Article 106
(Amended, SG No. 77/2005) 
(1) The Minister of Environment and Water shall issue the permits referred to in Article 104 (1) herein.
(2) In any permit referred to in Article 104 (1) herein, the Minister of Environment and Water may establish conditions
related to the construction and operation of the establishment and/or installation.
Article 107
(Repealed, SG No. 77/2005)
Article 108
(Amended, SG No. 77/2005) 
(1) For the purpose of obtaining a permit referred to in Article 104 (1) herein, the operator shall submit an application to
the Minister of Environment and Water not later than:
1. four months after submission of the notification referred to in Article 103 (1)  herein: applicable  to  a  lower-tier
establishment and/or installation;
2. seven months after submission of the notification referred to in Article 103 (1) herein: applicable to an upper-tier
establishment and/or installation.
(2) The form and content of the application referred to in Paragraph (1) shall be determined by the ordinance referred to
in Article 104 (6) herein.
Article 109
(Repealed, SG No. 77/2005)
Article 110
(Amended, SG No. 77/2005) 
(1) The operator of any lower-tier establishment and/or installation shall enclose with the application referred to in Article
108 (1) herein:
1. a report on the major-accident prevention policy, designed to guarantee a high level of protection for man and the
environment by appropriate means, structures and management systems;
2. documentary proof of a fee paid under Article 71 herein.
(2) The operator of any lower-tier establishment and/or installation shall enclose with the application referred to in Article
108 (1) herein:
1. a safety report;
2. an emergency plan for the establishment and/or installation;
3. documentary proof of a fee paid under Article 71 herein.
(3) (New, SG No. 103/2009) If, on the basis of Commission Decision 98/433/EC of 26 June 1998 (OJ, L192 of 8 July
1998, pages 0019-0020) on harmonised criteria for dispensations according to Article 9 of Council Directive 96/82/EC of 9
December 1996 on the control of major-accident hazards involving dangerous substances, the operator ascertains that certain
Pdf password security - C# PDF Password Library: add, remove, edit PDF file password in C#.net, ASP.NET, MVC, WinForms, WPF
Help to Improve the Security of Your PDF Document by Setting Password
convert protected pdf to word; password pdf files
Pdf password security - VB.NET PDF Password Library: add, remove, edit PDF file password in vb.net, ASP.NET, MVC, WinForms, WPF
Help to Improve the Security of Your PDF Document by Setting Password
password on pdf; pdf user password
dangerous substances in the establishment and/or installation or parts thereof cannot initiate a major accident, the said operator
may request from The Minister of Environment and Water that the information in the safety report be limited to the prevention
of major- accident hazards and the limitation of the consequences thereof for man and the environment arising from other
dangerous substances present in the establishment and/or installation or parts thereof.
(4) (Renumbered from Paragraph 3, SG No. 103/2009)  The  form and  content  of the  documents  covered  under
Paragraphs (1) and (2) shall be determined by the ordinance referred to in Article 104 (6) herein.
(5) (Renumbered from Paragraph 4, SG No. 103/2009) The operator may request from the Minister of Environment and
Water that part of the information in the documents covered under Paragraphs (1) and (2) be declared confidential where the
said information constitutes a manufacturing or commercial secret.
(6) (Repealed, renumbered from Paragraph 5, SG No. 103/2009) Where the information covered under Paragraphs (1)
and (2) constitutes a state secret or an official secret or contains any personal data, the provisions of the Classified Information
Protection Act or of the Personal Data Protection Act, as the case may be, shall apply.
(7) (New, SG No. 103/2009) In the cases referred to in Paragraph (3) or (5), The Minister of Environment and Water
or an official empowered thereby shall notify the operator in writing within 5 days that the request thereof has been partly or
fully granted.
(8) (New, SG No. 103/2009) In the cases referred to in Paragraph (7), the operator shall provide The Minister of
Environment and Water with a revised version of the safety report or a revised version of the documents, not including
information accepted as confidential, within 5 days.
