pdf viewer in asp.net using c# : Copy and paste image into pdf SDK software service wpf winforms windows dnn sf424_rr_guide_general_adobe_verb9-part1120

PHS SF424 (R&R) Adobe Forms Version B Application Guide 
Part I: Instructions for Preparing and Submitting the Application 
86 
Field Name 
Instructions 
5. Subawards/Consortium/ 
Contractual Costs 
List total funds requested for 1) all subaward/consortium organization(s) 
proposed for the project and 2) any other contractual costs proposed for 
the project. 
This line item should include both direct and indirect costs for all 
subaward/consortium organizations. Contractual costs for support 
services, such as the laboratory testing of biological materials, 
clinical services, or data processing, are occasionally sufficiently 
high to warrant a categorical breakdown of costs. When this is the 
case, provide detailed information as part of the budget 
justification. 
NIH policy provides for exclusion of consortium/contractual 
F&A costs when determining if an applicant is in compliance 
with a direct cost limitation.  Please see the Supplemental 
Instructions, Part III, Section 1.1 for additional information 
regarding this exclusion Policy 
6. Equipment or Facility 
Rental/User Fees 
List total funds requested for equipment or facility rental/user fees. In the 
budget justification, identify each rental user fee and justify. 
7. Alterations and 
Renovations 
List total funds requested for alterations and renovations. In the budget 
justification, itemize by category and justify the costs of alterations and 
renovations including repairs, painting, removal or installation of 
partitions, shielding, or air conditioning. Where applicable, provide the 
square footage and costs.  
Under certain circumstances the public policy requirements that 
apply to construction activities may also apply to A&R activities. 
Please refer to the NIH Grants Policy Statement section on 
Construction Grants – Public Policy Requirements and 
Objectives” for more information. 
Note, costs for any Alterations and Renovations (A&R) were 
previously unallowable on applications from foreign institutions, 
international organizations and domestic applications with foreign 
subawards. However, an HHS policy change now allows for 
minor A&R (<$500,000) on these applications. 
When requesting minor A&R costs under this policy, please 
provide detailed information on the planned A&R in the budget 
justification. 
8-10 Other 
Add text to describe any “other” direct costs not requested above. Use the 
budget justification to further itemize and justify. 
List total funds requested for items 8-10 “Other.” 
Use lines 8-10 for such costs as patient care and tuition remission. 
If requesting patient care costs, request inpatient and outpatient 
costs separately using lines 8 and 9. 
Copy and paste image into pdf - copy, paste, cut PDF images in C#.net, ASP.NET, MVC, Ajax, WinForms, WPF
Detailed tutorial for copying, pasting, and cutting image in PDF page using C# class code
how to copy pictures from pdf; how to copy picture from pdf
Copy and paste image into pdf - VB.NET PDF copy, paste image library: copy, paste, cut PDF images in vb.net, ASP.NET, MVC, Ajax, WinForms, WPF
VB.NET Tutorial for How to Cut or Copy an Image from One Page and Paste to Another
copy a picture from pdf to word; how to copy pictures from pdf to powerpoint
PHS SF424 (R&R) Adobe Forms Version B Application Guide 
Part I: Instructions for Preparing and Submitting the Application 
87 
Field Name 
Instructions 
Total Other Direct Costs 
Total Funds requested for all other direct costs. 
Special Instructions for Patient Care Costs 
If inpatient and/or outpatient costs are requested, provide the names of any hospitals and/or 
clinics and the amounts requested for each in the budget justification. 
State whether each hospital or clinic has a currently effective DHHS-negotiated research patient 
care rate agreement and, if not, what basis is used for calculating costs. If an applicant does not 
have a DHHS-negotiated rate, the PHS awarding component can approve a provisional rate. 
Indicate, in detail, the basis for estimating costs in this category, including the number of patient 
days, estimated cost per day, and cost per test or treatment. If both inpatient and outpatient costs 
are requested, provide information for each separately. If multiple sites are to be used, provide 
detailed information by site. 
Include information regarding projected patient accrual for the project/budget periods and relate 
this information to the budget request for patient care costs. If patient accrual is anticipated to be 
lower at the start or during the course of the project, plan budget(s) accordingly. 
Provide specific information regarding anticipated sources of Other Support for patient care costs, 
e.g., third party recovery or pharmaceutical companies. Include any potential or expected 
utilization of General Clinical Research Centers. 
G. Total Direct Costs (A through F) 
Total Funds requested for all direct costs. 
