Chapter 8
Setting Up Payroll
178
How to select text in a pdf - search text inside PDF file in C#.net, ASP.NET, MVC, Ajax, WinForms, WPF
Learn how to search text in PDF document and obtain text content and location information
pdf text search; search pdf files for text
How to select text in a pdf - VB.NET PDF Text Search Library: search text inside PDF file in vb.net, ASP.NET, MVC, Ajax, WinForms, WPF
Learn How to Search Text in PDF Document and Obtain Text Content and Location Information in VB.NET application
how to make a pdf document text searchable; search pdf for text in multiple files
9
Setting Up Jobs
Overview
180
The Elements of Job Costing
180
How Can You Use Job Costing?
184
Setting Up Job Defaults
185
Setting Up Jobs
188
Setting Up Phases and Cost Codes
190
Job Beginning Balances
191
Applying Costs and Revenues 
to Jobs
192
Setting Up and Applying Labor 
Burden
193
Setting Up and Processing 
Retainage
194
C# PDF Image Extract Library: Select, copy, paste PDF images in C#
C#: Select All Images from One PDF Page. C# programming sample for extracting all images from a specific PDF page. C#: Select An Image from PDF Page by Position.
can't select text in pdf file; find and replace text in pdf
VB.NET PDF Image Extract Library: Select, copy, paste PDF images
VB.NET : Select An Image from PDF Page by Position. Sample for extracting an image from a specific position on PDF in VB.NET program.
how to make pdf text searchable; how to select text in pdf
180
✪ 
Setting Up Jobs 
Overview
Job Costing is an optional but extremely helpful feature available in Peacht-
ree. You can use Job Costing for tracking income and expenses for any 
project that your company undertakes. You can create estimates and use 
them as budgets. Once you set up job information for a particular project, 
you can apply to the job any invoices for materials and services used by 
going to the Accounts Payable and Payroll windows. You can also track rev-
enues and payments made toward a job so that you have a good picture of 
what your profits are on a job. Such information can help you adjust 
expenses in a current job or estimate a similar job differently in the future. 
Peachtree also lets you print various job reports during a job’s progress so 
you can get detailed information about the job. 
The Elements of Job Costing
This section provides descriptive information on the elements of job costing. 
Job ID 
This is the only required element in job costing. A job ID is a unique identi-
fication code for each particular job or project that your company is under-
taking. For example, if you are a construction company involved in 
residential and commercial construction projects, you can create job IDs as 
follows:
Phases 
Phases give you the second level of detail in a job. Phases are simply a dis-
tinct part of the job performed. They are all phases that, in various combina-
tions, you may use in all the different jobs that your company does. They do 
not need to refer to a time frame and need not be part of every job. Phases 
can divide the job into stages:
Job/Project
Job ID
Office Building
COM001
Apartment Home
RES001
VB.NET PDF Text Redact Library: select, redact text content from
Page. PDF Read. Text: Extract Text from PDF. Text: Search Text in PDF. Image: Extract Image from PDF. VB.NET PDF - Redact PDF Text. Help
convert a scanned pdf to searchable text; find text in pdf files
C# PDF Text Redact Library: select, redact text content from PDF
Page: Rotate a PDF Page. PDF Read. Text: Extract Text from PDF. Text: Search Text in PDF. C#.NET PDF SDK - Redact PDF Text in C#.NET.
pdf search and replace text; pdf searchable text converter
Overview
181
You do not have to divide your jobs into phases. If you do not need that sort 
of detail when you track costs for a job, simply use a job, as below.
Before defining phases, you may want to think about the various stages of 
different kinds of jobs that your company does and then define the phases 
that cover many such jobs. Since your tasks may differ with each job, you 
should try to define phases such that you can use them independently of a 
specific project. For example, a landscaping company can use phase P1 for 
grading in more than one job. 
Cost Codes 
If you need to track your job costs in even more detail than phases, you can 
use cost codes. If your phases have associated costs that you want to track 
separately, you should use cost codes in those phases. Cost codes identify a 
specific category/task within a phase. 
This is a job with two phases. 
For example, site preparation 
and sodding. By dividing a job in 
this manner, you can focus on 
total costs related to a phase as 
opposed to individual costs 
within phases.
This is a job with no phases 
asociated with it, for example, 
cutting shrubs, or parcel 
delivery. Setting up jobs like this 
just tracks expenses and 
revenues at the job level.
