WBS Schedule Pro
Insert
T
as
k
B
efo
r
e
Inserts a new Task "before" the selected one in the chart. Depending on the current View and
arrangement of tasks within a View, the term "before" could mean above or to the left of the
selected task. 
Adding links to pdf - insert, remove PDF links in C#.net, ASP.NET, MVC, Ajax, WinForms, WPF
Free C# example code is offered for users to edit PDF document hyperlink (url), like inserting and deleting
add a link to a pdf in preview; add links pdf document
Adding links to pdf - VB.NET PDF url edit library: insert, remove PDF links in vb.net, ASP.NET, MVC, Ajax, WinForms, WPF
Help to Insert a Hyperlink to Specified PDF Document Page
clickable links in pdf files; add a link to a pdf
page 182
WBS Schedule Pro
T
as
k
A
fte
r
Inserts a new Task "after" the selected one in the chart. Depending on the current View and
arrangement of tasks within a View, the term "after" could mean below or to the right of the
selected task. 
C# Create PDF Library SDK to convert PDF from other file formats
Create and save editable PDF with a blank page, bookmarks, links, signatures, etc. Besides, using this PDF document metadata adding control, you can
clickable links in pdf from word; add links to pdf
VB.NET PowerPoint: Add Image to PowerPoint Document Slide/Page
detail guides on these functions through left menu links. guide on C#.NET PPT image adding library. powerful & profession imaging controls, PDF document, tiff
add hyperlink in pdf; adding hyperlinks to a pdf
page 183
WBS Schedule Pro
Summa
r
T
as
k
Inserts a Summary Task above the selected Task. 
View Images & Documents in Web Image Viewer | Online Tutorials
document or image file, like Word, PDF or TIFF other mature image viewing features, like adding or deleting page And you can find the links to these professional
pdf reader link; adding an email link to a pdf
page 184
WBS Schedule Pro
Subtas
k
Inserts a Subtask to the selected Task. This could make the selected task a Summary Task to
the newly inserted Task. 
page 185
WBS Schedule Pro
D
e
l
ete
Deletes the selected Summary Task or Task. If you delete a Task you are NOT
prompted to confirm this deletion. Select Undo if you want to undo the delete, and
you are using WBS Standalone. You cannot undo the delete if you are working with a
chart that is linked to a Microsoft Project Plan. 
If you delete a Summary Task you are prompted to confirm and are given three
options. The options are listed below with an explanation of each: 
D
e
l
ete Summa
r
T
as
k
 xx and 
i
ts subtas
k
s
– Select this option and press OK to
delete the selected Summary Task 
and
all of its subordinates (the Summary Task
and everything below it). 
D
e
l
ete Summa
r
T
as
k
 xx but 
k
eep 
i
ts subtas
k
s
– Select this option and press
OK to delete the selected Summary Task but 
not
the items below the selected
Summary Task. 
C
ance
l – This cancels the Delete operation. 
page 186
WBS Schedule Pro
Task Info
G
ene
r
a
l
G
ene
r
a
l
The Task Information dialog box can be found by selecting T
as
k
 Info
from the Home
tab, by double-clicking a task. 
The Task Information dialog box is used for both Summary Tasks and Tasks. If you
display the Task Information for a Summary Task there may be some fields in the
dialog box that cannot be edited due to the fact that they are rolled up (calculated)
fields. 
N
ame
– Enter a name or description of the task. 
D
u
r
at
i
on
– Enter the duration for the task. The duration can be entered in Minutes,
Hours, Days, Weeks or Months. Duration can be entered using the following format: 
M = Minutes
H = Hours
D = Days
W = Weeks
MO = Months
page 187
WBS Schedule Pro
For example, for a 10 day task you can enter 
10d
in the duration field, a 2 week
task would be 
2w
For more information on Duration, see Scheduling
C
omp
l
ete
– Enter the Percent Complete for the task. This field is also calculated
for a task when the appropriate scheduling information is provided such as Actual
Start or Actual Finish.  
WB
S
– Enter the WBS for the task. The WBS code is initially derived from that task’s
position in the structure of the WBS chart with the top being 1 and the second level
1.1, 1.2, etc… You can let WBS Schedule Pro calculate this for you or you can enter
this information yourself. If you enter data into the WBS field yourself, WBS
Schedule Pro will no longer update this number for you even if you move the task.
