best free pdf library c# : How to save a pdf form in reader SDK application service wpf windows asp.net dnn PrefabNZ_Levers_(Web)1-part2035

9
LEVERS FOR PREFAB
While it is difficult to assess 
increased social and environmental 
benefits alongside economic 
benefits, it is acknowledged that 
quality, sustainability, design, 
safety and reduced time are all 
ways to save money in the medium 
term – and saving money is the 
primary up-front focus of New 
Zealand construction clients. 
The Value Case goes on to quantify 
that the hybrid (bathroom pod 
and wall panel assembly) method 
can save about 15% in total 
construction cost - $32,000 for 
a 157m2 house. Coordinated 
procurement can result in further 
cost savings – more than two 
tenders adds substantial tendering 
costs to industry’s bottom line, and 
effective material procurement can 
remove $15,000 from the cost of a 
standard house.
More efficient production can 
result in time and cost savings, 
as well as increased quality – 
prefabrication can remove $25,000 
from the cost of a standard house. 
Prefab and offsite construction 
is most effective when applied to 
deliver multiple units – precision 
sub-assemblies can save 15% of 
total construction cost. 
Why Levers for Prefab?
The Value Case for Prefab 
concludes with recommendations 
for Action Steps and four focus 
areas of benchmarking, process, 
procurement and training. The first 
step is an industry roundtable to 
prioritise the approaches to pent-
up housing demand. This led to 
the Levers for Prefab Roundtable 
with Productivity Partnership / 
MBIE hosted by Registered Master 
Builders Association (RMBA) in 
October 2014. The purpose of the 
roundtable was to invite large-scale 
residential builders, both those 
using larger prebuilt methods 
and those using traditional 
components, to gauge their 
feedback on challenges, successes 
and opportunities for using more 
prefabrication. Industry feedback 
was needed to extend, reinforce 
and update the Roadmap and 
Value Case action points, as well as 
gather industry support for follow-
on research proposals.
This Levers for Prefab white 
paper documents the findings of 
the roundtable discussion and 
subsequent action points which will 
go on to inform targeted action-
oriented research led by PrefabNZ 
and MBIE with other stakeholders 
in 2015 and beyond.
How to save a pdf form in reader - extract form data from PDF in C#.net, ASP.NET, MVC, Ajax, WPF
Help to Read and Extract Field Data from PDF with a Convenient C# Solution
extract data from pdf form; how to save a filled out pdf form in reader
How to save a pdf form in reader - VB.NET PDF Form Data Read library: extract form data from PDF in vb.net, ASP.NET, MVC, Ajax, WPF
Convenient VB.NET Solution to Read and Extract Field Data from PDF
extracting data from pdf forms; collect data from pdf forms
10
LEVERS FOR PREFAB
OPTION GENERATION 
Increasing consistency of 
construction industry work 
through boom and bust is an 
area for common action between 
government and industry.
Consistent visible pipeline of 
work will enable investment in 
innovative prefabrication and 
offsite manufacture methods 
but the procurement process 
must be appropriate to the 
construction industry in terms of 
deliverables, timeframes and risk 
apportionment.
Government procurement of 
large-scale repetitive units, 
such as houses, schools, 
healthcare units etc. can benefit 
from prefabrication methods. 
Procurement would need 
Top Three Levers for Prefab:
PrefabNZ,  Productivity  Partnership  (MBIE)  and  Master 
Builders (RMBA) invited large-scale residential builders and 
established  prefabrication  manufacturers  to  a  Roundtable 
Discussion (October 2014) on Levers for Prefab – the group 
discussed  residential  construction  and  feedback  focused 
on barriers, opportunities and successes with the top three 
areas for action identified as scale, liability and show-and-
tell.  Aspects  of  these  are  listed  below  and  flow-on  action 
points are tabled in the following section alongside outcomes, 
stakeholders and beneficiaries.
to take a triple bottom-line 
perspective, taking into account 
qualitative benefits such as 
health-and-safety, local jobs, low 
maintenance, and other social 
benefits such as reduced noise 
and disruption to neighbours.
Government procurement 
methods would benefit from 
internal MBIE construction 
expertise to ensure an industry 
appropriate procurement process 
is proposed and followed. 
There is potential for MBIE work 
on construction industry relevant 
procurement processes alongside 
industry stakeholders, such as 
the Construction Strategy Group 
(CSG) and Construction Industry 
Council (CIC).
