mvc pdf viewer free : Adding text to pdf form SDK control service wpf azure web page dnn 443-part1238

Page 26
E
E
E
x
x
x
i
i
i
t
t
t
ý
ý
ý
G
G
G
o
o
o
t
t
t
o
o
o
P
P
P
a
a
a
g
g
g
e
e
e
&
&
&
7
7
7
P
P
P
r
r
r
e
e
e
v
v
v
i
i
i
o
o
o
u
u
u
s
s
s
N
N
N
e
e
e
x
x
x
t
t
t
8
8
8
The next mapping step is to draw the basic production processes. To indicate a process we use
process box.   The general  rule of thumb for a door-to-door map is that a process box
indicates a process in which the material is flowing.  Since drawing one box for every single
processing step would make the map unwieldy, we use the process box to indicate one area of
material flow; ideally a continuous flow.  The process box stops wherever processes are
disconnected and the material flow stops.
For example, an assembly process with several connected workstations, even if there is some WIP inventory
between stations, would be drawn as one process box. But if one assembly process is disconnected from the next
assembly process downstream, with inventory stagnating, accumulating, and being moved in batches between
them, then two process boxes would be used.
Likewise, a machining line of say 15 sequential machining operations, such as drilling, tapping, etc., that are
connected by a transfer line between each operation would be shown with only one process box on the door-to-
door map, even if some inventory accumulates between machines. (If a detailed process-level map is made for the
machining area alone, then you would draw one box for every individual machining step.) But if there are
distinctly separate machining processes in the plant, with inventory between them stagnating and transferred in
batches, then each gets its own process box.
Adding text to pdf form - insert text into PDF content in C#.net, ASP.NET, MVC, Ajax, WinForms, WPF
XDoc.PDF for .NET, providing C# demo code for inserting text to PDF file
how to insert text into a pdf with acrobat; adding a text field to a pdf
Adding text to pdf form - VB.NET PDF insert text library: insert text into PDF content in vb.net, ASP.NET, MVC, Ajax, WinForms, WPF
Providing Demo Code for Adding and Inserting Text to PDF File Page in VB.NET Program
how to insert text box in pdf document; adding text to pdf in reader
Page 27
E
E
E
x
x
x
i
i
i
t
t
t
ý
ý
ý
G
G
G
o
o
o
t
t
t
o
o
o
P
P
P
a
a
a
g
g
g
e
e
e
&
&
&
7
7
7
P
P
P
r
r
r
e
e
e
v
v
v
i
i
i
o
o
o
u
u
u
s
s
s
N
N
N
e
e
e
x
x
x
t
t
t
8
8
8
Material flow is drawn from left to right on the bottom half of the map in the order of
processing steps; not according to the physical layout of the plant.  At Acme
Stamping we find six processes in the steering bracket material flow, which occur in
the  following order:
Ø
Stamping
Ø
Spot-Welding Workstation 1
Ø
Spot-Welding Workstation 2
Ø
Assembly Workstation 1
Ø
Assembly Workstation 2
Ø
Shipping
VB.NET PDF Text Box Edit Library: add, delete, update PDF text box
Link: Edit URL. Bookmark: Edit Bookmark. Metadata: Edit, Delete Metadata. Form Process. Provide VB.NET Users with Solution of Adding Text Box to PDF Page in VB
how to insert text box in pdf; how to enter text in a pdf document
VB.NET PDF Page Insert Library: insert pages into PDF file in vb.
Support adding PDF page number. Offer PDF page break inserting function. DLLs for Adding Page into PDF Document in VB.NET Class. Add necessary references:
add text to pdf in preview; add text pdf acrobat professional
Page 28
E
E
E
x
x
x
i
i
i
t
t
t
ý
ý
ý
G
G
G
o
o
o
t
t
t
o
o
o
P
P
P
a
a
a
g
g
g
e
e
e
&
&
&
7
7
7
P
P
P
r
r
r
e
e
e
v
v
v
i
i
i
o
o
o
u
u
u
s
s
s
N
N
N
e
e
e
x
x
x
t
t
t
8
8
8
Each of Acme’s spot-welding and assembly workstations are separate
processes because, as you can see in the overhead view of the plant (inside the
back cover of this workbook), products do not move in a flow from one to the
next. Inventory is moved in baskets and stagnates between the workstations.
On the map, each of these processes is represented by a process box, from left
to right on the bottom half of the page.
Note:
Unlike the Acme Stamping example, many value streams have multiple flows
that merge.  Draw such flows over one another as shown here.  But don’t try to
draw every branch if there are too many.  Choose the key components first,
and get the others later if you need to.
