.1.6  Group and Sort Projects at Enterprise Level 
13-7 
13.2 
Understanding Layouts 
13-7 
13.2.1  Applying an Existing Layout 
13-8 
13.2.2  Creating a New Layout 
13-9 
13.2.3  Layout Types 
13-9 
13.2.4  Changing Activity Layout Types in Panes 
13-10 
13.2.5  Activity Workspace Layout Panes 
13-10 
13.2.6  WBS and Projects Workspace Panes 
13-12 
13.3 
Copying a Layout To and From Another Database 
13-12 
14 
PRINTING AND REPORTS 
14-1 
14.1 
Printing 
14-1 
14.2 
Print Preview 
14-2 
14.3 
Page Setup 
14-3 
14.3.1  Page Tab 
14-3 
14.3.2  Margins Tab 
14-4 
14.3.3  Header and Footer Tabs 
14-4 
14.4 
Options Tab 
14-5 
14.5 
Print Form 
14-6 
14.6 
Print Setup Form 
14-6 
14.7 
Reports 
14-6 
15 
TRACKING PROGRESS 
15-1 
15.1 
Understanding Date Fields 
15-2 
15.2 
Setting the Baseline 
15-4 
15.2.1  Saving a Baseline 
15-4 
15.2.2  Deleting a Baseline 
15-5 
15.2.3  Restoring a Baseline to the Database as an Active Project 
15-5 
15.2.4  Setting  the Baseline Project 
15-5 
15.2.5  Understanding the <Current Schedule> Baseline 
15-6 
15.2.6  Update Baselines 
15-7 
15.2.7  Copying a Project with Baselines 
15-8 
15.2.8  Displaying the Baseline Data 
15-9 
15.3 
Practical Methods of Recording Progress 
15-9 
Documents you may be interested
Documents you may be interested