Scale = collaborating to improve consistency of workflow
Collaboration amongst builders 
and manufacturers will enable 
supply chain improvements 
and access to cheaper material 
prices.
Collaboration amongst builders 
and manufacturers could enable 
a factory-share environment to 
produce prefabricated panels for 
distribution and retail, much like 
pre-nail frame and truss.
A visible pipeline of social 
housing and retirement housing 
demand could be developed 
alongside Community Housing 
Aotearoa (CHA) and Retirement 
Villages Association (RVA) to 
enable prefabricated solutions 
to be tailored to these housing 
sector needs.
C# PDF: PDF Document Viewer & Reader SDK for Windows Forms
SaveFile(String filePath): Save PDF document file to a specified path form (Here, we take a blank form as an open a file dialog and load your PDF document in
save pdf forms in reader; pdf data extractor
C# PDF insert image Library: insert images into PDF in C#.net, ASP
put image into specified PDF page position and save existing PDF image to PDF in preview without adobe PDF reader installed. Insert images into PDF form field.
how to make a pdf form fillable in reader; extract data from pdf file to excel
11
LEVERS FOR PREFAB
There is a need to smooth 
complexity within the 
prefabrication consenting 
process – in particular the 
building consent process, 
product certification, inspections 
regime, and licensed building 
practitioner (LBP) scheme 
compliance.
Product versus Building Work 
needs clarification – with 
implications for building consent 
process, inspections and 
liability.
Inspections regime needs 
clarification based on the 
distinction between self-
inspection for product 
manufacture or local body 
certification for building work, 
hence LBP.
Multiproof needs more flexibility 
to enable a wider variety of 
housing plans to be preapproved 
as based on a set of standard 
materials and junctions, with 
varying plan outcomes – this 
flexibility needs to be clearly 
and widely communicated to 
industry.
Liability for Licensed Building 
Practitioners  for prefabricated 
elements (components, panels, 
volumes) needs clarification.
Joint Venture guidelines – a 
set of suggested joint venture 
arrangements and supporting 
contracts would be useful 
as guidance documents to 
specifiers and manufacturers for 
ways to work together.
Shared Intellectual Property 
– open book details of 
components and panels with 
associated costings has been 
requested by industry as a way 
to directly compare different 
prefabricated systems for client 
consideration.
Liability = clarifying the regulatory compliance process
Shared open source standard 
construction details for different 
types of panels could be 
developed alongside the current 
work on Building Information 
Modelling (BIM) via the BIM 
Acceleration Committee. www.
buildingvalue.co.nz/BIM-in-NZ
Huber & Sohn, Germany
VB.NET Image: How to Save Image & Print Image Using VB.NET
printing multi-page document files, like PDF and Word is used to illustrate how to save a sample RE__Test Public Partial Class Form1 Inherits Form Public Sub New
how to save editable pdf form in reader; how to extract data from pdf to excel
C# PDF File Merge Library: Merge, append PDF files in C#.net, ASP.
Merge Microsoft Office Word, Excel and PowerPoint data to PDF form. Append one PDF file to the end of another and save to a single PDF file.
save data in pdf form reader; extract data from pdf file
12
LEVERS FOR PREFAB
Show & Tell = communicating prefab benefits to change perceptions
Home Innovation Village (HIVE) 
display show-housing is a key 
way for a wide range of clients, 
industry and government to 
experience construction types.
Specific advantages around 
panelisation and communicating 
the successes of the early 
adopters needs to be shown – 
such as web-based time-lapse 
videos of traditional versus 
panelised construction methods.
Clearer benefits need to be 
communicated to consumers 
around the knowns (quality, 
cost, time, sustainability, design 
etc.).
Clearer benefits need to be 
quantified and communicated 
to builders around increasing 
quality, lowering risk, reducing 
weather delays, greater turnover 
and profitability from more 
house completions.
Developers need to understand 
prefabrication, its range of 
typologies and associated 
benefits. 
Banks need to understand 
prefabrication and mortgage 
lending criteria needs to match 
transportable housing provision.
A web and print based 
patternbook is a tool to 
communicate a range of 
prefabricated housing options 
with side-by-side comparison 
– also providing opportunities 
for consent preapproval, thus 
reducing liability for clients.
A permanent HIVE could 
showcase traditional and 
prefabricated housing solutions 
of a range of types, designs, 
materials, configurations and 
price ranges – located near the 
area of highest growth potential 
– noting that other countries 
have similar facilities
14
.
