WBS Schedule Pro
Group Headers behave a lot like Summary Tasks. Information is rolled-up to the
Group Headers much like Summary Tasks roll up information. Tasks can be added
within the groups. Tasks can even be moved from one group to another. As you
move tasks from one group to the next the task is updated with the new group
value. This allows you to do things like Group by Resource Names and drag a task
from one Resource group to another to reassign it. 
Grouping is a great way to visually display the various hierarchies that exist in a
project. See the next section on the how to change groups and to work with
projects while grouped. 
Add links to pdf online - insert, remove PDF links in C#.net, ASP.NET, MVC, Ajax, WinForms, WPF
Free C# example code is offered for users to edit PDF document hyperlink (url), like inserting and deleting
add a link to a pdf file; pdf link to email
Add links to pdf online - VB.NET PDF url edit library: insert, remove PDF links in vb.net, ASP.NET, MVC, Ajax, WinForms, WPF
Help to Insert a Hyperlink to Specified PDF Document Page
change link in pdf file; add hyperlink to pdf in
page 92
WBS Schedule Pro
C
hang
i
ng and 
E
d
i
t
i
ng 
Gr
oups
C
hang
i
ng the way p
r
o
j
ects a
r
Gr
ouped
The Grouping dialog allows you to change how the structure of the project is
displayed. 
There are three ways to Group the data in a project. They are:
1. T
he 
D
efau
l
O
ut
li
ne St
r
uctu
r
e
- This is the standard way to display a
hierarchy in WBS Schedule Pro. Creating a WBS Chart or Indenting Tasks in the
Gantt Chart or Task Sheet creates Tasks and Summary Tasks. For example, 
C# PDF Convert to HTML SDK: Convert PDF to html files in C#.net
HTML converter toolkit SDK, preserves all the original anchors, links, bookmarks and to Use C#.NET Demo Code to Convert PDF Document to Add necessary references
add links to pdf file; convert doc to pdf with hyperlinks
.NET PDF Document Viewing, Annotation, Conversion & Processing
Edit, delete text from PDF. Insert images into PDF. Edit, remove images from PDF. Add, edit, delete links. Form Process. Fill in form data programmatically.
add url to pdf; add links to pdf in preview
page 93
WBS Schedule Pro
o
r
The Default Outline Structure uses the Outline Number field to create the
hierarchy. The Outline Number field in WBS Schedule Pro can only be created by
Inserting or Moving Tasks and Summary Tasks. 
This is the same technique that Microsoft Project uses. Microsoft Project creates
the Outline by indenting tasks in a Gantt Chart. In WBS Schedule Pro, creating a
WBS Chart or Indenting/Outdenting tasks in the Gantt Chart or Task Sheet creates
the same Outline that you would see in Microsoft Project. 
2. U
s
i
ng a S
i
ng
l
Fi
e
l
d
- This refers to using a single field to define the structure
of the project. This single field must contain hierarchical information such as A,
A.1, A.1.1, A.1.2, etc. When you select this field on which to group, WBS Schedule
Pro will attempt to parse this field to determine a hierarchy. This is useful if you
have defined your own hierarchy using the WBS, Text or Outline Code fields. 
3. U
s
i
ng a Se
ri
es of 
Fi
e
l
ds
- This refers to using a non-hierarchical field to
display the structure of the project. This can be a single field with many of the
same values or several fields with various values to  define the structure. 
An example of this is the R
esou
r
ce 
N
ames
field. Grouping on Resource Names
would create a hierarchy of Resources and Tasks assigned to these Resources. Like
this: 
VB.NET PDF Convert to HTML SDK: Convert PDF to html files in vb.
Turn PDF images to HTML images in VB.NET. Embed PDF hyperlinks to HTML links in VB.NET. Convert PDF to HTML in VB.NET Demo Code. Add necessary references:
add page number to pdf hyperlink; pdf links
C# PDF Convert to Word SDK: Convert PDF to Word library in C#.net
the original text style (including font, size, color, links and boldness). C#.NET DLLs and Demo Code: Convert PDF to Word Document in C# Add necessary references
active links in pdf; clickable links in pdf from word
page 94
WBS Schedule Pro
The Text fields are another useful way to utilize this grouping feature. As a
example, if you used a Text field to store the Department names you may have
information like this: 
The current outline of the above uses the Default Outline Level to display the
structure. Selecting to Group on the Text 1 field would produce this result in a Task
Sheet: 
Or this in a WBS Chart: 
C# Create PDF Library SDK to convert PDF from other file formats
PDF with a blank page, bookmarks, links, signatures, etc. PDF document in C#.NET using this PDF document creating toolkit, if you need to add some text
add hyperlink pdf; add hyperlinks to pdf
C# Image: Tutorial for Document Management Using C#.NET Imaging
more detailed C# tutorials on each part by following the links respectively are dedicated to provide powerful & profession imaging controls, PDF document, image
pdf link open in new window; add email link to pdf
page 95
WBS Schedule Pro
The above uses a single Text field but you can also use several or a combination of
fields that contain the breakdown of information you wish to display. 
