open pdf from windows form c# : How to delete text in pdf acrobat control software platform web page windows .net web browser ReferenceManual_ApplicationsMaster_(English)_542-part1756

Reference Manual ApplicationsMaster 
Page  13 
2.3. Loading / Saving Project Formats 
It is possible to install different versions of Inpho 
software on one computer. Thus, it is important to 
know  that  newer  project  file  formats  are  not 
compatible with the older versions! That is to say, 
it is not  possible  to open project files of  version 
5.0  or  higher  in  version  MATCH-AT/T  4.0.x  or 
lower. Project files of version 4.0.x can be opened 
in  version  5.0  or  higher.  However,  due  to  a 
change in the project file format it is necessary to 
import  the  camera  file  during  the  conversion 
process.  
A major difference to the project file format of version 4.0.x or older consists in 
the  treatment  of  the  camera  data.  In  contrast  to  the  previous  procedure  of 
having a separate camera file, all information belonging to the project camera(s) 
is directly stored in the project file. The external camera file does no longer exist 
when working with the ApplicationsMaster 5.x
In order to ensure compatibility with older software versions, ApplicationsMaster 
5.2 provides the Save AS... function which offers the possibility to save a 
project either in the file format utilized by version 4.0.x (prj. V 1.5). 
Note: Starting with the version ApplicationsMaster 5.3 it is not anymore possible 
to save projects in older project formats ! 
Important: The project file does not contain tie point coordinates anymore. They 
are now stored in a separate file with the extension XPF. This allows a much 
faster handling of project files for those applications that do not need tie points. 
Project files created with former versions will be opened and further processed 
in  ApplicationsMaster  V5.3.  However,  some  applications  convert  them 
automatically.  All  tie  points  and  adjusted  coordinates  are  transferred  to  the 
external XPF file. There is no possibility to convert the project files back 
Formats of other system suppliers (ZI imaging, DAT/EM Summit Evolution, BAE 
SocetSet projects) can be imported using the "Convert Project" function from 
the Tools menu.  
Furthermore,  the  import  of  orientations  from  AEROSYS,  ASCII,  Bingo,  Bluh, 
PATB or PEX 2 as well as of image coordinates from ASCII, Bingo, PATB or ZI 
imaging  is  possible  by  using  interfaces  integrated  in  the  “
Project  Editor
“ 
Additionally, Inpho   project files  can  be merged by  using  the  "Inpho Project 
Merge" function from the Tools menu. 
To load or save projects the Project menu shows the corresponding functions. 
Inpho project files may be loaded either with the Open function or by selecting a 
project from the Recently Opened Projects list.  
How to delete text in pdf acrobat - delete, remove text from PDF file in C#.net, ASP.NET, MVC, Ajax, WinForms, WPF
Allow C# developers to use mature APIs to delete and remove text content from PDF document
how to erase text in pdf; how to delete text from a pdf in acrobat
How to delete text in pdf acrobat - VB.NET PDF delete text library: delete, remove text from PDF file in vb.net, ASP.NET, MVC, Ajax, WinForms, WPF
VB.NET Programming Guide to Delete Text from PDF File
how to delete text in pdf file online; delete text pdf acrobat
Reference Manual ApplicationsMaster 
Page  14 
Opening old project formats earlier than V.5.0  
As  already  mentioned,  old  project  files  can  be  opened  in  newer  versions. 
However, there are important things to be done to work with old files in new 
versions: 
Versions earlier than 5.0 stored the data of all known cameras in a central 
camera  file,  which  has  been  located  in  the  installation  directory  of  the 
program. From version 5.0 on, the data of all project relevant cameras are 
directly  stored  in the  project  file  (*.prj). During  import a  window  appears 
which  will  inform  that  the  format  of  the selected  project  file  is  no longer 
supported. Therefore it is necessary to convert the project file to a new file 
format. 
Having selected an old project file in the Open Project File dialog, you will 
be  asked  to  save  the  file  under  a  different  name  in  the  5.0  format.  