14.   http://www.bauzentrum-poing.de/de/Startseite/HiddenContent/general
Footnotes:
Home Innovation Village Christchurch (HIVE CH)
C# PDF Convert to HTML SDK: Convert PDF to html files in C#.net
Turn PDF form data to HTML form. makes it extremely easy for C# developers to convert and transform a multi-page PDF document and save each PDF page as
how to extract data from pdf file using java; pdf data extraction to excel
C# PDF: How to Create PDF Document Viewer in C#.NET with
Eaisly save and print designed PDF document using C# code; PDF document viewer can be created in C# Web Forms, Windows Form and mobile applications.
extract data from pdf c#; extracting data from pdf to excel
13
LEVERS FOR PREFAB
WORK PROGRAMME
The  Levers  for  Prefab  are  expanded  as  action  points  with 
outcomes, stakeholders, beneficiaries and timeframes.
Levers for Prefab
Action Plan
Outcomes
Stakeholders
Beneficiaries
Timeframe
Scale = collaborating to improve consistency of workflow
Boom and Bust
Control centralised 
procurement 
away from Boom 
times and procure 
instead in Bust 
times
Smoothed demand 
to enable job 
security, skill 
retention, and 
quality consistency
Industry leaders 
CIC / CSG, MBIE
Clients, Design 
+ Construction 
Supply Chain
5-10 years
Government 
procurement 
process 
appropriate to 
construction 
methods
Reduce number of 
tenderers and use 
full team planning 
at project inception 
for innovative 
methods to be 
explored
Opportunity 
to showcase 
innovative design 
and construction 
methods
CIC / CSG, MBIE
Government as 
Client, Taxpayers, 
General Public, 
Design + 
Construction 
Supply Chain
2-5 years
Government 
procurement 
process assesses 
qualitative benefits
Enable quantity 
surveyors to 
cost according 
to time-savings, 
increased safety, 
reduced waste, 
and other socio-
environmental 
benefits
Innovative prebuilt 
methods used to 
deliver buildings, 
esp. multi-unit 
schools, hospital 
rooms, corrections 
facilities etc.
MBIE, Min Health, 
Min Education, 
Min Corrections, 
CIC members 
(PrefabNZ, NZIQS 
etc.)
Government 
employees, 
Taxpayers, General 
Public, Design 
+ Construction 
Supply Chain
2-5 years
Government 
procurement 
incorporates 
MBIE construction 
expertise
Encourage 
guidelines that 
Government 
procurement best 
practice could 
consult MBIE on 
building works
Opportunity to 
streamline process, 
as well as showcase 
innovative methods
MBIE, Min Health, 
Min Education, Min 
Corrections, etc.
Government 
employees, 
Taxpayers, General 
Public, Design 
+ Construction 
Supply Chain
1-2 years
Supply chain 
improvements
Small and medium 
builders have 
clear mechanisms 
to engage with 
each other to 
gain the buying 
power of larger 
organisations 
Savings on building 
materials through 
access to partners 
and contracts 
for bulk buying 
agreements and 
joint venture 
arrangements 
CIC members 
(PrefabNZ, RMBF, 
CBANZ, BIF etc.), 
CSG, MBIE
Clients, Builders, 
Manufacturers
1-2 years
VB.NET PDF Page Delete Library: remove PDF pages in vb.net, ASP.
this RasterEdge XDoc.PDF SDK, you can simply delete a single page from a PDF document using VB.NET or remove any page from a PDF document and save to local
extracting data from pdf forms to excel; extract data from pdf
C# PDF Page Extract Library: copy, paste, cut PDF pages in C#.net
to extract single or multiple pages from adobe PDF file and save into a The portable document format, known as PDF document, is a widely-used form of file
how to save pdf form data in reader; exporting pdf data to excel
14
LEVERS FOR PREFAB
Levers for Prefab
Action Plan
Outcomes
Stakeholders
Beneficiaries
Timeframe
Factory-share 
environment
Small and medium 
manufacturers have 
clear mechanisms 
to engage with 
each other to 
gain the buying 
power of larger 
organisations
Access to high 
start-up investment 
technology through 
collaboration 
amongst 
manufacturers, 
eg. to move from 
frame-and-truss to 
closed panel
CIC members 
(PrefabNZ, BIF etc.), 
CSG
Clients, Builders, 
Manufacturers
1-2 years
Visible pipeline 
of social housing 
demand
Social housing 
sector providers 
present clear 
future demand for 
housing units over 
next 3, 5, 10 years
Coordinated 
collaborative 
supply of social 
housing, with 
opportunities for 
cost efficiencies 
using prebuilt parts
PrefabNZ, 
Community 
Housing Aotearoa 
(CHA), BRANZ
Social housing 
tenants, providers, 
design and 
construction supply 
chain
3-6 months
Visible pipeline of 
retirement housing 
demand
Retirement housing 
sector providers 
present clear 
future demand for 
housing units over 
next 3, 5, 10 years
Coordinated 
collaborative 
supply of social 
housing, with 
opportunities for 
cost efficiencies 
using prebuilt parts
PrefabNZ, 
Retirement Villages 
Association (RVA), 
BRANZ
Retirement housing 
tenants, providers, 
design and 
construction supply 
chain
3-6 months
Liability = clarifying the regulatory compliance process
Clarify when a 
prebuilt part is 
Product (pre-
consented in 
factory) vs Building 
Work (consent in 
factory as well as 
at site)
Prebuilt 
manufacturers 
work with MBIE 
Determinations 
and building 
officials to develop 
categorisation of 
prebuilt parts esp. 