C# HTML5 PDF Viewer SDK to view PDF document online in C#.NET
Tools Tab. Item. Name. Description. 1. Select tool. Select text and image on PDF document. 2. Hand tool. Pan around the document. Go To Tab. Item. Name. Description
cannot select text in pdf; convert pdf to searchable text online
VB.NET PDF- View PDF Online with VB.NET HTML5 PDF Viewer
Tools Tab. Item. Name. Description. 1. Select tool. Select text and image on PDF document. 2. Hand tool. Pan around the document. Go To Tab. Item. Name. Description
find and replace text in pdf file; how to select text in pdf and copy
Chapter 9
Setting Up Jobs
182
You should create cost codes that can apply to different phases and multiple 
jobs that you undertake. If you can create cost codes integral to the different 
jobs that you do, you can easily track your job cost and in turn arrive at 
more realistic quotes for another job that involves the same elements.
The best way to identify which cost codes to set up would be to consider all 
such resources whose cost affects your budget and that you use for complet-
ing a job. For example, as a landscaping company, you can set up your cost 
codes for materials or tasks such as Equipment Rental, Rock, Shrubbery, 
Mowing, Raking, Seeding and so on. Equipment Rental can be a used as a 
cost code for more than one phase (grading or maintenance), while Rock 
can be used as a cost code for any other job that calls for the use of rocks in 
landscaping. If you are a catering company, you can specify cost codes for 
Food, Beverages, Alcohol, Linen, Tableware, Truck Driver, Decorator, and 
all other requirements of the job.
You must be careful not to specify too many cost codes because then you 
may end up having too much detail that can be confusing, or you may end 
This is a job with more 
than one phase, of 
which one has two 
associated cost codes. 
These cost codes are a 
way of tracking the 
income and expense 
solely related to this 
phase. For example, C01 
may be the price of 
fertilizer, and C02 may 
be the subcontractor’s 
pay.
VB.NET PDF - View PDF with WPF PDF Viewer for VB.NET
Tools Tab. Item. Name. Description. Ⅰ. Hand. Pan around the PDF document. Ⅱ. Select. Select text and image to copy and paste using Ctrl+C and Ctrl+V.
search multiple pdf files for text; search text in multiple pdf
C# WPF PDF Viewer SDK to view PDF document in C#.NET
Tools Tab. Item. Name. Description. Ⅰ. Hand. Pan around the PDF document. Ⅱ. Select. Select text and image to copy and paste using Ctrl+C and Ctrl+V.
select text in pdf file; cannot select text in pdf file
Overview
183
up with cost codes that are too specific and unusable. A better way would be 
to have a few generic cost codes to begin with and add some later, if needed.
Cost Types 
Cost types are five categories in which you can classify most of your expenses 
and revenues related to a job. You must apply a cost type to each cost code 
you define and to any phase that does not have a cost code. Peachtree pro-
vides you five options in the 
Cost Types
drop-down list box:
Labor (for work performed by your employees, temporary help, and so 
forth)
Materials (for materials used in any phase of the job)
Equipment (for private or rental equipment used to perform the job)
Subcontractors (for work performed by sub-contract labor)
Other (for miscellaneous expenses such as permits, training costs, trans-
portation, overheads, and so on)
On some jobs reports, you can include the cost type information you 
entered for each cost code used, or cost information for any phase without a 
cost code. This can help determine where and when your money was used 
while completing a certain job. Note that you must select a cost type for all 
phases that do not use cost codes for the purposes of job costing. 
If you have a reason for using two cost types (for example, if you paid a sub-
contractor for bringing materials), you should use the predominant cost type 
for any job transaction you enter. 
Thus, the things to remember while setting up information for job costing 
are:
set up a job ID for each project you undertake
optionally divide jobs into phases with cost types if you want to track 
expenses or revenues by phase
optionally set up cost codes with cost types for tracking more details 
about a job’s phases 
If you use the job costing options as explained, you will be able to:
provide summaries of estimated costs and actual costs paid to date by job
C# WPF PDF Viewer SDK to annotate PDF document in C#.NET
Click to select drawing annotation with default properties. Other Tab. Item. Name. Description. 17. Text box. Click to add a text box to specific location on PDF
select text in pdf; search pdf documents for text
VB.NET PDF - Annotate PDF with WPF PDF Viewer for VB.NET
Click to select drawing annotation with default properties. Other Tab. Item. Name. Description. 17. Text box. Click to add a text box to specific location on PDF
pdf text search; pdf text searchable
Chapter 9
Setting Up Jobs
184
identify cost overruns promptly so corrective actions can be taken
track and review costs of labor, subcontractors, material, equipment and 
other miscellaneous costs
provide historical data to improve your estimating process
How Can You Use Job Costing?
The following describes some strategies for tracking different levels of job 
detail.
Note: If you are using Peachtree Pro Accounting, you will only be able to 
track jobs at one level.
Selecting detail for a job depends on the following factors:
Will you benefit from dividing a job into stages, or phases?
