syncfusion pdf viewer mvc : How to copy an image from a pdf to word SDK control API .net web page winforms sharepoint PTW_V6.5_Tutorial26-part415

261 
SKM Power*Tools for Windows 
Setting up a Reliability Study 
After defining the reliability data for each of the components in the component editor, the 
next step is to setup a reliability study.  Start the Reliability Analysis module by selecting 
the Reliability Analysis from the Run menu, or by pressing the toolbar icon. 
Once you start the Reliability Analysis module, the following study manager appears with a 
default study named “Study1”.  You can rename it to  a more descriptive name.   
Selecting each different folder/icon on the left hand side will bring up its corresponding 
context on the right hand side.  For example, selecting the root of the tree will show a list 
all major aspects of study results for all studies in this project, selecting the Study folder 
will show major results in the current study only, selecting Reliability Analysis under the 
study will lists all reliability related indices, and selecting Cost Evaluation under the study 
will lists all cost related evaluation results.  Since we haven’t run the study yet, there are no 
results listed under the Load Point Indices Results or IEEE Indices Results folders.  
How to copy an image from a pdf to word - copy, paste, cut PDF images in C#.net, ASP.NET, MVC, Ajax, WinForms, WPF
Detailed tutorial for copying, pasting, and cutting image in PDF page using C# class code
cut and paste pdf image; how to copy a picture from a pdf to a word document
How to copy an image from a pdf to word - VB.NET PDF copy, paste image library: copy, paste, cut PDF images in vb.net, ASP.NET, MVC, Ajax, WinForms, WPF
VB.NET Tutorial for How to Cut or Copy an Image from One Page and Paste to Another
copy and paste images from pdf; copy images from pdf file
Reliability Study Setup 
The reliability study setup contains the following study parameters: 
 Disconnect Switches 
Disconnect switches allows restoration of all load points between the supply point 
and the point of isolation before the repair process has been completed.  The 
option assumes that you have a disconnect switch that can isolate each problem 
area and can re-energize the unaffected areas.  Additional control can be achieved 
by setting the repair and switching times appropriately for each branch. 
 Include Load Reliability 
If Include Load Reliability is checked, the reliability analysis will include failure 
rate and restoration time of all loads and motors in the Load Point Indices 
calculations.   
 Replace or Repair Transformers 
Corresponding replace or repair time entered from the component editor will be 
used in the calculations.  This is a global setting for all transformers in the project 
for the current study.  If you would like to set a few transformers to use the replace 
time while all other transformers are using the repair time as set in the global 
setting, you will need to select them in the Custom Setting Components list and 
make changes from there. 
 Fuse Settings 
Fuses allow disconnection of its load point until the failure is repaired.  Thus will 
not affect or cause the disconnection of any other load point.  The Failure 
Probability of fuse is the chance of fuse not being able to operate successfully.  If 
the failure probability is 0.1, the fuses operates successfully 9 out of 10 times 
when required.  The Isolation Time of fuse is the time it takes for all failures to be 
isolated. 
C# PDF Image Extract Library: Select, copy, paste PDF images in C#
How to C#: Extract Image from PDF Document. List<PDFImage> allImages = PDFImageHandler. ExtractImages(page); C#: Select An Image from PDF Page by Position.
copy picture from pdf to powerpoint; how to copy pdf image to jpg
VB.NET PDF Image Extract Library: Select, copy, paste PDF images
VB.NET PDF - Extract Image from PDF Document in VB.NET. Support PDF VB.NET : Select An Image from PDF Page by Position. Sample for
how to cut a picture out of a pdf file; extract images from pdf files without using copy and paste
263 
SKM Power*Tools for Windows 
 Alternative Supply 
In the event of a system failure, the normally open tie-breaker can be closed in 
order to recover loads that have been disconnected. 
 Transfer Load Probability 
It is not always feasible to transfer all loads that are lost in a distribution system 
onto another feeder through a normally open point.  All loads that are lost will be 
transferred if the probability is 1.0.  The Transfer Load Probability is active only 
when the Alternative Supply option is selected. 