H. Indirect Costs 
Field Name 
Instructions 
Indirect Cost Type 
Indicate the type of cost (e.g., Salary & Wages, Modified Total Direct 
Costs, or Other [explain]). Also indicate if Off-site. If more than one 
rate/base is involved, use separate lines for each. If you do not have a 
current indirect rate(s) approved by a Federal agency, indicate, “None—
will negotiate” and include information for a proposed rate. Use the 
budget justification if additional space is needed. 
Indirect Cost Rate (%) 
Indicate the most recent indirect cost rate(s) (also known as Facilities & 
Administrative Costs [F&A]) established with the cognizant Federal 
office, or in the case of for-profit organizations, the rate(s) established 
with the appropriate agency. If you have a cognizant/oversight agency and 
are selected for an award, you must submit your indirect rate proposal to 
that office for approval. If you do not have a cognizant/oversight agency, 
contact the awarding agency. 
If this field does not allow a figure greater than 100% to be 
entered, use two lines to show the entire calculation. This field 
should be entered using a rate such as “55.5.” 
C# PDF Page Extract Library: copy, paste, cut PDF pages in C#.net
Ability to copy selected PDF pages and paste into another PDF file. Copy three pages from test1.pdf and paste into test2.pdf.
copy image from pdf to; how to copy a picture from a pdf
C# PDF Image Extract Library: Select, copy, paste PDF images in C#
How to C#: Extract Image from PDF Document. List<PDFImage> allImages = PDFImageHandler. ExtractImages(page); C#: Select An Image from PDF Page by Position.
copy images from pdf file; copy pictures from pdf to word
PHS SF424 (R&R) Adobe Forms Version B Application Guide 
Part I: Instructions for Preparing and Submitting the Application 
88 
Field Name 
Instructions 
Indirect Cost Base ($) 
Enter the amount of the base for each indirect cost type. 
Funds Requested 
Enter funds requested for each indirect cost type. 
Total Indirect Costs 
Total Funds requested for indirect costs. 
Cognizant Federal Agency  Enter the name of the cognizant Federal Agency, name and phone number 
of the individual responsible for negotiating your rate. If no cognizant 
agency is known, enter “None.” 
I. Total Direct and Indirect Institutional Costs (G + H) 
Total Funds requested for direct and indirect costs. 
J. Fee 
Generally, a fee is not allowed on a grant or cooperative agreement. Do not include a fee in your budget, 
unless the program announcement specifically allows the inclusion of a “fee” (e.g., SBIR/STTR). If a fee 
is allowable, enter the requested fee. 
K. Budget Justification 
Use the budget justification to provide the additional information requested in each budget category 
identified above and any other information the applicant wishes to submit to support the budget request. 
The following budget categories must be justified, where applicable: equipment, travel, participant/trainee 
support and other direct cost categories. Only one file may be attached. 
Use this section to list the names, role (e.g., PostDoc or Graduate Student), associated months, 
salary and fringe benefits for all Postdoctoral Associates and Graduate Students included in 
Budget Section B. Other Personnel. 
Include a justification for any significant increases or decreases from the initial year budget. 
Justify budgets with more than a standard escalation from the initial to the future year(s) of 
support. Also use this section to explain any exclusions applied to the F&A base calculation. 
If the application includes a subaward/consortium budget, a separate budget justification is 
submitted for that budget. See Section 4.8 Special Instructions for Preparing Applications with a 
Subaward/Consortium
Completing Budget Periods 2-5 
If funds are being requested for more than one budget period, you must complete a separate detailed 
budget for each year of support requested. To navigate to screens for the next budget period, click the 
Next Period button at the top of the 3
rd
budget screen (Sections F through K). You must complete all the 
required information (i.e., those fields that are highlighted in yellow, outlined in red and noted with an 
“*”) before the Next Period button is activated. If no funds are requested for a required field, enter “0.” 
Note the Budget Justification is also a required item and must be attached before the Next Period button 
is activated. 
Supplemental/Revision Application 
For a supplemental/revision application, show only those items for which additional funds are 
requested. If the initial budget period of the supplemental/revision application is less than 12 
months, prorate the personnel costs and other appropriate items of the detailed budget. 
VB.NET PDF Image Extract Library: Select, copy, paste PDF images
VB.NET PDF - Extract Image from PDF Document in VB.NET. Support PDF VB.NET : Select An Image from PDF Page by Position. Sample for
how to copy an image from a pdf; copy picture to pdf
VB.NET PDF Page Extract Library: copy, paste, cut PDF pages in vb.
