syncfusion pdf viewer mvc : How to copy image from pdf file control application system azure html asp.net console PTW_V6.5_Tutorial25-part414

251 
SKM Power*Tools for Windows 
Double clicking on Load Flow A,B,C Phases.rpt will open the report as shown. 
Phase A to Ground Fault Current Displayed in Datablocks. 
Use the 
button to move to the next page, and the following report will appear. 
The Crystal Reports can be printed directly or saved in a variety of formats.  This 
completes the Single-Phase/Unbalanced module Tutorial. 
How to copy image from pdf file - copy, paste, cut PDF images in C#.net, ASP.NET, MVC, Ajax, WinForms, WPF
Detailed tutorial for copying, pasting, and cutting image in PDF page using C# class code
paste image into pdf; paste picture to pdf
How to copy image from pdf file - VB.NET PDF copy, paste image library: copy, paste, cut PDF images in vb.net, ASP.NET, MVC, Ajax, WinForms, WPF
VB.NET Tutorial for How to Cut or Copy an Image from One Page and Paste to Another
how to copy pictures from pdf in; how to copy pictures from pdf
This Page Left Blank 
VB.NET PDF Image Extract Library: Select, copy, paste PDF images
PDF file in VB.NET. Extract multiple types of image from PDF file in VB.NET, like XObject Image, XObject Form, Inline Image, etc.
how to copy pictures from pdf to word; how to copy an image from a pdf in preview
C# PDF Image Extract Library: Select, copy, paste PDF images in C#
library for Visual Studio .NET. Extract various types of image from PDF file, like XObject Image, XObject Form, Inline Image, etc.
how to paste a picture in a pdf; copy picture to pdf
253 
SKM Power*Tools for Windows 
Part 10  - Distribution Reliability and 
Economic Evaluation 
Reliability Analysis Objectives 
The Reliability study module provides the following analysis for distribution power 
systems:  
 Load Point Reliability Indices calculation 
 Protection Zone Reliability Indices calculation 
 Utility System Evaluation 
 Distribution System Evaluation 
The Load Point Reliability includes the following indices for each load and motor in the 
system:  
 MTBF   
mean time between failure, MTBF = MTTF + MTTR 
 Failure Rate 
λ
failures per year 
 MTTF    
mean time to failure (1/ 
λ
), or years per failure 
 Annual Outage Time 
total hours of downtime per year 
 MTTR   
average outage time, or average downtime per failure 
 Annual Availability% 
(1 - total outage hours per year / 8760) * 100 
 EENS   
expected energy not supplied per year 
 ECOST  
total damage cost in k$ per year due to failures 
The Protection Zone Reliability includes the following IEEE indices for each protection 
zone in the system:  
 SAIFI   
system average interruption frequency index 
(interruptions/customer-year) 
 SAIDI   
system average interruption duration index (hours/customer-yr.) 
 CAIDI    
customer average interruption frequency index (hours/customer-
interruption) 
 ASAI   
average service availability index 
 ASUI    
average service unavailability index  
 EENS   
expected energy not supplied index (kWh/year 
 AENS   
average energy not supplied (kWh/customer-year) 
 ECOST  
total damage cost in k$ per year due to failures 
The Utility System Evaluation includes the following aspects of the utility portion of the 
system: 
 Installed Cost  equipment costs 
 Operation 
switching and lockout complexity 
 Reliability 
probability of failure and mean time to repair 
 Expansion 
process that must be shutdown for maintenance and expansion 
 Recovery 
capacity to isolate from supply line faults 
capacity to recover from equipment and bus faults 
capacity to recover from breaker failures 
 Evaluation  
overall system evaluation 
C# PDF Page Extract Library: copy, paste, cut PDF pages in C#.net
PDF Pages in C#.NET. Easy to Use C# Code to Extract PDF Pages, Copy Pages from One PDF File and Paste into Others in C#.NET Program.
how to copy a pdf image into a word document; how to paste a picture into a pdf
VB.NET PDF Page Extract Library: copy, paste, cut PDF pages in vb.