(9) (New, SG No. 103/2009) In the cases referred to in Paragraph (3), The Minister of Environment and Water or an
official empowered thereby shall provide the European Commission annually by the  31st  day of January with a  list  of
establishments whereof the request has been partly or fully granted, specifying the reasons for the decision.
Article 110a
(New, SG No. 77/2005)
(1) Within fourteen days after receipt of the documents covered under Article 110 herein, the Minister of Environment
and Water or a person empowered thereby shall notify the operator of any errors and deficiencies committed in the said
documents and shall allow up to one month for the curing of the said errors and deficiencies.
(2) (Amended, SG No. 95/2005, SG No. 82/2006, SG No. 102/2006, SG No. 93/2009, effective 25.12.2009) Within
three days after expiry of the time limit referred to in Paragraph (1) for inspection of the documents or for curing of the errors
and deficiencies as committed, the Minister of Environment and Water or a person empowered thereby shall transmit the
documents covered under Article 110 herein for observations to the Minister of Health, the Minister of Interior, the President
of the State Agency for Metrological and Technical Surveillance, the Regional Governor and the mayor of the municipality
within whose territory the establishment and/or installation is located.
(3) The Minister of Environment and Water, the authorities covered under Paragraph (2) or persons empowered thereby
may conduct on-site inspections for the purpose of assessing the conformity of the documents covered under Article 110 herein
with the measures envisaged by the operator to prevent major industrial accidents and to limit the consequences of such
accidents.
(4) The authorities covered under Paragraph (2) shall transmit the observations thereof to the Minister of Environment
and Water within two months after receipt of the documents covered under Article 110 herein.
(5) Should any of the authorities covered under Paragraph (2) fail to transmit observations within the statutory time limit,
tacit consent shall be presumed.
(6) Where on the basis of any observations referred to in Paragraph (2) it is ascertained that the operators did not
envisage the requisite measures for the prevention of major accidents and for the limitation of the consequences of such
accidents by the documents covered under Article 100 herein, within ten days after the expiry of the time limit referred to in
Online Remove password from protected PDF file
hlep protect your PDF document in C# project, XDoc.PDF provides some PDF security settings. On this page, we will talk about how to achieve this via password.
add password to pdf reader; protected pdf
C# PDF Digital Signature Library: add, remove, update PDF digital
Document Protect. Password: Set File Permissions. Password: Open Document. How to C#: Add Digital Signatures to PDF. Help to Improve the Security of Your PDF File
password on pdf file; break password pdf
Paragraph (4) the Minister of Environment and Water or a person empowered thereby shall allow the operator time to cure the
non-conformities and deficiencies as ascertained.
Article 111
(Amended, SG No. 77/2005) 
(1) Within the time limit referred to in Article 110a (2) herein, the Minister of Environment and Water or a person
empowered thereby shall post the documents covered  under  Article  110  herein on the  Internet  site  of the  Ministry of
Environment and Water and shall afford public access to the said documents in the course of one month.
(2) Within three days after  receipt  of the  documents  covered  under  Article  110a  (2),  the  mayor  of the  relevant
municipality shall inform the public by means of the local media of mass communication of this fact and shall afford access to the
documents for a period of one month.
(3) (Amended, SG No. 103/2009) In the cases where a request to declare any information confidential has  been
granted, the Minister of Environment and Water shall make the documents referred to in Article 110 (8) herein available to the
public.
(4) Members of the public may submit reasoned observations in writing to the Minister of Environment and Water not
later than the expiry of the one-month time limit referred to in Paragraph (1).
Article 112
(Amended, SG No. 77/2005) 
The Minister of Environment and Water shall issue the permit referred to in Article 104 (1) herein within one month after
expiry of the time limit referred to in Article 110a (4) herein or after receipt of the rectified and complemented documents
referred to in Article 110 (6) herein.