Dim page As PDFPage = doc.GetPage(3) ' Select image by the point example below will show you how to copy pages from a PDF file and paste into another one.
copy picture from pdf reader; how to paste a picture into pdf
PHS SF424 (R&R) Adobe Forms Version B Application Guide 
Part I: Instructions for Preparing and Submitting the Application 
89 
Submitting Budgets With More Than 5 Budget Periods 
When authorized or requested by the appropriate NIH IC, applicants may submit applications 
with more than 5 budget periods. In these situations complete the detailed budget for periods 1-5 
as usual. However, include the same level of detail for Period 6 in the Budget Justification along 
with an explanation of the situation. Also, be sure to include a cover letter that addresses these 
extra budget periods, and include the IC Program Official’s preapproval as part of the Cover 
Letter PDF. 
4.7.4  Cumulative Budget 
All values on this form are calculated automatically. They present the summations of the amounts that 
you have entered previously, under Sections A through K, for each of the individual budget periods. 
Therefore, no data entry is allowed or required, in order to complete this “Cumulative Budget” section. 
If any of the amounts displayed on this form appears to be incorrect, you may correct it by adjusting one 
or more of the values that contribute to that total. To make any such adjustments, you will need to revisit 
the appropriate budget period form(s), to enter corrected values.  
VB.NET PDF insert image library: insert images into PDF in vb.net
Ability to put image into defined location on PDF page. Provide image attributes adjust functionalities, such as resize image by zooming and cropping.
copy and paste image from pdf; pasting image into pdf
C# PDF insert text Library: insert text into PDF content in C#.net
Parameters: Name, Description, Valid Value. value, The char wil be added into PDF page, 0
copying a pdf image to word; how to copy pictures from a pdf
PHS SF424 (R&R) Adobe Forms Version B Application Guide 
Part I: Instructions for Preparing and Submitting the Application 
90 
Once all data have been entered use the scroll bar to scroll up. You will be returned to the Grant 
Application Package screen. To remove a document from the Submission box, click the document name 
to select it and then click the Move Form to Delete button. This will return the document to the 
Mandatory Documents Submission List or Optional Documents Submission List. 
C# PDF insert image Library: insert images into PDF in C#.net, ASP
document. Ability to put image into specified PDF page position and save existing PDF file or output a new PDF file. An independent
how to copy picture from pdf to word; paste image into pdf acrobat
C# Create PDF from images Library to convert Jpeg, png images to
Component for combining multiple image formats into one or multiple PDF file in C#.NET. Any piece of area is able to be cropped and pasted to PDF page.
copy pdf picture to word; copy and paste image from pdf to pdf
PHS SF424 (R&R) Adobe Forms Version B Application Guide 
Part I: Instructions for Preparing and Submitting the Application 
91 
4.8  Special Instructions for Preparing Applications with a 
Subaward/Consortium 
A complete subaward/consortium budget form  (including the budget justification section) should be 
completed by each consortium grantee organization. Separate budgets are required only for 
subawardee/consortium organizations that perform a substantive portion of the project.  
Note, a complete subaward/consortium budget form  is only required when the prime grantee is submitting 
a detailed budget using the R&R Budget Form. Do not use this subaward/consortium budget form  for 
applications using the PHS 398 Modular Budget Form . Applicants using the Modular Budget Form 
should see Section 5.4 for instructions concerning information on consortium budgets. 
For any subaward or consortium sites, it is appropriate and expected that someone may be designated as 
the consortium lead investigator responsible for ensuring proper conduct of the project or program at that 
site. However, when completing the Project Role for the consortium lead investigator, the project role of 
“PD/PI” should only be used if the entire application is being submitted under the Multiple PI policy. 
Otherwise, this individual should be assigned some other project role in the senior/key personnel section 
of the application. Also, the role of Co-PD/PI is not currently used by NIH and other PHS agencies. 
Assigning an individual(s) the role of "Co-PD/PI" will not identify the application as a Multiple PD/PI 
application. Although NIH now recognizes the role of “Co-Investigator,” if applicants wish to use the role 
of “Consortium PI” or some other similar role, select “Other” for the Project Role field and then insert the 
appropriate role descriptor in the Other Project Role Category field.  
PHS SF424 (R&R) Adobe Forms Version B Application Guide 
Part I: Instructions for Preparing and Submitting the Application 
92 
NIH continues to support the policy established in April 2004, (revised in November 2004) regarding 
applications that involve consortium/contractual F&A costs (See NOT-OD-05-004). This policy allows 
applicants to exclude consortium/contractual F&A costs when determining compliance for any 
application where a direct cost limit applies. The use of the SF424 (R&R) application with separately 
submitted subaward/consortium budgets allows NIH to take advantage of a system validation for this 
policy. When an application is submitted in response to a program with a direct cost limit, the eRA 
system will perform the calculation by taking the total direct costs requested by the prime/parent 
organization in their detailed budget, and subtracting all subaward/consortium F&A from each and every 
subaward budget attached. When the validation calculation equals or exceeds the respective direct cost 
limit, the application will receive a warning. 