To make WBS Schedule Pro calculate the WBS field after you have entered
information into this field, remove the data that you entered. WBS Schedule Pro will
then calculate this data again. 
W
o
rk – Enter the Work (Hours) for the task.
C
ost
– Enter the Cost for the task. 
Sta
r
t
– The date and time a task is scheduled to begin. You can enter the start date,
or it will be calculated based on the Project Start/Finish date, dependencies,
Constraint Type and Constraint Date.  
Fi
n
i
sh
– The date and time a task is scheduled to Finish. You can enter the finish
date, or it will be calculated based on the Project Start/Finish date, dependencies,
Constraint Type and Constraint Date. 
C
onst
r
a
i
nt 
T
ype 
Select a constraint from the list. For more information on how
Constraints work, see Scheduling
C
onst
r
a
i
nt 
D
ate 
Enter a date for the constraint. For more information on how
Constraints work, see Scheduling
R
esou
r
ce 
N
ames
– Lists resources that are assigned to this task. You cannot assign
resources into this field directly; you must use the Resources button. 
R
esou
r
ces>>
- Displays the Assign Resource form. In the Assign Resource form,
select a resource (or resources) to assign to this task and press OK. The assigned
resources will then appear in the Resource Names field. If the Resources button is 
not
available it means that you do not have resources defined in this project. You
must define the list of resources before you can assign them. To define the
Resources for this project select the Tools-Resources menu. 
page 188
WBS Schedule Pro
C
ustom
C
ustom
The Custom Tab allows you to list additional fields for entering data. For example, if
you want to enter data into the Actual Start and Actual Finish fields then you could
list these fields in the Custom Tab, since they are not fields that appear in the
General Tab. 
Choose the Add Field button to add a field to the end of the list. Choose Insert Field
to insert a field above the selected field. Choose Remove Field to remove the
selected field. 
page 189
WBS Schedule Pro
Fl
ags
Fl
ags
The Flag Tab allows you to quickly set a Flag field for a task. The Flag fields are
simple Yes/No fields that are displayed as checked or non-checked fields (checked
means Yes and non-checked means No). If multiple Flags are set on a task, the
lowest numbered Flag takes precedence and the others are ignored. The Flag fields
in WBS Schedule Pro correspond to the Microsoft Project Flag fields, but you can use
them independent of Microsoft Project.
The Flag fields can be used to define task box colors in the WBS chart. To use the
Flag fields to define colors, select the Format-Borders menu and select the “Borders
Based on Flags” option. Then, define different colors/styles/shadows for each Flag
field. Once this is done, select tasks in the WBS chart and use the Flag Tab in the
Task Information dialog box to define that a specific task use a specific Flag, as
shown below:
For more information on the different ways to color your WBS chart dependent on
Critical Path, the Flag fields or Progress, see Borders
page 190
WBS Schedule Pro
H
ype
rli
n
k
s
H
ype
rli
n
k
The Hyperlink Tab allows you to enter a Hyperlink to go to the specified document or
web page from within WBS Schedule Pro. When you enter a Hyperlink file or web
page address you can go to this link from within WBS Schedule Pro by clicking the
Hyperlink button associated with the task. This button is a small square that appears
above and to the left of the task. Clicking this button jumps to the specified link. 
There are four Hyperlink fields in the Task Information form. These four fields work
together to point to one hyperlink location for a task (you cannot enter more than
one hyperlink per task). They are: 
H
ype
rli
n
k – This is the “displayed” name for the Hyperlink. By default when you
enter a Hyperlink Address the Hyperlink field copies this information but if you
type text into the Hyperlink field after the link is created it will display this text. 
H
ype
rli
n
k
Hr
ef
– This is the full address of the document or web page. It is the
concatenation of the Hyperlink Address and Hyperlink Subaddress fields. You can
enter the complete address in this field or enter the Hyperlink Address along with
the Hyperlink Subaddress and the Hyperlink Href will be the sum of the two. 
H
ype
rli
n
k
A
dd
r
ess
– This is the main document or web page that a task is linked
to. 
H
ype
rli
n
k
 Subadd
r
ess
– The Hyperlink Subaddress goes to a certain place
within the link referred to in the Hyperlink Address field. The most common use for
this is to jump to a Bookmark (section within a document or web page).