Article 112a
(New, SG No. 77/2005)
Within seven days after the date of issuance of a permit, the Minister of Environment and Water or a person empowered
thereby:
1. shall notify in writing the operator and the authorities covered under Article 110a (2) herein, and
2. (amended, SG No. 52/2008) shall announce the issuance of the permit through the Internet site of the Ministry of
Environment and Water and a national daily newspaper.
Article 112b
(New, SG No. 77/2005)
(1) By a reasoned decision, the Minister of Environment and Water shall refuse to issue a permit within one month after
expiry of the time limit referred to in Article 110a (4) herein or after receipt of the rectified and complemented documents
referred to in Article 110a (6) herein where:
1. the operator has not envisaged the requisite measures in the documents covered under Article 110 herein, or the
measures envisaged are not sufficient for the prevention of major accidents, or for the limitation of the consequences of such
accidents, and/or
2. the operator has failed to submit the documents covered under Articles 108, 110 or Article 110a (6) herein within the
appointed time limits.
VB.NET PDF Digital Signature Library: add, remove, update PDF
Protect. Password: Set File Permissions. Password: Open Document. NET PDF - Add Digital Signatures to PDF in VB VB.NET Programmers to Improve the Security of Your
pdf password protect; convert password protected pdf to excel online
VB.NET PDF Library SDK to view, edit, convert, process PDF file
XDoc.PDF SDK allows users to perform PDF document security settings in VB.NET program. Password, digital signature and PDF text, image and page redaction will
acrobat password protect pdf; pdf protection remover
(2) Within the time limit referred to in Paragraph (1), by a reasoned decision, the Minister of Environment and Water may
refuse to issue a permit for construction of a new establishment and/or installation upon receipt of a reasoned objection on
grounds of legal conformity against the implementation of the project from any of the authorities covered under Article 110a (2)
herein.
(3) Within seven days after the date of issuance of the permit referred to in Paragraphs (1) or (2), the Minister of
Environment and Water or a person empowered thereby:
1. shall notify in writing the operator and the authorities referred to in Article 110a (2) herein, and
2. (amended, SG No. 52/2008) shall announce the issuance of the decision through the Internet site of the Ministry of
Environment and Water and a national daily newspaper.
Article 113
(Amended, SG No. 77/2005, SG No. 30/2006) 
Any permit  and  any refusal to  issue  a  permit  shall be  appealable  according to  the  procedure  established  by the
Administrative Procedure Code within fourteen days after announcement under Item 2 of Article 112 or under Item 2 of Article
112b (3) herein.
Article 114
(Amended, SG No. 77/2005) 
(1) The Minister of Environment and Water shall keep a public register of the permits issued under Article 112 herein and
of the refusals referred to in Article 112b (1) and (2) herein.
(2) The form and content of the register shall be determined by the ordinance referred to in Article 104 (6) herein.
Article 115
(Amended, SG No. 77/2005) 
The operator of an establishment and/or installation for which a permit under Article 104 (1) herein has been issued shall
be obligated to:
1. take all measures necessary to prevent major accidents involving dangerous substances and to limit the consequences
of such accidents for human life and health and for the environment;
2. immediately inform the Minister of Environment and Water of each planned substantial change to the establishment
and/or the installation.
Article 116
(Amended, SG No. 77/2005) 
(1) (Amended, SG No. 35/2009, effective 12.05.2009) Upon occurrence of a major accident, the operator of an
establishment and/or installation for which a permit under Article 104 (1) herein has been issued shall immediately inform the
Chairperson of the Regional Council on Security.