This form accommodates a set number of separate subaward budgets (i.e., 10 or 30). If you are submitting 
an application with more subaward budgets than the form allows, the remaining budgets should be 
converted to PDF and included as part of Section K. Budget Justification of the parent budget. Reminder, 
the sum of all subaward budgets; e.g., those attached separately and those provided as part of the budget 
justification, must be included in Line F.5 Subawards/Consortium/Contractual Costs of the parent budget. 
To start the process, the applicant organization should: 
Select the Subaward Budget Attachment Form from the Optional Documents in the Grant 
Application Package. 
Open the form, and click the Click here to extract the R&R Subaward Budget 
Attachment button in the middle of the form. A “SAVE” dialog box appears. 
Save the file locally using the first ten letters of the consortium organization’s name and use 
“.pdf” as the file extension. (The extracted file is an Adobe PDF file.) Once you have saved 
the file there is no need to extract another budget attachment. Doing so may cause you to lose 
any data already stored in the saved file. 
E-mail the extracted, saved form to the consortium grantee. Note: consortium grantees must 
have installed a compatible version of Adobe Reader before they can complete the form. The 
consortium grantee should complete all the budget information as instructed in the R&R 
Budget form  instructions in Section 4.7. Note: Organizational DUNS and Name of 
Organization fields must reflect that of the subaward/consortium grantee.  
The consortium grantee must complete the budget form  and e-mail it back to the applicant 
organization.  
Return to the Subaward Budget Attachment Form and attach the consortium grantee’s budget 
to one of the blocks provided on the form.  
Submitting Subaward Budgets that are not Active for all Periods of the Prime Grant 
When submitting subaward budgets that are not active for all periods of the prime grant, fill out the 
subaward R&R Budget form and include only the number of periods for which the subaward is active. 
The budget period start/end dates reflected in each period should reflect the corresponding prime budget 
period start/end dates. This approach is the most workable solution to the limitations in existing forms 
that do not allow an “empty” budget period and do not allow submission of a subaward budget with zero 
effort to skip a budget period.  
For example, suppose the prime has filled out a budget form with the following periods: 
period 1    Jan 1, 2008 – Dec 31, 2008  
period 2    Jan 1, 2009 – Dec 31, 2009 
PHS SF424 (R&R) Adobe Forms Version B Application Guide 
Part I: Instructions for Preparing and Submitting the Application 
93 
period 3    Jan 1, 2010 – Dec 31, 2010 
period 4    Jan 1, 2011 – Dec 31, 2011 
period 5    Jan 1, 2012 – Dec 31, 2012 
Now, suppose there is a subaward that performs in support year 1 and does not become active again until 
support year 4. The subaward can fill out the first two periods of their budget form as follows: 
period 1   Jan 1, 2008 – Dec 31, 2008   (dates correspond to prime period 1) 
period 2   Jan 1, 2011 – Dec 31, 2011   (dates correspond to prime period 4) 
It is not necessary that the budget period numbers between the prime and subaward match; the correlation 
is reflected in the dates. Do be careful, however, that the dates exactly match what is listed for the period 
in the prime budget.  
Note this approach may cause a validation warning regarding the NIH $500,000 per year limit on direct 
costs, therefore you should document in both the cover letter and the subaward budget justification that 
the subaward is only active for specific periods of the prime. Appropriate NIH staff has access to the 
cover letter and reviewers have access to the budget justification. This documentation will make the date 
correlation immediately apparent and will help avoid any confusion. 
Once all data have been entered use the scroll bar to scroll up. You will be returned to the Grant 
Application Package screen. To remove a document from the Submission box, click the document name 
to select it and then click the Move Form to Delete button. This will return the document to the 
Mandatory Documents Submission List or Optional Documents Submission List. 