The 
So
r
t by
options allow you to change the order in which the detail items
appear. The Sort options only apply when you are grouped by a Single
non-hierarchical field or Series of Fields. 
The 
Show 
E
mpty 
Gr
oups
option displays a group header when there are no items
assigned to that group. For example, if you have Resources defined and are
Grouped by Resource Names, selecting this checkbox would display all Resources
in the chart including Resources that don't have Task assignments. De-selecting
this option would only display Resources that have been assigned to Tasks. 
The Grouping defined in the Groups dialog applies across WBS Charts, Network
Charts, Gantt Charts and Task Sheets unless you select the Independent checkbox
in the Home tab. Selecting the Independent checkbox applies the Grouping
changes only to the current view. 
VB.NET PDF: Basic SDK Concept of XDoc.PDF
You may add PDF document protection functionality into your VB.NET program. to edit hyperlink of PDF document, including editing PDF url links and quick
add hyperlink in pdf; adding hyperlinks to pdf files
How to C#: Basic SDK Concept of XDoc.PDF for .NET
You may add PDF document protection functionality into your C# program. to edit hyperlink of PDF document, including editing PDF url links and quick
add hyperlink to pdf; add hyperlink pdf document
page 96
WBS Schedule Pro
Tr
ansfe
rri
ng a p
r
o
j
ect to 
Mi
c
r
osoft 
Pr
o
j
ect
You can use WBS Schedule Pro to create your projects first and then transfer these to
Microsoft Project for further scheduling. 
If you create a new project in WBS Schedule Pro it is considered a “standalone”
project. This means that the project (the .wbs file) is a self-contained file with 
a
ll
 of
the data and fo
r
matt
i
ng opt
i
ons
embedded into this file. 
To transfer the current WBS Schedule Pro standalone project to Microsoft Project,
select the MS Project button on the Home tab.
Transferring a standalone WBS Schedule Pro project to Microsoft Project means that
the 
data that ex
i
sts 
i
n the 
WB
S Schedu
l
Pr
o p
r
o
j
ect cha
r
t w
ill
 be t
r
ansfe
rr
ed
to the 
Mi
c
r
osoft 
Pr
o
j
ect p
l
an
. The  WBS Schedule Pro project then becomes
"linked" to this Microsoft Project plan. 
During this process you are prompted to save the data to the Microsoft Project plan.
Once this happens you will then have two files; the Microsoft Project file (*.mpp)
containing the data and the WBS Schedule Pro project (*.wbs) containing the
formatting options. Opening a WBS Schedule Pro file that is linked to a Microsoft
Project plan opens the WBS chart with all the formatting and also opens the
corresponding Microsoft Project file to which it is linked. 
N
ote
: Do not delete a Microsoft Plan that is linked to a WBS Schedule Pro plan. If you
do this your data will be lost. 
If you have configured Microsoft Project to integrate with WBS Schedule Pro you can
also open the Microsoft Project plan first and select the WBS Chart, Network Chart or
Task Sheet buttons to go to the saved chart corresponding to the Microsoft Project
plan.  
page 97
WBS Schedule Pro
Cr
eat
i
ng cha
r
ts f
r
om 
Mi
c
r
osoft 
Pr
o
j
ect
If you have configured Microsoft Project to include the integration to WBS Schedule
Pro you can create WBS Schedule Pro charts from existing Microsoft Project plans. 
To set this up: 
See: Configuring Microsoft Project 98 to Project 2007
See: Configring Microsoft Project 2010, 2013 and 2016
To create a WBS Schedule Pro chart from an existing Microsoft Project plan: 
1. Start Microsoft Project. 
2. Click the WBS Chart, Network Chart or Task Sheet button from within MS
Project to go to that chart. 