(2) (Amended, SG No. 103/2009) Upon occurrence of a major accident, immediately after the accident occurs, the
operator shall provide the authorities referred to in Paragraph (1) with information regarding:
1. the circumstances of occurrence of the accident;
2. the dangerous substances which have caused the occurrence of the accident or which aggravate the consequences
C# HTML5 Viewer: Deployment on AzureCloudService
RasterEdge.XDoc.PDF.HTML5Editor.dll. system.webServer> <validation validateIntegratedModeConfiguration="false"/> <security> <requestFiltering
copy text from protected pdf to word; create password protected pdf
C# HTML5 Viewer: Deployment on ASP.NET MVC
RasterEdge.XDoc.PDF.HTML5Editor.dll. system.webServer> <validation validateIntegratedModeConfiguration="false"/> <security> <requestFiltering
pdf password reset; crystal report to pdf with password
thereof;
3. the data available for assessing the effects of the accident on human life and health and on the environment;
4. the emergency measures taken;
5. the measures envisaged to prevent any recurrence of such an accident;
6. the measures envisaged to limit the consequences of the accident.
(3) The operator shall be obligated to update the information covered under Paragraph (2) and to provide the said
information to the authority referred to in Paragraph (1) where justified by new facts related to the causes of occurrence of the
accident and the consequences thereof.
Article 116a
(New, SG No. 77/2005)
(1) The operator of any upper-tier establishment and/or installation shall supply the public concerned with:
1. information on the safety measures planned and the requisite behaviour and action in the event of an accident;
2. (amended, SG No. 103/2009) the safety report referred to in Item 1 of Article 110 (2) herein or  the  revised
documents referred to in Article 110 (8) herein;
3. (amended, SG No. 103/2009) a list of the dangerous substances referred to in Article 103 (1) herein, with the
exception of such as have been declared confidential information under Article 110 (5) herein, and of the information referred
to in Article 110 (6) herein;
4. information regarding the possibility of a domino effect.
(2) The operator shall furthermore supply the information referred to in Item 1 of Paragraph (1) to the establishments
serving the public which are liable to be affected by a major accident.
(3) The operator shall review and, where necessary, shall update the information referred to in Item 1 of Paragraph (1)
every three years, as well as in the cases of substantial changes to the establishment and/or installation.
(4) The information referred to in Item 1 of Paragraph (1) shall be updated every five years.
(5) The minimum requirements to the content of the information referred to in Item 1 of Paragraph (1), as well as the
methods of provision of the said information, shall be determined by the ordinance referred to in Article 104 (6) herein.
Article 116b
(New, SG No. 77/2005)
(1) Where planning substantial changes to the establishment and/or installation, the operator shall review and update the
report on the major-accident prevention policy or the safety report.
(2) The operator shall transmit the updated report referred to in Paragraph (1) to the Minister of Environment and Water.
(3) In the cases referred to in Paragraph (3), the operator shall submit an application for a review of the permit referred
to in Article 104 (1) to the Minister of Environment and Water as soon as practicable but not later than four months prior to the
date planned for implementation of the changes.
(4) The operator shall enclose the updated documents referred to in Paragraph (1) to the application referred to in
Paragraph (3).
VB.NET PDF Page Extract Library: copy, paste, cut PDF pages in vb.
DNN (DotNetNuke), SharePoint. Security PDF component download. Online source codes for quick evaluation in VB.NET class. A good external
create password protected pdf from word; pdf open password
.NET PDF SDK - Description of All PDF Processing Control Feastures
Easy to change PDF original password; Options for setting PDF security level; PDF text content, image and pages redact options. PDF Digital Signature.
add password to pdf file; advanced pdf password remover
(5) The form and content of the application referred to in Paragraph (3) and the documents referred to in Paragraph (1)
shall be determined by the ordinance referred to in Article 104 (6) herein.
Article 116c
(New, SG No. 77/2005)
(1) The operator of any upper-tier establishment and/or installation shall review and, where necessary, shall update the
safety report referred to in Item 1 of Article 110 (2) herein:
1. every five years;
2. at the initiative of the operator or at the request of the Minister of Environment and Water, where justified by new facts
or to take account of new technical knowledge about the safe operation of the establishment and/or installation.