panels
Guidance 
documentation 
to manufacturers 
of prebuilt parts 
to clarify risk, 
responsibility and 
compliance
MBIE 
(Determinations), 
PrefabNZ 
(Members), BRANZ, 
BIF
Designers, 
architects, 
engineers, 
manufacturers, 
builders, building 
officials, MBIE 
(Determinations) + 
Multiproof team
3-6 months
Inspections 
regime clarified 
for Products vs 
Building Work
Prebuilt 
manufacturers 
work with MBIE 
Determinations and 
building officials to 
clarify inspections 
of prebuilt parts 
esp. panels
Guidance 
documentation 
with self-inspection 
process or 
template for a 
quality assurance 
/ management 
system
MBIE 
(Determinations), 
PrefabNZ 
(Members), BRANZ, 
RMBA, CBANZ
Designers, 
architects, 
engineers, 
manufacturers, 
builders, building 
officials, MBIE 
(Determinations) + 
Multiproof team
3-6 months
Liability around 
products and LBP 
clarified
Prebuilt 
manufacturers 
work with MBIE 
Determinations and 
building officials to 
clarify liability / risk 
/ LBP for prebuilt 
parts esp. panels
Guidance 
documentation 
with clarity around 
liability (as industry 
terms its risk)
MBIE 
(Determinations), 
PrefabNZ 
(Members), BRANZ, 
RMBA, CBANZ
Designers, 
architects, 
engineers, 
manufacturers, 
builders, building 
officials, MBIE 
(Determinations) + 
Multiproof team
3-6 months
C# Image: Save or Print Document and Image in Web Viewer
or image, you can easily save the changes to DLL Library, including documents TIFF, PDF, Excel, Word string fileName = Request.Form["saveFileName"]; string fid
pdf data extraction open source; extract data from pdf table
C# PDF Convert to Tiff SDK: Convert PDF to tiff images in C#.net
Description: Convert to DOCX/TIFF with specified zoom value and save it into stream. Parameters: zoomValue, The magnification of the original PDF page size.
extract data from pdf forms; extract data from pdf into excel
15
LEVERS FOR PREFAB
Levers for Prefab
Action Plan
Outcomes
Stakeholders
Beneficiaries
Timeframe
More flexibility 
in Multiproof 
communicated
Clarify where 
flexibility currently 
lies or could lie 
in future and 
communicate to 
industry
Greater uptake 
of Multiproof 
and wider 
understanding of 
tool
MBIE 
(Determinations), 
PrefabNZ 
(Members), BRANZ, 
RMBA, CBANZ, 
NZIA, ADNZ
Designers, 
architects, 
engineers, 
manufacturers, 
builders, building 
officials, MBIE 
(Determinations) + 
Multiproof team
3-6 months
Joint Venture 
guidelines
Bring designers, 
manufacturers and 
builders together 
to determine 
best practice for 
repetition of design 
and manufacture
Contract templates 
for joint venture 
structures 
for design / 
manufacture 
of prebuilt 
parts, and best 
communication 
structure across all 
associations
PrefabNZ, Anthony 
Harper, BRANZ, 
NZIA, ADNZ, BIF, 
RMBA, CBANZ
Designers, 
architects, builders, 
manufacturers, 
construction 
lawyers
6-12 months
Open source 
prebuilt details
Manufacturers 
share offsite 
construction joint 
details for both 
their products, and 
differing products
Downloadable BIM 
details of prebuilt 
components, 
panels and volumes
PrefabNZ, MBIE, 
BRANZ (BIM 
Acceleration 
Committee), BIF
Specifiers, 
manufacturers, 
distributors
6-12 months
Show & Tell = communicating prefab benefits to change perceptions
Home Innovation 
Village showcasing 
prebuilt 
construction
Secure site for 
developer and 
project group 
to design and 
build medium-
density affordable 
housing using a 
range of prebuilt 
components, 
panels and volumes 
– communicate 
project via media 
channels and 
partners
Enable public, 
industry and 
government 
to touch-and-
feel prebuilt 
construction 