Additionally,  the  import  wizard  asks  you  to  specify  the  location  of  the 
corresponding camera file, which is being integrated into the new project 
file. 
The old project file will in any case be converted to the new format, if it is 
saved. Therefore it cannot be used any longer in earlier versions! 
Note: It is not possible anymore to save current project files in former formats 
(from version 5.3 on). 
SAVE AS 
The Save As...  function  is  used  to  store  any  complete  project  environment 
under a different name. Together with the saved new project file, the parameter 
file (*.xpf, *.cnt, *.xml, *.bgd ) name and all links to output files will be converted.  
NoteFrom version 5.3 on the Save AS... function cannot be used anymore to 
store a new project file (version 5.0) under a different project format compatible 
to previous software versions (4.0.x).  
.NET PDF Document Viewing, Annotation, Conversion & Processing
Redact text content, images, whole pages from PDF file. Annotate & Comment. Edit, update, delete PDF annotations from PDF file. Print.
pdf text remover; how to delete text in pdf document
C# PDF Converter Library SDK to convert PDF to other file formats
Allow users to convert PDF to Text (TXT) file. can manipulate & convert standard PDF documents in other external third-party dependencies like Adobe Acrobat.
how to remove highlighted text in pdf; delete text pdf preview
Reference Manual ApplicationsMaster 
Page  15 
2.4. Analyzing Results 
2.4.1.  Project Definition Check 
After setting up a project as well as after updating an existing one, a check for 
consistency must be performed to ensure a valid project definition for the next 
processing steps. Therefore, the “
Project Editor
“ accomplishes an automatic 
project inspection before saving a project to the hard disk.  
The 
Project Validator" pops up with warnings and / or error messages if an 
inconsistency (e.g. a missing camera definition) has been detected.  With the 
aid of this information, possible erroneous arrangements might be reviewed and 
corrected.  Although  the  possibility  exist
s  to  close  the  “
Project  Validator
“  in 
order  to  save  the  project  without  removing  inconsistent  definitions,  it  is  not 
recommended disregarding these messages.     
Apart from the internal inspection, the 
Check…
button l
aunches the “
Project 
Validator
” to examine the project at any time.
Project Validator 
The left tree view shows elements and groupings that are checked. 
The  digits  behind those  elements  indicate the number  of inconsistencies 
detected for this element. Select one of those elements and an explanation 
of the problem will be displayed in the table on the right. 
To see  a more detailed  explanation  of  the problem  click  on the Details 
button. 
The  "Project Validator"  only  shows  failed  integrity  checks.  It  does  not 
correct  the  project.  Corrections  have  to  be  done  in  the  corresponding 
"Project Editor" dialogs. 
Most of the detected problems are incomplete definitions of elements. Also 
time  stamps  are  analyzed,  e.g.  if  there  is  an  interior  orientation  that  is 
younger than an exterior orientation. 
C# powerpoint - PowerPoint Conversion & Rendering in C#.NET
documents in .NET class applications independently, without using other external third-party dependencies like Adobe Acrobat. PowerPoint to PDF Conversion.
delete text from pdf online; erase pdf text online
C# Word - Word Conversion in C#.NET
Word documents in .NET class applications independently, without using other external third-party dependencies like Adobe Acrobat. Word to PDF Conversion.
delete text pdf files; delete text pdf document
Reference Manual ApplicationsMaster 
Page  16 
Particularly  interesting  is  the Kappa value integrity  check  of  the  strip 
definition. Here, the existing orientation parameters of the individual photos 
(e.g. the approximate values they were initialized with) are compared to the 
kappa values that are computed from the strip azimuth. If the kappa values 
differ more than 18deg this message appears. 
This might for example happen whenever the photos were not initialized with 
orientation  parameters, which  is  necessary  for a  successful automatic tie 
point  extraction.  So  go  back  to  the  "Photos"  dialog  and  initialize  the 
orientations (Initialize EO...) from the "Edit" dialog. 