(2) (Supplemented, SG No. 103/2009) The operator referred to in Paragraph (1) shall be obligated to check, review
and, where necessary, to update the emergency plan referred to in Item 2 of Article 110 (2) herein:
1. (amended, SG No. 103/2009) at appropriate intervals not exceeding three years;
2. at the initiative of the operator or at the request of the Minister of Environment and Water, where justified by new facts
or to take account of new technical knowledge about the safe operation of the establishment and/or installation.
(3) In the cases covered under Paragraph (1) and/or Paragraph (2), the operator shall notify the Minister of Environment
and Water, submitting an application for a review of the permit referred to in Article 104  (1)  herein and  enclosing the
documents updated under Paragraph (1) and/or Paragraph (2) or a written declaration to the effect that there is no need to
update the said documents.
(4) The form and content of the application referred to in Paragraph (3) and the documents covered under Paragraphs
(1) and (2) shall be determined by the ordinance referred to in Article 104 (6) herein.
Article 116d
(New, SG No. 77/2005)
In the cases referred to in Article 116b and Article 116c herein, the Minister of Environment and Water or a person
empowered thereby shall review the permit as issued according to the procedure established by Article 110a and Article 111
herein.
Article 116e
(New, SG No. 77/2005)
(1) Within one month after expiry of the time limit for receipt of observations from the authorities covered under Article
110a (2) herein or after receipt of the rectified and complemented document from the operator, the Minister of Environment
and Water shall review the permit as issued with a view to:
1. leaving the permit as issued in effect, or
2. modifying the permit as issued.
(2) In the cases referred to in Paragraph (1), the Minister of Environment and Water or a person empowered thereby
shall make a decision leaving the permit issued in effect or modifying the said permit.
(3) Within seven days after the date of issuance of the decision referred to in Paragraph (2), the Minister of Environment
and Water or a person empowered thereby:
1. shall notify in writing the operator and the authorities covered under Article 110a (2) herein, and
2. shall announce the issuance of the decision through a national daily newspaper.
Article 116f
(New, SG No. 77/2005)
(1) By a reasoned decision, the Minister of Environment and Water may refuse to permit the implementation of the
change referred to in Article 116b herein within the time limit referred to in Article 116c (1) herein where:
1. the operator has not envisaged the requisite measures in the documents covered under Article 116b and Article 116c
herein, or  the  measures  envisaged  are  not  sufficient  for  the  prevention of major  accidents,  or  for  the  limitation of the
consequences of such accidents, and/or
2. any of the authorities covered under Article 110a (2) herein has lodged a reasoned objection on grounds of legal
conformity against the implementation of the modification referred to in Article 116b herein.
(2) Within seven days after the date of issuance of the decision referred to in Paragraph (1), the Minister of Environment
and Water or a person empowered thereby:
1. shall notify in writing the operator and the authorities covered under Article 110a (2) herein, and
2. shall announce the issuance of the decision through a national daily newspaper.
Article 116g
(New, SG No. 77/2005, amended, SG No. 30/2006) 
Any decision referred to in Article 116e (2) and in Article 116f (1) shall be appealable according to the procedure
established by the Administrative Procedure Code within fourteen days after announcement of the said decision under Item 2 of
Article 116e (3) and Item 2 of Article 116f (2) herein.
Article 116h
(New, SG No. 77/2005)
(1) Where, on the basis of the documents covered under Article 110 (2) herein, the Minister of Environment and Water
identifies any establishments and/or installations or any group of establishments and/or installations posing a risk of a domino
effect, the said Minister shall notify the operators of the said establishments and/or installations.
(2) In the cases referred to in Paragraph (1), the operators shall be obligated:
1. to exchange information enabling them to take account of the nature and extent of the hazard of a major accident in the
establishments and/or installations;
2. to update the documents covered under Article 110 (2) herein with the information referred to in Item 1.
(3) (Amended, SG No. 103/2009) In the cases referred to in Paragraph (1), the operators shall cooperate in:
1. supplying the information covered under Article 116a herein to the public;
2. supplying information required for the preparation of an external emergency plan.