5.  Completing PHS 398 Forms 
5.1  Overview 
In conjunction with the SF424 (R&R) forms, NIH and other PHS agencies grants applicants should also 
complete and submit additional forms titled “PHS 398.” Note the PHS 398 forms include additional data 
required by the agency for a complete application. While these are not identical to the PHS 398 
application form pages, the PHS 398 reference is used to distinguish these additional data requirements 
from the data collected in the SF424 (R&R) forms. A complete application to NIH and other PHS 
agencies will include SF424 (R&R) and PHS 398 forms. The PHS 398 forms include: 
PHS Cover Letter Form (optional, however applicants are strongly encouraged to include this 
form
PHS 398 Cover Page Supplement (this supplements the data requirements in the R&R Cover 
form
PHS 398 Modular Budget Form (use only when a modular budget is submitted instead of a 
detailed budget) 
PHS 398 Research Plan Form 
PHS 398 Checklist Form 
Complete each form  using the instructions provided below. 
PHS SF424 (R&R) Adobe Forms Version B Application Guide 
Part I: Instructions for Preparing and Submitting the Application 
94 
5.2  Cover Letter Form  
Applicants are encouraged to include a cover letter with the application. The cover letter is only for 
internal use and will not be shared with peer reviewers. The letter should contain any of the following 
information that applies to the application: 
16) 1. Application title. 
17) 2. Funding Opportunity (PA or RFA) title of the NIH initiative. 
18) 3. Request of an assignment (referral) to a particular awarding component(s) or Scientific 
Review Group (SRG). The PHS makes the final determination. 
19) 4. List of individuals (e.g., competitors) who should not review your application and why. 
20) 5. Disciplines involved, if multidisciplinary. 
21) 6. For late applications (see Late Application policy in Section 2.14) include specific 
information about the timing and nature of the cause of the delay.  
22) 7. When submitting a Changed/Corrected Application after the submission date, a cover 
letter is required explaining the reason for the Changed/Corrected Application. If you 
already submitted a cover letter with a previous submission and are now submitting a 
Changed/Corrected Application, you must include all previous cover letter text in the revised 
cover letter attachment. The system does not retain any previously submitted cover letters 
until after an application is verified; therefore, you must repeat all information previously 
submitted in the cover letter as well as any additional information. 
23) 8. Explanation of any subaward budget forms that are not active for all periods of the 
proposed grant. 
24) 9. Statement that you have attached any required agency approval documentation for the 
type of application submitted. This may include approval for applications $500,000 or more, 
approval for Conference Grant or Cooperative Agreement (R13 or U13), etc. 
25)   Two types of approval documentation are cited as examples in item 6 above: NIH IC 
approval for an application $500,000 or more and NIH institute approval for a Conference 
Grant or Cooperative Agreement application (R13 or U13). To attach the approval 
PHS SF424 (R&R) Adobe Forms Version B Application Guide 
Part I: Instructions for Preparing and Submitting the Application 
95 
documents to this submission, please append those referenced documents to your Cover 
Letter File, and upload as one attachment. 
Suggested Cover Letter Format 
The Division of Receipt and Referral (DRR), Center for Scientific Review (CSR) is responsible for 
assigning applications to ICs and to Scientific Review Groups (SRGs). DRR will be utilizing knowledge 
management approaches as an adjunct to the work of referral experts as part of an overall plan to shorten 
the time from submission to review. Analysis has shown that requests made by investigators are a 
valuable source of information in this process. In order to facilitate the use of these requests in 
conjunction with knowledge management analysis of the content of the application, applicants are 
requested to use the following format when assignment requests are contained in a cover letter. 
List one request per line. 
Place Institute/Center (IC) and SRG review requests (if both are made) on separate lines. 
Place positive and negative requests (if both are made) on separate lines. 
Include name of IC or SRG, followed by a dash and the acronym. Do not use parentheses. 
Provide explanations for each request in a separate paragraph. 
Examples: 
Please assign this application to the following: 
Institutes/Centers 
b.  National Cancer Institute - NCI 
c.  National Institute for Dental and Craniofacial Research – NIDCR 
Scientific Review Groups 
d.  Molecular Oncogenesis Study Section – MONC 
e.  Cancer Etiology Study Section – CE 
Please do not assign this application to the following: 
Scientific Review Groups 
f.  Cancer Genetics Study Section – CG 
The reasons for this request are [provide a narrative explanation for the request(s)]. 
Save this information in a single file in a location you remember and convert the file to PDF. Click Add 
Cover Letter File, browse to where you saved the file, select the file, and then click Open. The name of 
the file attached will automatically appear in the “Mandatory Cover Letter Filename” field. 
Once all data have been entered use the scroll bar to scroll up. You will be returned to the Grant 
Application Package screen. To remove a document from the Submission box, click the document name 
to select it and then click the Move Form to Delete button. This will return the document to the 
Mandatory Documents Submission List or Optional Documents Submission List. 
Documents you may be interested
Documents you may be interested