Another  reason,  if  the  photos  were  already  initialized  and seem  to  show 
correct  kappa  values,  might  be  a  wrong  strip  direction.  Typically,  the 
computed  strip  azimuth  will  differ  about  180deg  from  the  photos  kappa 
values. So go back to the "Strips" dialog and reverse the strip direction for 
the incorrect strip. Furthermore, a wrong camera mount rotation might cause 
this conflict. Check the rotation in the “
Camera Editor
”.
If the photos were initialized with IMU data and the strip direction is correctly 
specified, a kappa integrity failure might indicate a wrong kappa definition in 
your  IMU  data  (typically  +180deg). Check the data  and  if  necessary  add 
+180  deg  to  the  kappa  values  in  your  IMU  file.  Re-import  the  file  and 
reinitialize the photos EO parameters. 
The validation checks should of course not show any errors before going to 
the next steps. Warnings may be acceptable, but should be checked. 
2.4.2.  Check Image Pyramids 
The  availability  of  a  sufficient  set  of  image  pyramid  levels  is  checked 
automatically  by  the  application.  However,  to  check  the  presence  of  image 
pyram
id levels, launch the “
Image Commander
from the Basics menu of the 
ApplicationsMaster
” window.
The column Overviews indicates the number of image pyramid (resolution) 
levels already available for each image. 
Inpho  software  generates automatically pyramid levels until the coarsest 
resolution  level  under-runs  a  threshold  of  30*30  pixels.  The  number  of 
pyramid levels depends on the size of the original image and might vary 
slightly from project to project. 
Working with tiled and uncompressed images results in achieving the best 
navigation and calculation performance. 
VB.NET PDF: How to Create Watermark on PDF Document within
create a watermark that consists of text or image (such And with our PDF Watermark Creator, users need no external application plugin, like Adobe Acrobat.
remove text watermark from pdf online; how to delete text in pdf converter professional
C# Windows Viewer - Image and Document Conversion & Rendering in
standard image and document in .NET class applications independently, without using other external third-party dependencies like Adobe Acrobat. Convert to PDF.
remove text from pdf online; how to delete text in pdf acrobat
Reference Manual ApplicationsMaster 
Page  17 
2.4.3.  Check Interior Orientation 
The “
Interior orientation
” (
IO) module computes the transformation parameters 
from  the  pixel  coordinate  system  (row,  column)  into  the  image  coordinate 
system (x, y).  It therefore establishes a basis that all following processes are 
referring to. Only a good quality of the interior orientation can produce a high 
accuracy in the later steps.  
Determining  the  interior  orientation  is  only  required  for  digitized  analogue 
images because the relationship between pixel and image coordinate system is 
directly given for digital cameras from the sensor parameters. 
In the following, find the necessary steps to reliably analyze the results of the 
interior orientation. 
The Scan Position (rotation  of the  image coordinate system of the  scanned 
image on the computer screen) can automatically be computed for Leica RC 
C# Excel - Excel Conversion & Rendering in C#.NET
Excel documents in .NET class applications independently, without using other external third-party dependencies like Adobe Acrobat. Excel to PDF Conversion.
remove text from pdf preview; delete text from pdf file
VB.NET PowerPoint: VB Code to Draw and Create Annotation on PPT
other documents are compatible, including PDF, TIFF, MS free hand, free hand line, rectangle, text, hotspot, hotspot more plug-ins needed like Acrobat or Adobe
delete text pdf acrobat professional; pdf editor delete text
Reference Manual ApplicationsMaster 
Page  18 
cameras. Other cameras need this parameter being correctly specified before 
starting  the  automatic  fiducial  mark  measurement.  If  the  scan  position  was 
changed automatically, it will be highlighted with a yellow background. Check, if 
the detected rotation is ok. If necessary, use the manual orientation dialog to 
analyze this. 
This dialog shows for RC and RMK-Top cameras an index that corresponds to 
the index printed on the photos (as specified in the "Camera Editor"). 