exemplars – 
breaking down 
misperceptions 
and educating 
about quality, 
time-savings, safety 
and sustainable 
attributes
PrefabNZ, MBIE, 
WCC, BRANZ, Pure 
Advantage, and 
many industry 
partners
Public, first-time 
home-owners, 
local government, 
central 
government, 
specifiers and 
producers
1-2 years
Time-lapse videos
Use the moving 
image as a 
powerful tool to 
educate those 
who can’t visit a 
building site by 
documenting HIVE 
and PrefabNZ 
Member work
Visually compare 
traditional with 
prebuilt and host 
on websites / TV
PrefabNZ, MBIE, 
WCC, BRANZ, Pure 
Advantage, and 
many industry 
partners
Public, first-time 
home-owners, 
local government, 
central 
government, 
specifiers and 
producers
1-2 years
16
LEVERS FOR PREFAB
Levers for Prefab
Action Plan
Outcomes
Stakeholders
Beneficiaries
Timeframe
Consumer 
education
Develop a 
recognised media 
voice for innovation 
in the built 
environment via a 
regular TV show or 
newspaper / web 
column 
Established media 
channels showcase 
prebuilt exemplars 
to explain benefits 
of quality, time-
savings, safety, 
sustainability etc.
PrefabNZ, 
Imagination TV 
/ Mediaworks 
(Grand Designs 
NZ), Consumer 
magazine, Pure 
Advantage
Public, first-time 
home-owners, 
local government, 
central 
government, 
specifiers and 
producers
1-2 years
Builder education
Develop an 
appropriate 
medium to educate 
or upskill builders
Established builder 
communication 
channels showcase 
benefits and 
explain processes
PrefabNZ, BRANZ, 
Progressive 
magazine, 
PlaceMakers, BIF, 
RMBA, CBANZ, BCITO
Builders, clients 
/ first-time 
homeowners, 
specifiers, 
producers
1-2 years
Developer 
education
Extend the Value 
Case for Prefab 
work to include 
multi-unit and 
commercial 
buildings to show 
economic benefits
Established 
developer 
communication 
channels explain 
quantitative 
benefits
PrefabNZ, NZIQS, 
Property Council, 
NZGBC
Developers, 
clients / first-time 
homeowners, 
specifiers, 
producers
1-2 years
Bank education
Work with financial 
and banking 
institutions to 
develop a reduced 
risk approach to 
enable first-time 
homeowners to 
access borrowing 
for transportable 
housing
The five major 
banks understand 
the prebuilt 
industry delivery 
methods and 
access to 
traditional 
mortgages
PrefabNZ, 
Kiwibank, 
Heavy Haulage 
Association (HHA), 
five major banks, 
BRANZ, financial 
lending companies
Clients, first-time 
homeowners, 
specifiers, 
producers
1-2 years
Web and print 
pattern-book of 
prebuilt homes
A tangible, 
visually stunning 
publication of 
compact and 
affordable housing 
appropriate for 
small sections and 
infill sections, esp. 
Auckland
Reduced risk for 
consumers to 
purchase a pre-
consented and 
prebuilt home from 
a pattern-book
PrefabNZ, CIC 
(ADNZ, NZIA, NZIQS 
etc.) BRANZ, Pure 
Advantage
Clients, first-time 
homeowners, 
specifiers, 
producers
1-2 years
Permanent HIVE
Develop a 
permanent housing 
showcase village 
to enable a wide 
range of visible 
housing choice for 
consumers
Consumer 
education and 
visible choice
PrefabNZ, CIC / 
CSG, BRANZ, MBIE, 
Consumer NZ
Clients, first-time 
homeowners, 
specifiers, 
producers
5-10 years
Levers for Prefab takes the 
opinions of several large 
residential builders and reiterates 
the importance of action areas 
from the Value Case for Prefab, 
as scale (procurement), liability 
(regulation process) and show-and-
tell (benchmarking). The immediate 
next steps are for the short-term 
action points to be grouped under 
the Levers for Prefab Action Plan 
research programme with BRANZ 
and industry partners.