 Age Factor 
The Customer Reliability Data library allows you to enter the historical data for 
failure rate and restoration time for each year in the past.  A curve fitting program 
is used to define a mathematical representation for failure rate and restoration time 
as a function relative to the year installed.  If the Include Age Multiplying Factor is 
checked, the Evaluation Year field can be entered  
and the Reliability Analysis program will use the evaluation year and year installed 
to adjust the failure rates and repair times.  See Reliability Data Library for more 
information. 
 Evaluation Year 
Enter a current or future year you want to calculate reliability and related costs.  
C# PDF Page Extract Library: copy, paste, cut PDF pages in C#.net
Ability to copy selected PDF pages and paste into The portable document format, known as PDF document, is a they are using different types of word processors.
paste jpg into pdf preview; how to cut a picture from a pdf document
VB.NET PDF Convert to Word SDK: Convert PDF to Word library in vb.
VB.NET Tutorial for How to Convert PDF to Word (.docx) Document in VB.NET. using RasterEdge.XDoc.PDF; Convert PDF to Word Document in VB.NET Demo Code.
how to copy images from pdf to word; copying images from pdf files
Custom Setting Components 
The Study setup parameters apply to all components in the project for the particular study.  
If you have parameters that need to be specified at the component level, you can use the 
“Select Components” menu to add these components to  the “Custom Setting Components” 
list, and change the settings individually.  For example, repair times are used by default for 
all loads and motors.  But you can select LOAD-0001 and change it to use the replace time 
instead.  
VB.NET PDF Page Extract Library: copy, paste, cut PDF pages in vb.
Dim page As PDFPage = doc.GetPage(3) ' Select image by the point VB.NET: Clone a PDF Page. Dim doc As PDFDocument = New PDFDocument(filepath) ' Copy the first
how to paste a picture into a pdf document; how to copy text from pdf image to word
VB.NET PDF insert image library: insert images into PDF in vb.net
VB.NET PDF - Add Image to PDF Page in VB.NET. Insert Image to PDF Page Using VB. Add necessary references: RasterEdge.Imaging.Basic.dll.
how to copy pdf image into word; how to copy an image from a pdf file
265 
SKM Power*Tools for Windows 
Running a Reliability Study 
Once the study setup parameters are set and the custom setting components are selected and 
settings are set, you are ready to select the “Run” ”  button to run the study. 
To run a study, select any folder under the study name you would like to analyze and 
simply press the “Run” button on the bottom left co rner of the reliability study tree.  
Alternatively, you can select “Run Study” under the  Reliability menu or the right mouse 
menu.   
The load point indices and IEEE indices will be calculated and the study progress/log 
report will be listed under the study setup output window.  Any input data errors and 
warnings will be reported in this window for your review.  It is highly recommended that 
you resolve all errors and understand all warnings before proceeding to the indice results. 
Running All Studies 
If you made changes on the study setup parameters or custom component settings within 
each study, it may be useful to setup a few different studies for comparison and run them in 
one action.  To run all studies in the project, select the root of the reliability study manager 
tree and simply press the “Run” button on the botto m left corner, or select the “Run Study” 
menu option.   
If you make change on the system topology from the one-line or change data from the 
component editor from one study to another, then you are using different studies just to 
keep track of output results.  In this case, you should run each study right after the changes 
are made and do not run all studies in one action. 
C# Create PDF from Word Library to convert docx, doc to PDF in C#.
A convenient C#.NET control able to turn all Word text and image content into high quality PDF without losing formatting. Convert
copy picture from pdf reader; cut and paste image from pdf
C# PDF Convert to Word SDK: Convert PDF to Word library in C#.net
key. Quick to remove watermark and save PDF text, image, table, hyperlink and bookmark to Word without losing format. Powerful components
how to cut a picture out of a pdf; copy image from pdf to word
Load Point Reliability Indices 
The Load Point Reliability includes the following indices for each load and motor in the 
system.  Definitions for the indices follow.   Most of them come from the IEEE Standard 
493-1997 Gold Book - “Design of Reliable Industrial  and Commercial Power Systems”: 
 MTBF   
The mean exposure time between consecutive failures of a 
component.  It can be estimated by dividing the exposure time by the number of 
failures in that period, provided that a sufficient number of failures have occurred 
in that period.  MTBF = MTTF + MTTR 
 Failure Rate 
The mean number of failures of a component per unit exposure 
time.  Usually exposure time is expressed in years and failure rate is given in 
failures per year. 
