SKM Power*Tools for Windows 
The Detail View for the bus report lists all 3 contributions, the trip time for each branch, 
and the cumulative energy when each branch clears. For this example, the Utility 
Contribution clears in 0.23 seconds, the Generator Contribution clears in 1.12 seconds, and 
the Synchronous Motor clears in 7.21 seconds (assuming no AC decay), but displays the 2 
seconds maximum time specified in the study setup. When the Utility branch clears, the 
incident energy is 2.84 cal/cm2 (Class 1). When the Generator Branch clears 0.89 seconds 
later, the accumulated energy is 5.54 cal/cm2 (Class 2). 
The Utility contribution is 73% and the generator is 21% of the total arcing fault current at 
Gen-Bus. With the Cleared Fault Threshold option set to 80%, the Summary display and 
Labels will report the energy accumulated up to the time when at least 80% of the total fault 
current is cleared. This occurs when the Generator contribution is cleared. The Summary 
View lists only the generator branch protective device since when the generator trips, 94% 
of the fault current has cleared. This means that the arc will be diminished and the 
remaining contribution (6%) cannot sustain the arc. 
The Summary View displays the generator branch protective device as the last tripped 
device with the total accumulated incident energy up to interruption of this device. 
Utility 
Generator 
Motor 
Gen 
Motor 
Motor only 
0.15s 
0.882s 
0.885s 
10.67kA 
Arcing  
Fault 
Current 
At Bus 
2.91 kA 
0.67 kA 
Accumulated 
Energy at Bus 
How to paste a picture into a pdf document - copy, paste, cut PDF images in C#.net, ASP.NET, MVC, Ajax, WinForms, WPF
Detailed tutorial for copying, pasting, and cutting image in PDF page using C# class code
how to copy image from pdf to word; paste image into pdf acrobat
How to paste a picture into a pdf document - VB.NET PDF copy, paste image library: copy, paste, cut PDF images in vb.net, ASP.NET, MVC, Ajax, WinForms, WPF
VB.NET Tutorial for How to Cut or Copy an Image from One Page and Paste to Another
copy images from pdf; copy and paste images from pdf
Important Concept:  Minimum and Maximum Faults 
It’s important to consider both minimum and maximum  fault conditions when performing 
arc flash calculations.  The reason why both are important is illustrated below: 
0.5
1
10
100
1K
10K
0.01
0.10
1
10
100
1000
CURRENT IN AMPERES
tcc5.tcc   Ref. Voltage: 480   Current Scale x10^0   1Line001.drw
TIME IN SECONDS
Panel Main
Panel Main
Arcing
Fault
Current
based on
Maximum
Fault
Arcing
Fault
Current
based on
Minimum
Fault
Trip time of 
1.05 seconds
for Minimum
Fault
Trip time of 
0.07seconds
for Maximum
Fault
Arcing
Fault
Current
based on
Maximum
Fault
Arcing
Fault
Current
based on
Minimum
Fault
Trip time of 
1.05 seconds
for Minimum
Fault
Trip time of 
0.07seconds
for Maximum
Fault
On the TCC drawing you can see that the trip time remains in the instantaneous trip region (0.07 
seconds) for a maximum arcing fault. Using a smaller minimum fault current due a different mode 
of operation for the network results in a lower fault current that takes slightly more than one 
second to trip (1.05 seconds). Using the maximum fault current, the incident energy is calculated 
as 1.22 J/cm2 resulting in a Class 0 FR Clothing Class. Using the minimum fault current, the 
incident energy is 11.9 J/cm2 resulting in a Class 1 FR Clothing Class. For this case, the lower 
fault current results in a longer trip time producing higher incident energy exposure to the worker. 
Making conservative assumptions regarding both the minimum and maximum fault currents will 
provide higher certainty in specifying the proper clothing class and selecting conservative 
protective device settings. 