Thresholds for  check criteria  can  be  specified in  the "Settings" dialog  called 
from the IO menu of the main window. 
Sigma0 should at least correspond to 1/3 
pixel 
Max  Difference  of  Pixel  Size (scale!) 
between  given  and  computed  pixel  size 
should be less than 0.05 um. 
The Number of Fiducial Marks should 
correspond  to  the  number  given  in  the 
camera definition (automatic). 
If one  of  the  specified  check  criteria 
has  not  been  reached,  the  status of 
the  interior  orientation  shows  a 
"failed" icon. 
In this case, open the manual interior orientation to check the measurements. 
The failed status is only a warning. Computed interior orientation will be stored 
anyway. 
Reference Manual ApplicationsMaster 
Page  19 
A sigma0 larger than 1/3 pixel 
Might result from  a bad  (old) camera  calibration  or  from a  missing  (old) 
geometric scanner calibration. Check this, if all sigma values are too bad. 
Also bad sigma values might result from bad fiducial measurements; check 
the manual interior orientation to take a look onto the measurements. 
 third  reason  for  bad  sigma  values  is  an  incorrect  scan  position.  This 
means, not the correct fiducial marks were measured (e.g. fiducial mark 1 
was measured at position 2). Use the manual interior orientation to check 
this.  This  dialog  shows  for  RC  and  RMK-Top  cameras  an  index  that 
corresponds to the index printed on the photos (as specified in the "Camera 
Editor"). 
In the manual interior orientation dialog, the largest residual is displayed in 
red. 
The RMS value displayed is a little bit better than the sigma0 because it 
does not consider the redundancy. Sigma0 should correspond with app. 1/3 
pixel.  
Sigma0=SQRT ([vv] / (n-u)) r.m.s = root mean square = SQRT ([vv] / n) 
v=residual, n=number of observations, u=unknowns, [vv]=square sum of residuals.
If not all fiducial marks were automatically measured 
A  reason might be that  the scanned  image  does  not contain the fiducial 
mark. If possible, re-scan the image. 
Because the automatic fiducial mark measurement is counting pixels (with 
the specified pixel size) to locate the search area for a fiducial mark, the 
pixel  size  has to be  set  correctly.  No  fiducial mark can automatically  be 
measured unless the correct value is specified. If you are not sure about the 
pixel  size  of  the  images,  perform  one  interior  orientation  manually.  The 
scale computed equals the pixel size! 
If the template does not fit to the fiducial marks, edit the template using the 
"Template Editor". For old cameras like RMK-A, where fiducial marks are 
not  clearly defined  (dots  are  not  of  equal  size  throughout  all  images),  it 
might only be possible to measure the interior orientation manually. 
Especially for older cameras (RMK-A), it might be better to use a smaller 
Size of the Matching Window e.g. about 10mm (see "Settings" dialog), 
not  to  be  in  danger  of  measuring  the  fiducial  marks  somewhere  in  the 
image content. 
Another reason is that fiducial marks appear to dark in the image. Either re-
scan  the  images  or  try  a  different Color Channel selectable  from  the 
"Settings" dialog. 
If  negative  images  were  used,  no  fiducial  mark  can  automatically  be 
measured unless Negative Images is selected from the "Settings" dialog. 
If images are scanned with a large frame, it might be possible, that the search 
area is no longer in the correct place. 
Reference Manual ApplicationsMaster 
Page  20 
In this case select the Use Initial Transformation option from the "Settings" 
dialog. Measure one interior orientation manually; the automatic fiducial mark 
measurement will use its results as a template for the rest of the images. This is 
also applicable with images that have a slight rotation. It is assumed that all 
images have the same effect!  
To output the matching windows, activate “
Output Matching Windows
”. For all 
fiducial marks, the search area will be captured as small tiff files to check, if the 
fiducial marks are inside the search area. 
If  fiducial marks are  looking like  the  one  displayed  below (halo), it  might be 
necessary  to  change  the  parameter Threshold For Fiducial Mark 
Identification. The parameter defines the percentage of the histogram that is 
used for the background. For extreme examples like here a value of 50% or 
even more would be suitable. 