WBS Schedule Pro is started and the current project plan from Microsoft Project is
displayed in the corresponding chart. 
When you create a WBS chart from an existing Microsoft Project plan, the WBS chart
is dynamically linked to this Microsoft Project plan. If you add, modify or delete tasks
in the WBS chart, this information is immediately sent to Microsoft Project. 
Ti
p
:
When a WBS chart is dynamically linked to a Microsoft Project plan the word
L
I
NKED appears in the lower right corner of the screen. 
Sav
i
ng a 
WB
S Schedu
l
Pr
o p
r
o
j
ect 
li
n
k
ed to a 
Mi
c
r
osoft 
Pr
o
j
ect p
l
an
In a WBS Schedule Pro project that is linked to MS Project, keep in mind that the data
is stored in Microsoft Project (a .MPP file) and the WBS chart formatting is stored in
the WBS chart file (a .WBS file). When you save a WBS Schedule Pro project that is
linked to a Microsoft Project plan, it saves both the WBS Schedule Pro file (.WBS) 
and
the corresponding Microsoft Project plan (.MPP). 
The saved WBS Schedule Pro project contains the formatting of the chart, and a link
to the Microsoft Project plan where the data is stored. 
To save the WBS Schedule Pro project, select the File menu and choose Save (or Save
As). Specify a filename and click OK.
O
pen
i
ng a 
WB
S cha
r
li
n
k
ed to a 
Mi
c
r
osoft 
Pr
o
j
ect p
l
an
There are two ways to open a WBS Schedule Pro project that is linked to a Microsoft
Project plan. They are: 
page 98
WBS Schedule Pro
1. From within Microsoft Project, click a WBS Schedule Pro button. If you have
previously created a project from this Microsoft Project plan and saved it, it will
remember this and automatically open this chart for you to continue working. If
it does not open the previously saved chart, see the Note below. 
2. From within WBS Schedule Pro, if you open the WBS Schedule Pro project
(*.WBS file) that is linked to the Microsoft Project plan it will automatically open
Microsoft Project and the corresponding Microsoft Project plan. 
N
ote
:
If you rename or move a Microsoft Project plan that is linked to a WBS
Schedule Pro project, Microsoft Project may not be able to locate the WBS Schedule
Pro project the next time you try to load  it  from the Microsoft Project plan. If you
move or rename a Microsoft Project plan that is linked to a particular WBS Schedule
Pro file, perform the following to relink the MS Project plan to the WBS Schedule Pro
file: 
1.
Open WBS Schedule Pro. 
2.
Select File-Open.
3.
Click on the WBS Schedule Pro file (the .WBS file) that was linked to the
Microsoft Project plan. 
4.
Select Li
n
k
 to anothe
r
 datasou
r
ce
and click Open.
5.
Locate the Microsoft Project plan and select Open.
page 99
WBS Schedule Pro
When you save the WBS Schedule Pro project it will remember the new name and
location of the Microsoft Project plan to which it is linked. 
page 100
WBS Schedule Pro
Ti
ps fo
r
 us
i
ng 
WB
S Schedu
l
Pr
o w
i
th 
M
Pr
o
j
ect
When you create a chart from an existing Microsoft Project plan you must remember
that you are dynamically linked to this plan and any changes made in WBS Schedule
Pro are immediately reflected in Microsoft Project. If you add or delete tasks in WBS
Schedule Pro, these tasks are immediately added or deleted in Microsoft Project. 
A chart created from an existing Microsoft Project can be saved but this does not save
the data into the .wbs file. All project data is still maintained in Microsoft Project.
Saving a chart that is linked to a Microsoft Project plan only saves the link and any
chart-specific items that cannot be saved in Microsoft Project like box placement,
custom box colors and formatting options.
If you create a chart from an existing Microsoft Project plan and you do not want this
chart to be dynamically linked to the corresponding Microsoft Project plan you can 
U
n
li
n
k the chart. In WBS Schedule Pro, to Unlink a plan from a MS Project plan,
choose Project-Unlink. Unlinking the chart from the Microsoft Project plan will save all
of the data to the WBS Schedule Pro file. Once you save as a standalone chart, this
chart cannot be linked back to the original Microsoft Project plan from which it was
created. You can only use this standalone chart to create a 
new
Microsoft Project
plan.
See also Saving charts