C# PDF insert image Library: insert images into PDF in C#.net, ASP
vector images to PDF file. Import graphic picture, digital photo, signature and logo into PDF document. Ability to put image into
copy paste picture pdf; copy pdf picture
VB.NET PDF insert image library: insert images into PDF in vb.net
project. Import graphic picture, digital photo, signature and logo into PDF document. Add images to any selected PDF page in VB.NET.
how to copy pictures from pdf file; how to copy an image from a pdf file
163 
SKM Power*Tools for Windows 
Important Concept: Relationship Between 3-Phase Fault and Arcing 
Fault 
The equations used to calculate the magnitude of an arcing fault are relative to the available 3-
phase bolted fault current.  Single-line to ground and line-to-line faults are not directly considered 
when calculating arcing fault or incident energy.  While it’s recognized that many arcing faults 
are initiated by a line to ground fault, the arc flash equations in the IEEE 1584 standard are 
relative to the available bolted-3-phase fault current for the following reasons: 
a) 3-phase faults give the highest possible short circuit energy in AC equipment. 
b) Arcing faults that begin as line-to-line or line-to-ground faults quickly escalate into 3 
phase faults as the air ionizes across the phases.   The high-speed video photography of 
arc flash tests show the arc rotating between the phases and the metal box.  The tests were 
performed on grounded and ungrounded systems and the arc fault equation includes a 
grounded/ungrounded variable. 
PTW will ignore ground fault devices.  When using multi-function devices, make sure that 
the first function is defined as “Phase”.  If a sep arate relay component is used as a ground 
fault device, make sure that the function name is set to “Ground” or “Earth”.  Relays with 
the function name set to Ground or Earth will be ignored in the Arc Flash calculations. 
Important Assumptions: 
 Arc Flash searches the entire system topology, starting from the faulted bus out, to 
find the first protective device with an over-current trip curve.  When the first 
device is located, the search is discontinued (i.e. assumes coordination with 
upstream branches).  The next upstream protective device may be included in the 
search by selecting the “Check upstream devices for  mis-coordination” option.  If 
there are multiple contributions to the faulted bus, the search process will be 
repeated until each contribution is cleared by it’s  protective device, or the search 
reaches the end of the topology.  Protection functions with a name of “Ground”, 
“Earth”, or “AF_EX” will be excluded from the prote
ctive device search and the 
next upstream device is used instead.  Upstream refers to the flow of power from 
the primary sources of power to the faulted location from the perspective of 
standing at the fault location. 
 The trip time is determined for all protective devices located in the branch that 
contains the first trip device and the device with the fastest trip time for the given 
arcing fault current is used. 
C# PDF remove image library: remove, delete images from PDF in C#.
Support removing vector image, graphic picture, digital photo, scanned signature, logo, etc. Able to cut and paste image into another PDF file.
how to paste a picture in a pdf; copy pictures from pdf to word
VB.NET PDF remove image library: remove, delete images from PDF in
PDF Image Extract; VB.NET Write: Insert text into PDF; C#.NET PDF pages extract, copy, paste, C#.NET Support removing vector image, graphic picture, digital photo
how to copy pictures from a pdf file; copy image from pdf to word
 Worker is stationary during the entire arc flash incident (constant working 
distance). 
 Induction motors contribute continuous sub-transient current until removed at user 
specified time ‘x’, unless they are specifically ex cluded from the arc flash study. 
 When applying generic current-limiting fuse representation, the current-limiting 
range is assumed to start where fuse clearing curve drops below 0.01 sec. 
 When applying generic current-limiting fuse representation, fuses operating in the 
current limiting range are assumed to clear in ½ cycle for currents 1 to 2 times the 
current where the current-limiting range begins, and ¼ cycle for currents higher 
than 2 times the current where the current-limiting range begins. 
 Interrupting device is rated for the available short circuit current (no equipment 
damage is considered). 