Dim page As PDFPage = doc.GetPage(3) ' Select image by the point NET programming example below will show you how to copy pages from a PDF file and paste
how to cut pdf image; how to copy picture from pdf file
To calculate the load point reliability and protection zone reliability indices, you need to 
collect information such as equipment failure rate, restoration time.  For utility and 
distribution systems evaluation, you need to know the system configurations, equipment 
costs, and whether spare equipments are available or not, and most importantly, the costs of 
power outage. 
To predict the system reliability at a future time, the program estimates the failure rate and 
restoration time at the year of evaluation based on historical data.  Enter the historical 
failure rate and restoration time in the Customer Reliability Data library and Year Installed 
for the components of interests in the Component Editor, and Evaluation Year in the study 
setup.  The program will come up with a mathematical representation of failure rate and 
restoration time as a function of  (Year Evaluate – –  Year Installed).  The predicted failure 
rate and restoration time at the evaluation year will be used in the calculation of reliability 
indices and cost evaluations. 
Reliability Analysis Study Scope 
The reliability analysis is designed to cover distribution and industrial systems.  Loop 
systems with multiple utilities and co-generation sources can be analyzed.   In addition to 
calculating all the standard IEEE indices, this module emphasizes risk assessment and 
design evaluations of industrial facilities where IEEE indices don’t give you a straight 
forward comparison on the initial investment vs. the cost impact from loss of production. 
Reliability Analysis Module vs. Other Study Modules in PTW 
Like all other study modules in PTW, the reliability analysis module uses the same project 
database and one-lines, and has access to all other study results such as load flow, short 
circuit and protective device coordination settings, etc. 
Similar to TMS, ISIM, and HIWAVE, the reliability analysis module has its own Study-
Case Tree to manage different studies for easy evaluation of alternatives.  One scenario 
could be as simple as running the study with the intent to repair a motor at failure, while 
another scenario could be to keep a spare motor and replace it at failure.  The calculated 
reliability indices and costs from two different scenarios can be compared and quantitative 
trade-off can be made.
The Concept of a Zone 
A zone is a portion of the power system within which a fault would cause the first upstream 
protective device to trip and isolate the entire zone from the system.  Basically, any 
protective device (except a fuse) and the down stream system that use it as the primary 
protection make up a zone.  A fuse is not considered the main protection device for a zone 
since it can’t be switched on and off manually. 
VB.NET PDF File Compress Library: Compress reduce PDF size in vb.
Reduce image resources: Since images are usually or large size, images size reducing can help to reduce PDF file size effectively.
copy picture from pdf; paste image into pdf in preview
VB.NET PDF File Merge Library: Merge, append PDF files in vb.net
When you have downloaded the RasterEdge Image SDK for also provided you with detailed PDF processing demo Imaging.Demo directory with the file name RasterEdge
copy image from pdf to powerpoint; how to copy pdf image
255 
SKM Power*Tools for Windows 
Data Entry in Component Editor 
A new Reliability Data sub-view is added to each component type in PTW to gather basic 
information such as failure rate, restore time, equipment cost, year installed, etc.  Make sure 
that you complete PTW Tutorial - Part 1, Part 2, and Part 3 before beginning this section.  
The next steps demonstrate how to enter reliability related data in the component editor. 
1.  Since a fuse without a switch can not be the primary zone protection, the first step is to 
add a switch as shown below (PD-0005).  Also add a MV/HV Breaker (PD-0006). 
Add switch to define 
primary protection zone. 
Add HV/MV Breaker 
VB.NET PDF insert image library: insert images into PDF in vb.net
Create high resolution PDF file without image quality losing in .NET WinForms application. Insert single or multiple images or graphics to PDF document.
how to copy picture from pdf; how to copy and paste an image from a pdf
VB.NET PDF File Split Library: Split, seperate PDF into multiple
Professional VB.NET PDF file splitting SDK for Visual Studio and .NET framework 2.0. Split PDF file into two or multiple files in ASP.NET webpage online.
how to copy picture from pdf and paste in word; how to copy an image from a pdf to powerpoint
2.  Select the Reliability Data sub-view of Utility UTIL-0001 from the Component Editor, 
press the Library button and double click the “Util ity – IEEE – Single circuit” from the 
Customer Reliability Data library.  The permanent failure rate and restoration time will be 
displayed from the library.  Alternatively, you can type in custom values directly. 