As you walk this flow on the shop floor, you need to collect data that is
important for deciding what the future state will be. So a data box is drawn
under each process box. After mapping several current and future states you
will know instinctively what process information you need. The list at right
will help you get started.
To help you get started here is a
list of typical process data:
ü
C/T (cycle time)
ü
C/O (changeover time)
ü
uptime (on-demand
machine uptime)
ü
EPE (production batch
sizes)
ü
number of operators
ü
number of product
variations
ü
pack size
ü
working time (minus
breaks)
ü
scrap rate
C# PDF Text Box Edit Library: add, delete, update PDF text box in
Provide .NET SDK library for adding text box to PDF document in .NET WinForms application. Adding text box is another way to add text to PDF page.
how to add text box in pdf file; adding text to pdf in preview
VB.NET PDF Library SDK to view, edit, convert, process PDF file
Support adding protection features to PDF file by adding password, digital signatures and redaction feature. Various of PDF text and images processing features
how to insert text in pdf using preview; adding text to pdf form
Page 29
E
E
E
x
x
x
i
i
i
t
t
t
ý
ý
ý
G
G
G
o
o
o
t
t
t
o
o
o
P
P
P
a
a
a
g
g
g
e
e
e
&
&
&
7
7
7
P
P
P
r
r
r
e
e
e
v
v
v
i
i
i
o
o
o
u
u
u
s
s
s
N
N
N
e
e
e
x
x
x
t
t
t
8
8
8
At Acme Stamping, we have the following information to record in the data box under each processing step: the
cycle time (time that elapses between one part coming off the process to the next part coming off, in seconds); the
changeover time to switch from producing one product type to another (in this case switching between left-drive
and right-drive brackets); the number of people required to operate the process (which can be indicated with an
operator icon as shown); the available working time per shift at that process (in seconds, minus break, meeting,
and cleanup times); and machine uptime information.
In the “stamping” data box we also show EPE, which stands for “every part every ______” and is a measure of
production batch size.  For example, if you change over to produce a particular part once every three days, then the
production batch size is about three days worth of parts.  Notice that the cycle time is the time between parts
coming off the end of the process and not the total cycle time it takes one part to move through all process steps.
Also notice that available work time divided by cycle time multiplied by uptime percent is a measure of current
process capacity, if no changeovers are made.
Note
Value stream mapping uses seconds as the time unit for cycle times, takt times, and available working times. Many
of you have been taught to use decimal minutes to measure time, but that unit is unnecessarily complicated. Value
stream mapping is a tool everyone should be able to use.
As you walk the product’s material flow you will find places where inventory accumulates.
These points are important to draw on the current state map because they tell you where the flow
is stopping.  We use a “warning triangle” icon to capture the location and amount of inventory.
(If the same inventory accumulates in more than one location between two processes, draw a
triangle for each location.)
C# PDF Annotate Library: Draw, edit PDF annotation, markups in C#.
Provide users with examples for adding text box to PDF and edit font size and color in text box field in C#.NET program. C#.NET: Draw Markups on PDF File.
how to input text in a pdf; how to add text fields to a pdf
C# PDF insert image Library: insert images into PDF in C#.net, ASP
Insert images into PDF form field. To help you solve this technical problem, we provide this C#.NET PDF image adding control, XDoc.PDF for .NET.
add text to pdf file online; how to add text to a pdf document using acrobat
Page 30
E
E
E
x
x
x
i
i
i
t
t
t
ý
ý
ý
G
G
G
o
o
o
t
t
t
o
o
o
P
P
P
a
a
a
g
g
g
e
e
e
&
&
&
7
7
7
P
P
P
r
r
r
e
e
e
v
v
v
i
i
i
o
o
o
u
u
u
s
s
s
N
N
N
e
e
e
x
x
x
t
t
t
8
8
8
VB.NET PDF Text Add Library: add, delete, edit PDF text in vb.net
Edit URL. Bookmark: Edit Bookmark. Metadata: Edit, Delete Metadata. Form Process. Professional VB.NET Solution for Adding Text Annotation to PDF Page in
adding text to a pdf in preview; how to add text to a pdf file
C# PDF Page Insert Library: insert pages into PDF file in C#.net
By using reliable APIs, C# programmers are capable of adding and inserting (empty) PDF page or pages from various file formats, such as PDF, Tiff, Word, Excel
adding text to pdf reader; how to enter text into a pdf form
Page 31
E
E
E
x
x
x
i
i
i
t
t
t
ý
ý
ý
G
G
G
o
o
o
t
t
t
o
o
o
P
P
P
a
a
a
g
g
g
e
e
e
&
&
&
7
7
7
P
P
P
r
r
r
e
e
e
v
v
v
i
i
i
o
o
o
u
u
u
s
s
s
N
N
N
e
e
e
x
x
x
t
t
t
8
8
8
At Acme Stamping there is raw material inventory, finished goods inventory, and inventory between each process.