Search area 
correct               
Halo around fm 
min. 50% 
Bright fm 
10% background 
Dark fm 
10% background 
Reference Manual ApplicationsMaster 
Page  21 
2.5. Import, Export, Convert, Merge 
Inpho software has a manifold of interfaces to support project files of different 
formats. It is possible to read in older Inpho project file formats. Imports and 
exports help to integrate our products into existing workflows with other system 
components of different suppliers. Also, the "Project Converter" may be used, 
to convert a Z/I imaging (Intergraph), BAE SocetSet or DAT/EM Summit project 
working environment into the Inpho project format. 
The Inpho project merging function may be used to spread large AT projects 
onto a  wider  range  of  workstations to  work  simultaneously on  different  sub-
blocks. Those sub-project files  can  be later merged to  one  file  to produce a 
homogeneous result. 
2.5.1.  Merging Inpho Projects 
Especially if very large projects are to be 
processed,  it might  be  an  option,  to  use 
several  licenses  of  "MATCH-AT"  on 
different  workstations  to  divide  the 
complete project into several sub-projects.  
Those  projects  can  then  be  processed 
separately with the full computation power 
of  one  workstation.  However,  to  get  a 
homologous  result  and  the  best 
distribution of small errors, it is obligatory 
to  have  one  common  block  adjustment  in  the  end.  If  the  sub-projects  were 
defined with overlap, those projects can be merged to one complete file. This 
complete block should then be post-processed as one unit. 
Important: Automatically measured points will be renamed when merging 
projects,  to  avoid  numbering  conflicts.  Manual  measurements  (control  point 
measurements and manual tie point measurements) will not be renamed. So be 
careful not to use the same point ID's especially for manual tie points in different 
projects  to  be  merged.  Recommendation:  use  a  sub-block  ID  for  each 
measurement, e.g. "block1_12345". 
To merge projects, use the "Merge" tool, called from the  
Tools > Merge > Project menu of the main window of ApplicationsMaster. 
2.5.2.  Convert Images 
ApplicationsMaster allows lots of possiblities 
to convert TIFF images. Selecting  
TOOLS > Convert > Image opens a window 
where the images can be selected via 
directory or using a project. Then the 
conversion options can be selected as 
Overview Extraction (all / single / selected 
overviews) 
Colorimetry (grayscale, grayscale 
Reference Manual ApplicationsMaster 
Page  22 
channel, RGB channel) 
Organization (scanlined/rows per strip, tiled/tile width, create BigTIFF) 
Compression (convert to uncompressed, convert to TIFF JPG, factor) 
Image Depth  (convert to 8bit, convert to 16bit) 
2.5.3.  Convert Intergraph / BAE / DAT/EM 
Projects 
 complete  Z/I  imaging  (Intergraph),  BAE 
SocetSet  or  DAT/EM  Summit  project 
environment  can  be  converted  into  the 
Inpho project format with the "Inpho Project 
Converter". To use the converter, launch it 
from the Tools menu of the main window of 
the ApplicationsMaster. 
Distortion  grids  created  with  Z/I 
imaging  software  might  be 
converted using the import function 
integrated  in  the  camera  editor. 
This  grid  files  are  currently  not 
taken  into  account  during  the 
project conversion. 
For more information about how to 
convert  projects,  refer  to  the 
chapter “
Project Converter
” of this documentation.
2.5.4.  Project File Exports 
To be able to use the Inpho project in 
a variety of products of other system 
suppliers, Inpho  provides  several 
export interfaces to those systems.  
There are interfaces to: 
Different  adjustment  software 
products, such as: 
PATB (As most of other software packages are able to at least import 
PATB  files,  this  format  may  be  considered  being  a  stable  exchange 
format). GNSS observations are not exported! 
BINGO 
BLUH 
Pex 2 
Documents you may be interested
Documents you may be interested