3.  Select the Reliability Data sub-view of Transformer, XF2-0001 from the Component 
Editor, press the Library button and double click the “Transformer (IEEE)-601-15000V” 
from the Customer Reliability Data library.  The Permanent Failure Rate and Repair Time 
will be filled in from the library.  Alternatively, you can type in the values directly.   Enter 
the Replace Time, Equipment Cost, and the Year Installed as shown. 
257 
SKM Power*Tools for Windows 
4.  Select the Reliability Data sub-view of XF2-0002 from the Component Editor, press the 
Library button and double click the “Transformer, 3 00 KVA –10 MVA, ERM RAM” from 
the customer reliability data library.  The Permanent Failure Rate and Repair Time will be 
filled in from the library.  Alternatively, you can type in the values instead of using the 
library data.  
Enter the Replace Time, Equipment Cost, and enter the Year Installed as shown. 
5.  Select the Reliability Data sub-view of Cable CBL-0001 from the Component Editor, 
press the Library button to bring up the custom reliability data library and double click the 
“Cable, 600V Tray-ERM RAM” from the library.   The  permanent failure rate and repair 
time will be filled in from the library.   
The cable has another permanent failure rate and restoration time for each termination of 
each phase.  In the following example, the permanent failure rate is 0.004 and the cable 
termination (each end) data is entered as 0.0001 f/yr.  For example, if the cable is 3 phase 
with 5 conductors per phase, the total permanent failure rate of the cable would be (0.004 + 
3 * 2 * 0.0001).   
The switching time is used to simulate a disconnect switch. It is assumed that there is a 
disconnect switch for each branch.  When there is a fault somewhere in the zone, the main 
protection device for the zone will trip, then the disconnect switch will open to isolate the 
fault.  After that, the main protection device will close to restore power for the rest of the 
zone.   The switching time represents the total time it takes for these actions to take place.  
For branches where no disconnect mechanism is present, enter a switching time equal to the 
repair time. 
259 
SKM Power*Tools for Windows 
6.  Select the Reliability Data sub-view of LOAD-0001 from the Component Editor, press 
the Library button for Customer Damage Function (CDF) and double click the “Type2, 
Industrial” from the library.   A table listing the  cost related to each failure duration will be 
filled in from the CDF library.   Move to the reliability data section and press the library 
button to select “Heater, Electric, General” from t he Custom Reliability Data library, enter 
the number of customers as 1. 
7.  Select the Reliability Data sub-view of Protective Device PD-0001 from the Component 
Editor, press the Library button for Custom Reliability Data and double click the “Fuse, 5-
15kV-PREP” from the library.   The Permanent Failur e Rate and Repair Time will be filled 
in from the library.  Enter the Equipment Cost and Year Installed. 
There are six protective devices in this project.  The data for all six devices follows: 
Device     Library 
Failure 
Repair 
Equipment     Year 
Rate 
Time 
Cost 
Installed 
(failures/year)  (hours) 
(k$) 
PD-0001   Fuse, 5-15kV-PREP 
0.0007 
0.5 
0.22  
1990 
PD-0002   Protective Relays-IEEE 
0.0002 
7.5 
1990 
PD-0003   Circuit Breaker LV-IEEE      0.0027 
8.7 
1990 
PD-0004   Circuit Breaker LV-IEEE      0.0027 
1.4 
1990 
PD-0005   Disconnect Switch-IEEE       0.0061 
3.6 
0.5 
1990 
PD-0006   Circuit Breaker MV-IEEE     0.0036 
83.1 
10.0 
1990 
Select each protective device and enter the reliability data for each.  This completes the 
data entry portion of the tutorial.  The next section will outline the study setup options. 
Documents you may be interested
Documents you may be interested