The observed amount of inventory is recorded below the triangle, in quantity and/or time.
Page 32
E
E
E
x
x
x
i
i
i
t
t
t
ý
ý
ý
G
G
G
o
o
o
t
t
t
o
o
o
P
P
P
a
a
a
g
g
g
e
e
e
&
&
&
7
7
7
P
P
P
r
r
r
e
e
e
v
v
v
i
i
i
o
o
o
u
u
u
s
s
s
N
N
N
e
e
e
x
x
x
t
t
t
8
8
8
Second View of the Current-State Map with all Processes,
Data Boxes, and Inventory Triangles
Page 33
E
E
E
x
x
x
i
i
i
t
t
t
ý
ý
ý
G
G
G
o
o
o
t
t
t
o
o
o
P
P
P
a
a
a
g
g
g
e
e
e
&
&
&
7
7
7
P
P
P
r
r
r
e
e
e
v
v
v
i
i
i
o
o
o
u
u
u
s
s
s
N
N
N
e
e
e
x
x
x
t
t
t
8
8
8
After Acme’s last assembly workstation, steering brackets in trays are taken to a storage
area (triangle icon).  They are then staged in the shipping area according to the daily
shipping schedule and delivered daily by truck to the customer’s assembly plant. A truck
icon and a broad arrow indicate movement of finished goods to the customer.  (Create
rail or air freight icons if you need them.)
At the other end of the map, we’ll represent the steel supplier with another factory icon.
We use the same truck icon and broad arrow to show movement of material from the
supplier to Acme. The steel supplier receives a weekly order from Acme and ships twice a
week.  We record in a data box that the supplier’s pack size is a 500 foot roll of coiled
steel. (In other words, the supplier cannot deliver less than a full coil but can deliver any
number of full coils, as requested.) Once at Acme, the coil steel is taken to a storage area,
as shown by the inventory triangle.
Note
Do not map every purchased part in your product family. Just draw the flow for one or two
main raw materials. Presentation of all purchased parts is best shown on a process-level
layout diagram.
Page 34
E
E
E
x
x
x
i
i
i
t
t
t
ý
ý
ý
G
G
G
o
o
o
t
t
t
o
o
o
P
P
P
a
a
a
g
g
g
e
e
e
&
&
&
7
7
7
P
P
P
r
r
r
e
e
e
v
v
v
i
i
i
o
o
o
u
u
u
s
s
s
N
N
N
e
e
e
x
x
x
t
t
t
8
8
8
Third View of the Current-State Map
Showing the Material Flow
Page 35
E
E
E
x
x
x
i
i
i
t
t
t
ý
ý
ý
G
G
G
o
o
o
t
t
t
o
o
o
P
P
P
a
a
a
g
g
g
e
e
e
&
&
&
7
7
7
P
P
P
r
r
r
e
e
e
v
v
v
i
i
i
o
o
o
u
u
u
s
s
s
N
N
N
e
e
e
x
x
x
t
t
t
8
8
8
information flow
But how does the Acme plant, each process within the plant, and the
steel coil supplier know how much to make and when?  Let’s add the
second aspect of our value stream map: the information flow.  To do
this we’ll need a few more icons and arrows, in particular a narrow line
to show information flows.  This line is modified with a lightening-like
wiggle when the information flows electronically (via electronic data
interchange) rather than by paper.  A small-box icon or node is used to
label or describe different information-flow arrows.
electronic
information flow
Information flow is drawn from right to left in the top half of the map space.  In our Acme Stamping
example, we draw the flow of information back from the State Street Assembly Plant to Acme’s
Production Control department and from there to Acme’s steel-coil supplier.  Notice there are separate
lines for the forecasts and daily orders, as these are different information flows.
The Acme production control department is drawn with a process box, including the note that Acme uses a
computerized Materials Requirements Planning system (MRP) to schedule the shop floor.  Acme production
control collects information from customers and the shop floor, consolidates and processes it, and sends specific
instructions to each manufacturing process about what it should produce and when.  Production control also sends
a daily shipping schedule to the shipping department.
“go see”
scheduling
Note
In your shop floor mapping efforts you may find information flows more complicated than at Acme
Stamping. For example, in many shops supervisors count inventory and make schedule adjustments
based on such information.  (We call this “go see” scheduling and show it with an eyeglass icon.)
Try to incorporate these “informal” scheduling processes into your map using the same information
arrows and nodes. If it looks messy, that’s probably because it is!
Documents you may be interested
Documents you may be interested