Article 116i
(New, SG No. 77/2005)
The Minister of Environment and Water shall notify the potentially affected countries of the risk of a major accident with
transboundary effects occurring in an upper-tier establishment and/or installation.
Section II
Integrated Permits
Article 117
(1) The construction and operation of new installations and facilities of industrial activities of the categories listed in Annex
4 hereto, and the operation of existing installations and facilities of the said categories shall be admitted after issuance of an
integrated permit according to the provisions of this Chapter.
(2) (Amended, SG No. 77/2005) The requirement referred to in Paragraph (1) shall furthermore apply to any substantial
change to existing facilities and installations.
(3) Acting on a written application by the relevant operators, integrated permits referred to in Paragraphs (1) and (2) may
furthermore be issued for any installations and facilities outside the scope of Annex 4 hereto.
(4) In the event of change of the operator, the new operator, whether a natural or juristic person, shall assume the rights
and obligations according to the permit.
(5) (Amended, SG No. 77/2005) The submission of an application for the issuance of an integrated permit or the
existence of an integrated permit for construction and operation of new facilities and installations and/or for operation of existing
facilities and installations shall waive the requirements for issuance and obtaining of the  following authorizations,  permits,
licences, expert opinions and assessments:
1. under Article 37 in reference to Article 12 of the Waste Management Act; 
2. under Littera (e) of Item 1 of Article 46 (1) of the Water Act. 
(6) (New, SG No. 77/2005) The operators of any facilities and installations within the scope of Annex 4 hereto may
submit documents for obtaining the permit referred to in Item 1 of Paragraph (5) or the permit referred to in Item 5 of
Paragraph (5) until commencement of the time limit for submission of an application for the issuance of an integrated permit, as
set by the ordinance referred to in Article 119 herein.
(7) (Renumbered from Paragraph (6), SG No. 77/2005) No facilities or parts of facilities used for scientific research,
development and testing of new products and processes shall be subject to the provisions of this Chapter.
Article 118
(1) (Redesignated from Article 118, SG No. 105/2008) An integrated permit referred to in Article 117 herein shall be a
mandatory condition for the issuance of a building permit.
(2) (New, SG No. 105/2008) An exception under Paragraph (1) shall be admitted in respect of any facilities and
installations for which an EIA procedure has been completed with a decision confirming the application of the best available
techniques, in accordance with Article 99a herein.
(3) (New, SG No. 105/2008) In the cases referred to in Paragraph (2), the integrated permit shall be a mandatory
condition for the commissioning of the facilities and installations.
Article 119
(1) The terms and a procedure for the issuance of an integrated permit referred to in Article 117  herein shall be
established by a regulation of the Council of Ministers.
(2) The regulation referred to in Paragraph (1) shall furthermore establish relevant requirements for:
1. the content and the form of the applications for issuance of integrated permits;
2. the procedure and manner for determination of the best available techniques (BAT);
3. (Amended, SG No. 77/2005, SG No. 46/2010,  effective  18.06.2010)  the  procedure  and  manner  for  review,
modification, updating and revocation of any integrated permits as issued;
4. the procedure and manner for reporting noxious substance emissions;
5. the content of the monitoring referred to in Item 3 of Article 123 (1) herein, including the monitoring procedures and
the obligation to provide relevant information to the authorities responsible for enforcement of compliance under Article 128
herein.
Article 120
(1) (Supplemented, SG No. 77/2005, amended, SG No.  46/2010,  effective  18.06.2010,  SG  No.  42/2011)  The
Executive Director of the Executive Environment Agency shall be the authority competent to issue, review, modify, update and
revoke any permits referred to in Article 117 (1) and (2) herein.
(2) (Supplemented, SG No. 77/2005, amended, SG No. 46/2010, effective 18.06.2010) The competent RIEW director
shall be the authority competent to issue, review, modify, update and revoke any permits referred to in Article 117 (3) herein.