 MTTF   
Mean time to failure (1/ 
λ
), or years per failure 
 Annual Outage Time: Total hours per year when a component or system is not 
available to properly perform its intended function due to some event directly 
associated with that component or system. 
 MTTR   
The mean-time to repair or replace a failed component.  It can 
be estimated by dividing the summation of repair times by the number of repairs, 
and, therefore, it is practically the average repair time. 
 Availability 
The long-term average fraction of time that a component or 
system is in service and satisfactorily performing its intended function. 
 Annual Availability% 
(1 - Annual Outage Time / 8760) * 100, 8760 I the total 
hours per year. 
 EENS   
Expected energy (kWh) not supplied per year. 
 ECOST  
Total damage cost in thousands of dollars (k$) per year due to 
failures.  
c(r): cost which depending on the outage time ($/kW), this can be obtained from 
Customer damage function (CDF) of each load. 
267 
SKM Power*Tools for Windows 
IEEE Reliability Indices 
The IEEE Reliability Indices include the following indices for each protective device in the 
system.   
System Average Interruption Frequency Index, SAIFI (interruptions/customer-yr.) 
where l
i
is the failure rate and N
is the number of customers of load point i. 
 System Average Interruption Duration Index, SAIDI (hours/customer-yr.) 
where U
i
is the annual outage time and N
is the number of customers of load point 
i. 
 Customer Average Interruption Frequency Index, CAIDI (hours/customer-
interruption) 
 Average Service Availability Index, ASAI 
 Average Service Unavailability Index, ASUI 
 Expected Energy Not Supplied Index, ENS (kWh/yr.) 
where L
a (i)
is the average load connected to load point i. 
 Average Energy not Supplied, AENS (kWh/customer-yr.) 
where L
a(i)
is the average load connected to load point i. 
c(r): cost which depending on the outage time ($/kW), this can be obtained from 
Customer damage function(CDF) of each load. 
269 
SKM Power*Tools for Windows 
Utility System Evaluation 
The economic analysis for cost-reliability evaluation cannot be considered in a general 
sense.  Most of the reasons and justifications are managerial decisions that can only be 
made based on your business goals.  However, the reliability analysis conducted in Part 3 
and Part 4 should provide you with one of the most important input parameters in your 
decision making process.  The basis for the method used in the program for utility and 
distribution system evaluation comes from IEEE paper No. PCIC 2000-02 “Improvements 
in Modeling and Evaluation of Electrical Power System Reliability” by John E. Propst and 
Daniel R. Doan.  Combining the reliability indices with these system evaluation methods 
bring reliability and cost considerations together in an easy to manage, scenario-based tool 
to help you make decisions effectively. 
Utility System Configurations 
Selecting the “Utility System Installed Cost” under  the “Cost Evaluation” folder will bring 
up the following dialog for you to select a utility system configuration.  There are 7 choices 
ranging from the simplest (least expensive, and least reliable) Single Source, Single 
Transformer, to the most complex (most expensive, and most reliable) Dual Source, Dual 
Transformer with Ring Bus configuration.  As you select a different configuration, a sample 
one-line next to the selection will show its basic design. 
Refer to John E. Propst and Daniel R. Doan’s paper  for more detail on the cost-reliability 
trade-off for these configurations. 
Utility System Installed Cost - Single Source, Single Transformer 
Select single source, single transformer, and the program will fill in the equipment required 
for this configuration, the cost for each piece of equipment, and the total cost for the utility 
portion of the system. 
Customize the a Default Configuration 
You can customize what’s in each default configurat ion by entering new equipment with the 
cost and number of each.  Once you choose “Save As  Template”, the list will be saved as 
the new default.   The next time you choose the same configuration, you will see your 
customized equipment list and pricing for the utility portion of the system.
Documents you may be interested
Documents you may be interested