This can be true if your job can be distinctly divided into more than one 
step, or if the job is going to be completed by more than one person such 
as you and a subcontractor.
Will it help you to track cost of materials, labor, equipment, etc.?
Tracking these costs can help you manage your finances better and also 
help you assess what constitutes the largest expense in the job. This can 
directly affect your profit.
Will it help you group certain costs together?
You may be getting paid in installments, in which case all costs incurred 
in one phase of the project will be paid for in one transaction. Or, certain 
costs may be so well integrated that they would always be incurred in 
conjunction, such as rental equipment, regardless of which item is 
rented. In such cases, specific costs do not need to be tracked, only a 
combination of expenses for a certain part of the job.
Once you have determined these basic requirements, you can set up your 
jobs accordingly. The following table shows you how:
Setting Up Job Defaults
185
Remember that you have the option to set up any job with or without 
phases and codes/types. The program treats every job differently, so you can 
select a different combination of job costing elements for each job.
Setting Up Job Defaults
To use job costing, you must first set up some default information that auto-
matically appears in job windows or is automatically used by the system. 
Certain items must be set up prior to setting up jobs.
To open Job defaults, select Maintain, then Default Information, 
then Jobs. 
Custom Fields
You may have additional information that you keep on your jobs, such as 
additional contact people or additional phone numbers, e-mail addresses, 
and so on. If so, you can set up custom fields to track this information. 
Then, when you set up an individual job, on the General tab of the Main-
tain Jobs window, you could enter the appropriate information for that job 
in the custom fields.
If...
Then...
You want to see only gross expenses and revenue 
for a job.
Use job ID only
You want to divide the job into stages and you 
want to group costs collectively under types, but 
want more than one category.
Use phases with cost 
types in your Job
You want to assess the cost of each item, its type/
group, its time of usage in each stage of your 
project.
Use phases, cost types 
and cost codes
Chapter 9
Setting Up Jobs
186
Since Peachtree reports are customizable, you can add any or all of your cus-
tom fields to many of the job reports that Peachtree offers.
Billing and Retainage (Construction only)
In addition, you can use the Billing and Retainage tab to enter default bill-
ing information, such as Retainage Percent, Accounts Receivable and Pay-
able Retainage accounts, and Billing Method. For detailed steps to setting 
up Peachtree to handle retainage, see “Setting Up and Processing Retainage 
(Construction only)” on page 194
.
In job defaults, check the 
Enabled box for the 
Custom Field Labels you 
need; then, enter the 
Label name in the field 
next to it. 
In Maintain Jobs, you can then enter 
information for those labels that is 
specific to that customer. 
Select your Billing Method
and. . .
Select a default retainage
percentage, if any, and
accounts where retainage
amounts will be applied.
Setting Up Job Defaults
187
Billing Methods for Jobs (Construction only)
You have four choices for your Billing Method. Your selection for a job will 
determine how Peachtree handles billing during the Progress Billing routine, 
as well as how estimated revenues are handled for the Percent of Proposal 
billing method
If you select No Progress Billing, Peachtree will not perform any progress 
billings for your jobs.
If you select Percent of Completion, Peachtree will bill for a job based on 
the percent of expenses incurred. The Amount to Bill on a progress bill-
ing invoice will be equal to (Estimated Revenue * Total %) - Previously 
Billed. In this case, the Total % will be the value of Actual Expenses/Esti-
mated Expenses.
If you select Percent of Contract, Peachtree will bill based on a manually 
entered percentage for the estimated job revenue. The Amount to Bill on 
a progress billing invoice will be equal to (Estimated Revenue * Total %) 
- Previously Billed. In this case, the Total % will be the value you enter.
Note: For these two billing methods to work properly in Peachtree, you 
must specify a customer and enter Estimated Expenses and Estimated Reve-
nues for your jobs prior to performing a progress billing.
If you select Percent of Proposal, Peachtree will allow you to bill this job 
based on accepted proposals. In addition, on the Estimated Expenses & 
Revenue tab of the Maintain Jobs window, Peachtree will control the 
estimated revenues based on accepted proposals. You will still be able to 
enter estimated expenses, however. Once you select Percent of Proposal 
and enter open proposals for a job, you should not change the billing 
method for that job, since you will lose data for Estimated Revenues. To 
change the billing method, you must first close any open proposals and 
make notes on what the Estimated Revenues for the job should be.
Labor Burden (Construction only)
The Labor Burden tab provides fields for a default labor burden percentage 
and labor burden accounts. You must fill in these fields if you are going to 
apply labor burden to employee earnings. For more information on labor 
burden and how to set up Peachtree to handle it, see “Setting Up and Apply-
ing Labor Burden (Construction only)” on page 193
.