17
LEVERS FOR PREFAB
The roundtable uncovered two 
notable areas to watch – one is 
on the ground in the incremental 
change from pre-nail to panel, 
and the other is the club of first 
followers with their ability to share 
learnings around the core group of 
early adopters.
The ones to watch are 
those leading the uptake of 
prefabrication – those like Stanley 
Group who have been doing it for 
15+ years in true Kiwi style, those 
like Stonewood Homes who have 
travelled the world researching 
intensively and now making moves 
into bathroom pod production, 
and those like Spanbild who are 
joining forces with others to invest 
$10 million in manufacturing 
equipment alone to change the way 
housing can be delivered by panels 
rather than frames.
14
There are many others creating 
prefab visibility – Keith Hay Homes 
providing three generations of 
affordable housing and recently 
integrating top-notch designs from 
high-end architecture, architect-
designed housing like High 
Performance Homes which provides 
a system for more energy efficient 
living, and locally-made products 
of international acclaim such as 
Cross-Laminated Timber (CLT). 
MONITORING AND SUCCESS 
Success is when prefabrication is mainstream
– Brent Mettrick, 
Stonewood Homes, Levers for Prefab Roundtable (October 2014)
14.  Spanbild and Mike Greer Homes have created a new joint venture manufacturing company trading as Concision to produce 
panels for floors, walls and ceilings. Stonewood Homes has joined with Arrow International to create Construction 
Components to manufacture bathroom pods.
Footnotes:
PlaceMakers frame and truss facility, Auckland
18
LEVERS FOR PREFAB
There is widespread interest 
and engagement with innovative 
prefabrication design and 
construction methods by the 
specifiers (architects, engineers, 
designers), as well as equally 
widespread resistance and 
complacency to change by 
the producers (builders and 
manufacturers). As a result there 
are relatively few early adopters.
The industry is moving (albeit 
slowly) towards an evolution 
in manufacturing as led by 
early adopters such as Stanley 
Group and increasingly visible 
manufacturers like Stonewood 
(modular bathrooms) and most 
importantly by visible joint 
ventures and manufacturing 
investment capacity such as the 
panelisation plant by Concision 
(Spanbild with Mike Greer Homes). 
Under the umbrella of PrefabNZ, 
together these businesses are 
reaching a tipping point in 
understanding of the merits of 
building more parts away from the 
construction site. Where once pre-
nailed roof trusses and wall frames 
were the latest technology (1950s) 
and are now commonplace, one 
day traditional construction in New 
Zealand will be using panels that 
enable a weathertight building to 
be completed in a matter of days. 
This change in technology could be 
in as little as five years.
It is only when prefabrication is 
mainstream that PrefabNZ and 
the wider industry stakeholders 
will have succeeded. This is the 
ultimate goal. In the short-term, the 
industry needs to smooth the way 
to ensure that the early adopters 
are not rejected by the market due 
to forces beyond their control.
PrefabNZ and MBIE can continue to 
work together to ensure a smooth 
regulatory transition in terms of 
clarifying liability, risk, building 
work and product requirements 
for the building consent process. 
It is essential that the industry 
work alongside government to 
support the growing success 
of these early adopters. It is 
imperative that the early adopters 
survive and thrive and pull the rest 
of the industry along with their 
momentum.
Key measures will focus on acting 
now and measuring inputs that 
can be tracked over time such as 
the following:
changes in uptake of prebuilt 
components, panels and 
volumes
changes in size of prefabrication 
manufacturers and builders, 
including joint ventures
changes in manufacturers using 
in-house quality assurance 
alongside compliance regimes
changes in availability of open-
source prefabricated components 
and technical details
changes in decision-makers 
commissioning and developing 
projects using prefab parts
changes in visibility of prefab 
through a variety of media online, 
print and built showcases
Action may look like market 
focused workshops, published 
pipelines, infographics that chart 
success and enable re-measuring 
to take place in a meaningful 
way – together with show-and-tell 
events, case studies, websites, 
magazines and newsletters. These 
are the tools that will be used to 
deliver the Levers for Prefab action 
points.
Supporting the establishment 
and growth of the prefabrication 
community in New Zealand will 
enable our children to access a 
wider range of higher quality and 
cost effective housing options. 
This is what success will look like.
Documents you may be interested