(3) The competent authority referred to in Paragraph (1) shall coordinate the terms and procedures for the issuance of
permits in cases where more than one competent authority is involved therein.
(4) (Amended, SG No. 77/2005) The competent authority referred to in Paragraphs (1) and (2) shall ensure the use of
any information received and conclusion reached in EIA upon the issuance of the integrated permits.
(5) The Ministry of Environment and Water shall follow the development of the best available techniques and shall
maintain an information system thereon.
Article 121
During the operation of the installations and facilities, the operator shall oversee:
1. the implementation of all appropriate preventive measures against pollution, in particular through application of the best
available techniques;
2. the implementation of environmental management systems;
3.  the  prevention of environmental pollution according to  the  emission limit  values  and  the  environmental  quality
standards;
4. the avoidance of waste generation; where waste is produced, it shall be recovered; where such recovery is technically
and economically impossible, the waste shall be disposed of while avoiding or reducing any impact thereof on the environment;
5. the efficient use of energy;
6. the implementation of all possible measures to prevent industrial accidents and limit the consequences thereof;
7. the undertaking of necessary measures to avoid any possible pollution risks and to return the site of operation to a
satisfactory state upon definitive cessation of activities.
Article 122
(1) For the purpose of obtaining an integrated  permit,  the  operator  of the  facility and  installation shall submit  an
application to the relevant competent authority.
(2) The application referred to in Paragraph (1) shall include a description of:
1. (supplemented, SG No. 77/2005) the facility and the various modes of operation thereof, including a description of the
main alternatives, if any;
2. the raw and prime materials used (including auxiliary materials);
3. the utilized and/or generated energy;
4. characteristics of the site on which the installation is located;
5. (amended, SG No. 77/2005) the nature and quantities of foreseeable emissions from the facility into each medium
covered under Article 4 herein and by factor covered under Article 5 herein, as well as identification of possible significant
effects of the said emissions on the environment;
6. the proposed technology and other techniques for preventing or, where this is not possible, reducing emissions from
the installation;
7. measures for the prevention, recovery and/or safe disposal of waste generated by the installation;
8. further measures planned to comply with the general principles of the basic obligations of the operator as provided for
in Article 121 herein;
9. monitoring of noxious substance emissions into the environment.
(3) Any application for the issuance of an integrated permit shall furthermore include a non-technical summary of the
details covered under Paragraph (2).
Article 122a
(New, SG No. 105/2008)
(1) Within forty-five days after submission of the application, the competent authority referred to in Article 120 (1) and
(2) herein shall verify whether the content and form of the said application conform to the requirements of the ordinance
referred to in Article 119 (1) herein and, where necessary, shall conduct an on-site inspection.
(2) Upon ascertainment of any deficiencies and non-conformities within the time limit referred to in Paragraph (1), the
competent authority referred to in Article 120 (1) and (2) herein shall notify the operator referred to in Article 122 (1) herein in
writing, giving directions as to the necessary corrections and additional information and stating the grounds for this.
(3) In the cases referred to in Paragraph (2), the operator referred to in Article 122 (1) herein shall submit the additional
application within one month.
(4) In case the directions referred to in Paragraph (2) or the time limit referred to in Paragraph (3) are not complied with,
the competent authority referred to in Article 120 (1) and (2) herein shall refuse to issue an integrated permit.
(5) Within fourteen days after completion of the verifications referred to in Paragraph (1) or the re-submission of the
application referred to in Paragraph (3), the competent authority referred to in Article 120 (1) and (2) herein, acting jointly with
the  municipalities,  shall announce  and  afford  the  persons  concerned  equal access,  in the  course  of one  month,  to  the
application, including the persons concerned in the State affected by the operation of the facility in conditions of transboundary
impact.
(6) Within forty-five days after the expiry of the time limit referred to in Paragraph (5), the competent authority referred
Documents you may be interested
Documents you may be interested