 Upstream branch devices are properly coordinated with downstream branch 
devices.  The next upstream protective device may be included in the search by 
selecting the “Check upstream devices for mis-coord ination” option.  The device 
that clears the arcing fault fastest is used. 
 Ground fault and motor over load devices are not included. 
 For multi-function protective devices, only the first function is used to determine 
the trip time. 
 Reports only the larger incident energy based on low or high tolerances applied to 
the calculated arcing fault current. 
 When the total fault current cleared is less than the threshold percent specified in 
the study setup, or no protective device is found, the bus is labeled as Dangerous 
and the incident energy and flash boundary are not reported. 
 If the trip time obtained from the time current curve is larger than the maximum 
protection trip time defined in the study setup, the maximum protection trip time is 
used. 
This completes the Arc Flash section of the Tutorial 
C# HTML5 Viewer: Deployment on ASP.NET MVC
the size of SDK package, all dlls are put into RasterEdge.DocImagSDK a Home folder under Views according to config in picture above. RasterEdge.XDoc.PDF.dll.
copy picture from pdf to powerpoint; how to paste a picture into pdf
C# HTML5 Viewer: Deployment on AzureCloudService
Please note: In order to reduce the size of SDK package, all dlls are put into RasterEdge.DocImagSDK/Bin directory (as shown in picture). RasterEdge.XDoc.PDF.dll.
how to paste picture on pdf; how to copy pdf image to word
165 
SKM Power*Tools for Windows 
This Page Intentionally Left Blank 
C# Raster - Modify Image Palette in C#.NET
Read: PDF Image Extract; VB.NET Write: Insert text into PDF; edit, C#.NET PDF pages extract, copy, paste, C#.NET to reduce the size of the picture, especially in
copy image from pdf acrobat; copying a pdf image to word
C# Word - Document Processing in C#.NET
Get the main ducument IDocument doc = document.GetDocument(); //Document clone IDocument doc0 = doc.Clone(); //Get all picture in document List<Bitmap> bitmaps
paste image into preview pdf; how to copy a picture from a pdf
This Page Intentionally Left Blank 
167 
SKM Power*Tools for Windows 
Part 6  -  Motor Starting Analysis
Make sure that you completed Tutorial - Part 1 successfully before beginning this section. 
This section demonstrates how to simulate motor starting effects.  We will look at a 
simplified “snap-shot” impact motor start study usi ng the load flow study module and a 
more detailed time-based simulation using TMS.  If you have not completed the CAPTOR 
protective coordination tutorial, your one-line will not display the protective device 
symbols.  The protective devices are not required for this part of the tutorial. 
1.  To begin the motor starting calculations, we need to add a motor to our base tutorial 
project.  Although we can connect multiple components to a bus-node, it’s easier to 
work with a regular bus.  To change the bus-node between cable CBL-0001 and load 
LOAD-0001, select the node by clicking on it or by drawing a selection box around it 
as shown below. 
Select Bus-Node to convert to Bus. 
When the Bus-Node is selected, use the One-Line>Convert to Bus menu option to convert 
the bus-node to a bus.  The bus name is BUS-0004 and will be displayed automatically. 
2.  Stretch BUS-0004 by positioning the cursor just past the right edge of the bus until the 
cursor changes to a Left and Right arrow.  When you have the correct cursor displayed, 
hold down your left mouse button and drag the cursor to the right.  This will extend the 
bus.  Next select the New Induction Motor icon and attach the new motor to BUS-0004 
as shown in the figure below. 
169 
SKM Power*Tools for Windows 
Add Induction Motor MTRI-0001 to BUS-0004. 
2.  Double-click on the symbol for motor, MTRI-0001 to display the motor data in the 
Component Editor.  Enter 100 hp for the rated size, as shown in the figure below. 
Specify Induction Motor Rated Size in Component Editor 
3.  Now that we have added a 100 HP motor, we need to re-run the load flow analysis to 
evaluate the steady-state current, power and operating voltage.  Select the 
Run>Balanced System Studies menu item. 